| Citywide Street Resurfacing - mill and resurface all City streets |
Miami |
FL |
3500 |
$175,000,000 |
Streets/Roads |
-34 |
| Port of Miami Tunnel |
Miami |
FL |
2000 |
$100,000,000 |
Streets/Roads |
-32 |
| Citywide Drainage Improvements |
Miami |
FL |
1000 |
$50,000,000 |
Streets/Roads |
10 |
| Coconut Grove Roadway Improvements (Master Plan), Drainage and Road Improvements |
Miami |
FL |
1000 |
$50,000,000 |
Streets/Roads |
0 |
| Citywide Storm Sewer System De-silting - remove granular material from manholes, inlets, cross-drains, French drains and slab-covered trenches. |
Miami |
FL |
900 |
$45,000,000 |
Streets/Roads |
-3 |
| Downtown Infrastructure and Beautification - install lighting, replace sidewalk, add ADA, repave, landscaping |
Miami |
FL |
600 |
$30,000,000 |
Streets/Roads |
-13 |
| Overtown Greenway Phase II |
Miami |
FL |
600 |
$30,000,000 |
Streets/Roads |
-6 |
| Health District Roadway Improvements and Streetscapes |
Miami |
FL |
500 |
$25,000,000 |
Streets/Roads |
-3 |
| Health District Streetscape & Roadway Improvements |
Miami |
FL |
400 |
$20,000,000 |
Streets/Roads |
-11 |
| Overtown Greenway Phase 2 |
Miami |
FL |
400 |
$20,000,000 |
Streets/Roads |
-14 |
| Miami River Greenway Extension (west of NW 12th Avenue) |
Miami |
FL |
300 |
$15,000,000 |
Streets/Roads |
2 |
| Citywide Bridge Repair/Rehab |
Miami |
FL |
260 |
$13,000,000 |
Streets/Roads |
8 |
| Citywide slab cover trenches cleaning |
Miami |
FL |
240 |
$12,000,000 |
Streets/Roads |
-4 |
| SE Overtown/Park West Area wide Roadway and Utility Improvements |
Miami |
FL |
240 |
$12,000,000 |
Streets/Roads |
-6 |
| Citywide Traffic Calming |
Miami |
FL |
200 |
$10,000,000 |
Streets/Roads |
-11 |
| NW 14th Terr. Streetscape, Drainage and Road Improvements |
Miami |
FL |
200 |
$9,500,000 |
Streets/Roads |
2 |
| Citywide Bicycle Facilities |
Miami |
FL |
160 |
$8,000,000 |
Streets/Roads |
5 |
| Miami Baywalk |
Miami |
FL |
160 |
$8,000,000 |
Streets/Roads |
-9 |
| South Bayshore Drive Drive Roadway Improvements, Drainage and Road Improvements |
Miami |
FL |
160 |
$8,000,000 |
Streets/Roads |
1 |
| Omni Utitlity Improvements |
Miami |
FL |
138 |
$6,921,000 |
Streets/Roads |
-5 |
| Buena Vista Heights Street Improvements, Phase II, Drainage and Road Improvements |
Miami |
FL |
120 |
$6,112,890 |
Streets/Roads |
-1 |
| North Bayshore Drive Drainage Improvements, Drainage and Road Improvements |
Miami |
FL |
120 |
$5,926,690 |
Streets/Roads |
1 |
| Overtown Greenway @ NW 11 Terrace, Overtown Greenway Segment Improvements |
Miami |
FL |
110 |
$5,500,000 |
Streets/Roads |
-2 |
| Auburn Storm Sewer Drainage and Road Improvements |
Miami |
FL |
100 |
$5,320,000 |
Streets/Roads |
-1 |
| Palm Grove Road Improvements, Drainage and Road Improvements |
Miami |
FL |
100 |
$5,280,000 |
Streets/Roads |
-5 |
| North 14th Street Multimedia Entertainment District, Drainage and Road Improvements |
Miami |
FL |
100 |
$5,064,740 |
Streets/Roads |
-2 |
| Brickell Area Roadway and Street Improvements |
Miami |
FL |
100 |
$5,000,000 |
Streets/Roads |
-3 |
| City-wide Bridge Repair, Bridge Repair and Restoration |
Miami |
FL |
100 |
$5,000,000 |
Streets/Roads |
3 |
| N. Spring Garden Greenway Improvements, Miami River Greenway Road and Drainage Improvements |
Miami |
FL |
80 |
$4,130,710 |
Streets/Roads |
-2 |
| Garden Storm Sewer, Drainage and Road Improvements |
Miami |
FL |
80 |
$4,110,000 |
Streets/Roads |
-2 |
| City-wide Roadway Resurfacing/Repair and Swale Improvement, Road Improvements |
Miami |
FL |
80 |
$4,000,000 |
Streets/Roads |
-1 |
| Miami River Greenway - East Little Havana , Miami River Greenway Road and Drainage Improvements |
Miami |
FL |
70 |
$3,808,200 |
Streets/Roads |
0 |
| City-wide Sidewalk and ADA Ramp installation and repair |
Miami |
FL |
60 |
$3,000,000 |
Streets/Roads |
-2 |
| Citywide Storm Sewer Drainage Inlet Retrofit - retrofit all drainage inlets with barrier screens to keep trash out of drainage system |
Miami |
FL |
60 |
$3,000,000 |
Streets/Roads |
3 |
| Citywide Traffic Control Measures, Citywide Traffic Calming Measures |
Miami |
FL |
50 |
$2,640,000 |
Streets/Roads |
-1 |
| Bird Avenue Road Improvements, Drainage and Road Improvements |
Miami |
FL |
50 |
$2,541,000 |
Streets/Roads |
3 |
| Coral Gate Wall, Design & Construction of a 12 foot concrete wall |
Miami |
FL |
50 |
$2,500,000 |
Streets/Roads |
-10 |
| Northwest 14th Street Streetscape Improvements, Drainage and Road Improvements |
Miami |
FL |
40 |
$2,232,000 |
Streets/Roads |
-1 |
| Miami River Greenway NW 5th Street Bridge Extension, Miami River Greenway Road and Drainage Improvements |
Miami |
FL |
60 |
$2,077,280 |
Streets/Roads |
4 |
| Brickell Key Bridge, Ridge Restoration |
Miami |
FL |
40 |
$2,000,000 |
Streets/Roads |
4 |
| Coral Way Roadway Improvements PH II |
Miami |
FL |
40 |
$2,000,000 |
Streets/Roads |
0 |
| Intelligent Transportation System (ITS) Devices on Bridges over the Miami River |
Miami |
FL |
40 |
$2,000,000 |
Streets/Roads |
-3 |
| SW 10th Street Drainage Improvements, Drainage and Road Improvements |
Miami |
FL |
35 |
$1,848,000 |
Streets/Roads |
0 |
| Dinner Key Mooring, Boat Anchorage and Upland Improvements |
Miami |
FL |
30 |
$1,773,580 |
Streets/Roads |
-7 |
| Citywide Traffic Study, Evaluation of Traffic Calming Measures |
Miami |
FL |
30 |
$1,584,000 |
Streets/Roads |
-3 |
| Citywide GIS archival registration of as-built documents |
Miami |
FL |
30 |
$1,500,000 |
Streets/Roads |
2 |
| NW 82nd Street Traffic Calming |
Miami |
FL |
30 |
$1,500,000 |
Streets/Roads |
-5 |
