| Mills 50 Main Street District Streetscape- Transportation Enhancement project including design and build out of gateways, sidewalks, drainage, traffic-calming, lighting, signage, landscaping, irrigation, and underground utilities. |
Orlando |
FL |
353 |
$33,000,000 |
Streets/Roads |
-112 |
| Downtown South Main Street District Streetscape- Transportation Enhancement project including design and build out of gateways, sidewalks, drainage, traffic-calming, lighting, signage, landscaping, irrigation, and underground utilities. |
Orlando |
FL |
246 |
$23,000,000 |
Streets/Roads |
-97 |
| Edgewater Drive Main Street District Streetscape-Transportation Enhancement project including design and build out of gateways, sidewalks, drainage, traffic-calming, lighting, signage, landscaping, irrigation, and underground utilities. |
Orlando |
FL |
176 |
$16,500,000 |
Streets/Roads |
-82 |
| Ivanhoe Village Main Street District Streetscape- Transportation Enhancement project including design and build out of gateways, sidewalks, drainage, traffic-calming, lighting, signage, landscaping, irrigation, and underground utilities. |
Orlando |
FL |
128 |
$12,000,000 |
Streets/Roads |
-72 |
| Mission Road Part 2 This critical 0.7 mile segment of the 4-lane divided minor arterial, Mission Road Project includes the 0.4 mile completion of Metrowest Boulevard. The roadway will serve as an alternate north/south route |
Orlando |
FL |
428 |
$11,503,000 |
Streets/Roads |
-30 |
| Downtown Orlando ITS Network-This project consists of the expansion of the Intelligent Transportation System throughout Downtown Orlando. The ITS technology uses new technology to provide congestion management and incident management capability. |
Orlando |
FL |
252 |
$6,770,000 |
Streets/Roads |
-6 |
| Audubon Park Main Street District Streetscape- Transportation Enhancement project including design and build out of gateways, sidewalks, drainage, traffic-calming, lighting, signage, landscaping, irrigation, and underground utilities. |
Orlando |
FL |
59 |
$5,500,000 |
Streets/Roads |
-52 |
| Boone Avenue Extension-While the recently completed I-4/SR 408 Interim Interchange project has improved limited access interstate mobility, it has resulted in less collector network mobility for Downtown Orlando. |
Orlando |
FL |
112 |
$3,020,000 |
Streets/Roads |
-22 |
| Florida Hospital Commuter Rail Station - Located just north of Downtown Orlando within walking distance of Lake Ivanhoe and Loch Haven Park and will serve one of the largest employers in Central Florida, Florida Hospital. |
Orlando |
FL |
104 |
$2,800,000 |
Streets/Roads |
36 |
| Church Street Commuter Rail Station-Located in the heart of Downtown Orlando, adjacent to the existing Downtown landmark Church Street Station, providing service to the core of the Downtown business area, all major government buildings, senior high-rise h |
Orlando |
FL |
100 |
$2,700,000 |
Streets/Roads |
23 |
| Amtrak/ORMC Commuter Rail Station - Located just south of Downtown Orlando, provides quick and easy mode change to Amtrak, the region's existing train service, and provides service to another leading employer, Orlando Regional Medical Center |
Orlando |
FL |
74 |
$2,000,000 |
Streets/Roads |
24 |
| LYNX Central Commuter Rail Station - Located north of Livingston St. in Downtown Orlando adjacent to the Downtown Bus Terminal providing quick and easy mode change to the regional bus network. Station enhancements include 10 ft. walkways |
Orlando |
FL |
56 |
$1,500,000 |
Streets/Roads |
22 |
| Pine Street Extension The extension of a 2-lane downtown street and the two-waying of an adjacent Pine Street segment are necessary for adequate traffic circulation in Downtown Orlando. Collector level traffic circulation has been impacted |
