| Street Repaving-Roadway improvements for a backlog of 78 miles of Federal Aid (FAM) streets; work included the resurfacing of the streets, reconstruction of all handicap ramps to bring them in compliance with new ADA requirements; design and placement |
Philadelphia |
PA |
940 |
$87,500,000 |
Streets/Roads |
27 |
| ADA complaints ramps:
City wide program to accelerate the installation ADA compliant ramps |
Philadelphia |
PA |
470 |
$30,000,000 |
Streets/Roads |
-62 |
| Street Lighting Pole Replacement – Install 5000 new fiberglass streetlight poles with new energy-efficient luminaries at existing locations as replacements for existing obsolete aluminum poles |
Philadelphia |
PA |
196 |
$12,500,000 |
Streets/Roads |
-50 |
| Passyunk Avenue Business Corridor traffic signal improvement:
Traffic signal improvement project for the Passyunk Avenue Business Corridor. Also includes pedestrian improvements, curb bump-outs, realignment and traffic island construction. |
Philadelphia |
PA |
110 |
$7,000,000 |
Streets/Roads |
-33 |
| East Coast Greenway Ped Bridge: Complete final design and construct a pedestrian bridge to allow unobstructed access over railroad lines to a portion of the East Coast Greenway trail network |
Philadelphia |
PA |
80 |
$5,100,000 |
Streets/Roads |
0 |
| Lancaster Avenue traffic signal improvements:
Traffic Signal improvement project for the Lancaster Avenue traffic corridor. |
Philadelphia |
PA |
47 |
$3,000,000 |
Streets/Roads |
-15 |
| Engineering, construction management and administration (15%) |
Philadelphia |
PA |
661 |
$42,188,900 |
Water |
-47 |
| Manayunk sewer overflow basin |
Philadelphia |
PA |
627 |
$40,000,000 |
Water |
27 |
| Poquessing Intercepting Sewer Relief Project:
Construction of relief sewer to mitigate overflows |
Philadelphia |
PA |
627 |
$40,000,000 |
Water |
20 |
| Water and Sewer Reconstruction Projects:
24 projects across the city to replace mains and sewers that are approximately 100 years old. Projects are selected based on a point system that takes into account the water main age, # of water main breaks, and |
Philadelphia |
PA |
480 |
$30,735,000 |
Water |
49 |
| Northeast Water Pollution Control Plant improvements - infrastructure and deferred maintenance |
Philadelphia |
PA |
419 |
$26,700,000 |
Water |
35 |
| Belmont Water Treatment Plant Improvements – Deferred facility maintenance |
Philadelphia |
PA |
401 |
$25,488,000 |
Water |
8 |
| Baxter Water Treatment Plant Improvements - Infrastructure improvements and deferred maintenance. |
Philadelphia |
PA |
255 |
$16,344,000 |
Water |
10 |
| Sewer Lining Projects – Four projects rehabilitate sewers, many more than a century old, that otherwise are prohibitively expensive or extremely difficult to reconstruct. |
Philadelphia |
PA |
249 |
$15,900,000 |
Water |
23 |
| Queen Lane high service pump station |
Philadelphia |
PA |
235 |
$15,000,000 |
Water |
-5 |
| Queen Lane Water Treament Plant Improvements |
Philadelphia |
PA |
228 |
$14,500,000 |
Water |
5 |
| Multiple Water Main Reconstructions :
Water Main Reconstruction Projects – 19 projects across the city to replace mains that are approximately 100 years old. Projects are selected based on a point system that takes into account the water main age, # of |