| Miami River Greenway 2nd Ave / Miami Ave Riverwalk Extension, Miami River Greenway Road and Drainage Improvements |
Miami |
FL |
30 |
$1,483,900 |
Streets/Roads |
4 |
| NW 2nd Avenue Road Improvements, Drainage and Road Improvements |
Miami |
FL |
30 |
$1,450,000 |
Streets/Roads |
1 |
| Miami River Greenway - Miami Circle Greenway, Miami River Greenway Improvements |
Miami |
FL |
20 |
$1,320,000 |
Streets/Roads |
2 |
| Shenandoah Traffic Calming Phase 2, Traffic Calming Measures |
Miami |
FL |
25 |
$1,213,000 |
Streets/Roads |
-2 |
| Shenandoah Traffic Calming Priority 4, Traffic Calming Measures |
Miami |
FL |
20 |
$1,050,000 |
Streets/Roads |
-1 |
| Durham Terrace Drainage Improvements, Drainage and Road Improvements |
Miami |
FL |
20 |
$1,000,000 |
Streets/Roads |
-3 |
| Miami River Greenway - NW 5th Street Bridge Approach, Miami River Greenway Road and Drainage Improvements |
Miami |
FL |
10 |
$844,000 |
Streets/Roads |
4 |
| Miami River Greenway - NW 5th Street Extension, Miami River Greenway Road and Drainage Improvements |
Miami |
FL |
12 |
$844,000 |
Streets/Roads |
-1 |
| Miami River Greenway SE 5th Street Extension, Miami River Greenway Road and Drainage Improvements |
Miami |
FL |
12 |
$844,000 |
Streets/Roads |
-1 |
| Traffic Calming - Grove area |
Miami |
FL |
20 |
$728,500 |
Streets/Roads |
-7 |
| Flagami Traffic Calming (including East Little Havana), Traffic Calming Measures |
Miami |
FL |
10 |
$700,000 |
Streets/Roads |
-3 |
| Storm Drainage Master Plan Update |
Miami |
FL |
10 |
$650,000 |
Streets/Roads |
0 |
| Silver Bluff Traffic calming Priority 3, Traffic Calming Measures |
Miami |
FL |
10 |
$600,000 |
Streets/Roads |
0 |
| North Bayshore Drive Operational Improvements, Traffic Roundabout and Median Modifications |
Miami |
FL |
10 |
$500,000 |
Streets/Roads |
0 |
| 16th St. from 27 to 28 Ave., Drainage and Road Improvements |
Miami |
FL |
10 |
$450,000 |
Streets/Roads |
-1 |
| 18th St from 30 to 32 Ave., Drainage and Road Improvements |
Miami |
FL |
10 |
$450,000 |
Streets/Roads |
-1 |
| NW 16th Street and 16th Terrace Streetscape, Drainage and Road Improvements |
Miami |
FL |
10 |
$450,000 |
Streets/Roads |
-1 |
| NW 18th Street Streetscape, Drainage and Road Improvements |
Miami |
FL |
10 |
$450,000 |
Streets/Roads |
1 |
| Calle Ocho Landscaping Project, Landscaping/Beautification |
Miami |
FL |
5 |
$302,500 |
Streets/Roads |
-6 |
| NW 24th St from 12th to 13th Ave Streetscape, Drainage and Road Improvements |
Miami |
FL |
5 |
$251,000 |
Streets/Roads |
0 |
| Belle Meade - FPL Duct Bank Supplemental, Electrical Supply to Belle Meade Pump Station |
Miami |
FL |
5 |
$247,000 |
Streets/Roads |
0 |
| Buena Vista East Historic Dist. Streetscape, Drainage and Road Improvements |
Miami |
FL |
5 |
$240,000 |
Streets/Roads |
0 |
| DKM Emergency Repairs Pier #3 & #5, Marina Repairs and Restoration |
Miami |
FL |
5 |
$200,000 |
Streets/Roads |
2 |
| NW 58 Street Improvements (Miscellaneous Street Paving), Road Improvements |
Miami |
FL |
2 |
$174,027 |
Streets/Roads |
0 |
| Citywide Traffic Circles D2, D3 and D5, Traffic Calming Measures |
Miami |
FL |
2 |
$100,000 |
Streets/Roads |
-1 |
| Bicentennial Park Sewer & Water Treatment Plant Relocation |
Miami |
FL |
2000 |
$100,000,000 |
Water |
-4 |
| Citywide Canal Maintenance Dredging |
Miami |
FL |
600 |
$30,000,000 |
Water |
4 |
| Wagner Creek Seybold Canal Environmental Cleanup and Dredging |
Miami |
FL |
350 |
$17,000,000 |
Water |
7 |
| City wide storm water outfalls retrofitting |
Miami |
FL |
240 |
$12,000,000 |
Water |
4 |
| Storm water pump stations rehabilitation |
Miami |
FL |
240 |
$12,000,000 |
Water |
5 |
| City wide storm inlets survey data collection |
Miami |
FL |
100 |
$5,000,000 |
Water |
-2 |
| Wagner Creek stationary trash screen |
Miami |
FL |
100 |
$5,000,000 |
Water |
-4 |
| Ademar and Davis Canal Dredging Project |
Miami |
FL |
79 |
$3,927,400 |
Water |
-3 |
| Dinner Key Dredging Mitigation, Maintenance Dredging and Environmental Mitigation |
Miami |
FL |
40 |
$2,300,000 |
Water |
5 |
| Fern Isle Waterway Cleaning |
Miami |
FL |
40 |
$2,000,000 |
Water |
-3 |
| Albert Pallot Park Shoreline Stabilization |
Miami |
FL |
24 |
$1,200,000 |
Water |
19 |
| MIA Central Boulevard Widening, Realignment and Service Loop project (CAPACITY) |
Miami |
FL |
715 |
$97,000,000 |
Airport |
-1 |
| North Terminal Development Program (CAPACITY) |
Miami |
FL |
400 |
$61,000,000 |
Airport |
3 |
| MIA Perimeter Road Widening and Rerouting through NW 42nd Court (SECURITY) |
Miami |
FL |
140 |
$24,000,000 |
Airport |
-6 |
| North Terminal Development Program - Regional Commuter Facility |
Miami |
FL |
46 |
$17,000,000 |
Airport |
3 |
| North Terminal Development Program - Regional Commuter Facility Covered Walkway |
Miami |
FL |
60 |
$16,000,000 |
Airport |
-9 |
| North Terminal Development Program - Contract 746I - BC 3rd Level Office Remodeling |
Miami |
FL |
125 |
$16,000,000 |
Airport |
-4 |
| Security & Operations Command Center (SECURITY) |
Miami |
FL |
165 |
$15,000,000 |
Airport |
-5 |
| TMB - Runway 9R-27L Extension (CAPACITY) |
Miami |
FL |
170 |
$13,000,000 |
Airport |
5 |
| North Terminal Development Program - Cc. D-C 400HzPower and Pre-Conditioned Air |
Miami |
FL |
67 |
$7,000,000 |
Airport |
-1 |
| North Terminal Development Program - Cc D Extension Completion Work |
Miami |
FL |
100 |
$5,000,000 |
Airport |
-2 |
| Airport Police Department K-9 Facility (SECURITY) |
Miami |
FL |
100 |
$4,500,000 |
Airport |
-4 |
| Watson Island Heliport Facility |
Miami |
FL |
80 |
$4,000,000 |
Airport |
-9 |
| Sewer Booster PumpStation (CAPACITY) |
Miami |
FL |
40 |
$2,600,000 |
Airport |