Orlando |
FL |
45 |
$1,200,000 |
Streets/Roads |
-13 |
| Medical City and VA Hospital Traffic Signal/ITS Interconnect - The Medical City Part of Orlando is the future home of Central Florida, VA Hospital and the UCF Medical School. The installation of fiber optic communications along key corridors |
Orlando |
FL |
41 |
$1,095,000 |
Streets/Roads |
25 |
| Neighborhood Sidewalk Initiative -The Surface Transportation Policy Project ranked Metro Orlando as having the "Meanest Streets" in 2004. The City has been trying to improve the safety of pedestrians with Sidewalk Projects in the Urban Core |
Orlando |
FL |
36 |
$970,000 |
Streets/Roads |
8 |
| Raleigh Street Congestion Management - The roadway on the west side of the City of Orlando continues to experience congestion and safety problems as it accommodates over 16,000 Daily Trips on a two-lane roadway that lacks left turn lanes. |
Orlando |
FL |
18 |
$475,000 |
Streets/Roads |
4 |
| SR 50 /Downtown Orlando - Congestion Management Improvements - The improvements will optimize traffic flow and reduce cut-through traffic in Downtown Core Neighborhoods. The project consists of additional turn lanes approaching SR 50 (Colonial Dr) at the |
Orlando |
FL |
18 |
$475,000 |
Streets/Roads |
19 |
| Regional Transit Center Parking Lot Located adjacent to LYNX Central Station and due to its ideal location, will provide a significant benefit to LYNX employees, guests, visitors, etc., and will ultimately be a hub for future rail expansion, Commuter Rail |
Orlando |
FL |
15 |
$425,000 |
Streets/Roads |
13 |
| Shingle Creek Trail-Critical 1000 foot segment of a paved multi-use trail that is part of overall regional trail network providing access to multiple schools and employment areas. |
Orlando |
FL |
4 |
$110,000 |
Streets/Roads |
-27 |
| Parramore Heritage Park Water Retention |
Orlando |
FL |
25 |
$3,000,000 |
Water |
-25 |
| Water Pipeline Replacement-SR 482 Sand Lake Road from Presidents Drive to S. Orange Blossom Trail |
Orlando |
FL |
10 |
$2,524,190 |
Water |
7 |
| Lake Dot/Hughey Avenue Retrofit- |
Orlando |
FL |
10 |
$1,800,000 |
Water |
-18 |
| Water Pipeline Replacement-Robinson Avenue from Primrose Drive to Mills Avenue |
Orlando |
FL |
10 |
$1,400,000 |
Water |
-5 |
| Silver Star Road FM Project |
Orlando |
FL |
10 |
$1,300,000 |
Water |
-14 |
| Lake Breeze Drive Sanitary Sewers |
Orlando |
FL |
10 |
$1,200,000 |
Water |
6 |
| Oakley St./Pine Bluff Drainage Improvements- |
Orlando |
FL |
10 |
$1,000,000 |
Water |
-2 |
| Lake Eola Upgrade |
Orlando |
FL |
15 |
$1,000,000 |
Water |
-24 |
| Water Pipeline Replacement-Lake Holden Terrace/Albert Shores |
Orlando |
FL |
10 |
$885,000 |
Water |
-1 |
| Lake Monterey Area-Lift Station 27 Relocation |
Orlando |
FL |
10 |
$750,000 |
Water |
-6 |
| Solandra Drive Area-Sanitary Sewer- |
Orlando |
FL |
10 |
$750,000 |
Water |
5 |
| Water Pipeline Replacement-Narcoossee Road Widening-Boggy Creek Road to SR 417 |
Orlando |
FL |
10 |
$640,500 |
Water |
11 |
| Water Pipeline Replacement-SR 50- Good Homes Road to Pine Hills Road |
Orlando |
FL |
10 |
$432,947 |
Water |
0 |
| Clear Lake Area -Lift Station 57 Rehabilitation |
Orlando |
FL |
10 |
$100,000 |
Water |
5 |
| Englewood Park Area- Lift Station 16 Rehabilitation |
Orlando |
FL |
10 |
$100,000 |
Water |
5 |
| Holden Heights Area-Lift Station 18 Rehabilitation |
Orlando |
FL |
10 |
$100,000 |
Water |
7 |
| Lake Sunset Area-Lift Station 54 Rehabilitation Convert type lift station to submersible pump type lift station to address age, maintenance and safety concerns. |
Orlando |
FL |
10 |
$100,000 |
Water |
3 |
