| Village-wide Valve and Fire Hydrant Removal and Replacement |
Sauk Village |
IL |
23 |
$500,000 |
CDBG |
2 |
| Village-wide Street Resurfacing |
Sauk Village |
IL |
45 |
$2,200,000 |
CDBG |
7 |
| Small Business Loan Program |
Schaumburg |
IL |
0 |
$50,000 |
CDBG |
-8 |
| James Court Roadway & Sanitary Sewer Repair |
Schaumburg |
IL |
30.5 |
$762,880 |
CDBG |
4 |
| Water improvemrnt |
Seatonville |
IL |
1 |
$40,000 |
CDBG |
5 |
| Rebuild shipyard road to truck route standards for improved access to industrial park |
Seneca |
IL |
137 |
$968,000 |
CDBG |
-19 |
| Construct 80' X 40' addition to the Village Hall to house Police Department, 911 Center, Public Safety function. |
Seneca |
IL |
9 |
$325,000 |
CDBG |
-22 |
| Completely rehabilitate two malfunctioning and obsolete wastewater lift stations. |
Sheffield |
IL |
3 |
$100,000 |
CDBG |
6 |
| Construct roof over digestor and drying beds and rehabilitate clarifier #3 to improve treatment quality. |
Sheridan |
IL |
7 |
$250,000 |
CDBG |
-5 |
| Construction of new water tower to replace aging undersized structure and watermain replacement |
South Wilmington |
IL |
22 |
$800,000 |
CDBG |
1 |
| Street improvements |
South Wilmington |
IL |
11 |
$400,000 |
CDBG |
4 |
| Storm sewer improvements |
South Wilmington |
IL |
11 |
$400,000 |
CDBG |
3 |
| Streetscape and Infrastructure Imporvements - Includes utility improvements,streetscape, signage, sidewalks, planting, etc. |
Thornton |
IL |
0 |
$6,500,000 |
CDBG |
-7 |
| Infrastructure Improvement- Bury Overhead Utilities. |
Thornton |
IL |
0 |
$5,400,000 |
CDBG |
2 |
| Street replacements on Main and Wauponis. Construct new profile to replace old railroad crossing, construct new street base and surface, construct new curb and gutter. |
Tonica |
IL |
13 |
$460,000 |
CDBG |
7 |
| Construct new public works garage, office, and shop facility to replace leased one. |
Tonica |
IL |
8 |
$280,000 |
CDBG |
-5 |
| Construction of new wastewater treatment and collection system for community that has no central sanitary system. |
Troy Grove |
IL |
64 |
$2,300,000 |
CDBG |
17 |
| Street improvements |
Verona |
IL |
8 |
$300,000 |
CDBG |
0 |
| Replace existing cast iron main with a new 6" water main to prevent leaks and breaks causing boil orders from occuring again in the future. |
West Brooklyn |
IL |
5 |
$172,500 |
CDBG |
4 |
| Construction of an elevated storage tank that would provide more adequate fire flow and pressure while also providing new chemical feed and control systems to enhance and repair the current issues. |
West Brooklyn |
IL |
13 |
$460,000 |
CDBG |
5 |
| Construction of a new sidewalk, the Downtown sidewalk/Johnson Street, to replace the deteriorated sidewalk, to provide an ADA compliant entrance to all of the existing businesses, and to add decorative lighting and handrails to beautify the downtown area. |
West Brooklyn |
IL |
10 |
$345,000 |
CDBG |
-3 |
| Building Demolition/Future Senior Housing Facility Site |
Woodridge |
IL |
5 |
$200,000 |
CDBG |
4 |
| Heritage Parkway Bikepath Extension |
Woodridge |
IL |
4 |
$72,000 |
CDBG |
-14 |
| Police Department Facility Expansion |
Woodridge |
IL |
90 |
$9,000,000 |
CDBG |
-12 |
| 63rd Street Stormwater Inlet Improvement |
Woodridge |
IL |
4 |
$50,000 |
CDBG |
6 |
| Crabtree Stream Bank Erosion Mitigation and Outlet Pipe Restoration Project |
Woodridge |
IL |
7 |
$200,000 |
CDBG |
-1 |
| Construction of Outdoor Material Storage Facility |
Woodridge |
IL |
6 |
$300,000 |
CDBG |
-4 |
| Stormwater Lining Project: 48" Corrugated Metal Pipe Lining |
Woodridge |
IL |
5 |
$225,000 |
CDBG |
3 |
| Construction of a Municipal Road Salt Storage Dome |
Woodridge |
IL |
5 |
$300,000 |
CDBG |
4 |
| Replace existing broken and leaking hydrants and valves, installing new valves at strategic locations to provide more efficient operation of the distribution system and to replace small diameter and failing water mains. |
Wyanet |
IL |
12 |
$420,000 |
CDBG |
3 |
| Central Park Phase II - Includes construction of shelters, restroom building, and playground including spray park |
