| Horseshoe Drive; Masonic Drive to Horseshoe - reconstruction of existing two-lane asphaltic concrete roadway with open ditches to three-lane concrete roadway with subsurface drainage |
Alexandria |
LA |
50 |
$8,000,000 |
Streets/Roads |
-23 |
| Versailles Boulevard, Phase 2, Package 4 - construction of new three-lane concrete roadway with subsurface drainage and utilities (gas, water and sewer); approximate length of 5300' |
Alexandria |
LA |
35 |
$7,014,000 |
Streets/Roads |
-13 |
| Culpepper Road; North Boulevard to MacArthur Drive; reconstruction of an existing 20' asphaltic concrete road with open ditches to two-lane concrete roadway with subsurface drainage |
Alexandria |
LA |
30 |
$6,000,000 |
Streets/Roads |
-18 |
| Culpepper Road; Masonic Drive to North Boulevard- reconstruction of an existing 20' asphaltic concrete road with open ditches to two-lane concrete roadway with subsurface drainage |
Alexandria |
LA |
30 |
$6,000,000 |
Streets/Roads |
-23 |
| Masonic Drive (US 165) and Horseshoe Drive Intersection Improvements; reconstruction of existing intersection for improved capacity and safety |
Alexandria |
LA |
20 |
$3,500,000 |
Streets/Roads |
-10 |
| Jackson Street (LA 1208-3) and Horseshoe Drive Intersection Improvements; reconstruction of existing intersection for improved capacity and safety |
Alexandria |
LA |
20 |
$3,500,000 |
Streets/Roads |
1 |
| Lincoln Road Street and Drainage Improvements - reconstruction of existing 22' asphaltic concrete roadway with open ditches to 28' concrete roadway with subsurface drainage approximate length of 1800 feet; replacement of water, gas and sewer utilities |
Alexandria |
LA |
30 |
$2,500,000 |
Streets/Roads |
-17 |
| Versailles Boulevard, Phase 2, Package 5 - construction of new three-lane concrete roadway with subsurface drainage and utilities (gas, water and sewer); approximate length of 1600' |
Alexandria |
LA |
10 |
$1,250,000 |
Streets/Roads |
2 |
| City Park Historical Bridge Preservation; partial reconstruction and preservation of two historical bridges on North City Park Blvd. |
Alexandria |
LA |
5 |
$300,000 |
Streets/Roads |
-6 |
| Alexandria West Treatment Plant - construction of 22 MGD wastewater plant to relieve existing treatment and faciliate development and growth in west Alexandria. |
Alexandria |
LA |
15 |
$67,000,000 |
Water |
7 |
| Downtown Water Main Replacement - portions of our original water system downtown date to the late 1800's or early 1900's. A complete reconstruction of the downtown water infrastrucutr is needed. |
Alexandria |
LA |
22 |
$18,000,000 |
Water |
6 |
| Water Well Additions and Rehabilitations - the bulk of the City's water wells were installed in the late 1960's. New wells need to be drilled and existing wells need rehabilitation or replacement. In addition, the City desperately needs more water produ |
Alexandria |
LA |
12 |
$12,000,000 |
Water |
5 |
| Test and Collector Well at Hamilton Street - 2MG storage tank built in the 1992 needs water wells to fill and operate properly. |
Alexandria |
LA |
25 |
$1,500,000 |
Water |
-4 |
| Hamilton Street Pump Station - 2MG storage tank located at Hamilton Street pump station located at 505 Monroe Street. The existing pumps in this station are 60 plus years old surplus from Camp Livingston. |
Alexandria |
LA |
15 |
$500,000 |
Water |
-5 |
| Ditch enclosure and sidewalk construction (single-side 5' walk approximately 1600' in length)along Enterprise Road, a CDBG target area, to improve pedestrian safety. |