Philadelphia |
PA |
195 |
$12,409,000 |
Water |
20 |
| Citywide Street Tree Planting / Planters / Swales |
Philadelphia |
PA |
183 |
$11,700,000 |
Water |
18 |
| Casting and manholes adjustments to correspond to Streets Department paving work |
Philadelphia |
PA |
157 |
$10,000,000 |
Water |
-9 |
| Stream & Wetland Restoration |
Philadelphia |
PA |
141 |
$9,000,000 |
Water |
18 |
| Southwest Water Pollution Control Plant Improvements - Infrastructure improvements and deferred maintenance. |
Philadelphia |
PA |
95 |
$6,001,000 |
Water |
5 |
| Standby generator projects at Roxborough Pump Station and Torresdal Pump Station |
Philadelphia |
PA |
89 |
$5,650,000 |
Water |
6 |
| West Philadelphia sewer maintenance facilty |
Philadelphia |
PA |
78 |
$5,000,000 |
Water |
2 |
| "I" Street & Ramona sewer outfall storage project:
Construction of a steel gate at the outfall to store combined sewer flow in the sewer and prevent it from entering the stream. The stored sewage will be drained down slowly into our system after the stor |
Philadelphia |
PA |
65 |
$4,163,250 |
Water |
7 |
| Southeast Water Pollution Control Plant Improvements – Infrastructure improvements and deferred maintenance. |
Philadelphia |
PA |
48 |
$3,009,300 |
Water |
2 |
| Design / Project Management / Geotechnical Investigations / Infiltration Testing |
Philadelphia |
PA |
47 |
$3,000,000 |
Water |
-8 |
| Flat Rock Dam Rehabilitation |
Philadelphia |
PA |
41 |
$2,600,000 |
Water |
5 |
| Green Schools Demonstration Projects |
Philadelphia |
PA |
39 |
$2,500,000 |
Water |
-38 |
| Roxborough Tanks - finished water storage rehabilitation |
Philadelphia |
PA |
35 |
$2,200,000 |
Water |
4 |
| Biosolids Recycling Center |
Philadelphia |
PA |
32 |
$2,024,000 |
Water |
20 |
| City Facilities Green Infrastructure Retrofits |
Philadelphia |
PA |
31 |
$2,000,000 |
Water |
-11 |
| Water Department Facilities Green Infrastructure Retrofits |
Philadelphia |
PA |
31 |
$2,000,000 |
Water |
-8 |
| 29th & Cambria Water Conveyance Headquarters Improvements |
Philadelphia |
PA |
27 |
$1,716,000 |
Water |
-9 |
| Utility and Channel Stabilization Projects – Two projects to project sewer infrastructure and streams from impacts of erosion. |
Philadelphia |
PA |
21 |
$1,335,000 |
Water |
0 |
| Drainage Right of Way |
Philadelphia |
PA |
19 |
$1,232,000 |
Water |
-6 |
| City Facilities Green Roof Program |
Philadelphia |
PA |
16 |
$1,000,000 |
Water |
9 |
| Bureau of Laboratory Services - fencing, parking, lighting and security improvements |
Philadelphia |
PA |
9 |
$600,000 |
Water |
-23 |
| Replace Roof at Water Conveyance Headquarters Bldg. |
Philadelphia |
PA |
6 |
$396,000 |
Water |
-5 |
| Eden St Stormwater Outfall |
Philadelphia |
PA |
5 |
$300,000 |
Water |
5 |
| Stormwater Detention Basin Retrofits Program |
Philadelphia |
PA |
5 |
$300,000 |
Water |
1 |
| Water Department Headquarters - Computer center HVAC Upgrade and Back-Up |
Philadelphia |
PA |
1 |
$85,000 |
Water |
-11 |
| Reconstruct D-E Apron - Over one million square feet of 14-inch thick
concrete paving located between Terminals D and E will be replaced.