Carmel |
IN |
45 |
$1,500,000 |
CDBG |
-23 |
| Central Park 116th Street Entrance - Construction of entrance and interior park roadway to better access existing facilities |
Carmel |
IN |
135 |
$4,500,000 |
CDBG |
-36 |
| Inter Urban Trail - Construction of trail and reconstruction of existing rail bridge. |
Carmel |
IN |
30 |
$1,000,000 |
CDBG |
-23 |
| Park Maintenance Building Construction - New Maintenance Building to allow Carmel Parks to consolidate all maintenance operations in one location |
Carmel |
IN |
105 |
$3,500,000 |
CDBG |
-42 |
| Hazel Dell Park Phase III - Includes construction of shelters, trails, and bridge connection to adjacent park on opposite side of White River |
Carmel |
IN |
105 |
$3,500,000 |
CDBG |
-29 |
| Founders Park Phase II Construction - including playground equipment, shelter house, restrooms, and community building. |
Carmel |
IN |
90 |
$3,000,000 |
CDBG |
-22 |
| Central Park Meeting House - Reconstruction of existing meeting house and construction of new parking area. |
Carmel |
IN |
75 |
$2,300,000 |
CDBG |
-27 |
| City Center Parking Structure Phase II |
Carmel |
IN |
360 |
$12,000,000 |
CDBG |
-31 |
| Central Park Aquatic Center Phase II - Constrution of additional water slide and wave pool. |
Carmel |
IN |
75 |
$2,500,000 |
CDBG |
-84 |
| City Center Parking Structure Phase I |
Carmel |
IN |
240 |
$8,000,000 |
CDBG |
-26 |
| This work shall include but not limited to new HMA pavement, textured concrete pavement, concrete sidewalk, storm and sanitary sewers, concrete curb & gutters; new traffic signal at the intersections; landscaping; and ornamental street lighting. |
East Chicago |
IN |
75 |
$6,000,000 |
CDBG |
-14 |
| FULTON AVENUE/RIVERSIDE DRIVE STREETSCAPE ENHANCEMENTS
The State of Indiana is funding and reconstructing the interchange at Fulton Avenue and the Lloyd Expressway. This cost is estimated at $32 million. |
Evansville |
IN |
43 |
$5,300,000 |
CDBG |
-11 |
| KLEYMEYER SOFTBALL COMPLEX – SPORTS RENOVATION
The Kleymeyer Softball Complex was developed in the 1970s over a former landfill. The softball fields, backstops, dugouts, parking lot and concession stand/restrooms need to be renovated |
Evansville |
IN |
4 |
$350,000 |
CDBG |
-18 |
| STRAIGHTEN MAIN STREET SERPENTINE-When Main Street was closed to traffic and became a pedestrian mall, a brick serpentine roadway with no curbs was installed. |
Evansville |
IN |
36 |
$4,500,000 |
CDBG |
-72 |
| WESSELMAN PARK SHELTER – NEW/CONVERT SHELTER
A new or converted shelter in Wesselman Park will provide for more reunions, wedding receptions and parties for the public. Currently, we have two duplex shelters that are open air. |
Evansville |
IN |
1 |
$125,000 |
CDBG |
1 |
| DOWNTOWN TRAFFIC SIGNALIZATION MODERNIZATION PROJECT- Traffic flow into, within and around downtown Evansville will be improved through this project. After conducting a Downtown Traffic Survey and two Public Forums, the City intends to implement numero |
Evansville |
IN |
36 |
$4,600,000 |
CDBG |
-25 |
| GARVIN PARK SHELTER – NEW/CONVERT SHELTER
Convert or build a new shelter to be available for all months of the year. The current shelters or open air and are available only from April to November. |
Evansville |
IN |
1 |
$125,000 |
CDBG |
5 |
| FRONT DOOR PRIDE NEIGHBORHOOD STREET AND STREETSCAPE IMPROVEMENT- The infrastructure in the Front Door Pride neighborhood is in dire need of repair and improvement. The Neighborhood Stabilization Program funds along with the existing CDBG and HOME fund |
Evansville |
IN |
34 |
$4,300,000 |
CDBG |
-17 |
| SIDEWALK REPLACEMENT
Project utilizes the Barrett Law (IC 36-9-36) and, under a municipal ordinance adopted in 2004, enables property owners to petition the City and participate in the cost of replacing sidewalks adjacent to their property |
Evansville |
IN |
0 |
$2,000,000 |
CDBG |
7 |
| DOWNTOWN GATEWAYS AND WAY-FINDING SIGNAGE -To improve ability to navigate and locate destinations in Downtown Evansville, the City intends to create a hierarchy of gateways into Downtown and create districts with a system of way-finding signage. This p |