Alexandria |
LA |
8 |
$750,000 |
CDBG |
-19 |
| Monroe Street sidewalk improvements. Monroe Street is in a CDBG target area and is used by a large number of children to walk to a neighborhood elementary school and a junior high school. Safety for pedestrians would be greatly enhanced |
Alexandria |
LA |
8 |
$600,000 |
CDBG |
-11 |
| Sidewalk construction on Masonic Drive (US 165-B) from Texas Avenue to Lee Street, located in a CDBG target area. Presently no sidewalks exist. This corridor houses ball parks, the zoo, City Park, tennis courts and other venues for children's and other |
Alexandria |
LA |
6 |
$575,000 |
CDBG |
-7 |
| Energy Retrofit of City Hall and Consolidated Compound - energy retrofit for 2 major City owned operational facilities. |
Alexandria |
LA |
4 |
$5,000,000 |
Energy |
-12 |
| Construction of the I-49 corridor through Alexandria seriously disrupted fire response time. The city undertook a fire station repositioning study to assess the needs of fire response. The study concluded the need to relocate and construct 4 new fire st |
Alexandria |
LA |
60 |
$12,000,000 |
Public Safety |
7 |
| Renovation to Fire Station #4, on Masonic Drive to inprove fire protection for the district and further implementation of the fire station repositioning study. |
Alexandria |
LA |
25 |
$2,300,000 |
Public Safety |
2 |
| purchase of mobil police command center for responding to emergency situations. |
Alexandria |
LA |
0 |
$550,000 |
Public Safety |
-18 |
| Purchase ladder truck for service atFire Station #% to address anticipated commercial growth trends in western portion of city. |
Alexandria |
LA |
0 |
$380,000 |
Public Safety |
1 |
| Police/fire driving simulator for training of fire and police officers. |
Alexandria |
LA |
0 |
$102,000 |
Public Safety |
-11 |
| Fire arms training simulator for training police offiers. |
Alexandria |
LA |
0 |
$84,647 |
Public Safety |
-2 |
| Acquisition of property on Bolton Ave. in central Alexandria for construction of new bus transfer station to improve public transportation. |
Alexandria |
LA |
0 |
$750,000 |
Transit |
-13 |
| Purchase of 4 new 26 passenger buses to reduce fuel cost and improve nighttime bus service. |
Alexandria |
LA |
0 |
$720,000 |
Transit |
-12 |
| South Plank Road Relocation (Obstruction and Safety Runway 31) |
Baton Rouge |
LA |
70 |
$22,100,000 |
Streets/Roads |
-27 |
| Central Thruway Phase I-Provides new 4-lane divided hwy that is part of our transportation improvement program and provides needed flood evacuation route, including RR overpass and intersection improvements at US Hwy 190 |
Baton Rouge |
LA |
195 |
$18,300,000 |
Streets/Roads |
15 |
| South Harrell's Ferry Road Improvements-Capacity and safety improvements to upgrade functionally obsolete 2 lane open ditch roadway to a 4 lane curb and gutter hwy with turn lanes and sidewalks, including a bridge replacement over Jones Creek |
Baton Rouge |
LA |
191 |
$18,000,000 |
Streets/Roads |
16 |
| Sullivan Road Improvements- Capacity and safety improvements to upgrade functionally obsolete 2 lane open ditch roadway with a 4 lane divided hwy and to provide connectivity with adjoining Parish and I-12 |
Baton Rouge |
LA |
191 |
$18,000,000 |
Streets/Roads |
20 |
| Staring Lane Extension-Capacity and connectivity with a 4 lane divided curb and gutter hwy with sound walls, including a bridge over Bayou Fountain, a 66" sanitary sewer upgrade, and an intersection improvement with Burbank Dr (LA 42) |
