Advanced search added: keywords, zip codes, and recipients 11/25/2009

Thanks to the tireless work of developer Peter Snyder, Stimulus Watch 2.0 now has an advanced search capability that will…

Jerry Brito on Washington DC’s Federal News Radio... 11/24/2009

Jerry Brito on Washington DC’s Federal News Radio discussing the new features available on Stimulus Watch 2.0.

We've relaunched with new official data of stimulus projects in your neighborhood! 11/18/2009

Welcome to Stimulus Watch 2.0. While our original site featured proposed stimulus projects taken from the U.S. Conference of Mayors…

OpenRegs.com
Find government regulations by issue or agency. Comment, add links and subscribe to regulations.

Projects in Tacoma, Washington

Below are the "shovel-ready" projects for which this city submitted in the 2008 U.S. Conference of Mayors report. You can click on a project to read (and add to) its description. You can also discuss the project and vote on whether you believe it is critical or not.

The total cost of all the projects submitted by Tacoma is $283,925,000

Description City State Jobs Cost Program Type Vote Ratio
CTP Energy Management. This project will implement the recommendations from Central Treatment Plant Energy Management Study prepared by MWH for the CTP Upgrade Project Tacoma WA 112 $7,000,000 Water -11
CTP Dissolved Air Flotation Thickeners Upgrade. This project will upgrade and add additional supply lines and controls to the Dissolved Air Flotation Thickeners (DAFT's) tanks used in the Central Treatment Plant secondary treatment process to remove liq Tacoma WA 88 $5,500,000 Water -7
Surface Water Collection System Rehabilitation Associated with Street Paving Projects. This project generally consist of open-cut replacement or extension of approximately 8, 400 linear feet of surface water mains in conjunction with street paving projec Tacoma WA 86 $5,400,000 Water 9
Wastewater Collection System Rehabilitation Associated with Street Paving Projects. Tacoma WA 48 $3,000,000 Water 4
Wastewater Collection System Rehabilitation. Rehabilitate (CIPP lining) and spot repairs of approximately 50,000 linear feet of aging wastewater collection system pipes. Tacoma WA 32 $2,000,000 Water 11
PS4103 Force Main Replacement. Replacement of the Pump Station 4103 Force Main under the Hylebos Waterway by directional Drilling. This project will also provide upgrades at Pump Stations 4102 and 4103, including provisions for third pumps at each stati Tacoma WA 30 $1,900,000 Water -2
Jefferson Street Surface Water Main Replacement. This project generally consist of open-cut replacement of approximately 3, 000 linear feet of existing surface water mains that were constructed in the early 1900's and are structurally deteriorated. Tacoma WA 16 $1,000,000 Water 7
Jefferson Street Wastewater Main and Replacement. This project generally consist of open-cut replacement of approximately 3, 000 linear feet of existing wastewater mains that were constructed in the early 1900's and are structurally deteriorated. Tacoma WA 16 $1,000,000 Water 8
Law Enforcement Support Agency (LESA) is a multi jurisdictional agency. New LESA 9-1-1 Communications Center. Tacoma WA 1866 $117,000,000 CDBG -61
Puyallup River Bridge This dilapidated structure, is an important east-west connection between the Port of Tacoma and the City of Tacoma as well as the City of Fife, has serious structural issues and may soon have load limits imposed on it. Tacoma WA 398 $25,000,000 CDBG 41
Tacoma Police Headquarters- 3 Story Parking garage entering off Fife street (120 new stalls). Headquarters Public Building addition with sky bridge to existing HQ. Tacoma WA 311 $19,500,000 CDBG -52
Arterial Street Program The arterial street program currently has 12 projects that are partially funded through grants and other means. These projects cannot be put out to bid until they are fully funded. A total of $13.2 million in grants were allocated Tacoma WA 289 $18,100,000 CDBG 4
Tacoma Dome facilities upgrades and renovations. Examples include seating replacement, security system, and Exhibition Hall upgrades. Tacoma WA 283 $17,750,000 CDBG -68
Americans with Disabilities Act Curb Ramp Program In 2007 a survey of sidewalks and intersections was completed by the City of Tacoma. The survey found that 17,754 curb ramps needed to be constructed to fully comply with the Americans with Disabilities A Tacoma WA 239 $15,000,000 CDBG 7
Construct new 3-1-1 Customer Assistance Call Center for LESA Tacoma WA 154 $9,700,000 CDBG -41
Construct new Real Time Crime Center for LESA. Tacoma WA 85 $5,325,000 CDBG -12
New computer aided dispatch system for LESA. Tacoma WA 15 $4,000,000 CDBG -8
The proposed project would reroof the Municipal Complex which includes Tacoma Municipal Building, Tacoma Municipal Building North, and the Municipal Garage. The roofing system has exceeded its usefull life and is need of replacement Tacoma WA 50 $3,625,000 CDBG -3
Murray Morgan Bridge The Murray Morgan Bridge is currently closed to vehicular traffic due to its severe state of disrepair. While the bridge is currently open to pedestrian traffic, the Washington State Department of Transportation has determined that Tacoma WA 48 $3,000,000 CDBG 38
Structural Sidewalks The City of Tacoma currently has a number of structural sidewalks that are unsafe as determined by the CityÂ’s structural engineer. These structural sidewalkÂ’s potential for collapse pose a hazard to pedestrians as well as the occupan Tacoma WA 48 $3,000,000 CDBG 16
Tacoma Police Range and structure improvements. Tacoma WA 31 $1,960,000 CDBG -14
The proposed project would refurbish the exterior of the Tacoma Municpal Building which is listed on the National Historic Register and was built in the 1920's. Tacoma WA 25 $1,500,000 CDBG -9
The proposed project would upgrade the elevators in the Tacoma Municipal Building including both software and hardware components. Tacoma WA 10 $650,000 CDBG -9
Tacoma Police Department Sub Station Sector 4 Rehabilitation. Tacoma WA 9 $575,000 CDBG -1
Tacoma Police Special Teams Warehouse Improvements. Tacoma WA 7 $460,000 CDBG -6
Tacoma Police Fleet Warehouse Improvements. Tacoma WA 5 $310,000 CDBG -6
4 Tacoma Police Substations mechanical system rehabilitation. Tacoma WA 2 $120,000 CDBG -6
Digester Gas Energy Recovery. This project willcollect digester gas from thhe wastewater treatment plant and use to produce heat and energy. This will provide an alternative energy source fo rthe plant saving money while reducing greenhouse gases. Tacoma WA 49 $7,000,000 Energy 21
The proposed project would upgrade the existing HVAC system in the Tacoma Municpal Building which has exceeded its useful life expectancy. The project would provide a much higher efficiency along with better climate control and tenant comfort. Tacoma WA 25 $1,850,000 Energy -11
The proposed project would remove and replace the existing lighting system in the Tacoma Municpal Complex in order to make the complex operate more efficiently. Tacoma WA 20 $1,000,000 Energy -17
The proposed project would install new HVAC systems in both the Beacon and Lighthouse Senior Centers replacing the existing steam boiler heat and replacing them with more efficient heat pumps in order to provide both heat and cooling. Tacoma WA 15 $700,000 Energy 5