| Malibu Groves Area-Lift Station 60 Rehabiliatation |
Orlando |
FL |
10 |
$100,000 |
Water |
3 |
| Richmond Heights Area-Lift Station 65 Rehabilitation |
Orlando |
FL |
10 |
$100,000 |
Water |
3 |
| Rio Grande Park Area-Lift Station 28 Rehabilitation |
Orlando |
FL |
10 |
$100,000 |
Water |
4 |
| Silver Star Area-Lift Station 41 Rehabilitation |
Orlando |
FL |
10 |
$100,000 |
Water |
3 |
| West Colonial Area-Lift Station 35 Rehabilitation |
Orlando |
FL |
10 |
$100,000 |
Water |
5 |
| ORLANDO INTERNATIONAL AIRPORT-Rehabilitation of Taxiway C-Phase 2 |
Orlando |
FL |
100 |
$20,000,000 |
Airport |
-1 |
| ORLANDO EXECUTIVE AIRPORT-Airfield Improvement Projects |
Orlando |
FL |
20 |
$3,200,000 |
Airport |
-39 |
| ORLANDO INTERNATIONAL AIRPORT-Upgrade Airfield Lighting Equipment |
Orlando |
FL |
8 |
$1,300,000 |
Airport |
-6 |
| ORLANDO EXECUTIVE AIRPORT-Airport Drainage & Master Plan Updates |
Orlando |
FL |
4 |
$500,000 |
Airport |
-11 |
| Orlando Amtrak/Commuter Rail Transfer Station Renovation-1400 Sligh Blvd-Orlando, FL 32806 |
Orlando |
FL |
15 |
$3,500,000 |
Amtrak |
39 |
| Park Improvements-throughout the City |
Orlando |
FL |
145 |
$7,725,000 |
CDBG |
-29 |
| Homeless MenÂ’s Service Center-The facility would provide 24/7 case management, supportive services (including job training, mental health and substance abuse counseling) and beds for 250 homeless men. It will be a two story 28,000 sq. ft. facility with a |
Orlando |
FL |
70 |
$6,700,000 |
CDBG |
31 |
| Mission Road Part 1 The initial segment of the 4-lane divided arterial, Mission Road, will provide critical surface street access between multi-family housing areas, and industrial/retail employment opportunities. |
Orlando |
FL |
234 |
$6,300,000 |
CDBG |
-1 |
| Recreation Facility Improvements-Locations throughout the City |
Orlando |
FL |
60 |
$3,800,000 |
CDBG |
-30 |
| Homeless Assistance Drop-in Center |
Orlando |
FL |
5 |
$2,000,000 |
CDBG |
24 |
| Lake Dot/Hughey Avenue Stormwater Retrofit Project |
Orlando |
FL |
10 |
$1,800,000 |
CDBG |
1 |
| Englewood/Monterey Underdrain Construction |
Orlando |
FL |
10 |
$1,100,000 |
CDBG |
1 |
| New Malibu Underdrain Construction |
Orlando |
FL |
10 |
$1,100,000 |
CDBG |
-4 |
| North Parramore Site Development-Infrastructure/site improvements for housing development in the Parramore neighborhood |
Orlando |
FL |
25 |
$1,100,000 |
CDBG |
-4 |
| Lake Angel/Conroy Basin Drainage Improvements |
Orlando |
FL |
10 |
$1,000,000 |
CDBG |
-5 |
| Oakley Street Drainage Improvements |
Orlando |
FL |
10 |
$1,000,000 |
CDBG |
-2 |
| Bumby Avenue Resurfacing |
Orlando |
FL |
10 |
$985,500 |
CDBG |
16 |
| Orange Blossom Trail Corridor Drainage Improvements |
Orlando |
FL |
10 |
$850,000 |
CDBG |
-3 |
| Lake Mann Estates Underdrain Construction |
Orlando |
FL |
10 |
$669,200 |
CDBG |
-6 |
| Andora Street Drainage Improvements |
Orlando |
FL |
10 |
$350,000 |
CDBG |
0 |
| Coalition for the Homeless-Women & Children Bathroom Facilities Renovation |
Orlando |
FL |
12 |
$274,197 |
CDBG |
32 |
| Center for Multicultural Wellness & Prevention-Renovation/Site Improvement for Youth Academic Enrichment Center |
Orlando |
FL |
12 |
$245,500 |
CDBG |
-24 |
| Z.L. Riley Park |
Orlando |
FL |
20 |
$200,000 |
CDBG |
-6 |
| Mercy Drive Resurfacing/Underdrains |
Orlando |
FL |
10 |
$185,500 |
CDBG |
3 |
| Quest, Inc.-South Vocational Facility Rehabilitation |
Orlando |
FL |
12 |
$124,898 |
CDBG |
-5 |
| Center for Drug Free Living |
Orlando |
FL |
3 |
$35,589 |
CDBG |
-5 |
| 600 Kilowatt rooftop solar array system downtown-to increase renewable energy production in Central Florida and support the growing solar industry in Florida |
Orlando |
FL |
53 |
$3,700,000 |
Energy |
