| Raymond Diehl Road Improvements, curb, gutter, sidewalks and bike lanes |
Tallahassee |
FL |
22 |
$3,000,000 |
Streets/Roads |
-15 |
| New Cascade Lane and Intersection Improvements to improve safety and continuity |
Tallahassee |
FL |
35 |
$2,850,100 |
Streets/Roads |
-6 |
| Capital Circle Northwest/Southwest Demolition |
Tallahassee |
FL |
10 |
$500,000 |
Streets/Roads |
-8 |
| Northeast Capital Circle Force Mail Replacement |
Tallahassee |
FL |
22 |
$7,800,000 |
Water |
-16 |
| Delta Regional Stormwater Management Facility construction |
Tallahassee |
FL |
100 |
$7,725,000 |
Water |
-5 |
| Cascade Park Stormwater Project- By-Pass Box Culvert |
Tallahassee |
FL |
50 |
$4,239,120 |
Water |
-1 |
| Capital Circle Northwest Regional Stormwater Pond and Park Enhancements |
Tallahassee |
FL |
59 |
$1,200,000 |
Water |
-6 |
| Cascade park Sanitary Sewer Replacement to reduce high fecal coliform in adjacent stream and reduce costs at treatment center |
Tallahassee |
FL |
12 |
$891,930 |
Water |
12 |
| Pump Station 53 Construction |
Tallahassee |
FL |
10 |
$750,000 |
Water |
6 |
| Pump Station 70 Construction |
Tallahassee |
FL |
8 |
$540,000 |
Water |
3 |
| Capital Circel Southeast Sinkhole repair |
Tallahassee |
FL |
10 |
$250,000 |
Water |
-5 |
| Cascade Park Spot Remediation- excavation and removal of soil from impacted areas |
Tallahassee |
FL |
25 |
$250,000 |
Water |
-5 |
| South General Aviation Apron Rehabilitation to demolish and reconstruct pavement, drainage system, and base material |
Tallahassee |
FL |
30 |
$7,700,000 |
Airport |
-17 |
| North General Aviation Apron Rehabilitiation to reconstruct and overlay with new asphalt |
Tallahassee |
FL |
30 |
$6,600,000 |
Airport |
-8 |
| Replacement of Fire Alarm and Public Address Systems in the Passenger Terminal - This project is to replace the now 20 year old Fire Alarm and Public Address Systems in the Passenger Terminal Building |
Tallahassee |
FL |
5 |
$1,900,000 |
Airport |
-12 |
| Providence Neighborhood ditch and sidewalk improvements |
Tallahassee |
FL |
70 |
$8,907,280 |
CDBG |
-22 |
| Reconstruct curb, gutter, sidewalk and milling and overlay roadway for Gaines Street Corridor |
Tallahassee |
FL |
30 |
$3,500,000 |
CDBG |
-2 |
| Low-Income Home Energy Efficiency Retrofit for 1000 homes |
Tallahassee |
FL |
100 |
$3,000,000 |
CDBG |
-19 |
| Bicycle and Pedestrian Master Plan- construct six missing sidewalk segments to provide safe access to several elementary schools |
Tallahassee |
FL |
28 |
$2,454,000 |
CDBG |
13 |
| Gaines Street Revitalization- Water and Sewer upgrades and replacement of inadequate pipes |
Tallahassee |
FL |
20 |
$1,640,000 |
CDBG |
6 |
| Bicycle and Pedestrian Master Plan- milling/resurfacing/restriping to create a route for cyclists to bypass one of the busiest downtown streets |
Tallahassee |
FL |
15 |
$1,530,000 |
CDBG |
-1 |
| Relocation and upgrade of overhead electrical lines to support the Gainest Street Redevelopment |
Tallahassee |
FL |
8 |
$1,500,000 |
CDBG |
1 |
| Tom Brown Park Upgrades Repave tennis courts and stabilize soil, upgrade court lights, fencing, bleachers, add metal roof and renovate control station bathroom roof, grading improvements around courts, Dam renovation at Lake Leon, replace ball field light |
Tallahassee |
FL |
30 |
$1,500,000 |
CDBG |
-41 |
| Historical restoration of the Ashmore/Yates block and Frenchtown Village construction |
Tallahassee |
FL |
50 |
$1,500,000 |
CDBG |
-39 |
| Curb and gutter/asphalt for park parking in various parks |
Tallahassee |
FL |
30 |
$1,000,000 |
CDBG |
-11 |
| Replace fence in various parks |
Tallahassee |
FL |
15 |
$500,000 |
CDBG |
-14 |
| Replace old boardwalks, Picnic shelter renovations |
Tallahassee |
FL |
15 |
$500,000 |
CDBG |
-8 |
| Retrofit roof system at Smith Williams Community Center |
Tallahassee |
FL |
25 |
$500,000 |
CDBG |
-8 |
| Winthrop Park upgrade Develop and construct drainage plan to control erosion on East side, Replace sidewalk and drainage around tennis courts, improve ball fields construct retaining walls |
Tallahassee |
FL |
10 |
$280,000 |
CDBG |
-5 |
| Playground upgrades |
Tallahassee |
FL |
10 |
$250,000 |
CDBG |
-16 |