old pavement surface has reached the end of useful life for safe
operation of aircraft" |
Philadelphia |
PA |
792 |
$24,000,000 |
Airport |
6 |
| Reconstruct RW 9R/27L - Funds will be used for pavement resurfacing to Runway 9R/27L. |
Philadelphia |
PA |
495 |
$15,000,000 |
Airport |
5 |
| Airfield Electrical Improvements- The airfield signage, lighting, and cabling will be replaced and upgraded. |
Philadelphia |
PA |
132 |
$4,000,000 |
Airport |
-2 |
| Rehabilitate Taxiways A & L (PNE) - Pavement rehabilitation will consist of mill and overlay, crack repairs, and full depth pavement replacement. |
Philadelphia |
PA |
99 |
$3,000,000 |
Airport |
-4 |
| Airfield - New Interior Perimeter Service Road |
Philadelphia |
PA |
66 |
$2,000,000 |
Airport |
-14 |
| Library Improvements:
Project completion for upgrades and expansion of central library |
Philadelphia |
PA |
1351 |
$115,000,000 |
CDBG |
-15 |
| Market StreetCoordior-Market East: Acquistion, Construction, infrastructure and related costs to revitalize Market Street Corridor and Covention Center District, including adjacent Chinatown development |
Philadelphia |
PA |
1111 |
$100,000,000 |
CDBG |
-52 |
| Philadelphia Museum of Art:
Reconstruction of loading docks and other infrastructure improvements |
Philadelphia |
PA |
889 |
$80,000,000 |
CDBG |
-108 |
| Family Court Building Development: Consolidation and relocation of the Family Court facility |
Philadelphia |
PA |
833 |
$75,000,000 |
CDBG |
-29 |
| Park and Recreation capital investment:
Renovation and deferred maintenance of park and recreation facilities. Includes demolition of condemned and abandoned buildings, repaving, trail construction and rehabilitation, environmental restoration, historic |
Philadelphia |
PA |
823 |
$70,000,000 |
CDBG |
18 |
| Housing Production & Preservation: Funding for preservation, new construction, acquistion, housing counseling and anti-foreclosure programs |
Philadelphia |
PA |
556 |
$50,000,000 |
CDBG |
-29 |
| Navy Yard: Site preparation and development of the new Corporate Center, infrastructure improvements and other projects at Naval Yard |
Philadelphia |
PA |
556 |
$50,000,000 |
CDBG |
-20 |
| Revitalization of West Market Street: Renovations, construction and infrastructure repair on the West Market Street corridor |
Philadelphia |
PA |
556 |
$50,000,000 |
CDBG |
-7 |
| Commercial Corrdior Improvements:
Citywide commercial corridor improvements including lighting, street trees, signage, gateways and other |
Philadelphia |
PA |
333 |
$30,000,000 |
CDBG |
-1 |
| Hunting Park Redevelopment: Planning, acquisition and redevelopment of Hunting Park Area |
Philadelphia |
PA |
333 |
$30,000,000 |
CDBG |
-38 |
| Library system expansion:
Construction of two new regional libraries in north and south sections of the city |
Philadelphia |
PA |
352 |
$30,000,000 |
CDBG |
-32 |
| Centennial District: Construction, infrastructure improvements and other costs related to the Centennial District Project |
Philadelphia |
PA |
278 |
$25,000,000 |
CDBG |
4 |
| Central Delaware Waterfront: Riverfront trail, decking, finger piers, parks, transit connections and other development along the Delaware River |
Philadelphia |
PA |
278 |
$25,000,000 |
CDBG |
0 |
| City-Wide Transit Oriented Development: Aquisition, redevelopment, and infrastructure for transit- oriented development |
Philadelphia |
PA |
278 |
$25,000,000 |
CDBG |
31 |
| Free Library: Renovation and expansion of regional branches |
Philadelphia |
PA |
278 |
$25,000,000 |
CDBG |
25 |
| Girard Avenue Streetscape Project: Streetscape infrastructure and transit improvement project from Delaware River to 33rd St. |
Philadelphia |
PA |
278 |
$25,000,000 |
CDBG |
23 |
| Schuylkill River Park: Design, engineering and construction of trail, pedestrain overpass, decking and bridging st Schuylkill river |
Philadelphia |
PA |
278 |
$25,000,000 |
CDBG |
8 |