2 |
| New FAA Air-Traffic Control Tower (ATCT) (SAFETY) |
Miami |
FL |
86 |
$1,900,000 |
Airport |
5 |
| Runway 27 - Threshold Relocation (CAPACITY) |
Miami |
FL |
30 |
$1,500,000 |
Airport |
-4 |
| Jackson Health System Pediatric Ambulatory & Children's Centers |
Miami |
FL |
4134 |
$210,000,000 |
CDBG |
10 |
| Citywide Parking Garages - marinas, design district, upper east side, little Havana |
Miami |
FL |
4000 |
$200,000,000 |
CDBG |
-33 |
| Jackson Health System Capital Projects |
Miami |
FL |
2762 |
$172,000,000 |
CDBG |
6 |
| Citywide ADA Improvements |
Miami |
FL |
2000 |
$100,000,000 |
CDBG |
-7 |
| Orange Bowl Site Parking Garage, Construction of multi-story parking garages. |
Miami |
FL |
900 |
$94,000,000 |
CDBG |
-36 |
| Jackson Health Facilities Infrastructure Improvements |
Miami |
FL |
1191 |
$71,686,000 |
CDBG |
-2 |
| Museum Park Construction |
Miami |
FL |
1400 |
$70,000,000 |
CDBG |
-20 |
| Virginia Key Landfill Environmental Conversion |
Miami |
FL |
800 |
$40,000,000 |
CDBG |
3 |
| Citywide Environmental Remediation |
Miami |
FL |
600 |
$30,000,000 |
CDBG |
-1 |
| Citywide Fire Station Construction & Improvements |
Miami |
FL |
600 |
$30,000,000 |
CDBG |
3 |
| Municipal Broadband Network |
Miami |
FL |
560 |
$28,000,000 |
CDBG |
-3 |
| Grove Waterfront Park Construction |
Miami |
FL |
500 |
$25,000,000 |
CDBG |
-15 |
| New Moore Park Community Center, Tennis Center and Day Care |
Miami |
FL |
550 |
$25,000,000 |
CDBG |
-24 |
| Gibson Park New Construction, Demolition of existing buildings and construction of new Community Center, Aquatic Center, Sports & Fitness Center, field resurfacing and new landscaping |
Miami |
FL |
400 |
$20,868,100 |
CDBG |
-15 |
| IT Infrastructure Modernization |
Miami |
FL |
20 |
$20,000,000 |
CDBG |
1 |
| Legion Park Building & Kayak Launch Improvements |
Miami |
FL |
400 |
$20,000,000 |
CDBG |
-12 |
| Virginia Key Beach Museum |
Miami |
FL |
400 |
$20,000,000 |
CDBG |
-18 |
| Jackson Health System Trauma Center |
Miami |
FL |
198 |
$12,000,000 |
CDBG |
12 |
| Hadley Park Youth Center & Field Improvements, New: 22,000 sf building w/ basketball gym, lockers & restrooms, classrooms, storage and field improv. |
Miami |
FL |
230 |
$11,000,000 |
CDBG |
-6 |
| Bayfront Park Renovation |
Miami |
FL |
200 |
$10,000,000 |
CDBG |
-8 |
| Camillus House Building Improvements |
Miami |
FL |
200 |
$10,000,000 |
CDBG |
-3 |
| New Curtis Park Aquatic Center |
Miami |
FL |
200 |
$10,000,000 |
CDBG |
-13 |
| New Duarte Park Building - construction of a new community building |
Miami |
FL |
200 |
$10,000,000 |
CDBG |
-7 |
| New Morningside Park Aquatic Center |
Miami |
FL |
200 |
$10,000,000 |
CDBG |
-19 |
| New Virrick Park Aquatic Center |
Miami |
FL |
200 |
$10,000,000 |
CDBG |
-13 |
| Site Improvements for Fern Isle Park Expansion |
Miami |
FL |
200 |
$10,000,000 |
CDBG |
-6 |
| Caribbean Market Place Building Improvements |
Miami |
FL |
140 |
$7,000,000 |
CDBG |
-9 |
| Buena Vista Heights Street Improvements - Drainage and Road Improvements |
Miami |
FL |
120 |
$6,112,890 |
CDBG |
-3 |
| Buena Vista Heights Street Improvements, Phase II, Drainage and Road Improvements |
Miami |
FL |
120 |
$6,112,890 |
CDBG |
-3 |
| North Bayshore Drive Drainage Improvements, Drainage and Road Improvements |
Miami |
FL |
120 |
$5,926,690 |
CDBG |
-3 |
| Old Firehouse # 2 - structural stabilization and historic renovation |
Miami |
FL |
100 |
$5,000,000 |
CDBG |
6 |
| Virginia Key Shoreline Stabilization Project |
Miami |
FL |
100 |
$5,000,000 |
CDBG |
-1 |
| North Spring Garden Greenway Improvements, Miami River Greenway Road and Drainage Improvements |
Miami |
FL |
80 |
$4,376,710 |
CDBG |
0 |
| New Brickell Park at South Miami Ave |
Miami |
FL |
20 |
$4,000,000 |
CDBG |
-6 |
| Robert King High Park New Building Construction, New 5,768 sf Community Building and site improvements: covered BB court, new tennis court, lighting , parking, playground & picnic area. |
Miami |
FL |
70 |
$3,619,790 |
CDBG |
-6 |
| Citywide Parks ADA Compliance, Correction of ADA deficiencies at 24 City parks |
Miami |
FL |
60 |
$3,000,000 |
CDBG |
4 |
| Dinner Key Marina Dock Master Building |
Miami |
FL |
60 |
$3,000,000 |
CDBG |
-7 |
| James L. Knight Center Renovation - ADA accessibility, other improvements |
Miami |
FL |
60 |
$3,000,000 |
CDBG |
0 |
| Manuel Artime Fire Alarm/Sprinkler Improvements |
Miami |
FL |
60 |
$3,000,000 |
CDBG |
-5 |
| Shenandoah Recreational Building Improvements |
Miami |
FL |
60 |
$3,000,000 |
CDBG |
-3 |
| Williams Park Community Center/Recreation Building |
Miami |
FL |
60 |
$3,000,000 |
CDBG |
-5 |
| Roberto Clemente Park Recreation Building Renovation, New: 9,000 s.f. building w/ offices, meeting rooms, recreation spaces, and child care area. |
Miami |
FL |
55 |
$2,855,450 |
CDBG |
-5 |
| Athalie Range Field Improvements and Reconfiguration |
Miami |
FL |
50 |
$2,676,250 |
CDBG |
-1 |
| Williams Park Improvements, Expand building for offices, multi-purpose room, storage. Renovate existing spaces and pool building |
Miami |
FL |
50 |
$2,536,210 |
CDBG |
-4 |
| MiaMarina Pier Improvements |
Miami |
FL |
50 |
$2,500,000 |
CDBG |
-4 |
| African Square Park New Bathroom Building, Splash Playground and New Recreation Building |
Miami |
FL |
48 |
$2,400,000 |
CDBG |
-18 |
| Henderson Park New Office/Restroom Facility, New 1,200 sf restrooms-office- storage building , 2,000 sf covered recreation area |
Miami |
FL |
40 |
$2,097,470 |
CDBG |
-4 |
| Kennedy Park Restroom/Building Improvements |
Miami |
FL |
40 |
$2,000,000 |
CDBG |
-3 |
