WARNING: You're looking at a page from the old site. We have relaunched with live stimulus data. Learn more here.


Recent News

Advanced search added: keywords, zip codes, and recipients 11/25/2009

Thanks to the tireless work of developer Peter Snyder, Stimulus Watch 2.0 now has an advanced search capability that will…

Jerry Brito on Washington DC’s Federal News Radio... 11/24/2009

Jerry Brito on Washington DC’s Federal News Radio discussing the new features available on Stimulus Watch 2.0.

We've relaunched with new official data of stimulus projects in your neighborhood! 11/18/2009

Welcome to Stimulus Watch 2.0. While our original site featured proposed stimulus projects taken from the U.S. Conference of Mayors…

OpenRegs.com
Find government regulations by issue or agency. Comment, add links and subscribe to regulations.

CDBG Projects

Description City State Jobs Cost Program Type Vote Ratio
Village-wide Valve and Fire Hydrant Removal and Replacement Sauk Village IL 23 $500,000 CDBG 2
Village-wide Street Resurfacing Sauk Village IL 45 $2,200,000 CDBG 7
Small Business Loan Program Schaumburg IL 0 $50,000 CDBG -8
James Court Roadway & Sanitary Sewer Repair Schaumburg IL 30.5 $762,880 CDBG 4
Water improvemrnt Seatonville IL 1 $40,000 CDBG 5
Rebuild shipyard road to truck route standards for improved access to industrial park Seneca IL 137 $968,000 CDBG -19
Construct 80' X 40' addition to the Village Hall to house Police Department, 911 Center, Public Safety function. Seneca IL 9 $325,000 CDBG -22
Completely rehabilitate two malfunctioning and obsolete wastewater lift stations. Sheffield IL 3 $100,000 CDBG 6
Construct roof over digestor and drying beds and rehabilitate clarifier #3 to improve treatment quality. Sheridan IL 7 $250,000 CDBG -5
Construction of new water tower to replace aging undersized structure and watermain replacement South Wilmington IL 22 $800,000 CDBG 1
Street improvements South Wilmington IL 11 $400,000 CDBG 4
Storm sewer improvements South Wilmington IL 11 $400,000 CDBG 3
Streetscape and Infrastructure Imporvements - Includes utility improvements,streetscape, signage, sidewalks, planting, etc. Thornton IL 0 $6,500,000 CDBG -7
Infrastructure Improvement- Bury Overhead Utilities. Thornton IL 0 $5,400,000 CDBG 2
Street replacements on Main and Wauponis. Construct new profile to replace old railroad crossing, construct new street base and surface, construct new curb and gutter. Tonica IL 13 $460,000 CDBG 7
Construct new public works garage, office, and shop facility to replace leased one. Tonica IL 8 $280,000 CDBG -5
Construction of new wastewater treatment and collection system for community that has no central sanitary system. Troy Grove IL 64 $2,300,000 CDBG 17
Street improvements Verona IL 8 $300,000 CDBG 0
Replace existing cast iron main with a new 6" water main to prevent leaks and breaks causing boil orders from occuring again in the future. West Brooklyn IL 5 $172,500 CDBG 4
Construction of an elevated storage tank that would provide more adequate fire flow and pressure while also providing new chemical feed and control systems to enhance and repair the current issues. West Brooklyn IL 13 $460,000 CDBG 5
Construction of a new sidewalk, the Downtown sidewalk/Johnson Street, to replace the deteriorated sidewalk, to provide an ADA compliant entrance to all of the existing businesses, and to add decorative lighting and handrails to beautify the downtown area. West Brooklyn IL 10 $345,000 CDBG -3
Building Demolition/Future Senior Housing Facility Site Woodridge IL 5 $200,000 CDBG 4
Heritage Parkway Bikepath Extension Woodridge IL 4 $72,000 CDBG -14
Police Department Facility Expansion Woodridge IL 90 $9,000,000 CDBG -12
63rd Street Stormwater Inlet Improvement Woodridge IL 4 $50,000 CDBG 6
Crabtree Stream Bank Erosion Mitigation and Outlet Pipe Restoration Project Woodridge IL 7 $200,000 CDBG -1