| Avenue of the Arts North: North Broad street infrastructure and Streetscape Improvements |
Philadelphia |
PA |
222 |
$20,000,000 |
CDBG |
-12 |
| Demolition, Site Preparation, and Greening:
Citywide demolition of vacant and blighted properties, site preparation and greening |
Philadelphia |
PA |
222 |
$20,000,000 |
CDBG |
18 |
| Dilworth Plaza: Construction, infrastructure improvements and other costs related to the Dilworth Plaza Project. |
Philadelphia |
PA |
222 |
$20,000,000 |
CDBG |
-37 |
| Philadelphia Zoo:
Construction, infrastructure, and other related costs for Children's Zoo, Aviary, Big Cat Falls and other exhibits |
Philadelphia |
PA |
222 |
$20,000,000 |
CDBG |
2 |
| Capital improvements to health centers:
Physical improvements to 8 neighborhood-based, community health centers. This includes weatherization, structural maintenance, mechanical systems upgrade, renovation, and upgrading of furniture and equipment |
Philadelphia |
PA |
176 |
$15,000,000 |
CDBG |
20 |
| Neighborhood Health Center:
Construction of neighborhood health center in underserved community in Philadelphia with high immigrant and uninsured populations |
Philadelphia |
PA |
176 |
$15,000,000 |
CDBG |
-17 |
| Residential facility:
Facility for individuals requiring skilled nursing care and/or assistance with activities of daily living |
Philadelphia |
PA |
176 |
$15,000,000 |
CDBG |
9 |
| Outdoor Community Theater:
Reconstruction of important Community Theater Robin Hood Dell |
Philadelphia |
PA |
141 |
$12,000,000 |
CDBG |
-61 |
| 30th Street Gateway:
Pedestrian connections, circulation and parking |
Philadelphia |
PA |
111 |
$10,000,000 |
CDBG |
10 |
| City-wide Supermarket Development: Aquisition, redevelopment, and infrastructure for supermarket development in underserved areas. |
Philadelphia |
PA |
111 |
$10,000,000 |
CDBG |
-20 |
| The Mann Center: Phase II renovations and construction of education center, concessions, restroom facilities & handicapped access area |
Philadelphia |
PA |
111 |
$10,000,000 |
CDBG |
-24 |
| Chinatown Community Center: Construction of Chinatown Community Center |
Philadelphia |
PA |
118 |
$10,000,000 |
CDBG |
-42 |
| Regional offices for human services:
Creation of local offices for child welfare services including advocates and court offices |
Philadelphia |
PA |
118 |
$10,000,000 |
CDBG |
-17 |
| Robin Hood Dell East:
Reconstruction of seating, drainage, lighting, stage, and other improvements |
Philadelphia |
PA |
56 |
$5,000,000 |
CDBG |
-19 |
| Branch Library Improvements:
Upgrade of Facilities including Structural and mechanical Systems |
Philadelphia |
PA |
58 |
$5,000,000 |
CDBG |
10 |
| Engagement center for homeless:
Central intake location for homeless individuals and families with feeding center, behavioral health assessment, and overnight sleeping accommodations while assessment and placement is undertaken. |
Philadelphia |
PA |
29 |
$2,500,000 |
CDBG |
48 |
| Bookmobiles:
Purchase and deployment of bookmobiles in underserved communities in the city. |
Philadelphia |
PA |
14 |
$500,000 |
CDBG |
-1 |
| Weatherization:
Whole house weatherization of approximately 10,000 homes in the next 12 months ($30m) and weatherization job training of additional auditors, insulators, and roofers ($4.5m) |
Philadelphia |
PA |
110 |
$34,500,000 |
Energy |
10 |
| City Hall:
Installation of modern HVAC systems |
Philadelphia |
PA |
120 |
$20,000,000 |
Energy |
-15 |
| Triplex - commercial office buildings:
Chiller plant and controls modernization |
Philadelphia |
PA |
70 |
$15,000,000 |
Energy |
-22 |
| Exterior modernization of libraries:
Windows and roof replacements at all libraries |
Philadelphia |
PA |
0 |
$9,000,000 |
Energy |
4 |
| Heaters:
Install 2,000 high efficiency heaters |
Philadelphia |
PA |
0 |
$7,000,000 |
Energy |
-15 |
| LED Lamps:
Replace incandescent bulbs and ten year old LED lamps with new all LED Lamps for 3000 signalized intersections in the City, which will save the City $1,000,000. per year in energy cost (1) |