| Miami Rowing Club Building Improvements/Addition Parking Lot Improvements/Lighting |
Miami |
FL |
40 |
$2,000,000 |
CDBG |
-19 |
| Moore Park Charrette and Building Improvements, Remodeling: upgrade of existing areas of the facility and provide new instructional spaces |
Miami |
FL |
40 |
$2,000,000 |
CDBG |
-4 |
| New Coral Gate Park Building |
Miami |
FL |
40 |
$2,000,000 |
CDBG |
-8 |
| Public Works Operation yard |
Miami |
FL |
40 |
$2,000,000 |
CDBG |
-2 |
| Roberto Clemente Gymnasium |
Miami |
FL |
40 |
$2,000,000 |
CDBG |
-5 |
| Simpson Park Environmental and Park Improvements |
Miami |
FL |
40 |
$2,000,000 |
CDBG |
-2 |
| Dinner Key Dredging, Dredging of approx, 10,000 cy for the main approach channel at north end of marina |
Miami |
FL |
40 |
$1,967,100 |
CDBG |
4 |
| Dinner Key Mooring Field Project, Boat Anchorage and Upland Improvements |
Miami |
FL |
35 |
$1,773,580 |
CDBG |
-5 |
| Miamarina Emergency Pier Repairs, Marina Repairs and Restoration |
Miami |
FL |
30 |
$1,675,740 |
CDBG |
-1 |
| Coral Gate Park Building Improvements, New 4,500 sf of: offices, restrooms, community spaces, roofed terrace, parking, landscaping & irrig. |
Miami |
FL |
30 |
$1,662,500 |
CDBG |
-10 |
| Ambrister Park Improvements |
Miami |
FL |
30 |
$1,500,000 |
CDBG |
-5 |
| Grapeland Flowrider - construction of a new aquatic element in the water park |
Miami |
FL |
30 |
$1,500,000 |
CDBG |
-7 |
| Duarte Park Building Renovation/Expansion, Remodel and expand existing Recreation Building to include multi-purpose room, office and A/C system. |
Miami |
FL |
30 |
$1,480,500 |
CDBG |
-5 |
| Hadley Park Restrooms/Concession Building, New 4,500 sf building w/ restrooms, field office, storage and concession & terrace area. |
Miami |
FL |
30 |
$1,440,000 |
CDBG |
-6 |
| Bryan Park New Tennis Center, New: 2,000 sf recreation building, one additional tennis court and sports lighting |
Miami |
FL |
25 |
$1,409,700 |
CDBG |
-9 |
| Robert King High Park Soccer Field, New soccer field, restrooms building, parking lot, irrigation, and bleachers . |
Miami |
FL |
25 |
$1,386,310 |
CDBG |
-6 |
| Citywide Emergency Park Generators |
Miami |
FL |
20 |
$1,000,000 |
CDBG |
-3 |
| Water Main Life Sciences Environmental Assessment |
Miami |
FL |
20 |
$1,000,000 |
CDBG |
0 |
| New Sewell Park Restroom/Office Building |
Miami |
FL |
18 |
$900,000 |
CDBG |
-7 |
| Kennedy Park Restroom Building Improvements, New 650 sf restrooms-storage building |
Miami |
FL |
12 |
$776,700 |
CDBG |
-3 |
| Albert Pallot Park Playground and Site Furnishings |
Miami |
FL |
10 |
$500,000 |
CDBG |
-10 |
| North Bayshore Drive Operational Improvements, Traffic Roundabout and Median Modifications |
Miami |
FL |
10 |
$500,000 |
CDBG |
-2 |
| Dinner Key Dredging Mitigation, Placement of approx 1,1000 cy of riprap as part of DERM requirement for the dredging project |
Miami |
FL |
7 |
$332,900 |
CDBG |
-2 |
| Lummus Park Historic Building Restroom, Remodel existing historic building to new use with new AC and electrical systems. |
Miami |
FL |
2 |
$225,770 |
CDBG |
-1 |
| BMX and Dirt Bike Trails at Virginia Key Park |
Miami |
FL |
2 |
$100,000 |
CDBG |
-13 |
| Citywide Solar Panel Retrofit/Installation |
Miami |
FL |
600 |
$30,000,000 |
Energy |
16 |
| Building energy efficiency upgrades - for 20 City buildings |
Miami |
FL |
200 |
$10,000,000 |
Energy |
3 |
| Solid Waste Implementation of Single Wastestream and Recycling Program |
Miami |
FL |
100 |
$5,000,000 |
Energy |
5 |
| Fleet upgrades - purchase of 200 hybrids at $22K each |
Miami |
FL |
2 |
$4,400,000 |
Energy |
-14 |
| Green Lab resource center construction |
Miami |
FL |
17 |
$1,000,000 |
Energy |
-4 |
| Solar panels and green roof installation City Hall |
Miami |
FL |
20 |
$1,000,000 |
Energy |
9 |
| Miami Shores ES-Roof, fire alarm, electrical, ADA, elevator, windows, structural repaisrs, major paint, sewer connection |
Miami |
FL |
36 |
$9,904,170 |
Schools |
2 |
| School Board Administration Complex-Annex building-chilled water AHU, controls |
Miami |
FL |
18 |
$5,728,860 |
Schools |
-15 |
| Miami Springs Middle-Windows and door replacement (Buildings 5&6 FCI) |
Miami |
FL |
28 |
$5,728,860 |
Schools |
-2 |
| Homestead SHS-Replace AHU, controls, stand alone A/C for server room |
Miami |
FL |
18 |
$4,951,580 |
Schools |
0 |
| Booker T. Washington SHS-Unit ventilators, chill water AHU, controls |
Miami |
FL |
18 |
$3,810,450 |
Schools |
-5 |
| Allapattah MS-Chill water AHU's, controls, VAV (Chillers being replaced in 08/09) |
Miami |
FL |
16 |
$3,795,000 |
Schools |
-1 |
| Liberty City ES-Window replacement (FCI school) |
Miami |
FL |
26 |
$3,376,530 |
Schools |
0 |
| Miami Sunset SHS-ADA Design Package No 8 |
Miami |
FL |
28 |
$3,239,980 |
Schools |
-1 |
| Glades MS-Chiller plant replacement-programming completed |
Miami |
FL |
16 |
$3,182,700 |
Schools |
-7 |
| Benjamin Franklin ES-Window replacement |
Miami |
FL |
24 |
$3,182,700 |
Schools |
-3 |
| Horace Mann MS Chill water AHU, chillers, unit ventilators |
Miami |
FL |
18 |
$2,962,000 |
Schools |
2 |
| Hialeah SHS-Window replacement |
Miami |
FL |
24 |
$2,825,380 |
Schools |
-1 |
| Gratigny ES-Design window replacement, ceiling and lighting, construction 11/12, EMS and VAV |
Miami |
FL |
26 |
$2,695,580 |
Schools |
1 |
| Thomas Jefferson MS-HVAC |
Miami |
FL |
22 |
$2,661,800 |
Schools |
-1 |
| School Board Administration Complex-SBAB Building-cooling towers, pumps, controls Phase 1 of 3 |
Miami |
FL |
14 |
$2,472,000 |
Schools |
-10 |
| Lindsey Hopkins Technical-Ventilators, VAV boxes, controls, chilled water AHU |
Miami |
FL |
18 |
$2,429,600 |
Schools |
-2 |
| Ben Sheppard ES-ADA Design Package 8 |
