| Citywide Roadway Resurfacing. Provides for resurfacing of existing city roadways. Project provides for approx. 10 miles of resurfacing. |
Tampa |
FL |
40 |
$4,000,000 |
Streets/Roads |
20 |
| Brorein Street Bridge Improvements.
Rehabilitation of existing movable bridge. |
Tampa |
FL |
10 |
$2,500,000 |
Streets/Roads |
-9 |
| Laurel Street Bridge Improvements.
Rehabilitation of existing movable bridge. |
Tampa |
FL |
30 |
$2,500,000 |
Streets/Roads |
-10 |
| Cass Street Bridge Improvements.
Rehabilitation of existing movable bridge. |
Tampa |
FL |
30 |
$2,000,000 |
Streets/Roads |
-8 |
| Dale Mabry / Kennedy Blvd Intersection Improvements.
Project provides for comprehensive improvements to this major intersection. |
Tampa |
FL |
20 |
$1,200,000 |
Streets/Roads |
-10 |
| Citywide Sidewalk Improvements. Project provides for installation of new sidewalks in locations without sidewalks. |
Tampa |
FL |
20 |
$1,000,000 |
Streets/Roads |
-22 |
| Citywide Sidewalk Repair and Replacement. Project provides for repair and replacement of existing sidewalks and accessibility improvements. |
Tampa |
FL |
20 |
$1,000,000 |
Streets/Roads |
-13 |
| Mac Dill / Kennedy Blvd Intersection Improvements.
Project provides for comprehensive improvements to this major intersection. |
Tampa |
FL |
20 |
$1,000,000 |
Streets/Roads |
3 |
| Tampa Theatre Electrical Room Upgrade. Project provides for new roof and roof structure over existing electrical room at theatre. Roof also serves as the sidewalk for Polk St. |
Tampa |
FL |
20 |
$600,000 |
Streets/Roads |
-31 |
| Fleet Maintenance Bulk Fluid Distribution System. Project provides for installation of bulk fluid delivery system, which eliminates use of barrells and drum storage for various vehicle fluids. |
Tampa |
FL |
20 |
$598,000 |
Streets/Roads |
-24 |
| River Garden Shoreline Improvements Phase II. Continuation of shoreline restoration north of columbus. Shoreline and greenspace provide waterside edge of existing roadway. |
Tampa |
FL |
20 |
$300,000 |
Streets/Roads |
-39 |
| Bayshore Balustrade. Implementation of structural repair of ballustrade on bayshore. Balustrade and seawall provide eastern edge of Bayshore Blvd corridor a major city arterial. |
Tampa |
FL |
20 |
$298,000 |
Streets/Roads |
-35 |
| School Zone Flasher Implementation.
Installation of 19 School Zone Flashers at 9 Elementary/Middle Schools in the City of Tampa. |
Tampa |
FL |
10 |
$125,000 |
Streets/Roads |
11 |
| CIAC Water Transmission Main – Area No. 1
Construction of a new 60,050 linear feet of 36-inch through 48-inch diameter water transmission main from the David L. Tippin Water Treatment Facility to downtown and South Tampa. Planned redevelopment in Down |
Tampa |
FL |
82 |
$25,586,000 |
Water |
12 |
| Spanishtown Creek Drainage Improvements. Three phases: Supplement an undersized and failing stormwater box culvert system ($15m), reinforce and restore the existing system ($3m), and extend laterals into area which depends on sheet flow ($5m) These projec |
Tampa |
FL |
80 |
$23,000,000 |
Water |
-14 |
| Euclid Box Rehabilitation.
Shotcrete existing stormwater box in place, no room in r/w for replacement. |
Tampa |
FL |
60 |
$6,550,000 |
Water |
1 |
| Bruce B. Downs Widening - Segment "B/C" - JPA with Hillsborough County.
Project consists of the installation of 18,000 feet of 30-inch force main in Bruce B. Downs between Palm Springs Boulevard to Cross Creek Boulevard. |
Tampa |
FL |
278 |
$5,000,000 |
Water |
21 |
| Davis Islands Distribution Main.
Replacement of 26,670 linear feet of 6-inch diameter water distribution main on Davis Islands. The existing pipelines are undersized cast iron. The new pipeline will improve water pressure, service reliability and fire |
Tampa |
FL |
74 |
$3,928,530 |
Water |
-25 |
| Morrison Distribution Main.
Replacement of 18,273 linear feet of 6-inch and 8-inch diameter water distribution main in the Morrison Avenue area. The existing pipelines are undersized and unlined cast iron. The new pipeline will improve water pressure, |
Tampa |
FL |
62 |
$2,748,000 |
Water |
8 |
| Interbay Water Distribution Main.
