| Construct drainage system behind homes off Boylson and Maple St. |
Meriden |
CT |
8 |
$250,000 |
Streets/Roads |
1 |
| Construct City-owned parking lot at Colony and Church. Lot will serve Central Business District. |
Meriden |
CT |
6 |
$200,000 |
Streets/Roads |
0 |
| Replace damaged guiderails citywide. |
Meriden |
CT |
12 |
$150,000 |
Streets/Roads |
-2 |
| Complete sewer rehabiliation in sub-basin 17. Project includes relining sanitary sewers, structural spot repairs, and rebuilding manhole covers in City Water Department system. |
Meriden |
CT |
20 |
$2,500,000 |
Water |
2 |
| Clean cement lining of all iron water mains in City Water Department system. Project includes replacement of all valves and hydrants. |
Meriden |
CT |
20 |
$2,500,000 |
Water |
1 |
| Design-build Broad Brook Pump Station Upgrade and Rehabiliation. Project consists of upgrading pumps, motors, motor control panel, pipine and other structures. |
Meriden |
CT |
20 |
$1,920,000 |
Water |
-2 |
| Upgrade 28- year old Silver Lake Pump Station. Upgrades include all mechanical and electrical equipment. |
Meriden |
CT |
12 |
$1,000,000 |
Water |
-2 |
| Remove 24" sanitary sewer from Hanover Pond. |
Meriden |
CT |
6 |
$500,000 |
Water |
0 |
| Design-build sanitary sewer replacement from Oakland Gardens to Griswold Street. Project will address sewer overflows at Jack Barry Field. |
Meriden |
CT |
8 |
$500,000 |
Water |
0 |
| Construct Heating Sytem at Broad Brook Treatment Plant. |
Meriden |
CT |
5 |
$400,000 |
Water |
-1 |
| Complete sewer rehabiliation from Griswold Street to Center Street. Project includes relining sanitary sewers. |
Meriden |
CT |
6 |
$100,000 |
Water |
0 |
| Design-build electrical upgrades to Platt and Lincoln wells. Project consists of replacing all outdated electrical equipment with code-compliant equipment. |
Meriden |
CT |
5 |
$90,000 |
Water |
1 |
| Construct needed utilities and infrastructure at City-owned Meriden HUB brownfields site. Redevelop site as mixed use area and open space. Site located in low mod area. |
Meriden |
CT |
200 |
$10,000,000 |
CDBG |
-2 |
| Demolish Blighted Structures at City-owned Factory H Brownfields Site. Redevelop site as mixed use area and open space. Site located in low mod area. |
Meriden |
CT |
65 |
$3,700,000 |
CDBG |
-3 |
| Replace pool at Hubbard Park. Public/community facility serving low mod clients. |
Meriden |
CT |
9 |
$1,200,000 |
CDBG |
-10 |
| Demolish two blighted structures on Miller Street. Redevelop site with City-owned parking area to serve Meriden Public Library and low mod clients. |
Meriden |
CT |
8 |
$500,000 |
CDBG |
1 |
| Demolish Blighted Structures at 84/88 Grove Street. Redevelop area as public parking. Site located in low mod area. |
Meriden |
CT |
5 |
$420,000 |
CDBG |
-1 |
| Expand downtown WiFi network. Public infrastructure project in downtown/low mod income area. |
Meriden |
CT |
4 |
$50,000 |
CDBG |
-2 |
| Construct job seeker computer center at Meriden Public Library. Public/community facility serving low mod clients. |
Meriden |
CT |
3 |
$50,000 |
CDBG |
-1 |
| Install two 400 kWh Fuel Cells for electricity generation to be used by the City's Water Pollution Control Plant on Evansville Ave. |
Meriden |
CT |
8 |
$4,000,000 |
Energy |
3 |
| Replace windows, heating and HVAC systems and other exterior improvements at DPW Facility located at Michael Drive for energy conservation. |
Meriden |
CT |
14 |
$3,000,000 |
Energy |
-3 |
| Replace windows, heating and HVAC systems at Meriden Health Dept./Stoddard Building for energy conservation. |
Meriden |
CT |
10 |
$1,500,000 |
Energy |
0 |
| Replace windows, heating and HVAC systems at City Hall for energy conservation. |
Meriden |
CT |
4 |
$1,000,000 |
Energy |
1 |
| Replace windows, heating and HVAC systems at Meriden Public Library for energy conservation. |
Meriden |
CT |
6 |
$1,000,000 |