Miami |
FL |
24 |
$2,344,160 |
Schools |
3 |
| Maritime & Science Technology Academy-Chill water AHU |
Miami |
FL |
16 |
$2,276,000 |
Schools |
0 |
| Avocado ES-ADA Design Package No 8 |
Miami |
FL |
24 |
$2,005,600 |
Schools |
-3 |
| North Miami Beach SHS-AHU replacement |
Miami |
FL |
16 |
$1,909,620 |
Schools |
1 |
| Miami Lakes MS-Phase 2 HVAC |
Miami |
FL |
18 |
$1,909,620 |
Schools |
-2 |
| Lorah Park ES-ADA Design Package 10 |
Miami |
FL |
24 |
$1,899,910 |
Schools |
1 |
| Norwood ES-HVAC |
Miami |
FL |
18 |
$1,829,620 |
Schools |
-3 |
| Henry H. Filer MS-Window replacement |
Miami |
FL |
24 |
$1,829,620 |
Schools |
-2 |
| Oak Grove ES-Window replacement |
Miami |
FL |
24 |
$1,829,620 |
Schools |
-3 |
| Parkview ES-Window replacement |
Miami |
FL |
24 |
$1,822,250 |
Schools |
-3 |
| Highland Oaks MS-Phase 2 HVAC |
Miami |
FL |
12 |
$1,800,000 |
Schools |
-2 |
| Allapattah MS-Roofing Project#00343600 |
Miami |
FL |
18 |
$1,800,000 |
Schools |
2 |
| Cutler Ridge MS-Roofing |
Miami |
FL |
18 |
$1,700,000 |
Schools |
1 |
| Lenora Braynon Smith ES-ADA Design Package 10 |
Miami |
FL |
26 |
$1,584,860 |
Schools |
0 |
| Calusa ES-ADA Design Package 12 |
Miami |
FL |
24 |
$1,549,080 |
Schools |
0 |
| Joella C. Good ES-ADA Design Package 11 |
Miami |
FL |
24 |
$1,467,420 |
Schools |
2 |
| Rockway MS-Roofing |
Miami |
FL |
18 |
$1,450,000 |
Schools |
0 |
| Jane S. Roberts K-8 Center-Complete HVAC water cooled chiller replacement |
Miami |
FL |
16 |
$1,436,000 |
Schools |
-1 |
| Miami Springs ES-ADA Design Package No 8 |
Miami |
FL |
24 |
$1,423,130 |
Schools |
2 |
| Sylvania Heights ES-Roofing |
Miami |
FL |
18 |
$1,413,120 |
Schools |
-1 |
| Dr. Bowman Foster Ashe ES-ADA Design Package 10 |
Miami |
FL |
24 |
$1,381,090 |
Schools |
-3 |
| Palm Springs MS-Window replacement |
Miami |
FL |
20 |
$1,370,960 |
Schools |
-4 |
| Madie Ives Community ES-ADA Design Package 11 |
Miami |
FL |
24 |
$1,320,200 |
Schools |
1 |
| Toussaint L'Ouverture ES-Roofing |
Miami |
FL |
16 |
$1,298,160 |
Schools |
0 |
| Kelsey L. Pharr ES-Chill water AHU, pumps |
Miami |
FL |
14 |
$1,255,840 |
Schools |
-1 |
| Morningside ES-Partial AHU replacement unit ventilators |
Miami |
FL |
14 |
$1,255,840 |
Schools |
-1 |
| Palmetto MS-Upgrade the overloaded electrical service, also to the labs 222 and 238 to prevent circuit overload |
Miami |
FL |
14 |
$1,236,000 |
Schools |
1 |
| Myrtle Grove ES-Roofing |
Miami |
FL |
18 |
$1,227,350 |
Schools |
1 |
| Palm Springs MS-Paint, water intrussion, Bldg 6 |
Miami |
FL |
8 |
$1,200,000 |
Schools |
-1 |
| William H. Turner Technical-Air handler units (portion that is not funded) |
Miami |
FL |
16 |
$1,200,000 |
Schools |
1 |
| ADA Design Package 12 |
Miami |
FL |
24 |
$1,184,370 |
Schools |
-3 |
| Lawton Chiles-Major Paint |
Miami |
FL |
8 |
$1,174,200 |
Schools |
-9 |
| Amelia Earhart ES-Roofing; Project #A01095 (pull out) |
Miami |
FL |
16 |
$1,170,000 |
Schools |
-2 |
| Ponce De Leon MS-Unit ventilators, new digital controls and exposed line insulation |
Miami |
FL |
16 |
$1,146,290 |
Schools |
2 |
| Hammocks MS-HVAC replacement project 00459000-design phase has been funded |
Miami |
FL |
10 |
$1,112,400 |
Schools |
1 |
| Henry H. Filer MS-Unit ventilators, Hallway A/C, Electrical |
Miami |
FL |
18 |
$1,112,400 |
Schools |
-2 |
| Mae M. Walters ES-Roofing; Project #00340500 |
Miami |
FL |
18 |
$1,092,640 |
Schools |
0 |
| Felix Varela SHS-Major paint-correct water intrusion |
Miami |
FL |
8 |
$1,082,120 |
Schools |
-2 |
| James H. Bright ES-ADA Deaign Package 9 Includes J.W. Johnson ES) |
Miami |
FL |
22 |
$1,065,060 |
Schools |
1 |
| Rockway ES-ADA Design Package 12 |
Miami |
FL |
22 |
$1,062,660 |
Schools |
1 |
| Springview ES-ADA Design Package 11 |
Miami |
FL |
20 |
$1,057,900 |
Schools |
5 |
| Glades MS-HVAC and controls-programming in progress |
Miami |
FL |
4 |
$1,049,020 |
Schools |
1 |
| Miami Lakes Educational Center-Major paint |
Miami |
FL |
12 |
$1,049,020 |
Schools |
-1 |
| Coral Gables SHS-Major paint |
Miami |
FL |
10 |
$1,046,720 |
Schools |
-3 |
| ADA Design Package 10 |
Miami |
FL |
22 |
$1,034,970 |
Schools |
-2 |
| Highland Oaks MS-Major Paint |
Miami |
FL |
8 |
$1,020,000 |
Schools |
-3 |
| Lakeview ES-Roofing |
Miami |
FL |
16 |
$1,020,000 |
Schools |
-1 |
| School Board Administration Complex-Fire alarm system, alarm and PA-Annex Building |
Miami |
FL |
12 |
$1,012,960 |
Schools |
-6 |
| Central East Transportation Center-Resurfacing and drainage for parking lot |
Miami |
FL |
16 |
$1,012,960 |
Schools |
-1 |
| Comstock ES-ADA Design Package 12 |
Miami |
FL |
18 |
$987,209 |
Schools |
-3 |
| Dr. Gilbert L. Porter ES-Roofing |
Miami |
FL |
18 |
$985,200 |
Schools |
-3 |
| Dr. Gilbert L. Porter ES-HVAC and Controls project 00417700-T&B investigation completed |
Miami |
FL |
16 |
$983,454 |
Schools |
-1 |
| Meadowlane ES-ADA Design Package 12 |
Miami |
FL |
18 |
$982,295 |
Schools |
1 |
| South Miami SHS-Major paint-old building |
Miami |
FL |
10 |
$960,000 |
Schools |
1 |
| Kensington Park ES-Unit ventilators (all except cafe/kit rooftop unit whichis being done in 08/09) |
Miami |
FL |
16 |
$950,175 |
Schools |
-1 |
| William A. Chapman ES-Replace cooling tower and main chillers, server room AC |
Miami |
FL |
14 |
$927,000 |
Schools |
-1 |
| Miami Springs Middle-Replace cooling tower and chillers |
Miami |
FL |
16 |
$927,000 |
Schools |
1 |
| Dr. Carlos J. Finlay ES-Major paint, interior corridor cracks require stucco repairs |
Miami |
FL |
8 |
$917,891 |
Schools |
-2 |
| Banyan ES-ADA Design Package 11 |
Miami |
FL |
18 |
$902,811 |
Schools |
1 |