49 |
| Illuminated Street Name Signs Upgrade Project -This project will provide an energy savings and improve navigation throughout the City by replacing incandescent illuminated street name signs at traffic signals with energy efficient LED street name signs. |
Orlando |
FL |
75 |
$2,018,000 |
Energy |
23 |
| Reeves Terrace-Security Fencing & Signage |
Orlando |
FL |
8 |
$500,000 |
Housing |
-17 |
| Ivey Lane Dumpster Enclosures, Approach and Landscaping |
Orlando |
FL |
2 |
$122,000 |
Housing |
-33 |
| Griffin Park -Playground Equipment |
Orlando |
FL |
2 |
$90,000 |
Housing |
-13 |
| Citrus Square-Security Lighting |
Orlando |
FL |
10 |
$75,000 |
Housing |
3 |
| Murchison Terrace Dumpster Enclosures, Approach and Landscaping |
Orlando |
FL |
2 |
$61,000 |
Housing |
-15 |
| Griffin Park -Demolition of Building 812 |
Orlando |
FL |
5 |
$50,000 |
Housing |
-5 |
| Police In-Car video cameras for all patrol vehicles. This will enhance officer safety and capture evidence from traffic stops and vehicle pursuits. |
Orlando |
FL |
0 |
$3,238,400 |
Public Safety |
8 |
| The Orlando Police Department is implementing a new crime fighting and prevention tool, IRIS (Innovative Response to Improve Technology). This project uses camera technology to prevent, detect, and respond to crime throughout the City of Orlando. |
Orlando |
FL |
1 |
$500,000 |
Public Safety |
-17 |
| The Orlando Police DepartmentÂ’s Crime Scene Investigations Unit has identified new technology for investigating crime scenes: a laser measuring system for more precise measurements which is crucial during court proceedings & a digital recording system, Cr |
Orlando |
FL |
0 |
$316,500 |
Public Safety |
-23 |
| Orlando Police Department's Drug Enforcement Division is currently utilizing out-dated covert audio and video equipment. The equipment is approximately 5 to 10 years old. The division is also in need of night vision optics to assist in surveillance during |
Orlando |
FL |
0 |
$285,000 |
Public Safety |
1 |
| The Orlando Police Department has employed various methods & tactics in an effort to reduce violent crime. The addition of two sworn-officers in our busiest areas would allow patrol units to increase the number of self-initiated actions |
Orlando |
FL |
2 |
$250,000 |
Public Safety |
13 |
| Protective vests save lives. The Orlando Police Department utilizes different types of vests for patrol units, criminal investigative units & SWAT units all of which have manufacturers' life expectancies. |
Orlando |
FL |
0 |
$150,000 |
Public Safety |
28 |
| Taser technology has improved over the years. The Orlando Police Department's officers currently use Taser Model M26 which is 2003 technology. Budget constraints currently prevent the replacement of 20% of the department's M26s with today's model X26. |
Orlando |
FL |
0 |
$135,000 |
Public Safety |
-21 |
| The Orlando Police Department's two specialized units, Motors & Mounted (Motorcycles & Horses) are vital units to fighting crime in the City of Orlando. These units both utilize equipment that has recommended manufacture's life expectancy. |
Orlando |
FL |
0 |
$128,000 |
Public Safety |
1 |
| The Orlando Police Department's Forensic Imaging equipment has outlived its life expectancy & should any of the components fail, our department's photographic capability regarding latent prints will be severely hampered. Current budget constraints hinder |
Orlando |
FL |
0 |
$115,000 |
Public Safety |
11 |
| Digital cameras have become the standard for photographing crime scenes, accidents, suspects, etc. Current budget constraints have hampered the purchase of new & replacement still & video equipment in the Orlando Police Department. |