Energy |
3 |
| Install backup generator for use by Meriden Public Library, Health Department and Board of Education. |
Meriden |
CT |
5 |
$900,000 |
Energy |
-2 |
| Replace roof and install solar PV array for building's electricity needs at Meriden Parks & Recreation building. |
Meriden |
CT |
12 |
$750,000 |
Energy |
-7 |
| Construct Compressed Natural Gas (CNG) vehicle fueling station for use by the City fleet. |
Meriden |
CT |
5 |
$500,000 |
Energy |
3 |
| Replace windows at Augusta Curtis Cultural Center for energy conservation. |
Meriden |
CT |
5 |
$225,000 |
Energy |
-1 |
| Renovate Fire Stations 4, 5, 2 and 3 to address ongoing maintence problems, environmental issues, code issues, and outdated heating systems. Install Access Control System in all 5 City Fire Stations |
Meriden |
CT |
20 |
$5,909,000 |
Public Safety |
7 |
| Construct addition to Police Department headquarters to accommodate community police program. |
Meriden |
CT |
30 |
$5,500,000 |
Public Safety |
0 |
| Purchase two-site simulcast and dispatch communications equipment for City's Emergency Operations Center and Police Dispatch. |
Meriden |
CT |
3 |
$3,200,000 |
Public Safety |
0 |
| Construct Impound/Evidence Storage Facility at City transfer facility to house and process impound evidence. |
Meriden |
CT |
10 |
$800,000 |
Public Safety |
2 |
| Install high-speed Fiber SONET Ring network to allow for networking among City buildings. |
Meriden |
CT |
6 |
$600,000 |
Public Safety |
-2 |
| Install security cameras and internet communications at Meriden Health Center located in the Stoddard Building. |
Meriden |
CT |
3 |
$70,000 |
Public Safety |
-2 |
| Purchase new servers, network equipment, electrical and data cables for Police Department Data Center. |
Meriden |
CT |
5 |
$60,000 |
Public Safety |
3 |
| Install emergency electrical generator at South Meriden Volunteer Fire Department. |
Meriden |
CT |
3 |
$55,000 |
Public Safety |
5 |
| Replace pools at City High Schools to meet State law. Incoporate renewable energy technologies in pool reconstruction. |
Meriden |
CT |
9 |
$5,500,000 |
Schools |
-9 |
| Construct building addition at Hanover Elementary School to accommodate all-day kindergarden. |
Meriden |
CT |
40 |
$5,500,000 |
Schools |
-1 |
| Construction of city parking lot.
280 spaces plans complete, bid in Feb. 09 |
Middletown |
CT |
40 |
$750,000 |
Streets/Roads |
-7 |
| Mattabasset Regionalization. Abandon 1970's sewage plant on CT River and tie into modern sewage plant 2 miles to north. |
Middletown |
CT |
300 |
$25,000,000 |
Water |
14 |
| Straighten Country Club Road. Designed to eliminate 2 very bad curves. |
Middletown |
CT |
100 |
$6,000,000 |
Water |
-9 |
| Completion of 8 soccer fields, to include 2 24/7 lighted turf fields. Land acquired, fully approved site work underway. |
Middletown |
CT |
150 |
$4,000,000 |
CDBG |
-22 |
| Aqusition, demolition and relocation of blighted neighborhood. Implementation of fully approved Redevelopment Plan. |
Middletown |
CT |
100 |
$3,500,000 |
CDBG |
-8 |
| Northend Homeownership Project. Completly designed and approved. Creation of 17 units of affordable housing in low to mod census tract. |
Middletown |
CT |
100 |
$2,500,000 |
CDBG |
-8 |
| Use of landfill gas, solar panels and other forms of alternate energy to provide heat and electricity to city owned 184,000 sq.ft. brownfield building constructed in 1894. |
Middletown |
CT |
200 |
$5,000,000 |
Energy |
5 |
| Replacement of Town wide Sidewalks, existing bid in place |
Naugatuck |
CT |
36 |
$1,500,000 |
Streets/Roads |
-8 |
| Reconstruction of Historic Town Brick Paver Road, Last Brick Road in Town, Survey complete /30 %Design |
Naugatuck |
CT |
19 |
$800,000 |
Streets/Roads |
-8 |
| Town Wide Paving Program |
Naugatuck |
CT |
24 |
$750,000 |
Streets/Roads |
1 |
| Rubber Ave Bridge #03713 |
Naugatuck |
CT |
28 |