| Phillis Wheatley ES-Cooling towers (cafeteria), unit ventilators, water-cooled units |
Miami |
FL |
16 |
$900,000 |
Schools |
2 |
| Shadowlawn ES-Roofing |
Miami |
FL |
16 |
$900,000 |
Schools |
2 |
| Gratigny ES-ADA Design Package 10 |
Miami |
FL |
18 |
$892,591 |
Schools |
2 |
| Joella C. Good ES-Electrical, ceiling and lighting |
Miami |
FL |
16 |
$891,156 |
Schools |
2 |
| John G. Dupuis ES-FA, PA, & Clock, security alarm |
Miami |
FL |
14 |
$865,200 |
Schools |
2 |
| Cypress ES-ADA Design Package 10 |
Miami |
FL |
20 |
$859,460 |
Schools |
1 |
| Campbell Drive ES-ADA Design Package 11 |
Miami |
FL |
18 |
$856,077 |
Schools |
1 |
| South Pointe ES-ADA Design Package 12 |
Miami |
FL |
20 |
$838,824 |
Schools |
2 |
| Southwest Transportation Center-Interior paint and seal parking lots |
Miami |
FL |
10 |
$821,940 |
Schools |
-2 |
| Kinloch Park MS-Major paint |
Miami |
FL |
8 |
$803,400 |
Schools |
-1 |
| Emerson ES-ADA Design Package 12 |
Miami |
FL |
20 |
$794,848 |
Schools |
0 |
| Coconut Grove ES-ADA Design Package 11 |
Miami |
FL |
20 |
$785,335 |
Schools |
1 |
| Citrus Grove ES-Unit ventilators, chilled water AHU, RTUs |
Miami |
FL |
14 |
$784,273 |
Schools |
2 |
| W.R. Thomas MS-Roofing |
Miami |
FL |
18 |
$775,200 |
Schools |
0 |
| Region Maint Center 4-Roofing |
Miami |
FL |
16 |
$750,000 |
Schools |
0 |
| Coral Reef ES-ADA Design Package No 8 |
Miami |
FL |
16 |
$744,640 |
Schools |
-1 |
| William H. Turner Technical-Roofing |
Miami |
FL |
18 |
$738,000 |
Schools |
1 |
| Miami Gardens ES-FA, PA & Clock |
Miami |
FL |
14 |
$720,000 |
Schools |
-3 |
| Palm Springs MS-FA, PA & Clock |
Miami |
FL |
14 |
$720,000 |
Schools |
0 |
| Lake Stevens ES-ADA Design Package 10 |
Miami |
FL |
24 |
$705,468 |
Schools |
0 |
| Riverside ES-Major paint |
Miami |
FL |
8 |
$700,194 |
Schools |
-1 |
| Dr. Edward L. Whigham ES-Replace HVAC controls and insulation |
Miami |
FL |
12 |
$675,305 |
Schools |
-1 |
| Campbell Drive ES-Replace main chillers, standalone A/C for media room |
Miami |
FL |
14 |
$675,305 |
Schools |
1 |
| Ruth Owens Kruse Education-Replace 60 VAV boxes and wall thermostats |
Miami |
FL |
14 |
$675,305 |
Schools |
3 |
| Bent Tree ES-Upgrade the potable water system-possibly combine with ADA |
Miami |
FL |
16 |
$675,305 |
Schools |
1 |
| Design & Architecture SHS-Major paint and A/C ductwork |
Miami |
FL |
12 |
$655,636 |
Schools |
16 |
| North Transportation Center-Roofing |
Miami |
FL |
14 |
$653,014 |
Schools |
1 |
| George Washington Carver MS-Upgrade electrical panel |
Miami |
FL |
12 |
$636,540 |
Schools |
0 |
| Air Base ES-ADA Design Package No 8 |
Miami |
FL |
16 |
$633,330 |
Schools |
1 |
| Gratigny ES-Security cameras, fences, and security alarm |
Miami |
FL |
12 |
$616,298 |
Schools |
0 |
| George Washington Carver ES-ADA Design Package No 8 |
Miami |
FL |
20 |
$613,487 |
Schools |
0 |
| Parkview ES-Major paint |
Miami |
FL |
8 |
$605,640 |
Schools |
-2 |
| Southwest Miami SHS-Misc Maintenance-stabilization |
Miami |
FL |
8 |
$600,000 |
Schools |
1 |
| Flagami ES-ADA Design Package 12 |
Miami |
FL |
16 |
$599,377 |
Schools |
1 |
| Miami Heights ES-Install surge protection, ceiling and light for 60% of classrooms |
Miami |
FL |
14 |
$593,280 |
Schools |
2 |
| Blue Lakes ES-Replace the A/C units for the media center and ESE buildings |
Miami |
FL |
12 |
$590,073 |
Schools |
0 |
| David Fiarchild ES-ADA Design Package 11 |
Miami |
FL |
16 |
$568,729 |
Schools |
2 |
| Maya Angelou ES-Cooling towers |
Miami |
FL |
14 |
$549,491 |
Schools |
1 |
| Miami Springs Middle-Entire fire alarm system |
Miami |
FL |
14 |
$541,059 |
Schools |
1 |
| West Homestead ES-Replace A/C system in ESE 6 Pk, replace main chiller |
Miami |
FL |
12 |
$540,244 |
Schools |
0 |
| Horace Mann MS-Repipe school |
Miami |
FL |
18 |
$540,244 |
Schools |
2 |
| Region Maint Center 3-Roofing |
Miami |
FL |
6 |
$540,000 |
Schools |
0 |
| Key Biscayne Community School-Major paint |
Miami |
FL |
8 |
$540,000 |
Schools |
-1 |
| Claude Pepper ES-ADA Design Package 9 |
Miami |
FL |
20 |
$531,060 |
Schools |
3 |
| Miami Springs SHS-Security cameras |
Miami |
FL |
6 |
$525,300 |
Schools |
2 |
| Shenandoah MS-Repipe school |
Miami |
FL |
18 |
$524,509 |
Schools |
2 |
| Shenandoah ES-Major paint |
Miami |
FL |
8 |
$498,284 |
Schools |
0 |
| Lenora Braynon Smith ES-Major paint |
Miami |
FL |
8 |
$491,727 |
Schools |
-1 |
| Blue Lakes ES-Roofing (FDLRS) |
Miami |
FL |
8 |
$490,272 |
Schools |
0 |
| Major paint |
Miami |
FL |
8 |
$482,040 |
Schools |
-4 |
| Merrick Educational Center-Roofing |
Miami |
FL |
8 |
$480,000 |
Schools |
2 |
| Skyway ES-Chiller, pumps, colls |
Miami |
FL |
14 |
$480,000 |
Schools |
2 |
| North Beach ES-ADA Design Package 9 |
Miami |
FL |
18 |
$478,184 |
Schools |
2 |
| Flagami ES-Major paint |
Miami |
FL |
8 |
$472,714 |
Schools |
-2 |
| Miami Park ES-Major paint |
Miami |
FL |
8 |
$472,714 |
Schools |
-2 |
| Coconut Grove ES-Fire alarm system |
Miami |
FL |
12 |
$472,714 |
Schools |
1 |
| George Washington Carver MS-Fire alarm system |
Miami |
FL |
12 |
$472,714 |
Schools |
1 |
| Comstock ES-Fire alarm system |
Miami |
FL |
12 |
$458,945 |
Schools |
0 |
| English Center-Fire alarm system |
Miami |
FL |
12 |
$458,945 |
Schools |
0 |
| Henry S. West Laboratory School-Fire alarm system |
Miami |
FL |
12 |
$458,945 |
Schools |
2 |
| Laura C. Saunders ES-Replace fire alarm system |
Miami |
FL |
12 |
$458,945 |
Schools |
2 |
| Shadowlawn ES-Fire alarm system |
Miami |
FL |
12 |
$458,945 |
Schools |
2 |
| Henry E.S. Reeves ES-Replace chillers |
Miami |
FL |
14 |
$458,945 |
Schools |
0 |
| Shadowlawn ES-Upgrade service |
