| Stormwater Management/Swale Improvements at Seacrest Corridor-Potable water main replacement and stormwater improvements |
Boynton Beach |
FL |
100 |
$7,529,600 |
Water |
-60 |
| Phase I New Force Main from East Plant Site to Regional Plant, new force main LS at SE 6th Ave., new LS at SE 6th Ave. - New regional sewage force main and pumping station to provide future capacity and redundancy of critical infrastructure |
Boynton Beach |
FL |
84 |
$6,320,000 |
Water |
-35 |
| Stormwater Improvement - SE 4th Street/SE Federal Hwy Corridor - Roadway improvements, potable water main installation, stormwater and reclaimed water improvements |
Boynton Beach |
FL |
67 |
$5,020,790 |
Water |
-29 |
| Stormwater Improvement and Water Main Replacement-NW 17th Ave. - Potable water main installation and stormwater improvements |
Boynton Beach |
FL |
43 |
$3,234,000 |
Water |
-20 |
| Perimeter Protection and Surveillance Entry Notification - Security improvements for water treatment and other utilities facilities |
Boynton Beach |
FL |
3 |
$227,670 |
Water |
-34 |
| New Police Facility - The Nationally accredited Boynton Beach Police Department currently operating in an 18,000 sq. ft. building. Recent space analysis found the need for 81,000 sq. ft. Experiencing increased public demand for police services. |
Boynton Beach |
FL |
300 |
$31,000,000 |
CDBG |
-161 |
| Congress Ave. Community Park - Construction of a 13 acre barrier-free community park including a 4,000 to 8,000 sq.ft. therapeutic recreation building built to LEEDS or Florida Green Building Coalition Standards. |
Boynton Beach |
FL |
100 |
$8,900,000 |
CDBG |
-133 |
| Boynton Harbor Public Marina - Redesign to improve boat slips, construct public walkways, lighting, signage, landscaping and public art. Design elements conserve water and electricity. Catalyst project for county water transit system. |
Boynton Beach |
FL |
75 |
$6,500,000 |
CDBG |
-92 |
| Seacrest & MLK, Jr. Blvd. Recconstruction - improve sections of low-income minority community to increase safety, encourage redevelopment and improve quality of life. Includes new lighting, crosswalks, wider sidewalks, landscaping, pavers and traffic cir |
Boynton Beach |
FL |
60 |
$5,500,000 |
CDBG |
-59 |
| Quantum Eco Park - Development of an "eco" park using LEEDS or other "green" design principals. Amenities to include trails through natural areas, nature center for environmental education, interpretive exhibits, rock garden, butterfly garden, botanical |
Boynton Beach |
FL |
50 |
$4,500,000 |
CDBG |
-109 |
| Oceanfront Park Boardwalk Replacement - Utilizing a renewable wood source this project calls for the replacement of approximately 900 linear feet of oceanfront boardwalk. The existing boardwalk has failed and is presenting a hazard to beach patrons. |
Boynton Beach |
FL |
50 |
$2,400,000 |
CDBG |
-47 |
| Hester and Pence Parks Lighting/Field Retrofit - Conversion of existing natural turf ball fields to synthetic turf and conversion of ball field lighting to computer controlled lighting for energy conservation, thereby eliminating the use of chemicals |
Boynton Beach |
FL |
10 |
$1,600,000 |
CDBG |
-71 |
| Municipal Grounds Landscape Retrofit - Upgrade landscaping to replace large turf areas with native plantings to reduce reliance on potable water supplies. Project would also result in the reduction of fertilizer/chemical applications |
Boynton Beach |
FL |
15 |
$1,000,000 |
CDBG |
-65 |
| Chiquita Boulevard Widening-widen roadway from 4 to 6 lanes |
Cape Coral |
FL |
436 |
$60,000,000 |
Streets/Roads |
-118 |
| Citywide roadway maintenance-resurfacing of deteriorating road surfaces |
Cape Coral |