Replacement of 18,046 linear feet of 6-inch and 8-inch diameter water distribution main in the Interbay neighborhood. The existing pipelines are undersized mains. The new larger pipeline will improve water pressure, |
Tampa |
FL |
62 |
$2,680,000 |
Water |
-4 |
| Larmon Street Distribution Main.
Replacement of 7,527 linear feet of 6-inch and 8-inch diameter water distribution main in the Larmon Street area. The existing pipelines are undersized and asbestos cement lined. The new pipeline will improve water press |
Tampa |
FL |
32 |
$1,132,000 |
Water |
-8 |
| Drew Park Distribution Main.
Replacement of 7,468 linear feet of 6-inch and 8-inch diameter water distribution main in Drew Park. The existing pipelines are undersized and are not looped. The new pipeline will improve water pressure, service reliability |
Tampa |
FL |
32 |
$1,125,000 |
Water |
-4 |
| Melrose Street Distribution Main.
Replacement of 7,335 linear feet of 6-inch and 8-inch diameter water distribution main in the Melrose Street area. The existing pipelines are undersized, unlined cast iron, and not looped. |
Tampa |
FL |
32 |
$1,102,000 |
Water |
-4 |
| Miscellaneous Cured-In-Place-Pipe Rehabilitation Contract. The project consists of the rehabilitation of gravity sewers from 8-inch diameter to 36-inch diameter at various locations throughout the City of Tampa Wastewater DepartmentÂ’s service area. |
Tampa |
FL |
56 |
$1,000,000 |
Water |
-1 |
| Corona Street Distribution Main.
Replacement of 5,077 linear feet of 6-inch and 8-inch diameter water distribution main in the Corona Street area. The existing pipelines are undersized. The new pipeline will improve water pressure, service reliability |
Tampa |
FL |
36 |
$762,000 |
Water |
-14 |
| Museum/Curtis Hixon Park Reclaimed Distribution Main.
Installation of 4,100 linear feet of 12-inch diameter reclaimed water distribution main from the intersection of Bayshore Boulevard and Hyde Park Boulevard to Curtis Hixon Park. |
Tampa |
FL |
24 |
$750,000 |
Water |
-17 |
| HFC AWTP Digester #6 Rehabilitation - Phase 2.
This project provides for the rehabilitation of an existing digester at the main water treatment plant. |
Tampa |
FL |
42 |
$750,000 |
Water |
5 |
| Sewer System Evaluation Study - Manhole Rehabilitation - Phase 1.
The project consists of the rehabilitation of approximately 100 manholes in the Krause Pumping Station basin. The rehabilitation will involve the application of a structural coating, rest |
Tampa |
FL |
42 |
$750,000 |
Water |
-19 |
| San Pablo Place Distribution Main.
Replacement of 4,684 linear feet of 6-inch and 8-inch diameter water distribution main in San Pablo Place area. The existing mains are asbestos cement lined pipes. The new pipeline will improve water pressure, service |
Tampa |
FL |
24 |
$699,000 |
Water |
-6 |
| Gunlock Avenue Distribution Main.
Replacement of 4,364 linear feet of 8-inch diameter water distribution main in the Gunlock Avenue area. The existing pipelines are undersized. The new pipeline will improve water pressure, service reliability |
Tampa |
FL |
24 |
$660,000 |
Water |
-8 |
| 42nd Street Pump Station Rehabilitation. Project provides for rehablitation and upgrade of existing wastewater pumping station. |
Tampa |
FL |
34 |
$600,000 |
Water |
0 |
| Bayerle Circle Distribution Main.
Replacement of 3,922 linear feet of 6-inch and 8-inch diameter water distribution main in the Bayerle Circle. The existing mains are undersized and asbestos lined. The new pipeline will improve water pressure, service |
Tampa |
FL |
24 |
$579,000 |
Water |
-1 |
| Knights: Harborview to Lawn.
Line existing stormwater box culvert in place. |
Tampa |
FL |
20 |
$500,000 |
Water |
-16 |
| HFC AWTP Junction Chamber #1 Rehabilitation - Phase 1. The project consists of the removal of approximately 750 cubic yards of sand, grit, and debris from Junction Chamber 1 located at the main wastewater treatment plant. |
Tampa |
FL |
28 |
$500,000 |
Water |
-1 |
| HFC AWTP Road Repairs - replace pavement south of Dewatering Building.
The project includes the replacement of 3,400 SY of existing failed asphalt pavement with concrete pavement at the main wastewater treatment plant. |
Tampa |
FL |
36 |
$460,000 |
Water |
-8 |
| Halifax Drive Distribution Main.