| Lake Ella Upgrades: Wall and erosion control on North side of lake, Improve street drainage curb and gutter parking lot, and street add irrigation |
Tallahassee |
FL |
15 |
$250,000 |
CDBG |
7 |
| ADA-compliance renovations |
Tallahassee |
FL |
10 |
$200,000 |
CDBG |
-1 |
| Dorothy B. Oven Park add/ renovate concrete unit pavers for all pedestrian walk ways |
Tallahassee |
FL |
10 |
$200,000 |
CDBG |
-15 |
| Myers Park Upgrade 4000 sq. feet sidewalk, construct an urban walking trail, handicap accessible, Add fitness stations, new walk bridges, improve grad around comfort station and remodel existing Comfort station |
Tallahassee |
FL |
10 |
$200,000 |
CDBG |
-4 |
| Myers Park Upgrade 4000 sq. feet sidewalk, construct an urban walking trail, handicap accessible, Add fitness stations, new walk bridges, improve grad around comfort station and remodel existing Comfort station |
Tallahassee |
FL |
10 |
$200,000 |
CDBG |
-9 |
| Replace all windows at Smith Willliams Community Center main building |
Tallahassee |
FL |
5 |
$150,000 |
CDBG |
-18 |
| Construct an elevator at Smith William Community Center |
Tallahassee |
FL |
10 |
$150,000 |
CDBG |
-21 |
| Renovate interior of gymnasium |
Tallahassee |
FL |
10 |
$150,000 |
CDBG |
-27 |
| Interior renvoation of annex building at Smith Williams Community Center |
Tallahassee |
FL |
10 |
$100,000 |
CDBG |
-11 |
| Renovate main building at Smith Williams Community Center |
Tallahassee |
FL |
5 |
$50,000 |
CDBG |
-10 |
| Turbocor Compressor commercial building retrofit 80% grant |
Tallahassee |
FL |
100 |
$5,000,000 |
Energy |
-20 |
| District Cooling with Ice Storage/ 2 megawatts |
Tallahassee |
FL |
125 |
$5,000,000 |
Energy |
-10 |
| 1000 Solar Rooftops- 80% grant for citizens |
Tallahassee |
FL |
100 |
$4,000,000 |
Energy |
10 |
| Upgrade kitchen countertops |
Tallahassee |
FL |
0 |
$375,000 |
Housing |
-136 |
| Replace damaged or extended-life roofs |
Tallahassee |
FL |
0 |
$338,000 |
Housing |
-12 |
| Energy efficient windows, roof and appliances upgrade |
Tallahassee |
FL |
12 |
$250,000 |
Housing |
-13 |
| Erosion control to improve safety and property values |
Tallahassee |
FL |
25 |
$250,000 |
Housing |
-1 |
| Replace bathroom sinks in vacant units |
Tallahassee |
FL |
0 |
$157,150 |
Housing |
-56 |
| Repair/replace existing sidewalks |
Tallahassee |
FL |
0 |
$152,500 |
Housing |
-18 |
| Replace kitchen cabinets in vacant units |
Tallahassee |
FL |
0 |
$48,000 |
Housing |
-34 |
| Security camera system for community centers |
Tallahassee |
FL |
0 |
$40,000 |
Housing |
-2 |
| Replace bathroom floors in two-story buildings |
Tallahassee |
FL |
2 |
$39,000 |
Housing |
-25 |
| Install low water pressure toilets |
Tallahassee |
FL |
0 |
$36,000 |
Housing |
-25 |
| Playground construction to prevent gang membership and create positive alternative |
Tallahassee |
FL |
0 |
$36,000 |
Housing |
-27 |
| Paint front and rear doors for neighborhood |
Tallahassee |
FL |
0 |
$30,500 |
Housing |
-50 |
| Upgrade appliances with energy star reated items |
Tallahassee |
FL |
0 |
$21,000 |
Housing |
-20 |
| Resident skill training center |
Tallahassee |
FL |
12 |
$10,000 |
Housing |
-14 |
| Additional parking for Springfield Community Center |
Tallahassee |
FL |
0 |
$5,000 |
Housing |
-21 |
| Implementing a surveillance camera system throughout downtown business district and adjoining Gaines Street corridor - utilizing technology as a tool for crime reduction |
Tallahassee |
FL |
75 |
$7,500,000 |
Public Safety |
-57 |
| Schools on Solar Program - solar energy in school facilities |
Tallahassee |
FL |
150 |
$5,000,000 |
Schools |
14 |
| Replacement buses for StarMetro, which has 30 buses which are past their useful life |
Tallahassee |
FL |
30 |
$11,730,000 |
Transit |
-6 |
| Construction of StarMetro (transit system) regional training center |
Tallahassee |
FL |
100 |
$1,657,530 |
Transit |
-24 |
| Increase StarMetro administrative office building |
Tallahassee |
FL |
10 |
$301,688 |
Transit |
-32 |
| Updating and expanding C.K. Steele transit hub |
Tallahassee |
FL |
10 |
$245,000 |
Transit |
-17 |
| StarMetro wellness center |
Tallahassee |
FL |
10 |
$175,208 |
Transit |
-60 |