Baton Rouge |
LA |
170 |
$16,000,000 |
Streets/Roads |
2 |
| Highland Road(LA 42) Improvements-Capacity and safety improvements to upgrade functionally obsolete 2 lane open ditch roadway to a 4 lane divided hwy, including (2) bridge replacements and improvements to an at grade RR crossing (KCSRR) |
Baton Rouge |
LA |
162 |
$15,200,000 |
Streets/Roads |
14 |
| Baton Rouge Computerized Signal Synchronization Project Future Phase Early Implementation (60 Intersections) |
Baton Rouge |
LA |
160 |
$15,000,000 |
Streets/Roads |
24 |
| North End Airport Industrial Park Roads |
Baton Rouge |
LA |
45 |
$15,000,000 |
Streets/Roads |
-28 |
| Comite Drive Improvements- Capacity and safety improvements to upgrade functionally obsolete 2 lane open ditch roadway with a 2 lane curb and gutter street with turn lanes and sidewalks |
Baton Rouge |
LA |
154 |
$14,500,000 |
Streets/Roads |
10 |
| Central Thruway Phase II-Provides new 4-lane divided hwy that is part of our transportation improvement program and provides needed flood evacuation route, including 3 new bridges over Beaver Bayou and intersection improvements at state route LA 37 |
Baton Rouge |
LA |
131 |
$12,300,000 |
Streets/Roads |
18 |
| Jones Creek Road Improvements Segment 3-Capacity and safety improvements to upgrade functionally obsolete 2 lane open ditch roadway to a 4 lane divided curb and gutter hwy, including a bridge replacement over Jones Creek |
Baton Rouge |
LA |
131 |
$12,300,000 |
Streets/Roads |
35 |
| Pavement Rehabilitation and Replacement Program Phase 09/01 |
Baton Rouge |
LA |
106 |
$10,000,000 |
Streets/Roads |
-2 |
| Pavement Rehabilitation and Replacement Program Phase 09/02 |
Baton Rouge |
LA |
106 |
$10,000,000 |
Streets/Roads |
-1 |
| Air Cargo Building Access Road |
Baton Rouge |
LA |
20 |
$8,000,000 |
Streets/Roads |
-15 |
| Baton Rouge Computerized Signal Synchronization Project Phase 5A |
Baton Rouge |
LA |
69 |
$6,500,000 |
Streets/Roads |
20 |
| Coursey Boulevard Pavement Rehabilitation (US Hwy 61 to Jones Creek Rd) |
Baton Rouge |
LA |
53 |
$5,000,000 |
Streets/Roads |
7 |
| Perkins Road(LA 427) at Stanford/Acadian Intersection Improvement-Major intersection improvements including dual turn lanes in all directions and new signal system on hwy connecting LSU with I-10 |
Baton Rouge |
LA |
53 |
$5,000,000 |
Streets/Roads |
4 |
| Foster-Government Street(LA 73) Intersection Improvement-Major intersection improvements including new turn lanes in all directions and new signal system on hwy leading to Baton Rouge Community College |
Baton Rouge |
LA |
37 |
$3,500,000 |
Streets/Roads |
3 |
| Bridge Replacement Frenchtown Road over Beaver Bayou |
Baton Rouge |
LA |
34 |
$3,200,000 |
Streets/Roads |
-3 |
| Major Arterial Signal Inter-Connect conversion of hard wire to fiber on College Dr, Sherwood Forest Blvd, and Highland Rd, and Nicholson Dr |
Baton Rouge |
LA |
21 |
$2,000,000 |
Streets/Roads |
-4 |
| Bridge Replacement Sharp Road over Jones Creek |
Baton Rouge |
LA |
16 |
$1,500,000 |
Streets/Roads |
4 |
| Pecue Lane Re-alignment at Perkins Rd (LA 427)-Capacity and safety improvements to re-align an offset intersection with turn lanes and new traffic signal |
Baton Rouge |
LA |
16 |
$1,500,000 |
Streets/Roads |
5 |
| Bridge Replacement East Grant Street over Corporation Canal |