Replacement of 2,914 linear feet of 8-inch diameter water distribution main in the Halifax Drive area. The existing pipelines are undersized. The new pipeline will improve water pressure, service reliability and fire pr |
Tampa |
FL |
22 |
$441,000 |
Water |
-5 |
| 124th Avenue: Taliaferro to 15th Street Force Main Replacement. Project consists of the installation of 3,500 feet of 6-inch force main in 124th Avenue between Taliaferro and 15th Streets. The work also includes a jack and bore crossing under CSX railro |
Tampa |
FL |
24 |
$425,000 |
Water |
-7 |
| HFC AWTP HVAC Improvements at Administration Building. Project provides for comprehensive replacement and upgrade of existing HVAC system for buildng at the main wastewater treatment plant. Includes new air handlers and chiller and associated work |
Tampa |
FL |
24 |
$425,000 |
Water |
-13 |
| Gomez Pump Station Rehabilitation.
Project provides for rehablitation and upgrade of existing wastewater pumping station. |
Tampa |
FL |
22 |
$400,000 |
Water |
7 |
| Boxwood Drive Distribution Main.
Replacement of 2,474 linear feet of 8-inch diameter water distribution main in the Boxwood Drive area. The existing mains are undersized. The new pipeline will improve water pressure, service reliability and fire protec |
Tampa |
FL |
22 |
$374,000 |
Water |
-11 |
| Olympia Avenue Distribution Main.
Replacement of 2,362 linear feet of 6-inch and 8-inch diameter water distribution main in the Olympia Avenue area. The existing pipelines are undersized and asbestos lined. The new pipeline will improve water pressure, |
Tampa |
FL |
22 |
$353,000 |
Water |
-5 |
| Morrison Pump Station Rehabilitation.
Project provides for rehablitation and upgrade of existing wastewater pumping station. |
Tampa |
FL |
16 |
$300,000 |
Water |
0 |
| San Carlos Pump Station Wet Well & Screen Room Rehabilitation. Project provides for the restoration of existing pump station components including concrete repair, ducts, alarms and skylights. |
Tampa |
FL |
16 |
$300,000 |
Water |
-8 |
| HFC AWTP - 60-inch Flow Meter Replacement at Meter Vault #2. The project scope is to replace the 60-inch flow meter (MRC-2) at the main wastewater treatment plant with a new magnetic flow meter and all associated electrical work. |
Tampa |
FL |
6 |
$100,000 |
Water |
-4 |
| Springhill Park.
New 14,000 sf community center, building built to satisfy silver LEED requirements. |
Tampa |
FL |
50 |
$3,600,000 |
CDBG |
-76 |
| Seminole Garden Center.
Renovation of existing community center. |
Tampa |
FL |
20 |
$1,500,000 |
CDBG |
-85 |
| NFL YET Community Center Addition.
Project provides for an audio visual studio and weight room addition to existing community center. |
Tampa |
FL |
30 |
$500,000 |
CDBG |
-131 |
| Tampa Municipal Office Building Climate Control (HVAC) System Upgrade.
This project provides for the replacement of 10 - 31 year old deteriorated air handlers and ductwork. |
Tampa |
FL |
30 |
$1,275,000 |
Energy |
-3 |
| Old City Hall Elevator restoration.
Project provides for the replacement of an existing manual passenger elevator with an automatic system. New controls will provide energy efficiency and savings. |
Tampa |
FL |
20 |
$650,000 |
Energy |
-34 |
| Parking Garage Lighting Upgrade.
This project provides for the replacement of deteriorated and inefficient lighting in parking garages with high efficiency lighting that will reduce electrical use and increase safety in the garages. |
Tampa |
FL |
20 |
$530,000 |
Energy |
20 |
| Roof Replacement.
This project provides for replacement of deteriorated roofs at various city owned facilities. The new material will be Cool Roof Rating Council approved and provide reduced heat gain which results in energy savings. |
Tampa |
FL |
20 |
$200,000 |
Energy |
11 |
| Climate Control.
This project provides for the replacement of deteriorated HVAC (heating, ventilating, air conditioning) systems at various city facilities. Many of these systems have exceeded their useful lives and replacement units will produce both en |
Tampa |
FL |
10 |
$150,000 |
Energy |
-18 |
| Fire Station Roof Replacements.
This project provides for the replacement of existing fire station roofs. Reroffing is necessary to maintain viability of stations. Roof types vary, but Cool Roof type materials to be utilized in all locations possible. |
Tampa |
FL |
20 |
$125,000 |
Energy |
19 |
| Energy Management Systems.
This project provides for the installation of energy management systems at various city facilities to reduce and optimize electrical consumption. System also allow remote monitoring so that problems are addressed quickly. |
Tampa |
FL |
10 |
$100,000 |
Energy |
2 |
| Fleet Maintenance Lighting.
This project provides for the replacement of deteriorated and inefficient lighting at the fleet maintenance service facility with high efficiency lighting that will reduce electrical usage and improve lighting quality. |
Tampa |
FL |
10 |
$100,000 |
Energy |
-37 |