Philadelphia |
PA |
94 |
$6,000,000 |
Energy |
67 |
| Residential Solar Energy Revolving Loan Fund:
Residential Solar Energy Revolving Loan Fund resulting in initiation of solar projects at 500 residences in city of Philadelphia(2) |
Philadelphia |
PA |
100 |
$4,000,000 |
Energy |
25 |
| Residential Rehabilitation:
PGW Conservation Works Program Expansion and Redirection for Residential Rehabilitation, removing structural barriers to energy conservation(2) |
Philadelphia |
PA |
100 |
$1,000,000 |
Energy |
-6 |
| Chiller Replacement:
Philadelphia Public Property Chiller Replacement at Criminal Justice Center. 2 year payback in energy cost savings for replacement of inefficient gas chillers with new electrical chillers.(1) |
Philadelphia |
PA |
12 |
$550,000 |
Energy |
9 |
| PHA Rehabilitation & Development:
Philadelphia Housing Authority public infrastructure improvements including new construction and rehabilation, utilities, curbing, sidewalks and landscaping for Mill Creek, Riverview and Paschall Homes developments, amon |
Philadelphia |
PA |
556 |
$50,000,000 |
Housing |
-25 |
| Youth Study Center:
Construction of new juvenile detention facility to replace inadequate and outdated existing facility. Currently in temporary location. |
Philadelphia |
PA |
1269 |
$110,000,000 |
Public Safety |
11 |
| Police administration building:
Critical repairs to the police administration building including mechanic, electrical, plumbing, heating and air conditioning. This includes a possible relocation of Headquarters to a site at 4601 Market St. and the poten |
Philadelphia |
PA |
115 |
$70,000,000 |
Public Safety |
17 |
| Prison facility repairs:
Additional prison facility repairs - upgrades to sprinkler and security systems, various facilities |
Philadelphia |
PA |
0 |
$63,000,000 |
Public Safety |
-22 |
| 800 MHz:
Upgrade the digital public safety radio system and implement new underground infrastructure to accommodate the system |
Philadelphia |
PA |
110 |
$60,000,000 |
Public Safety |
14 |
| Additional police facilities:
Critical repairs to additional police facilities. PICA identified numerous deficiencies in Police districts that are prioritized accordingly: 2% priority one; 47% priority 2; 14% priority 3; 37% priority. PICA funding wil |
Philadelphia |
PA |
0 |
$40,000,000 |
Public Safety |
23 |
| Fire repairs and replacement:
Apparatus repairs and replacement |
Philadelphia |
PA |
0 |
$40,000,000 |
Public Safety |
41 |
| Fusion Center:
Construction and co-location of police resources in Fusion Center |
Philadelphia |
PA |
120 |
$40,000,000 |
Public Safety |
-5 |
| Police/Fire Radio:
Police/Fire emergency communications radio system network. |
Philadelphia |
PA |
120 |
$40,000,000 |
Public Safety |
32 |
| VSS Fiber Plant:
Laying network of fiber to enable technologies such as video surveillance cameras. |
Philadelphia |
PA |
125 |
$40,000,000 |
Public Safety |
-2 |
| Morgue and Forensic Laboratory:
Relocation of obsolete medical examiner offices, morgue, and laboratory facilities. |
Philadelphia |
PA |
470 |
$40,000,000 |
Public Safety |
4 |
| Regional Training Center:
Redeveloping the Academy Grounds into a Regional Training Center as well provide for the renovation of acquired federal government facilities located at Woodhaven Rd. and Wissahickon Ave. |
Philadelphia |
PA |
0 |
$38,000,000 |
Public Safety |
-15 |
| Integrated Health Information System:
Extend health and opportunity information systems to integrate information multiple agencies and departments (CARES). |
Philadelphia |
PA |
200 |
$35,000,000 |
Public Safety |
-4 |
| Station updates:
Additional station updates |
Philadelphia |
PA |
0 |
$32,500,000 |
Public Safety |
1 |
| Juvenile detention facilities:
Construction of a new juvenile detention facility & critical repairs to existing facilities |
Philadelphia |
PA |
0 |
$30,000,000 |