Miami |
FL |
12 |
$445,945 |
Schools |
1 |
| Emerson ES-Major Paint |
Miami |
FL |
8 |
$445,578 |
Schools |
-9 |
| Airbase ES-Replace fire alarm system |
Miami |
FL |
12 |
$445,578 |
Schools |
3 |
| Avocado ES-Replace fire alarm system |
Miami |
FL |
12 |
$445,578 |
Schools |
3 |
| Banyan ES-Entire fire alarm system |
Miami |
FL |
12 |
$445,578 |
Schools |
2 |
| Edison Park ES-Fire alarm system |
Miami |
FL |
12 |
$445,578 |
Schools |
2 |
| Regional Center III-Entire fire alarm system |
Miami |
FL |
12 |
$445,578 |
Schools |
-1 |
| The 500 Role Models Academy-Entire fire alarm system |
Miami |
FL |
12 |
$445,578 |
Schools |
0 |
| Frederick Douglass ES-Upgrade electrical panel |
Miami |
FL |
14 |
$445,578 |
Schools |
2 |
| Kelsey L. Pharr ES-Upgrade electrical panel |
Miami |
FL |
14 |
$445,578 |
Schools |
3 |
| Morningside ES-Upgrade electrical panel |
Miami |
FL |
14 |
$445,578 |
Schools |
-1 |
| Phillis Wheatley ES-Upgrade electrical panel |
Miami |
FL |
14 |
$445,578 |
Schools |
0 |
| Paul Lawrence Dunbar ES-Upgrade electrical panel |
Miami |
FL |
16 |
$445,578 |
Schools |
-1 |
| Southwest Transportation Center-Replace the cooling tower, both pumps, piping and electrical for the HVAC (includes all 3 trans centers) |
Miami |
FL |
18 |
$445,578 |
Schools |
2 |
| Bel-Aire ES-Replace fire alarm system |
Miami |
FL |
12 |
$432,600 |
Schools |
0 |
| Florida City ES-Replace fire alarm system |
Miami |
FL |
12 |
$432,600 |
Schools |
0 |
| Gulfstream ES-Replace chiller, install A/C in the kitchen Proj. #00417200 |
Miami |
FL |
12 |
$432,600 |
Schools |
-1 |
| Miami Heights ES-Replace fire alarm system |
Miami |
FL |
12 |
$432,600 |
Schools |
0 |
| Palmetto ES-Replace the PA system |
Miami |
FL |
12 |
$432,000 |
Schools |
-5 |
| Caribbean ES-Replace cooling towers |
Miami |
FL |
12 |
$420,000 |
Schools |
0 |
| Greenglade ES-Replace the PA system |
Miami |
FL |
12 |
$420,000 |
Schools |
-3 |
| Irving & Beatrice Peskoe ES-Replace fire alarm system |
Miami |
FL |
12 |
$420,000 |
Schools |
-1 |
| Rivera MS-Replace the PA system |
Miami |
FL |
12 |
$420,000 |
Schools |
-4 |
| William A. Chapman ES-Replace fire alarm system |
Miami |
FL |
12 |
$420,000 |
Schools |
0 |
| Regional Center IV-Roofing (Region IV Police) |
Miami |
FL |
8 |
$405,183 |
Schools |
-4 |
| Region Center 3-Replace chillers |
Miami |
FL |
12 |
$405,183 |
Schools |
0 |
| Maya Angelou ES-ADA Design Package No 8 |
Miami |
FL |
18 |
$397,742 |
Schools |
-1 |
| Citrus Grove ES-ADA Design Package 8 |
Miami |
FL |
18 |
$395,893 |
Schools |
-1 |
| Comstock ES-Chilled water AHU |
Miami |
FL |
12 |
$394,636 |
Schools |
-2 |
| Christina M. Eve ES-Major paint |
Miami |
FL |
8 |
$393,382 |
Schools |
0 |
| Miami Springs ES-Water intrusion (rework architectural details around new addition) |
Miami |
FL |
8 |
$393,382 |
Schools |
2 |
| Horace Mann MS-AFSS and Hoods Kitchens 1&2 |
Miami |
FL |
12 |
$393,382 |
Schools |
0 |
| Pine Lake ES-Replace 2 main AHU, controls throughout school |
Miami |
FL |
12 |
$393,382 |
Schools |
-1 |
| Gloria Floyd ES-HVAC system |
Miami |
FL |
16 |
$393,382 |
Schools |
-1 |
| Winston Park K-8 Center-Major paint-older campus |
Miami |
FL |
8 |
$390,000 |
Schools |
-1 |
| Coral Terrace ES-ADA Design Package 9 |
Miami |
FL |
16 |
$386,273 |
Schools |
-1 |
| George T. Baker Aviation-Major paint |
Miami |
FL |
6 |
$381,924 |
Schools |
2 |
| Comstock ES-Upgrade switchgear and electrical panel-cafeteria/Kitchen |
Miami |
FL |
12 |
$381,924 |
Schools |
0 |
| Coral Park ES-Security cameras |
Miami |
FL |
8 |
$362,828 |
Schools |
0 |
| John F. Kennedy MS-ADA Design Package 11 |
Miami |
FL |
16 |
$361,712 |
Schools |
-2 |
| Skyway ES-Major paint |
Miami |
FL |
8 |
$360,000 |
Schools |
-1 |
| Booker T. Washington SHS-AFSS Kitchens 1&2, fire pumps |
Miami |
FL |
14 |
$340,931 |
Schools |
-1 |
| Centennial MS-Replace/upgrade auditorium seating |
Miami |
FL |
12 |
$337,653 |
Schools |
-3 |
| Golden Glades ES-Cooling tower |
Miami |
FL |
12 |
$337,653 |
Schools |
-1 |
| Orchard Villa ES-Replace 80 ton chiler |
Miami |
FL |
14 |
$337,653 |
Schools |
-1 |
| Coral Gables ES-Repipe school |
Miami |
FL |
18 |
$337,653 |
Schools |
-1 |
| Paul Lawrence Dunbar ES-Repipe school |
Miami |
FL |
18 |
$337,653 |
Schools |
-2 |
| Seminole ES-Major paint |
Miami |
FL |
6 |
$330,000 |
Schools |
-1 |
| Charles R. Hadley ES-Security cameras |
Miami |
FL |
6 |
$327,818 |
Schools |
-4 |
| Northwest Transportation Center-Roofing |
Miami |
FL |
6 |
$327,818 |
Schools |
-1 |
| Paul Lawrence Dunbar ES-Pipe insulation, DX units |
Miami |
FL |
8 |
$327,818 |
Schools |
-1 |
| Campbell Drive MS-Replace/upgrade auditorium seating |
Miami |
FL |
12 |
$327,818 |
Schools |
-1 |
| Homestead SHS-Replace gym bleachers |
Miami |
FL |
6 |
$318,270 |
Schools |
0 |
| May MS-Replace/upgrade auditorium seating |
Miami |
FL |
10 |
$318,270 |
Schools |
-2 |
| Eneida Massas Hartner ES-ADA Design Package 11 |
Miami |
FL |
18 |
$302,508 |
Schools |
-1 |
| The 500 Role Models Academy-Major paint |
Miami |
FL |
8 |
$296,640 |
Schools |
-7 |
| Homestead MS-Play field restoration |
Miami |
FL |
6 |
$295,036 |
Schools |
0 |
| South Miami Heights ES-Play field restoration |
Miami |
FL |
6 |
$295,036 |
Schools |
-1 |
| Golden Glades ES-ADA Design Package 9 |
Miami |
FL |
18 |
$293,389 |
Schools |
-1 |
| North Glade ES-ADA Design Package 11 |
Miami |
FL |
22 |
$287,760 |
Schools |
-1 |
| Bent Tree ES-ADA Design Package No 8 |
Miami |
FL |
14 |
$284,936 |
Schools |
-4 |
| Ojus ES-ADA Design Package 9 |
Miami |
FL |
16 |
$271,225 |
Schools |
-1 |
| Nautilus MS-New PA throughout |
Miami |
FL |