FL |
36 |
$10,000,000 |
Streets/Roads |
29 |
| Utility Expansion Program, Provide public water, sewer and wastewater recycle to replace well and septic-Sw 6/7area, Noth 1 through 8 areas and facility expamsion project |
Cape Coral |
FL |
1359 |
$345,400,000 |
CDBG |
-33 |
| Chiquita Boatlock-construct boat lock to facilitate state requirements for clean waterway on the south spreader waterway |
Cape Coral |
FL |
100 |
$13,000,000 |
CDBG |
-48 |
| Sidewalks and curbing program- retrofit 4 lane divided roadways |
Cape Coral |
FL |
36 |
$10,000,000 |
CDBG |
-76 |
| Construct perimeter walls around new reverse osmosis and water reclamation facilities |
Cape Coral |
FL |
20 |
$2,800,000 |
CDBG |
-47 |
| environmental building construction |
Cape Coral |
FL |
80 |
$9,200,000 |
Energy |
-103 |
| ASR Treatment System-Treatment for alternative storage and recovery wells |
Cape Coral |
FL |
20 |
$7,500,000 |
Energy |
-34 |
| Everest Odor Control-upgrade of odor control system at the water reclamation facility |
Cape Coral |
FL |
20 |
$2,600,000 |
Energy |
1 |
| North Cape Guard House- install guard house for homeland security feature at Reverse Osmosis water plant |
Cape Coral |
FL |
20 |
$800,000 |
Public Safety |
-81 |
| Marshall Street & Northeast Treatment Plants Centrifuge Dewatering |
Clearwater |
FL |
0 |
$2,800,000 |
Water |
-27 |
| Lake Bellevue Stormwater Expansion |
Clearwater |
FL |
0 |
$2,600,000 |
Water |
-23 |
| Northeast Treatment Plant Secondary Digester Improvements |
Clearwater |
FL |
0 |
$2,200,000 |
Water |
2 |
| Marshall Street Treatment Plant Generator Modifications |
Clearwater |
FL |
0 |
$1,600,000 |
Water |
-10 |
| Marshall Street and East Treatment Plants Hypochlorite Conversion |
Clearwater |
FL |
0 |
$1,300,000 |
Water |
-8 |
| Pump Station 65 Force Main Reroute |
Clearwater |
FL |
0 |
$820,000 |
Water |
-8 |
| Overlea & Stevenson Drives Sanitary Improvements |
Clearwater |
FL |
0 |
$600,000 |
Water |
-10 |
| Air Release Valve Relocations |
Clearwater |
FL |
0 |
$150,000 |
Water |
-13 |
| Fort Harrison Avenue/Pinellas Street Intersection Improvements |
Clearwater |
FL |
0 |
$1,800,000 |
CDBG |
-42 |
| Keene Road/Druid Road mast arm |
Clearwater |
FL |
0 |
$250,000 |
CDBG |
-40 |
| Municipal Services Building Parking Lot |
Clearwater |
FL |
0 |
$250,000 |
CDBG |
-32 |
| Ocean Beach Blvd.
use native plants/energy-efficient lighting. Intended to aid in controlling runoff to Indian River lagoon. (design phase complete) |
Cocoa Beach |
FL |
50 |
$2,000,000 |
Streets/Roads |
-12 |
| Re- line 500 manholes
8 ft. depth @ $250/ft. |
Cocoa Beach |
FL |
20 |
$1,000,000 |
Streets/Roads |
-37 |
| Slipline/replace stormwater lines
10,000 ft. @ $40/linear foot |
Cocoa Beach |
FL |
10 |
$400,000 |
Streets/Roads |
-2 |
| Asphalt rejuvination - City-wide project to extend life of existing paving |
Cocoa Beach |
FL |
10 |
$350,000 |
Streets/Roads |
-3 |
| SR 520 Landscaping & Irrigation -
Intended to aid in controlling runoff to
Indian River lagoon |
Cocoa Beach |
FL |
10 |
$250,000 |
Streets/Roads |
-17 |
| Completion of Sidewalk /Bike Path Master Plan |
Cocoa Beach |
FL |
10 |
$150,000 |
Streets/Roads |
-32 |
| Improvements to six (6) process systems:
(1) Influent Handling Facilities
(2) Biological Treatment Units
(3) Clarifiers (4) Filters (5) Chlorine contact
(6) Residuals Handling
(Study & preliminary costing done) |
Cocoa Beach |
FL |
50 |
$10,938,000 |
Water |
4 |
| Sewer System Rehabilitation -
Rehabilitation of systems serving
Lift Stations #4, #6 & #7
(Specific upgrades required are identified) |
Cocoa Beach |
FL |
20 |
$3,000,000 |
Water |
6 |
| Engineering evaluation of ASR site at PAFB.