Baton Rouge |
LA |
6 |
$600,000 |
Streets/Roads |
-4 |
| South Waste Water Treatment Plant Dry Weather Flow Immediate Action Improvements-Trickling Filter, re-circulation pump station, and sludge handling improvements |
Baton Rouge |
LA |
341 |
$42,000,000 |
Water |
20 |
| West Side Box Culvert to Increase Airport Public Parking |
Baton Rouge |
LA |
40 |
$11,000,000 |
Water |
-4 |
| Industriplex Area Sanitary Sewer Facility Upgrades which is part of our SSO elimination program |
Baton Rouge |
LA |
83 |
$10,200,000 |
Water |
-1 |
| Northwest Airport Box Culvert to Allow for Development (Monte Sano Bayou) |
Baton Rouge |
LA |
35 |
$10,000,000 |
Water |
-7 |
| Scotland Ave-Progress Rd Area Sanitary Sewer Comprehensive Rehabilitation which is part of our SSO elimination program |
Baton Rouge |
LA |
73 |
$9,000,000 |
Water |
-1 |
| Burbank Rd-Gardere Lane Area Sanitary Sewer Comprehensive Rehabilitation which is part of our SSO elimination program |
Baton Rouge |
LA |
73 |
$9,000,000 |
Water |
1 |
| Pump Station 136 Area Sanitary Sewer Upgrades which is part of our SSO elimination program |
Baton Rouge |
LA |
69 |
$8,500,000 |
Water |
0 |
| Foster-Hooper Road Area Sanitary Sewer Upgrades which is part of our SSO elimination program |
Baton Rouge |
LA |
69 |
$8,500,000 |
Water |
0 |
| Staring Lane-Boone Dr Area Sanitary Sewer Comprehensive Rehabilitation which is part of our SSO elimination program |
Baton Rouge |
LA |
49 |
$6,000,000 |
Water |
4 |
| Oak Villa Blvd-Choctaw Area Sanitary Sewer Comprehensive Rehabilitation which is part of our SSO elimination program |
Baton Rouge |
LA |
49 |
$6,000,000 |
Water |
4 |
| Parish Wide Sanitary Sewer Physical Inspection, CCTV, and Cleaning. This is a one year contract with the option to renew 2 additional yrs with the contract value set at $2 million per year |
Baton Rouge |
LA |
33 |
$4,000,000 |
Water |
-1 |
| North Waste Water Treatment Plant Odor Control and Liquid Phase Implementation |
Baton Rouge |
LA |
16 |
$4,000,000 |
Water |
4 |
| Lovett Road Area Multiple Sanitary Sewer Pump Station Upgrades which are part of our SSO elimination program |
Baton Rouge |
LA |
29 |
$3,600,000 |
Water |
3 |
| Aster Chimes Drainage Impovements Phase II (LSU to W. Roosevelt) |
Baton Rouge |
LA |
23 |
$1,500,000 |
Water |
-4 |
| Taxiway “F” Reconstruction and Extension |
Baton Rouge |
LA |
50 |
$16,300,000 |
Airport |
-13 |
| Entergy Transmission Tower Relocation on Plank Road (Obstruction & Safety to the Runway 22 Approach) |
Baton Rouge |
LA |
20 |
$9,000,000 |
Airport |
-1 |
| Runway 4R/22L Taxiway E & G Reconstruction |
Baton Rouge |
LA |
20 |
$8,200,000 |
Airport |
-5 |
| Complete Airfield Drainage Improvements |
Baton Rouge |
LA |
40 |
$5,300,000 |
Airport |
-1 |
| Runway 22R & 4L Safety Area Perimeter Road, 405 Study and Environmental Assessment for 4L/22R |
Baton Rouge |
LA |
30 |
$4,660,000 |
Airport |
-8 |
| Emergency Hurricane Generator, Airport Terminal Building, 4.3 Mega Watts |
Baton Rouge |
LA |
5 |
$4,000,000 |
Airport |
7 |
| Aircraft Rescue Fire Fighting Building Rehabilitation and Expansion |
Baton Rouge |
LA |
40 |
$3,000,000 |
Airport |
10 |
| Relocate Entergy Power Line at Harding Boulevard (Obstruction & Safety to Runway 4L Approach) |
Baton Rouge |
LA |
10 |
$3,000,000 |
Airport |
1 |
| Aircraft Rescue Fire Fighting Vehicle |
Baton Rouge |
LA |
10 |
$700,000 |
Airport |
7 |
| Baton Rouge River Center Expansion |
Baton Rouge |
LA |