12 |
$270,000 |
Schools |
-1 |
| Homestead SHS-AFSS Home EC. Kitchens 1&2 |
Miami |
FL |
6 |
$262,254 |
Schools |
-1 |
| Palm Springs MS-Kitchen A/C |
Miami |
FL |
12 |
$254,616 |
Schools |
-2 |
| Little River ES-Repipe school |
Miami |
FL |
16 |
$254,616 |
Schools |
1 |
| Charles R. Drew MS-Kitchens 1 and 2 AFSS |
Miami |
FL |
12 |
$247,200 |
Schools |
1 |
| Region Maint Center 3-Roofing (Phase 1) Mill Annex |
Miami |
FL |
6 |
$240,000 |
Schools |
-2 |
| John G. Dupuis ES-ADA Design Package No 8 |
Miami |
FL |
16 |
$238,400 |
Schools |
-1 |
| Hammocks MS-Replace/upgrade auditorium seating |
Miami |
FL |
6 |
$236,357 |
Schools |
-1 |
| Redland MS-Replace gym bleachers |
Miami |
FL |
8 |
$202,592 |
Schools |
-1 |
| Redland MS-Upgrade lighting in hallways |
Miami |
FL |
8 |
$202,592 |
Schools |
1 |
| Orchard Villa ES-Replace playground |
Miami |
FL |
10 |
$202,592 |
Schools |
0 |
| Redland MS-AFSS Kitchens 1&2 |
Miami |
FL |
8 |
$196,691 |
Schools |
-1 |
| Miami Springs ES-Replace playground |
Miami |
FL |
10 |
$196,691 |
Schools |
8 |
| Lake Stevens MS-HVAC Controls |
Miami |
FL |
12 |
$196,691 |
Schools |
0 |
| Arbase ES-Two server room A/C units |
Miami |
FL |
4 |
$195,839 |
Schools |
1 |
| Brownsville MS-Replace package unit (6 pack building) |
Miami |
FL |
6 |
$190,962 |
Schools |
-3 |
| Everglades K-8 Center-Replace playground |
Miami |
FL |
8 |
$190,962 |
Schools |
4 |
| Palmetto MS-Replace the roof top chilled water AHU-cafeteria |
Miami |
FL |
4 |
$185,400 |
Schools |
-1 |
| Plant Operations-Roofing |
Miami |
FL |
6 |
$180,000 |
Schools |
0 |
| Fulford ES-ADA Design Package No 8 |
Miami |
FL |
16 |
$170,056 |
Schools |
-1 |
| Miami Northwestern SHS-ADA Design Package No 6 |
Miami |
FL |
18 |
$168,796 |
Schools |
4 |
| Blue Lakes ES-Replace playground |
Miami |
FL |
8 |
$163,909 |
Schools |
3 |
| Flagami ES-Replace the obsolete simplex 2400 clock system |
Miami |
FL |
6 |
$159,135 |
Schools |
-1 |
| Robert Russa Moton ES-Replace the master clock system |
Miami |
FL |
6 |
$159,135 |
Schools |
-1 |
| Robert Russa Moton ES-Replace playground |
Miami |
FL |
8 |
$159,135 |
Schools |
0 |
| Tropical ES-Replace playgorund |
Miami |
FL |
8 |
$159,135 |
Schools |
-1 |
| Arcola Lakes ES-Cooling tower and piping |
Miami |
FL |
14 |
$157,353 |
Schools |
0 |
| Charles R. Drew MS-Replace perimeter fencing |
Miami |
FL |
4 |
$154,500 |
Schools |
-1 |
| Broadmoor ES-A/C for clinic and main office |
Miami |
FL |
6 |
$154,500 |
Schools |
0 |
| Natural Bridge ES-Provide parking lot, perimeter fence |
Miami |
FL |
14 |
$137,684 |
Schools |
-1 |
| Chapman House-Fire alarm system |
Miami |
FL |
12 |
$135,061 |
Schools |
1 |
| Homestead MS-AFSS kitchens one and two |
Miami |
FL |
10 |
$131,127 |
Schools |
-1 |
| Hibiscus ES-Electrical infrastructure for cameras |
Miami |
FL |
14 |
$131,127 |
Schools |
-1 |
| Campbell Drive MS-Install surge protection |
Miami |
FL |
6 |
$124,571 |
Schools |
0 |
| Miami Springs SHS-AFSS |
Miami |
FL |
4 |
$120,000 |
Schools |
1 |
| William H. Turner Technical-AFSS |
Miami |
FL |
6 |
$120,000 |
Schools |
-3 |
| Dr. Henry W. Mack/West Little River ES-Replace condensing unit for media center |
Miami |
FL |
6 |
$111,240 |
Schools |
-1 |
| Cope Center North-Infrastructure for security cameras |
Miami |
FL |
12 |
$108,049 |
Schools |
-1 |
| Westview MS-ADA Design Package No 8 |
Miami |
FL |
22 |
$107,880 |
Schools |
1 |
| Kenwood K-8 Center-Replace 5 package A/C units in Kitchen/Cafe, replace 30-ton condensing unit for media building |
Miami |
FL |
6 |
$104,902 |
Schools |
-3 |
| ADA Design Package 8 |
Miami |
FL |
14 |
$99,815 |
Schools |
1 |
| Campbell Drive ES-Install surge protection |
Miami |
FL |
4 |
$98,345 |
Schools |
1 |
| Irving & Beatrice Peskoe ES-Install surge protection |
Miami |
FL |
4 |
$98,345 |
Schools |
-1 |
| Redland Vehicle Maintenance Facility-Major paint |
Miami |
FL |
6 |
$98,345 |
Schools |
0 |
| Florida City ES-Install surge protection |
Miami |
FL |
4 |
$92,700 |
Schools |
1 |
| William A. Chapman ES-Install surge protection |
Miami |
FL |
4 |
$92,700 |
Schools |
1 |
| Laura C. Saunders ES-Install surge protection |
Miami |
FL |
4 |
$82,750 |
Schools |
0 |
| Cypress ES-Replace 4 5-ton package A/C units for the dining area |
Miami |
FL |
4 |
$81,037 |
Schools |
-1 |
| Miami Northwestern SHS-Fire pump |
Miami |
FL |
6 |
$74,160 |
Schools |
3 |
| Joe Hall ES-Replace 7 VAV boxes and controls for the main office |
Miami |
FL |
6 |
$67,531 |
Schools |
1 |
| Coral Reef ES-Replace the air cooled chiller for the media center |
Miami |
FL |
4 |
$67,473 |
Schools |
-3 |
| West Miami MS-Provide 6 power poles for the computer lab |
Miami |
FL |
4 |
$61,800 |
Schools |
-2 |
| Norwood ES-Storefront doors |
Miami |
FL |
4 |
$59,007 |
Schools |
-1 |
| Christina M. Eve ES-ADA Design Package 11 |
Miami |
FL |
10 |
$49,999 |
Schools |
-1 |
| Ethel Koger Beckham ES-ADA Design Package 9 |
Miami |
FL |
12 |
$46,441 |
Schools |
-1 |
| Norwood ES-Emergency generator |
Miami |
FL |
8 |
$43,260 |
Schools |
0 |
| South Florida East Coast Corridor (SFECC) Transit Extension |
Miami |
FL |
6000 |
$300,000,000 |
Transit |
28 |
| Miami Streetcar |
Miami |
FL |
560 |
$280,000,000 |
Transit |
-173 |
| Metromover Extension to Marlins Stadium |
Miami |
FL |
3000 |
$150,000,000 |
Transit |
10 |
| Metromover Brickell Loop Extension |
Miami |
FL |
600 |
$80,000,000 |
Transit |
18 |
| Downtown/Midtown Trolley |
Miami |
FL |
23 |
$1,500,000 |
Transit |
1 |
| Brickell Trolley - Rubberized |
Miami |
FL |
12 |
$800,000 |
Transit |
-6 |
| Overtown/Park West Trolley |
Miami |
FL |
5 |
$500,000 |
Transit |
-6 |