$300,000 |
Streets/Roads |
3 |
| Building Renovations To Charles Goodyear Cultural Center (Building 25) |
Naugatuck |
CT |
60 |
$1,665,000 |
CDBG |
-5 |
| Sanitary Sewer Rehabilitation |
Naugatuck |
CT |
41 |
$1,600,000 |
CDBG |
-2 |
| Brown Field Remediation for Renaissance Downtown Economic Revitalization Project, Project currently being rebid over budget |
Naugatuck |
CT |
51 |
$750,000 |
CDBG |
2 |
| Construction of Gunntown Park, design complete all approvals in place |
Naugatuck |
CT |
11 |
$400,000 |
CDBG |
-7 |
| Renovation and Irrigation and Lighting Cross Street School |
Naugatuck |
CT |
6 |
$250,000 |
CDBG |
0 |
| City Hill Field Lighting Project |
Naugatuck |
CT |
5 |
$200,000 |
CDBG |
-1 |
| Town Wide Park Safety Improvements |
Naugatuck |
CT |
4 |
$150,000 |
CDBG |
2 |
| Fawn Meadow Park Irrigation |
Naugatuck |
CT |
2 |
$100,000 |
CDBG |
-6 |
| State Street Bridge: Replace the bridge carrying State Street over the Mill River. Bridge is in "critical" condition according to CT-DOT inspections |
New Haven |
CT |
76 |
$7,600,000 |
Streets/Roads |
16 |
| Quinnipiac Avenue Phase I: Road reconstruction and Traffic Calming |
New Haven |
CT |
70 |
$7,000,000 |
Streets/Roads |
11 |
| Crown Street Renovation Program: Structural repairs, waterproofing, electrical work, mechanical, plumbing, signage, elevator, etc. associated with a complete state-of-good-repair reconstruction. |
New Haven |
CT |
25 |
$5,700,000 |
Streets/Roads |
0 |
| Prospect Street Bridge Replacement: Replace bridge, signalization and approaches - bridge in "poor" condition. |
New Haven |
CT |
25 |
$3,500,000 |
Streets/Roads |
8 |
| Downtown / Medical District Congestion Management Program: Replacement of 12 traffic signals in / around Yale New Haven Hospital and the Yale Medical District |
New Haven |
CT |
0 |
$3,000,000 |
Streets/Roads |
-2 |
| Major Arterial Rehabilitation: Mill and pave Congress Avenue from Davenport Avenue to North of Ward Street |
New Haven |
CT |
15 |
$440,000 |
Streets/Roads |
0 |
| District-wide Paving and Drainage Water Conservation Measures: Drainage and erosion control, including use of gray water for irrigation systems, water detention cisterns, pervious pavement for parking areas and retaining walls |
New Haven |
CT |
65 |
$6,000,000 |
Water |
2 |
| Bowen Field: Improvements to fields, track, bleachers, restrooms and ADA compliance |
New Haven |
CT |
65 |
$15,000,000 |
CDBG |
48 |
| River Street Industrial Park. 1. MDP Phase II: Sidewalk/Street improvements, lighting/signal work. 2. Brownfields: Environmental remediation of soils and factory buildings. 3. Waterfront: Construct bulkheads/walkway/park |
New Haven |
CT |
125 |
$8,200,000 |
CDBG |
3 |
| Brewery Square Seawall Reconstruction: the seawall is badly deteriorating and needs reconstruction. The park walkway is washing away. Steel Sheetpilings must be patched and concrete backing must be poured |
New Haven |
CT |
10 |
$1,000,000 |
CDBG |
7 |
| Dover Beach Seawall: Complete repairs to the section of the seawall located at Dover Beach Park |
New Haven |
CT |
10 |
$715,000 |
CDBG |
3 |
| Eastshore Park Erosion Control Phase II |
New Haven |
CT |
10 |
$700,000 |
CDBG |
1 |
| District-wide High Performance and Sustainable Energy Efficiency Improvements: Improve energy efficiency and sustainability for various school buildings with low e glass installation and high performance energy management system upgrades (including upgra |
New Haven |
CT |
225 |
$20,000,000 |
Energy |
4 |
| Central Utility Plant and Fuel Cell: Utility Plant that will provide mechanical / electrical services for new schools - Hill Central and Clemente School - inclusion of Fuel Cell for minimizing peak demands |
New Haven |
CT |
65 |
$6,500,000 |
Energy |
5 |
| Wind Turbine at Sound School: A 750kW wind turbine at the Sound School Vocational Aquaculture Center would fulfill all of the facility's electrical needs, creating ongoing savings of approximately $300,000 per year |
