WARNING: You're looking at a page from the old site. We have relaunched with live stimulus data. Learn more here.


Recent News

Advanced search added: keywords, zip codes, and recipients 11/25/2009

Thanks to the tireless work of developer Peter Snyder, Stimulus Watch 2.0 now has an advanced search capability that will…

Jerry Brito on Washington DC’s Federal News Radio... 11/24/2009

Jerry Brito on Washington DC’s Federal News Radio discussing the new features available on Stimulus Watch 2.0.

We've relaunched with new official data of stimulus projects in your neighborhood! 11/18/2009

Welcome to Stimulus Watch 2.0. While our original site featured proposed stimulus projects taken from the U.S. Conference of Mayors…

OpenRegs.com
Find government regulations by issue or agency. Comment, add links and subscribe to regulations.

Projects in Superior, Wisconsin

Below are the "shovel-ready" projects for which this city submitted in the 2008 U.S. Conference of Mayors report. You can click on a project to read (and add to) its description. You can also discuss the project and vote on whether you believe it is critical or not.

The total cost of all the projects submitted by Superior is $41,157,000

Description City State Jobs Cost Program Type Vote Ratio
Montreal Pier Sheet Piling. This project will enable new maritime business and/or research. Superior WI 0 $7,500,000 Streets/Roads -18
Billings Park Storm Sewer & Water Quality Basin. This project will ultimately reduce stormwater and surface water flows to combined sewers through construction of a system of separate storm sewers. Superior WI 0 $4,700,000 Streets/Roads 1
28th St. Reconstruction. Reconstruction of .85 miles of 28th Street. Superior WI 0 $2,900,000 Streets/Roads -2
Citywide Sidewalk Replacements. This project will consist of replacing and reparing old and deteriorating sidewalks throughout the city as determined by the City of Superior Sidewalk Replacement Program. Superior WI 0 $2,000,000 Streets/Roads -3
South Superior Stormwater Interceptor. Project will included installation of a stormwater interceptor and a network of sewer mains. Superior WI 0 $1,700,000 Streets/Roads 3
USH 2 Off Ramp to Susquehanna Ave. Development of an off ramp from USH 2 to the industrial park on Susquehanna Ave. Superior WI 0 $1,500,000 Streets/Roads 2
Tower Ave. Concrete Rehabilitation. Concrete Rehabilitation for four miles of Tower Ave. Superior WI 0 $1,000,000 Streets/Roads 1
Arrowhead Pier. This project will replace the existing structure with a new fishing pier and associated site improvements to support the pier. Superior WI 0 $800,000 Streets/Roads -8
City of Superior Salt Storage Facility. This project will greatly increase the city's salt storage capacity. Superior WI 0 $750,000 Streets/Roads -7
Bardon Road Reconstruction. Reconstruction of .9 miles of Roadway adjacent to the city of Superior Golf Course. Superior WI 0 $450,000 Streets/Roads -10
Sanitary Sewer Treatment Plant. This project entails establishing a pH adjustment system for the main treatment plant in order to maintain ammonia compliance with our upcoming permit. Superior WI 0 $1,600,000 Water 8
Sanitary Sewer Treatment Plant Ultra Violet Disinfection Conversion. Superior WI 0 $1,100,000 Water 2
Tower Ave. Combined Sewer Repair and Rehabilitation. This rehabilitation will alleviate flooding in the area. Superior WI 0 $450,000 Water 3
Lift Station 07/Upstream Piping Reconstruction. The project will replace undersized piping with larger diameter piping. Superior WI 0 $175,000 Water 1
Newton Creek/Sanitary Sewer Reconstruction. The project will mitigate a known sanitary sewer overflow location. Superior WI 0 $150,000 Water 1
Lift Station 04/Upstream Piping Reconstruction. The project is to remove the flow restriction with installation of appropriately sized piping. Superior WI 0 $75,000 Water 4
Wisconsin Point Road. Reconstruction of 3.4 miles of roadway and associated parking accessing the Wisconsin Point recreation area. Superior WI 0 $3,500,000 CDBG -6
Moccasin Mike Road. Reconstruction of 1.9 miles of roadway accessing the city of Superior landfill and Wisconsin Point recreation area. Superior WI 0 $2,300,000 CDBG -5
Superior Animal Rescue Building. A new state-of-the-art eco-conscious "green Animal Rescue Foundation building for the City of Superior. Superior WI 0 $2,102,000 CDBG -68
City of Superior Milling and Overlay Projects. This project consists of a 3.25 inch mill and HMA overlay on various streets in Superior. Superior WI 0 $2,000,000 CDBG -1
Winter Street Industrial Park. Development of a 6 lot Industrial Park located in Superior, WI Superior WI 0 $1,750,000 CDBG -2
Wetland Mitigation Bank. Development of a wetland mitigation bank in support of the city's SAMP Banking Program. Superior WI 0 $420,000 CDBG 1
Hill Avenue Culvert Rehabilitation. Rehabilitation of an 8 foot by 8 foot arch culvert under Hill Avenue on Faxon Creek in the city of Superior. Superior WI 0 $75,000 CDBG 0
28th Street Culvert Lining. Lining of a 48 inch culvert carrying flow from a tributary of Faxon Creek. Superior WI 0 $10,000 CDBG -2
Superior Landfill Gas to Energy. This project includes creating power generation at the Superior Landfill from landfill methane. Superior WI 0 $2,000,000 Energy 18
Great Lakes Elementary School Access and Parking Modifications. Reconfiguration of access points and parking areas at Great Lakes Elementary School. Superior WI 0 $150,000 Schools -18