Construct 500,000 GPD irrigation system. |
Cocoa Beach |
FL |
20 |
$750,000 |
Water |
-28 |
| Infiltration & Inflow Assessment -
Comprehensive survey of system to prioritize work required |
Cocoa Beach |
FL |
5 |
$500,000 |
Water |
-8 |
| Lift Station # 4 Conversion -
Major upgrade to "wet pit" status |
Cocoa Beach |
FL |
20 |
$400,000 |
Water |
3 |
| Rebuild and/or replace
six (6) high service pumps
(Equipment identified & replacements specified) |
Cocoa Beach |
FL |
10 |
$250,000 |
Water |
5 |
| Administration facility
solar powered/LEED certified
energy-efficient lighting
(property acquired/needs assessment study done)
)(must receive funding early 2009 to complete by end of 2010) |
Cocoa Beach |
FL |
50 |
$8,000,000 |
CDBG |
-51 |
| Vehicle storage building -
solar powered/LEED certified
Intended to extend vehicle life
by corrosion reduction |
Cocoa Beach |
FL |
10 |
$150,000 |
CDBG |
-25 |
| Equipment Storage building -
solar powered/LEED certified
Intended to extend vehicle life
by corrosion reduction |
Cocoa Beach |
FL |
5 |
$50,000 |
CDBG |
-19 |
| Install solar power grid. Provide power to some City facilities & sell remainder to grid. (Installation areas identified & available) |
Cocoa Beach |
FL |
10 |
$500,000 |
Energy |
7 |
| Public Safety (combined police/fire) facility,solar powered/LEED certified energy-efficient lighting
(property acquired/needs assessment done)(must receive funding early 2009 to complete by end of 2010) |
Cocoa Beach |
FL |
100 |
$12,000,000 |
Public Safety |
65 |
| Construct Fire Station # 2
solar powered/LEED certified
energy-efficient lighting (property acquired/needs assessment done))(must receive funding early 2009 to complete by end of 2010) |
Cocoa Beach |
FL |
70 |
$2,000,000 |
Public Safety |
3 |
| Coconut Creek Parkway Education Corridor (both phases) - Construction/Enhancements of existing highway linking five educational institutions including numerous pedestrian and transit features |
Coconut Creek |
FL |
200 |
$9,000,000 |
Streets/Roads |
-32 |
| Lyons Road Construction Improvements Phase IV - which includes transportation/pedestrain and environmental enhancements |
Coconut Creek |
FL |
60 |
$1,500,000 |
Streets/Roads |
-15 |
| Lyons Road Construction Improvements Phase III - which includes transportation/pedestrian and environmental enhancements |
Coconut Creek |
FL |
60 |
$1,000,000 |
Streets/Roads |
-11 |
| State Road 7 Median and Roadway Enhancements to reduce congestion and improve air quality |
Coconut Creek |
FL |
30 |
$1,000,000 |
Streets/Roads |
-15 |
| Reclaimed Water Line Extension along Copans Road to conserve potable water from Biscayne Aquifer linked to the Everglades and eliminate effluent discharge into Atlantic Ocean |
Coconut Creek |
FL |
25 |
$1,500,000 |
Water |
11 |
| Reclaimed Water Line Extension along Wiles Road to conserve potable water from Biscayne Aquifer linked to the Everglades and eliminate effluent discharge into Atlantic Ocean |
Coconut Creek |
FL |
30 |
$1,000,000 |
Water |
5 |
| 4 New Police Officers for growth in city and current crime trends |
Coconut Creek |
FL |
4 |
$450,000 |
Public Safety |
-12 |
| Construction of New Bus Shelters to expand public transit |
Coconut Creek |
FL |
10 |
$250,000 |
Transit |
-16 |
| Miracle Mile Streetscape |
Coral Gables |
FL |
95 |
$9,500,000 |
Streets/Roads |
-122 |
| Conveyance Improvements to C-3 Canal (Dredging) |
Coral Gables |
FL |
60 |
$7,000,000 |
Streets/Roads |
-14 |
| Ponce de Leon Boulevard Phase II and Phase III Improvements |
Coral Gables |
FL |
60 |
$6,000,000 |
Streets/Roads |
-13 |
| Pavement Resurfacing, Bridge Improvements, Traffic Calming and Sidewalk Extensions |
Coral Gables |
FL |
35 |
$3,500,000 |
Streets/Roads |
-3 |
| Storm Drainage Const. |
Coral Gables |
FL |
20 |
$2,000,000 |
Streets/Roads |
1 |
| Pump Station Upgrades |