Construction of Outdoor Material Storage Facility Woodridge IL 6 $300,000 CDBG -4
Stormwater Lining Project: 48" Corrugated Metal Pipe Lining Woodridge IL 5 $225,000 CDBG 3
Construction of a Municipal Road Salt Storage Dome Woodridge IL 5 $300,000 CDBG 4
Replace existing broken and leaking hydrants and valves, installing new valves at strategic locations to provide more efficient operation of the distribution system and to replace small diameter and failing water mains. Wyanet IL 12 $420,000 CDBG 3
Central Park Phase II - Includes construction of shelters, restroom building, and playground including spray park Carmel IN 45 $1,500,000 CDBG -23
Central Park 116th Street Entrance - Construction of entrance and interior park roadway to better access existing facilities Carmel IN 135 $4,500,000 CDBG -36
Inter Urban Trail - Construction of trail and reconstruction of existing rail bridge. Carmel IN 30 $1,000,000 CDBG -23
Park Maintenance Building Construction - New Maintenance Building to allow Carmel Parks to consolidate all maintenance operations in one location Carmel IN 105 $3,500,000 CDBG -42
Hazel Dell Park Phase III - Includes construction of shelters, trails, and bridge connection to adjacent park on opposite side of White River Carmel IN 105 $3,500,000 CDBG -29
Founders Park Phase II Construction - including playground equipment, shelter house, restrooms, and community building. Carmel IN 90 $3,000,000 CDBG -22
Central Park Meeting House - Reconstruction of existing meeting house and construction of new parking area. Carmel IN 75 $2,300,000 CDBG -27
City Center Parking Structure Phase II Carmel IN 360 $12,000,000 CDBG -31
Central Park Aquatic Center Phase II - Constrution of additional water slide and wave pool. Carmel IN 75 $2,500,000 CDBG -84
City Center Parking Structure Phase I Carmel IN 240 $8,000,000 CDBG -26
This work shall include but not limited to new HMA pavement, textured concrete pavement, concrete sidewalk, storm and sanitary sewers, concrete curb & gutters; new traffic signal at the intersections; landscaping; and ornamental street lighting. East Chicago IN 75 $6,000,000 CDBG -14
FULTON AVENUE/RIVERSIDE DRIVE STREETSCAPE ENHANCEMENTS The State of Indiana is funding and reconstructing the interchange at Fulton Avenue and the Lloyd Expressway. This cost is estimated at $32 million. Evansville IN 43 $5,300,000 CDBG -11
KLEYMEYER SOFTBALL COMPLEX – SPORTS RENOVATION The Kleymeyer Softball Complex was developed in the 1970s over a former landfill. The softball fields, backstops, dugouts, parking lot and concession stand/restrooms need to be renovated Evansville IN 4 $350,000 CDBG -18
STRAIGHTEN MAIN STREET SERPENTINE-When Main Street was closed to traffic and became a pedestrian mall, a brick serpentine roadway with no curbs was installed. Evansville IN 36 $4,500,000 CDBG -72
WESSELMAN PARK SHELTER – NEW/CONVERT SHELTER A new or converted shelter in Wesselman Park will provide for more reunions, wedding receptions and parties for the public. Currently, we have two duplex shelters that are open air. Evansville IN 1 $125,000 CDBG 1
DOWNTOWN TRAFFIC SIGNALIZATION MODERNIZATION PROJECT- Traffic flow into, within and around downtown Evansville will be improved through this project. After conducting a Downtown Traffic Survey and two Public Forums, the City intends to implement numero Evansville IN 36 $4,600,000 CDBG -25
GARVIN PARK SHELTER – NEW/CONVERT SHELTER Convert or build a new shelter to be available for all months of the year. The current shelters or open air and are available only from April to November. Evansville IN 1 $125,000 CDBG 5
FRONT DOOR PRIDE NEIGHBORHOOD STREET AND STREETSCAPE IMPROVEMENT- The infrastructure in the Front Door Pride neighborhood is in dire need of repair and improvement. The Neighborhood Stabilization Program funds along with the existing CDBG and HOME fund Evansville IN 34 $4,300,000 CDBG -17
