WARNING: You're looking at a page from the old site. We have relaunched with live stimulus data. Learn more here.


Recent News

Advanced search added: keywords, zip codes, and recipients 11/25/2009

Thanks to the tireless work of developer Peter Snyder, Stimulus Watch 2.0 now has an advanced search capability that will…

Jerry Brito on Washington DC’s Federal News Radio... 11/24/2009

Jerry Brito on Washington DC’s Federal News Radio discussing the new features available on Stimulus Watch 2.0.

We've relaunched with new official data of stimulus projects in your neighborhood! 11/18/2009

Welcome to Stimulus Watch 2.0. While our original site featured proposed stimulus projects taken from the U.S. Conference of Mayors…

OpenRegs.com
Find government regulations by issue or agency. Comment, add links and subscribe to regulations.

Projects in Reno, Nevada

Below are the "shovel-ready" projects for which this city submitted in the 2008 U.S. Conference of Mayors report. You can click on a project to read (and add to) its description. You can also discuss the project and vote on whether you believe it is critical or not.

The total cost of all the projects submitted by Reno is $108,527,600

Description City State Jobs Cost Program Type Vote Ratio
Install new and upgrade existing traffic signals to energy efficient technology; upgrade video detection system for traffic signals; replace traffic signal controllers with smart technology to lower vehicle idling time and reduce travel time, thereby redu Reno NV 551 $19,375,000 Streets/Roads -61
Rehabilitation & preventative maintenance of surface streets throughout city Reno NV 528 $18,500,000 Streets/Roads -5
Traffic calming measures to increase pedestrian and bicycle safety in areas near neighborhood centers Reno NV 9 $300,000 Streets/Roads -49
Flow equalization basin & reuse pumping station upgrades Reno NV 157 $5,500,000 Water -17
2009 Sanitary Sewer CIPP Lining Project - large diameter sewer pipe rehabilitation Reno NV 124 $4,350,000 Water -8
North Virginia Phase 1B Interceptor replacement and upsize Reno NV 120 $4,200,000 Water -16
Lawton-Verdi Interceptor phase V - river crossing and interceptor extension Reno NV 115 $4,025,000 Water -4
2010 Unit 2 Sewer Replacement small diameter sewer pipe replacement Reno NV 91 $3,200,000 Water -12
Lakeside trunk sewer replacement - re-align & replace aging sewer Reno NV 89 $3,100,000 Water -14
Storm drain & other flood control projects Reno NV 86 $3,000,000 Water -15
Phase 1 - extend TMWRF reuse distribution system Reno NV 49 $1,715,000 Water -18
Overlay of Clean Water Way from TMWRF to McCarran Ave Reno NV 36 $1,250,000 Water -16
Removal and replacement of existing maintenance-intensive sludge cake pumps in the dewatering building Reno NV 32 $1,120,600 Water -17
Removal and replacement of aging electrical transformers Reno NV 24 $850,000 Water -13
Replace aging electrical switchgear - replace main electrical switchgear Reno NV 24 $850,000 Water -14
Rehabilitation of Digester #4 Cover Reno NV 17 $600,000 Water -12
Replacement of asphalt pavement within plant site Reno NV 15 $515,000 Water -13
ADA Upgrades in City right-of-way for non-compliant wheelchair ramps and sidewalk sections Reno NV 715 $25,000,000 CDBG -57
South Virginia Retail Development - invest in the businesses along South Virginia, a main a in the form of facade improvements and small business loans Reno NV 86 $3,000,000 CDBG -67
Downtown Events Center Solar project Reno NV 94 $3,300,000 Energy -23
Parking gallery solar project Reno NV 8 $277,000 Energy -22
Autumn Village - a 43 unit affordable housing project serving families at or below 50% of the area median income including 9 units for households currently experiencing homelessness Reno NV 43 $1,500,000 Housing -16
Homeowner rehabilitation - supplement current area programs to assist low income homeowners make necessary health and safety repairs and energy efficiency upgrades to their homes. Reno NV 43 $1,500,000 Housing -24
Sierra Manor - an acquistion and rehabilitation project intended to provide a higher quality living environment for very low income seniors while continuing to provide truly affordable housing Reno NV 29 $1,000,000 Housing -17
St. Vincent's Residence - demolition of a substandard complex to be replaced with a 28 single-room occupancy units affordable to individuals with incomes below 50% of the area median income. While 6 units will be supportive, transitional housing for those Reno NV 14 $500,000 Housing -19