Orlando |
FL |
0 |
$65,000 |
Public Safety |
-6 |
| Up-to-date protective equipment is needed to allow the Orlando Police Department's training unit to increase the realism of exercises while protecting our officers & dogs. Current budget constraints have hampered the purchase of this equipment. |
Orlando |
FL |
0 |
$37,000 |
Public Safety |
-17 |
| Edgewater HS-Comprehensive school renovation to meet current educational adequacy, and enhance security, technology, and efficiency. |
Orlando |
FL |
750 |
$84,318,500 |
Schools |
30 |
| Odyssey MS-Construct a Relief School for the overcrowded Odyssey MS to enhance the student learning environment and eliminate portable classrooms. |
Orlando |
FL |
500 |
$40,136,600 |
Schools |
28 |
| Dr. Phillips 9th-Portable Replacement project to replace old portable classrooms with permanent construction to enhance the learning environment, safety, and security. |
Orlando |
FL |
200 |
$28,000,000 |
Schools |
17 |
| Nap Ford Community School- construction of permanent building |
Orlando |
FL |
300 |
$25,378,000 |
Schools |
56 |
| Shingle Creek ES-Replacement of modular classrooms with permanent classrooms which may include New Classroom Buildings , Administrative Addition, Remodel Cafeteria, Media Center, Upgrade Classrooms, Replace HVAC System, Replace Fire alarm System |
Orlando |
FL |
300 |
$23,580,800 |
Schools |
16 |
| Azalea Park ES Replacement-Comprehensive school renovation to meet current educational adequacy, and enhance security, technology, and efficiency. |
Orlando |
FL |
325 |
$19,724,900 |
Schools |
20 |
| Citywide-All-Network infrastructure enhancements to upgrade all existing schools within Orlando to current standards to meet the educational needs of all students, faculty and administrators. |
Orlando |
FL |
15 |
$18,000,000 |
Schools |
35 |
| Orange Center ES-Administrative Addition, Remodel Classroom Building, Remodel Media Center and Cafeteria, Build a new Central energy Plant. |
Orlando |
FL |
310 |
$12,134,400 |
Schools |
9 |
| Boone HS-Portable Replacement project to replace old portable classrooms with permanent construction |
Orlando |
FL |
150 |
$7,000,000 |
Schools |
26 |
| Citywide-All-Classroom Computer Installation/Upgrade to ensure the classroom computing environment at all existing schools within Orlando meet district standards in terms of computer availability and up-to-date software to meet the educational needs |
Orlando |
FL |
30 |
$6,520,000 |
Schools |
27 |
| Rosemont ES-Portable Replacement project to replace old portable classrooms with permanent construction to enhance student learning environment and eliminate portable classrooms. |
Orlando |
FL |
115 |
$4,800,000 |
Schools |
12 |
| Rosemont ES Comprehensive-Add Outside Air to Classroom HVAC Systems, Replace Kitchen Grease Traps and Fans, Upgrade Classroom Technology, Repair Roofing |
Orlando |
FL |
40 |
$3,951,360 |
Schools |
13 |
| Jones HS-New school Stadium (Football/Track) at the existing practice field facility with new Bleachers, Fieled House, Restrooms, and Concessions Stands to allow all School athletic activities to occur on-campus rather than in the Citrus Bowel. |
Orlando |
FL |
30 |
$3,800,000 |
Schools |
-33 |
| Jones HS/Howard MS/McCoy ES-All-Site Lighting LED Lighting Test Program to replace existing incandesant lighting with new high efficiency LED lighting. |
Orlando |
FL |
18 |
$3,750,000 |
Schools |
8 |
| Citywide-All-School Bicycle/Pedestrian enhancements to facilitate the convenient use of alternatives to internal combustion engine powered modes of transportation to move students to and from the schools. This would include sidewalk/biketrail improvement |
Orlando |
FL |
16 |
$2,500,000 |