SIDEWALK REPLACEMENT Project utilizes the Barrett Law (IC 36-9-36) and, under a municipal ordinance adopted in 2004, enables property owners to petition the City and participate in the cost of replacing sidewalks adjacent to their property Evansville IN 0 $2,000,000 CDBG 7
DOWNTOWN GATEWAYS AND WAY-FINDING SIGNAGE -To improve ability to navigate and locate destinations in Downtown Evansville, the City intends to create a hierarchy of gateways into Downtown and create districts with a system of way-finding signage. This p Evansville IN 22 $2,800,000 CDBG -23
CURB RAMP CONSTRUCTION Project involves the construction of curb ramps compliant with the Americans with Disabilities Act and arose out of a Voluntary Compliance Agreement entered into with the Federal Highway Administration in 2002 Evansville IN 0 $840,000 CDBG 4
BOAT RAMPS IMPROVEMENTS – INSTALL PRE-CAST CONCRETE Renovate Angel Mounds and Dogtown Boat Ramps by installing new concrete sections. The existing ramps are over 30 years old and the water edge of the ramps has deteriorated and has become a problem Evansville IN 15 $1,500,000 CDBG 172
ADA IMPROVEMENTS TO PARKS – RESTROOM MODIFICATIONS, SIDEWALKS RAMPS & PARKING Modify and upgrade all public Park restrooms to accommodate handicapped patrons; designate parking spaces and ensure all sidewalks have ramps for handicapped access. Evansville IN 10 $1,000,000 CDBG 8
Community Health Center Fort Wayne IN 80 $1,000,000 CDBG 4
Gingerbread House Daycare Development Fort Wayne IN 30 $500,000 CDBG -49
Commercial Facade Program Fort Wayne IN 80 $1,000,000 CDBG -17
Calhoun Street Conversion Fort Wayne IN 30 $1,300,000 CDBG -24
Alley Rehabilitation Fort Wayne IN 80 $2,000,000 CDBG -2
Owner-occupied Housing Rehab. Fort Wayne IN 120 $2,000,000 CDBG -10
Coombs Street Realingment Fort Wayne IN 25 $200,000 CDBG -9
Wells Street Infrastructure Fort Wayne IN 40 $1,100,000 CDBG -2
Renaissance Ponte Phase II Infrastructure Fort Wayne IN 80 $5,000,000 CDBG -20
Small Business Revolving Loan Fund Fort Wayne IN 0 $1,500,000 CDBG 1
Park Roads and Parking Lot Resurfacing Fort Wayne IN 40 $1,000,000 CDBG -7
Renaissance Pointe YMCA Fort Wayne IN 80 $4,000,000 CDBG -36
North Anthony Corridor Infrastructure Fort Wayne IN 40 $700,000 CDBG -3
North River Redevelopment (Acquisition, Brownfield Site Prep., Infrastructure) Fort Wayne IN 80 $10,000,000 CDBG -12
South Urban Trail Fort Wayne IN 30 $1,500,000 CDBG -22
Brownfield Field Clean Up: Environmental assessments for the proposed target sites indicate that clean up will be necessary for the re-use of these challenged parcels. This project requests clean up dollars for a minimum of 10 brownfields sites thus resu Gary IN 25 $1,000,000 CDBG 4
Department of Redevelopment, Scattered Site Redevelopment Areas: Acquisition, Demolition, and Environmental Remediation Gary IN 80 $20,000,000 CDBG -5
Barbara Leek Wesson Neighborhood Center Modernization: This center brings various opportunities to an underserved population in the Mid-Town community. Via this project, the center will be rehabilitated for a continued 20-yr lifecycle. This rehabilitation Gary IN 15 $1,500,000 CDBG -3
Fire Station Capital Improvement Plans : The Construction of New Buildings for Various Fire Stations (Six New Buildings) Gary IN 75 $18,000,000 CDBG 8
Neighborhood Center Capital Improvement Strategy: This request will bring new neighborhood centers for the Glen Park, Tolleston, and Miller communities. Via the creation of these three centers, low-to-moderate income families will be provided public se Gary IN 45 $3,000,000 CDBG -14
Gary Marina: Project is to develop the municipal marina at the lakefront west footprint. Such a marina would bring 350+ boating slips, a boat launch, and associated land base infrastructure such as storage, maintenance facilities, etc. The marina will Gary IN 35 $19,000,000 CDBG -8