Evansville |
IN |
22 |
$2,800,000 |
CDBG |
-23 |
| CURB RAMP CONSTRUCTION
Project involves the construction of curb ramps compliant with the Americans with Disabilities Act and arose out of a Voluntary Compliance Agreement entered into with the Federal Highway Administration in 2002 |
Evansville |
IN |
0 |
$840,000 |
CDBG |
4 |
| BOAT RAMPS IMPROVEMENTS – INSTALL PRE-CAST CONCRETE
Renovate Angel Mounds and Dogtown Boat Ramps by installing new concrete sections. The existing ramps are over 30 years old and the water edge of the ramps has deteriorated and has become a problem |
Evansville |
IN |
15 |
$1,500,000 |
CDBG |
172 |
| ADA IMPROVEMENTS TO PARKS – RESTROOM MODIFICATIONS, SIDEWALKS RAMPS & PARKING
Modify and upgrade all public Park restrooms to accommodate handicapped patrons; designate parking spaces and ensure all sidewalks have ramps for handicapped access. |
Evansville |
IN |
10 |
$1,000,000 |
CDBG |
8 |
| Community Health Center |
Fort Wayne |
IN |
80 |
$1,000,000 |
CDBG |
4 |
| Gingerbread House Daycare Development |
Fort Wayne |
IN |
30 |
$500,000 |
CDBG |
-49 |
| Commercial Facade Program |
Fort Wayne |
IN |
80 |
$1,000,000 |
CDBG |
-17 |
| Calhoun Street Conversion |
Fort Wayne |
IN |
30 |
$1,300,000 |
CDBG |
-24 |
| Alley Rehabilitation |
Fort Wayne |
IN |
80 |
$2,000,000 |
CDBG |
-2 |
| Owner-occupied Housing Rehab. |
Fort Wayne |
IN |
120 |
$2,000,000 |
CDBG |
-10 |
| Coombs Street Realingment |
Fort Wayne |
IN |
25 |
$200,000 |
CDBG |
-9 |
| Wells Street Infrastructure |
Fort Wayne |
IN |
40 |
$1,100,000 |
CDBG |
-2 |
| Renaissance Ponte Phase II Infrastructure |
Fort Wayne |
IN |
80 |
$5,000,000 |
CDBG |
-20 |
| Small Business Revolving Loan Fund |
Fort Wayne |
IN |
0 |
$1,500,000 |
CDBG |
1 |
| Park Roads and Parking Lot Resurfacing |
Fort Wayne |
IN |
40 |
$1,000,000 |
CDBG |
-7 |
| Renaissance Pointe YMCA |
Fort Wayne |
IN |
80 |
$4,000,000 |
CDBG |
-36 |
| North Anthony Corridor Infrastructure |
Fort Wayne |
IN |
40 |
$700,000 |
CDBG |
-3 |
| North River Redevelopment (Acquisition, Brownfield Site Prep., Infrastructure) |
Fort Wayne |
IN |
80 |
$10,000,000 |
CDBG |
-12 |
| South Urban Trail |
Fort Wayne |
IN |
30 |
$1,500,000 |
CDBG |
-22 |
| Brownfield Field Clean Up: Environmental assessments for the proposed target sites indicate that clean up will be necessary for the re-use of these challenged parcels. This project requests clean up dollars for a minimum of 10 brownfields sites thus resu |
Gary |
IN |
25 |
$1,000,000 |
CDBG |
4 |
| Department of Redevelopment, Scattered Site Redevelopment Areas: Acquisition, Demolition, and Environmental Remediation |
Gary |
IN |
80 |
$20,000,000 |
CDBG |
-5 |
| Barbara Leek Wesson Neighborhood Center Modernization: This center brings various opportunities to an underserved population in the Mid-Town community. Via this project, the center will be rehabilitated for a continued 20-yr lifecycle. This rehabilitation |
Gary |
IN |
15 |
$1,500,000 |
CDBG |
-3 |
| Fire Station Capital Improvement Plans : The Construction of New Buildings for Various Fire Stations (Six New Buildings) |
Gary |
IN |
75 |
$18,000,000 |
CDBG |
8 |
| Neighborhood Center Capital Improvement Strategy: This request will bring new neighborhood centers for the Glen Park, Tolleston, and Miller communities. Via the creation of these three centers, low-to-moderate income families will be provided public se |
Gary |
IN |
45 |
$3,000,000 |
CDBG |
-14 |
| Gary Marina: Project is to develop the municipal marina at the lakefront west footprint. Such a marina would bring 350+ boating slips, a boat launch, and associated land base infrastructure such as storage, maintenance facilities, etc. The marina will |
Gary |
IN |
35 |
$19,000,000 |
CDBG |
-8 |
| Creating Green Infrastructure through Vacant Property Management and Neighborhood Beautification: This project would employ and train residents and youth to clean up and clear a minimum of 100 vacant lots in the city for the purpose of securing, creatin |