New Haven |
CT |
20 |
$2,600,000 |
Energy |
20 |
| Davis Street School: Abate and demolish the existing Davis Street School and construct a new pre-K-8 school in its place. New school building would use highest quality energy efficiency measures |
New Haven |
CT |
500 |
$48,000,000 |
Schools |
-1 |
| District-wide code compliance and accessibility upgrades: ADA accessibility upgrade for civil rights compliance at several schools, including restrooms, counters, ramps, elevators, labs, signage, doors and swimming pools. |
New Haven |
CT |
85 |
$8,000,000 |
Schools |
-3 |
| Renovation of the urban core (approx. 30 acre site) infrastructure to include pedestrian-friendly sidewalks, lighting, roadway construction & utilty relocation |
Norwalk |
CT |
200 |
$43,000,000 |
Streets/Roads |
4 |
| 65 centerline miles of roadway paving |
Norwalk |
CT |
220 |
$25,000,000 |
Streets/Roads |
4 |
| Fairfield Avenue Reconstruction |
Norwalk |
CT |
75 |
$7,000,000 |
Streets/Roads |
-3 |
| Strawberry Hill Traffic Calming |
Norwalk |
CT |
75 |
$7,000,000 |
Streets/Roads |
-11 |
| Replacement of six traffic signals: Belden Ave @ Cross St; Belden Ave @ Rte 7; Van Zant St @ Fire House; Van Zant St @ Osborne; Fox Run and Ward St @ Freese Court |
Norwalk |
CT |
25 |
$1,500,000 |
Streets/Roads |
-5 |
| Cedar Street Improvements |
Norwalk |
CT |
35 |
$1,500,000 |
Streets/Roads |
-4 |
| Perry Avenue Bridge replacement |
Norwalk |
CT |
16 |
$700,000 |
Streets/Roads |
-6 |
| Route 1 Widening project |
Norwalk |
CT |
10 |
$450,000 |
Streets/Roads |
-2 |
| Removal of Old Tokeneke Bridge |
Norwalk |
CT |
10 |
$400,000 |
Streets/Roads |
1 |
| James Street Bridge replacement |
Norwalk |
CT |
5 |
$210,000 |
Streets/Roads |
-3 |
| Westmere Bridge replacement |
Norwalk |
CT |
5 |
$200,000 |
Streets/Roads |
-1 |
| Wastewater Treatment Plant Upgrade, Phase I |
Norwalk |
CT |
500 |
$45,000,000 |
Water |
9 |
| Keeler Brook Drainage Improvement Project [in design] |
Norwalk |
CT |
200 |
$9,000,000 |
Water |
-1 |
| Buckingham-Lockwood Drainage Improvement Project |
Norwalk |
CT |
100 |
$4,000,000 |
Water |
2 |
| Olmstead Place, NoahÂ’s Lane, Meadowbrook Drainage improvement package (bids received, contractor selected) |
Norwalk |
CT |
25 |
$1,000,000 |
Water |
1 |
| Mary Austin at Silvermine Avenue Drainage Installation [ready] |
Norwalk |
CT |
15 |
$350,000 |
Water |
-1 |
| Calf Pasture Beach: creating a Visitors Center and gateway to NorwalkÂ’s islands and waterfront. Adaptive Re-use of existing structure. |
Norwalk |
CT |
200 |
$3,500,000 |
CDBG |
-4 |
| Oyster Shell Park: A former landfill turned into a Riverfront Park offering the latest green technology. Key walkways connecting area attractions. Phase II and III, |
Norwalk |
CT |
200 |
$3,000,000 |
CDBG |
-2 |
| Demolition of the old police station |
Norwalk |
CT |
20 |
$2,775,000 |
CDBG |
0 |
| The Lockwood Matthews Mansion Museum needs new mechanical and electrical systems, an HVAC system upgrade, lighting and fire safety systems, and an elevator. Thermal wells and a potential solar heating system are being considered to support energy needs. |
Norwalk |
CT |
80 |
$2,500,000 |
CDBG |
-5 |
| Structural repairs to Yankee Doodle Garage |
Norwalk |
CT |
40 |
$1,800,000 |
CDBG |
-2 |
| City Hall roof replacement |
Norwalk |
CT |
15 |
$1,590,000 |
CDBG |
0 |
| Norwalk River Valley Trail |
Norwalk |
CT |
30 |
$1,500,000 |
CDBG |
17 |
| Renovation and repair of the Health Department building: new windows, new roof, handicapped access, interior light fixtures. |
Norwalk |
CT |
20 |
$1,500,000 |
CDBG |
2 |
| Structural Repairs SoNo Railroad Station garage |
Norwalk |
CT |
27 |
$1,200,000 |
CDBG |
-2 |
| Installation of a City Hall emergency generator |
Norwalk |
CT |
6 |
$700,000 |
CDBG |