Schools |
25 |
| Dr. Phillips HS-Replace Chilled Water Lines throughout the campus. Replace Air Handler Units and controls. Replace Chillers #2 & #3. Replace Cooling Tower. |
Orlando |
FL |
36 |
$2,350,000 |
Schools |
-3 |
| Odyssey MS Relief MS-Construct Narcoossee Roadway and Sidewalk improvements to facilitate safe and efficient movement of students into this new school site. |
Orlando |
FL |
20 |
$2,300,000 |
Schools |
0 |
| Jones HS-Kitchen equipment and additional Freezer, Cooler, and Dry Storage Space to support the Central Kitchen Concept which will enhance overall food service quality and efficiency. |
Orlando |
FL |
12 |
$2,000,000 |
Schools |
-10 |
| Magic Way-Driveway and Parking Lot Pavement and Sidewalk enhancement to promote safety at this OCPS Facilities Services location. |
Orlando |
FL |
12 |
$1,800,000 |
Schools |
-18 |
| Citywide-All-Site Security Fencing Enhancement Program to ensure compliance with Jessica Lunsford Act requirement that all campuses be secure from intrusion. |
Orlando |
FL |
15 |
$1,650,000 |
Schools |
13 |
| Edgewater HS-Sidewalk infrastructure improvements along Maurey Rd to enhance safety of students while travelling to and from school. |
Orlando |
FL |
15 |
$1,100,000 |
Schools |
3 |
| Citywide-All-Classroom Technology Installation/Upgrade to ensure the classroom learning environment at all existing schools within Orlando meet district standards in terms of audio enhancement, video projection and whiteboards to equitably meet the educat |
Orlando |
FL |
15 |
$1,040,000 |
Schools |
19 |
| Citywide-All-Server Virtualization to upgrade the school computing environment at all existing schools within Orlando to current standards to meet the educational needs of all students, faculty and administrators. |
Orlando |
FL |
15 |
$1,040,000 |
Schools |
14 |
| Engelwood ES-Replace obsolete technology spine to allow installation of computers in classrooms to facilitate an enhanced learning environment.. |
Orlando |
FL |
12 |
$501,000 |
Schools |
7 |
| Azalea Park ES-Replace existing offsite water main with larger line to achieve required fire flow. |
Orlando |
FL |
15 |
$500,000 |
Schools |
-1 |
| Northlake Park ES-Security Enhancements to facilitate compliance with Jessica Lundsford Act in this school which is co-located with the YMCA. |
Orlando |
FL |
14 |
$350,000 |
Schools |
7 |
| Cherokee School ES-Replace aging sewerage lift station, repave parking areas, and upgrade HVAC system to enhance safety, security, and efficiency. |
Orlando |
FL |
8 |
$275,000 |
Schools |
12 |
| Stonewall Jackson MS-Perform repairs to roofs approaching end of anticipated life to ensure a quality learning environment for the students and staff and prolong the life of the facility. |
Orlando |
FL |
12 |
$250,000 |
Schools |
13 |
| Lake Silver ES-Replace aging sewerage lift station, repave drives and parking areas, and perform upgrades to HVAC in selected buildings to enhance campus safety, security, and efficiency. Replace DX units (12 small) |
Orlando |
FL |
5 |
$210,000 |
Schools |
12 |
| Eccelston ES-Replace the roof on Building #12 |
Orlando |
FL |
12 |
$200,000 |
Schools |
8 |
| Catalina ES (old)-Parking and sidewalk improvements, restroom upgrades to ADA standards, HVAC upgrades and site improvements to facilitate continued District use of this obsolete facility. |
Orlando |
FL |
8 |
$120,000 |
Schools |
2 |
| Howard MS-Facility Accessibility (ADA) campus modifications, repave drives, parking lot and sidewalks to enhance safety, security and accessiblity. |
Orlando |
FL |
5 |
$105,000 |
Schools |
2 |
| Audubon Park Relie-Sidewalk infrastructure improvements in the surrounding community to enhance safety of children while travelling to and from school. |