Gary |
IN |
25 |
$2,000,000 |
CDBG |
-34 |
| City Wide Buildings, ADA & General Improvements: Improve numerous city-owned buildings to meet ADA compliance and to general modernization. Buildings included: City Hall, Adam Benjamin Metro Center, GPTC Admin Building, Genesis Center, Hudso Campbell, P |
Gary |
IN |
25 |
$7,000,000 |
CDBG |
5 |
| 3rd District Street Reconstruction projects (8 Streets) work to include storm, sanitary, and water main infrastructure, street lighting, and new road surface |
Hammond |
IN |
200 |
$6,889,120 |
CDBG |
10 |
| Conversion of former Hobart Middle School into City government facility to house Police Department and City Court |
Hobart |
IN |
70 |
$10,000,000 |
CDBG |
1 |
| Construct new Community/Senior Center to replace community center building damaged by recent flooding that can not be rebuilt in its current location or rehabbed. |
Hobart |
IN |
70 |
$3,000,000 |
CDBG |
1 |
| Replace and reposition 200 planters. Add additional planters in key areas. |
Indianapolis |
IN |
10 |
$2,000,000 |
CDBG |
-79 |
| Top 30 Residentials |
Indianapolis |
IN |
50 |
$7,889,000 |
CDBG |
-66 |
| Bike Lanes |
Indianapolis |
IN |
5 |
$1,000,000 |
CDBG |
11 |
| Green Infrastructure/Green Street Elements: Money would be used to fund green infrastructure and green street elements in currently scheduled transportation projects. As new infrastructure and transportation elements come online, we need to include money |
Indianapolis |
IN |
10 |
$4,000,000 |
CDBG |
-19 |
| The CanalÂ’s Ohio Street and Vermont Street Basins and other infrastructure have deteriorated and need replacement or significant repair in order to maximize this world-class asset. |
Indianapolis |
IN |
50 |
$10,000,000 |
CDBG |
-17 |
| Refurbish poles and sign boxes of 10-year old system. Add new signs as needed. |
Indianapolis |
IN |
2 |
$400,000 |
CDBG |
-9 |
| Contractor Crack Sealing |
Indianapolis |
IN |
10 |
$2,000,000 |
CDBG |
-6 |
| Operations Equipment Purchases |
Indianapolis |
IN |
35 |
$7,190,000 |
CDBG |
-15 |
| Continually repair and replace hardware, irrigation and materials in 12 gardens and gateways, including 1-70/Illinois, West Street and Capitol Gateways. |
Indianapolis |
IN |
1 |
$100,000 |
CDBG |
-20 |
| Alley Program |
Indianapolis |
IN |
10 |
$2,000,000 |
CDBG |
8 |
| Just beyond the new Lucas Oil Stadium, streetscape infrastructure improvements are needed from Georgia to Morris streets and from Pennsylvania to West streets to enhance public safety. Specifically, lighting, paving, landscaping and sidewalks need to be |
Indianapolis |
IN |
25 |
$5,000,000 |
CDBG |
-24 |
| Top 30 Thoroughfares |
Indianapolis |
IN |
150 |
$28,475,000 |
CDBG |
36 |
| ADA Ramp Installations |
Indianapolis |
IN |
10 |
$2,000,000 |
CDBG |
0 |
| Street lights and other street furniture, including newsbox modulars; Refurbish or replace deteriorated. Add new as needed. |
Indianapolis |
IN |
15 |
$3,000,000 |
CDBG |
-3 |
| Cultural trail bike paths and pedestrian ways. |
Indianapolis |
IN |
150 |
$50,500,000 |
CDBG |
-377 |
| Local Bridge Rehabilitations |
Indianapolis |
IN |
7 |
$1,500,000 |
CDBG |
33 |
| Sidewalks and curbs |
Indianapolis |
IN |
15 |
$3,000,000 |
CDBG |
40 |
| After 30 years, Monument Circle and Market Street improvements, including brick streets, sidewalks, street trees, electrical conduit, irrigation, pedestrian lighting, banner poles and benches have seriously declined. |
Indianapolis |
IN |
150 |
$30,000,000 |
CDBG |
-29 |
| Traffic Signal System Improvements |
Indianapolis |
IN |
5 |
$1,000,000 |
CDBG |
8 |
| Reconstruction of Waugh Street from North Street to Lordeman Street. This project would reconstruct this 1,300 foot portion of Waugh Street and provide new curb and gutter, sidewalk, and significant drainage improvements. |
Kokomo |
IN |
5 |
$360,000 |
CDBG |
-6 |
| Sewage extension to Darrough Chappel subdivision, a densely-populated, unsewered area |
Kokomo |
IN |
12 |
$900,000 |
CDBG |
11 |