Public Safety |
1 |
| Underground:
Enabling access to public safety radio system in the subterranean areas of the city (subway) |
Philadelphia |
PA |
500 |
$30,000,000 |
Public Safety |
20 |
| Officers for power shifts:
400 Officiers for Power Shifts - Desired force strength is 7,000. Intention to add 200 officers not realized in CY 08 due to budgetary constraints. Additional 400 officiers would bring force to desired strength. |
Philadelphia |
PA |
0 |
$25,000,000 |
Public Safety |
29 |
| 911 Infrastructure:
Upgrade 911 systems to increase system stability and performance and allow for growth. |
Philadelphia |
PA |
60 |
$20,000,000 |
Public Safety |
25 |
| Casino entertainment corridor:
Construction of a new combined 50,000 square foot facility to serve the citizens amongst the developing entertainment corridor . The location would include the relocation of the 6th and 9th police districts. |
Philadelphia |
PA |
0 |
$17,000,000 |
Public Safety |
-202 |
| Public Safety ERP:
Improved time reporting for time management, scheduling, and overtime payroll management |
Philadelphia |
PA |
20 |
$15,000,000 |
Public Safety |
-3 |
| Infrastructrure Stability:
Improve technology posture to improve stability and allow for growth. |
Philadelphia |
PA |
50 |
$15,000,000 |
Public Safety |
-5 |
| Electronic health record:
Purchase and deployment of electronic health records across the prison and linked health systems |
Philadelphia |
PA |
176 |
$15,000,000 |
Public Safety |
-17 |
| Colocation for sex crimes:
Creation of central, combined location for police sex crimes unit, human services sex abuse services, and advocates for sexually abused and assaulted individuals |
Philadelphia |
PA |
141 |
$12,000,000 |
Public Safety |
6 |
| Prison Mgmt Systems:
Upgrade information management system to improve imate tracking and medical records. |
Philadelphia |
PA |
25 |
$10,000,000 |
Public Safety |
-3 |
| Co-location of services:
Co-location of engine 20, ladder 23 and medic 1 for casino entertainment district |
Philadelphia |
PA |
0 |
$8,000,000 |
Public Safety |
-29 |
| Engine 38:
Relocation of Engine 38 |
Philadelphia |
PA |
0 |
$6,500,000 |
Public Safety |
18 |
| Public Safety Community Portal:
Improve public safety performance by community groups through outreach to groups such as PDAC, Crimewatch, Townwatch, fire block captains. |
Philadelphia |
PA |
5 |
$5,000,000 |
Public Safety |
4 |
| Fire Academy:
Repairs to the Fire Academy |
Philadelphia |
PA |
0 |
$3,500,000 |
Public Safety |
26 |
| Renovation and new schools:
to support renovation efforts, fund new school and replacement schools |
Philadelphia |
PA |
0 |
$150,000,000 |
Schools |
20 |
| Purchase of 40 Hybrid Buses - The SEPTA Board awarded a contract to New Flyer of America, Inc. for the purchase of 400 hybrid (diesel/electric) buses, with an option to purchase 20 additional buses each year for 4 years. SEPTA could quickly award an opti |
Philadelphia |
PA |
678.3 |
$17,850,000 |
Transit |
39 |
| Broad Street Subway Stations -
This project will provide for the construction of improvements to the Girard and Spring Garden Stations on the Broad Street Subway Line. These stations were originally constructed between 1928 and 1932 and are showing sig |
Philadelphia |
PA |
604 |
$15,900,000 |
Transit |
77 |
| Callowhil/Victory Bus Garages Ventilation System Improvements -
This project will provide for the installation of a new bus exhaust systems and general building ventilation system improvements at the Callowhill and Victory Bus Garages. The new bus exha |
Philadelphia |
PA |
114 |
$3,000,000 |
Transit |
-8 |
| Vehicle Washer Replacement -
Fern Rock Shop and Frankford Bus Garage - This project will provide for installation of new vehicle washers at Fern Rock Rail Shop and Frankford Bus Garage. Existing washers at both locations have been in operation for over |
Philadelphia |
PA |
99 |
$2,600,000 |
Transit |
-70 |