Coral Gables |
FL |
40 |
$4,000,000 |
Water |
9 |
| Mainline Rehabilitation |
Coral Gables |
FL |
25 |
$3,000,000 |
Water |
-3 |
| Force Main Replacement |
Coral Gables |
FL |
18 |
$2,000,000 |
Water |
-5 |
| Natural Gas Pipeline for City Maintenance Facility |
Coral Gables |
FL |
10 |
$300,000 |
Energy |
-3 |
| Energy Management for City owned properties |
Coral Gables |
FL |
8 |
$250,000 |
Energy |
-1 |
| Heat/Cooling Systems for City owned properties |
Coral Gables |
FL |
2 |
$40,000 |
Energy |
-13 |
| New Transit Buses |
Coral Gables |
FL |
15 |
$1,600,000 |
Transit |
-15 |
| Maint. Facility Upgrade |
Coral Gables |
FL |
5 |
$200,000 |
Transit |
-7 |
| Bus Route Expansion |
Coral Gables |
FL |
3 |
$150,000 |
Transit |
5 |
| Roadway Resurfacing Program |
Coral Springs |
FL |
20 |
$1,825,000 |
Streets/Roads |
-3 |
| Meadows and Dells Neighborhood Drainage Improvement Project |
Coral Springs |
FL |
10 |
$750,000 |
Streets/Roads |
-11 |
| Coral Hills Drive Drainage Improvements |
Coral Springs |
FL |
10 |
$127,000 |
Streets/Roads |
-9 |
| Water Treatment Plant Improvements |
Coral Springs |
FL |
25 |
$3,500,000 |
Water |
-2 |
| New Raw Water Supply Wells, Wellheads & Transmission System |
Coral Springs |
FL |
25 |
$2,500,000 |
Water |
0 |
| Conserve water and protect drinking water source from chemical run off by replacing athletic fields with artificial turf |
Coral Springs |
FL |
12 |
$1,500,000 |
Water |
-28 |
| Galvanized Water Service Replacement Program |
Coral Springs |
FL |
20 |
$1,000,000 |
Water |
1 |
| Lift Station Rehabilitation Program |
Coral Springs |
FL |
10 |
$980,000 |
Water |
5 |
| Water Distribution System Improvements |
Coral Springs |
FL |
20 |
$900,000 |
Water |
0 |
| Inflow and Infiltration Correction Program |
Coral Springs |
FL |
10 |
$700,000 |
Water |
3 |
| Water Plant Security Wall |
Coral Springs |
FL |
10 |
$400,000 |
Water |
-13 |
| Build Neighborhood Transit Center and Parking Garage |
Coral Springs |
FL |
80 |
$6,000,000 |
CDBG |
-41 |
| Implement Sample Road and University Drive Infrastructure Master Plan |
Coral Springs |
FL |
80 |
$4,000,000 |
CDBG |
-15 |
| Repair City Hall Roof |
Coral Springs |
FL |
8 |
$400,000 |
CDBG |
-4 |
| Traffic Calming: Traffic calming is a tool for the City to help improve the livability of neighborhoods by reducing speeding and cut through traffic. Funds will be used to install permanent speed humps in eligible neighborhoods. |
Coral Springs |
FL |
1 |
$50,000 |
CDBG |
-48 |
| Replace Althletic Field Lighting With Energy Efficient Fixtures |
Coral Springs |
FL |
2 |
$500,000 |
Energy |
-23 |
| Northwest County Communications Center Emergency Communiction Equipment Upgrade |
Coral Springs |
FL |
40 |
$6,000,000 |
Public Safety |
-11 |
| Mobile Command Unit |
Coral Springs |
FL |
0 |
$200,000 |
Public Safety |
-16 |
| In-Car Digital Camera System for Police Patrol Vehicles |
Coral Springs |
FL |
0 |
$150,000 |
Public Safety |
35 |
| Coral Springs Charter School Roof Replacement: replace existing roof with high reflective "green" coating material and higher RD insulation to substantially reduce solar heat gain and cooling load
of HVAC equipment, saving electrical energy. |
Coral Springs |
FL |
40 |
$2,500,000 |
Schools |
-12 |
| Charter School Information Technology Upgrade |
Coral Springs |
FL |
1 |
$250,000 |
Schools |
-27 |
| West Side Master Plan - expand and modernize vehicle repair facility |
Coral Springs |
FL |
2 |
$300,000 |
Transit |
-2 |
| Bus Shelter Installation |
Coral Springs |
FL |
5 |
$120,000 |
Transit |
-17 |
| 20 Passenger Bus with Lift to Transport Seniors |
Coral Springs |
FL |
0 |
$100,000 |
Transit |
-5 |
| NW 102 Ave 66-74 |
Doral |
FL |
100 |
$3,000,000 |
Streets/Roads |
-9 |
| NW 33 Street 92-97 Ave New Street Construction |
Doral |
FL |
65 |
$2,000,000 |
Streets/Roads |
-5 |