Creating Green Infrastructure through Vacant Property Management and Neighborhood Beautification: This project would employ and train residents and youth to clean up and clear a minimum of 100 vacant lots in the city for the purpose of securing, creatin Gary IN 25 $2,000,000 CDBG -34
City Wide Buildings, ADA & General Improvements: Improve numerous city-owned buildings to meet ADA compliance and to general modernization. Buildings included: City Hall, Adam Benjamin Metro Center, GPTC Admin Building, Genesis Center, Hudso Campbell, P Gary IN 25 $7,000,000 CDBG 5
3rd District Street Reconstruction projects (8 Streets) work to include storm, sanitary, and water main infrastructure, street lighting, and new road surface Hammond IN 200 $6,889,120 CDBG 10
Conversion of former Hobart Middle School into City government facility to house Police Department and City Court Hobart IN 70 $10,000,000 CDBG 1
Construct new Community/Senior Center to replace community center building damaged by recent flooding that can not be rebuilt in its current location or rehabbed. Hobart IN 70 $3,000,000 CDBG 1
Replace and reposition 200 planters. Add additional planters in key areas. Indianapolis IN 10 $2,000,000 CDBG -79
Top 30 Residentials Indianapolis IN 50 $7,889,000 CDBG -66
Bike Lanes Indianapolis IN 5 $1,000,000 CDBG 11
Green Infrastructure/Green Street Elements: Money would be used to fund green infrastructure and green street elements in currently scheduled transportation projects. As new infrastructure and transportation elements come online, we need to include money Indianapolis IN 10 $4,000,000 CDBG -19
The CanalÂ’s Ohio Street and Vermont Street Basins and other infrastructure have deteriorated and need replacement or significant repair in order to maximize this world-class asset. Indianapolis IN 50 $10,000,000 CDBG -17
Refurbish poles and sign boxes of 10-year old system. Add new signs as needed. Indianapolis IN 2 $400,000 CDBG -9
Contractor Crack Sealing Indianapolis IN 10 $2,000,000 CDBG -6
Operations Equipment Purchases Indianapolis IN 35 $7,190,000 CDBG -15
Continually repair and replace hardware, irrigation and materials in 12 gardens and gateways, including 1-70/Illinois, West Street and Capitol Gateways. Indianapolis IN 1 $100,000 CDBG -20
Alley Program Indianapolis IN 10 $2,000,000 CDBG 8
Just beyond the new Lucas Oil Stadium, streetscape infrastructure improvements are needed from Georgia to Morris streets and from Pennsylvania to West streets to enhance public safety. Specifically, lighting, paving, landscaping and sidewalks need to be Indianapolis IN 25 $5,000,000 CDBG -24
Top 30 Thoroughfares Indianapolis IN 150 $28,475,000 CDBG 36
ADA Ramp Installations Indianapolis IN 10 $2,000,000 CDBG 0
Street lights and other street furniture, including newsbox modulars; Refurbish or replace deteriorated. Add new as needed. Indianapolis IN 15 $3,000,000 CDBG -3
Cultural trail bike paths and pedestrian ways. Indianapolis IN 150 $50,500,000 CDBG -377
Local Bridge Rehabilitations Indianapolis IN 7 $1,500,000 CDBG 33
Sidewalks and curbs Indianapolis IN 15 $3,000,000 CDBG 40
After 30 years, Monument Circle and Market Street improvements, including brick streets, sidewalks, street trees, electrical conduit, irrigation, pedestrian lighting, banner poles and benches have seriously declined. Indianapolis IN 150 $30,000,000 CDBG -29
Traffic Signal System Improvements Indianapolis IN 5 $1,000,000 CDBG 8
Reconstruction of Waugh Street from North Street to Lordeman Street. This project would reconstruct this 1,300 foot portion of Waugh Street and provide new curb and gutter, sidewalk, and significant drainage improvements. Kokomo IN 5 $360,000 CDBG -6
Sewage extension to Darrough Chappel subdivision, a densely-populated, unsewered area Kokomo IN 12 $900,000 CDBG 11
Page:‹ First  < 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 >  Last ›