2000 |
$76,000,000 |
CDBG |
-125 |
| Downtown Parking Garage Replacements and Expansion |
Baton Rouge |
LA |
600 |
$69,000,000 |
CDBG |
-22 |
| Old City Dock Stabilization and Redevelopment |
Baton Rouge |
LA |
1000 |
$60,000,000 |
CDBG |
-16 |
| DeSoto Park Development as part of both the Riverfront Master Plan and Capitol Park Master Plan |
Baton Rouge |
LA |
1000 |
$55,000,000 |
CDBG |
-73 |
| Fire Station Replacements for Stations: No. 4, No. 8, No. 9, No. 10, No. 13, No. 14, No. 15, and No. 19 and Renovations to No. 12 along with Training Tower Replace |
Baton Rouge |
LA |
205 |
$26,200,000 |
CDBG |
9 |
| Construct North Side Railroad Spur at Airport for North End Development of Air Industrial Park. The only lacking mode of transportation for the |
Baton Rouge |
LA |
35 |
$16,400,000 |
CDBG |
-9 |
| Convention Center Expansion and Renovation |
Baton Rouge |
LA |
125 |
$16,000,000 |
CDBG |
-73 |
| North Boulevard Town Square Implementation to link civil and cultural assets including; Arts and Science Museum, Old State Capitol, Downtown Government, Downtown Library, Arts Center, Mississippi River, etc. |
Baton Rouge |
LA |
31 |
$4,000,000 |
CDBG |
-13 |
| Government Street and Florida Street Enhancements with improved street lights, cross walks and other ADA compliant modifications |
Baton Rouge |
LA |
27 |
$2,500,000 |
CDBG |
0 |
| Thomas Delpit pedestrian and street scape enhancements to service the LSB Community Center, YMCA,Polk Elementary and other public facilities |
Baton Rouge |
LA |
16 |
$2,000,000 |
CDBG |
-17 |
| Washington Street pedestrian and street scape enhancements to service the Butler Community Center, and City Park |
Baton Rouge |
LA |
16 |
$2,000,000 |
CDBG |
-8 |
| Downtown Wayfinding Signage and Visitors Amenity Plan |
Baton Rouge |
LA |
16 |
$2,000,000 |
CDBG |
-22 |
| 4th District Police Station Replacement |
Baton Rouge |
LA |
15 |
$1,900,000 |
CDBG |
9 |
| Mobile Police Video and Narcotics office space and vehicle work area |
Baton Rouge |
LA |
4 |
$300,000 |
CDBG |
-4 |
| Misdemeanor Investigation Room Addition and Hurricane Damage Repair |
Baton Rouge |
LA |
3 |
$200,000 |
CDBG |
6 |
| Traffic Division Office Space Expansion at Bon Carre Business Center |
Baton Rouge |
LA |
2 |
$150,000 |
CDBG |
-12 |
| School zone crossing flashers that are LED and solar powered (160 crossings) |
Baton Rouge |
LA |
5 |
$1,300,000 |
Energy |
-31 |
| Dynamic message signs for traveler information and assistance |
Baton Rouge |
LA |
12 |
$3,000,000 |
Transit |
-21 |
| Construct new Downtown Intermodal Transit Shelter |
Baton Rouge |
LA |
10 |
$1,000,000 |
Transit |
-29 |
| GPS Equipment and Tracking system for entire Transit Authority Fleet |
Baton Rouge |
LA |
3 |
$400,000 |
Transit |
-33 |
| Airline Drive Railroad Underpass |
Bossier City |
LA |
200 |
$18,500,000 |
Streets/Roads |
36 |
| ART - South |
Bossier City |
LA |
200 |
$10,000,000 |
Streets/Roads |
5 |
| Swan Lake Road |
Bossier City |
LA |
200 |
$9,500,000 |
Streets/Roads |
-6 |
| ART- Traffic Street Widening |
Bossier City |
LA |
150 |
$9,000,000 |
Streets/Roads |
7 |
| Bossier City Water Purification Facility |
Bossier City |
LA |
500 |
$80,000,000 |
Water |
7 |
| Bossier City Sewer Treatment Facility |
Bossier City |
LA |
500 |
$50,000,000 |
Water |
19 |
| Sewer Rehab |
Bossier City |
LA |
25 |
$2,000,000 |
Water |
7 |
| Lab Building & Rehab |
Bossier City |
LA |
50 |
$1,000,000 |
Water |
-13 |