Orlando |
FL |
5 |
$84,000 |
Schools |
-4 |
| Eagle's Nest Sidewalk infrastructure improvements in the surrounding community to enhance safety of children while travelling to and from school. |
Orlando |
FL |
5 |
$75,000 |
Schools |
22 |
| Audubon Park (old) ES-Replace and upgrade existing aged and failing sewerage lift station. |
Orlando |
FL |
10 |
$75,000 |
Schools |
7 |
| Howard MS-Replace and upgrade existing aged and failing sewerage lift station. |
Orlando |
FL |
10 |
$75,000 |
Schools |
11 |
| Engelwood ES-Sidewalk infrastructure improvements in the surrounding community to enhance safety of children while travelling to and from school. |
Orlando |
FL |
5 |
$65,000 |
Schools |
-5 |
| Grand Avenue ES-Sidewalk infrastructure improvements in the surrounding community to enhance safety of children while travelling to and from school. |
Orlando |
FL |
5 |
$65,000 |
Schools |
5 |
| Ivey Lane ES-Sidewalk infrastructure improvements in the surrounding community to enhance safety of children while travelling to and from school. |
Orlando |
FL |
5 |
$65,000 |
Schools |
-2 |
| Rock Lake ES-Sidewalk infrastructure improvements in the surrounding community to enhance safety of children while travelling to and from school. |
Orlando |
FL |
5 |
$65,000 |
Schools |
-4 |
| Boone HS-Re-pave drives, parking areas, and sidewalks to enhance campus safety. |
Orlando |
FL |
12 |
$65,000 |
Schools |
-4 |
| Richmond Heights ES-Sidewalk infrastructure improvements in the surrounding community to enhance safety of children while travelling to and from school. |
Orlando |
FL |
5 |
$54,000 |
Schools |
-5 |
| Eccelston ES ES Sidewalk infrastructure improvements in the surrounding community to enhance safety of children while travelling to and from school. |
Orlando |
FL |
5 |
$52,000 |
Schools |
0 |
| Lake Como ES-Sidewalk infrastructure improvements in the surrounding community to enhance safety of children while travelling to and from school. |
Orlando |
FL |
5 |
$52,000 |
Schools |
3 |
| Odyssey MS-Computer Server Room HVAC and Electrical Upgrade to upgrade the school computing environment. |
Orlando |
FL |
5 |
$45,000 |
Schools |
12 |
| Washington Shores ES-Sidewalk infrastructure improvements in the surrounding community to enhance safety of children while travelling to and from school. |
Orlando |
FL |
5 |
$45,000 |
Schools |
-4 |
| Blankner K-8 Schoo-Consolidate Fire Alarm System (Gym and Main Building) to ehance safety and security. |
Orlando |
FL |
5 |
$40,000 |
Schools |
10 |
| Audubon Park (old) ES-Parking and sidewalk improvements, restroom upgrades to ADA standards, and HVAC upgrades to facilitate continued District use of this obsolete facility. |
Orlando |
FL |
32 |
$36,050 |
Schools |
7 |
| Lake Silver ES-Sidewalk infrastructure improvements in the surrounding community to enhance safety of children while travelling to and from school. |
Orlando |
FL |
5 |
$35,000 |
Schools |
7 |
| Dover Shores ES-Re-pave drives, parking areas, and sidewalks to enhance campus safety. |
Orlando |
FL |
8 |
$32,000 |
Schools |
0 |
| Hillcrest ES-Sidewalk infrastructure improvements in the surrounding community to enhance safety of children while travelling to and from school. |
Orlando |
FL |
5 |
$25,000 |
Schools |
2 |
| Carver Facility Accessibility (ADA) campus modifications |
Orlando |
FL |
5 |
$20,000 |
Schools |
6 |
| Bus Rapid Transit System – Bus Replacement: The existing Downtown Bus Rapid Transit circulator connects the Downtown Central Business District Core, City Hall, Amway Arena, and the Orange County Courthouse to LYNX Central Station, which will also serve as |
Orlando |
FL |
260 |
$7,000,000 |
Transit |
7 |