| Street Resurfacing: Proposed funding would allow for 143 miles of roads to be resurfaced in non-CDBG eligible areas within one season, which is approximately 8 months out of the year. |
Louisville |
KY |
1200 |
$10,000,000 |
Streets/Roads |
-4 |
| Sidewalk/Curb Replacement: Proposed funding would allow for replacement of approximately 100,000 linear feet of sidewalk/curb in non-CDBG eligible areas. |
Louisville |
KY |
400 |
$4,000,000 |
Streets/Roads |
-14 |
| Extension of Air Commerce Drive: construction of a main boulevard, an access bridge and the necessary utilities to sustain commercial and light industrial development at the Renaissance Zone South Business Park |
Louisville |
KY |
180 |
$3,000,000 |
Streets/Roads |
-20 |
| New Sidewalks Proposed funding would allow for construction of approximately 100,000 linear feet of new sidewalk in non-CDBG eligible areas. |
Louisville |
KY |
200 |
$2,000,000 |
Streets/Roads |
-10 |
| Southern Parkway shared use path |
Louisville |
KY |
35 |
$1,620,000 |
Streets/Roads |
-17 |
| Johnson Road – 2.0 miles (Aiken Road to CSX RR)
Widen pavement to 18 to 20 feet with 2 foot shoulder and resurface at the locations below: |
Louisville |
KY |
15 |
$1,500,000 |
Streets/Roads |
-6 |
| Old Heady - 1.7 miles(Taylorsville to Snyder Freeway)
Widen pavement to 18 to 20 feet with 2 foot shoulder and resurface at the locations below: |
Louisville |
KY |
25 |
$1,300,000 |
Streets/Roads |
-3 |
| Independence School Road - 2.23 miles
Widen pavement to 18 to 20 feet with 2 foot shoulder and resurface at the locations below: |
Louisville |
KY |
10 |
$1,250,000 |
Streets/Roads |
0 |
| S. English Station Rd – 2.10 miles (Poplar Ln to Echo Tr.)
Widen pavement to 18 to 20 feet with 2 foot shoulder and resurface at the locations below: |
Louisville |
KY |
10 |
$1,250,000 |
Streets/Roads |
0 |
| Mill Creek shared use path – 24,000 linear feet between Sylvania Park and Sun Valley Park |
Louisville |
KY |
25 |
$1,200,000 |
Streets/Roads |
-9 |
| Factory Lane – 1.54 miles
Widen pavement to 18 to 20 feet with 2 foot shoulder and resurface at the locations below: |
Louisville |
KY |
10 |
$1,000,000 |
Streets/Roads |
-1 |
| Lover Ln – 1.44 miles (Veterans to Billtown)
Widen pavement to 18 to 20 feet with 2 foot shoulder and resurface at the locations below: |
Louisville |
KY |
10 |
$1,000,000 |
Streets/Roads |
-2 |
| Broad Run Road: Roadways are sliding down adjacent slopes. We will excavate and re-build roadside and improve drainage to stabilize roadways. |
Louisville |
KY |
15 |
$1,000,000 |
Streets/Roads |
2 |
| Chenoweth Run Bridge Replacements |
Louisville |
KY |
50 |
$775,000 |
Streets/Roads |
5 |
| Old Clark Sta. Rd. Bridge Replacement 2.3 M E |
Louisville |
KY |
40 |
$720,000 |
Streets/Roads |
-1 |
| Mud Lane – 1.0 mile (Blue Lick Road to Bier Dr)
Widen pavement to 18 to 20 feet with 2 foot shoulder and resurface at the locations below: |
Louisville |
KY |
10 |
$700,000 |
Streets/Roads |
8 |
| Poplar Lane – 1.13 miles
Widen pavement to 18 to 20 feet with 2 foot shoulder and resurface at the locations below: |
Louisville |
KY |
10 |
$700,000 |
Streets/Roads |
-2 |
| Bearcamp Road Bridge Replacements |
Louisville |
KY |
40 |
$610,000 |
Streets/Roads |
2 |
| A. B. Sawyer greenway and connector trails |
Louisville |
KY |
40 |
$560,000 |
Streets/Roads |
1 |
| Rehl Rd - 1.3 miles (Blankenbaker to Snyder Freeway)
Widen pavement to 18 to 20 feet with 2 foot shoulder and resurface at the locations below: |
Louisville |
KY |
10 |
$525,000 |
Streets/Roads |
2 |
| Broad Run Road at Broad Run Creek (C-168) |
Louisville |
KY |
10 |
$500,000 |
Streets/Roads |
-4 |
| Broad Run Road over Back Run Creek (C-169) |
Louisville |
KY |
10 |
$500,000 |
Streets/Roads |
1 |
| Easum Rd - 1.17 miles (Billtown to Chenoweth) Widen pavement to 18 to 20 feet with 2 foot shoulder and resurface. |
Louisville |
KY |
10 |
$500,000 |
Streets/Roads |
4 |
| Fairmount Rd – 0.71 miles (Bardstown Rd. to Gentry Ln.)
Widen pavement to 18 to 20 feet with 2 foot shoulder and resurface at the locations below: |
Louisville |
KY |
10 |
$500,000 |
Streets/Roads |
-2 |
| Easun Road Bridge Replacements |
Louisville |
KY |
30 |
$495,000 |
Streets/Roads |
-4 |
| Lyndon Lane over Middle Fork of Beargrass Creek |
Louisville |
KY |
10 |
$450,000 |
Streets/Roads |
6 |
| Old Heady over Drakes Branch Bridge Replacement |
Louisville |
KY |
10 |
$450,000 |
Streets/Roads |
0 |
| Penile Road Bridge Replacements |
Louisville |
KY |
30 |
$425,000 |
Streets/Roads |
-4 |
| Wibble Hill Rd - 0.71 miles
Widen pavement to 18 to 20 feet with 2 foot shoulder and resurface at the locations below: |
Louisville |
KY |
7 |
$400,000 |
Streets/Roads |
-3 |
| Ohio River Levee Trail – 13,000 linear feet between Riverside Historic Site and Mill Creek generating station |
Louisville |
KY |
7 |
$390,000 |
Streets/Roads |
-4 |
| Mt Washington – 1.0 miles (Rocky Road to Cedar Creek)
Widen pavement to 18 to 20 feet with 2 foot shoulder and resurface at the locations below: |
Louisville |
KY |
7 |
$350,000 |
Streets/Roads |
-1 |
| New Cut over Bee Lick Creek Bridge Replacement |
Louisville |
KY |
10 |
$275,000 |
Streets/Roads |
-3 |
| Old Westport over Goose Creek Bridge Replacement |
Louisville |
KY |
10 |
$275,000 |
Streets/Roads |
-4 |
| Old Taylorsville over Dunbar Creek Bridge Replacement |
Louisville |
KY |
15 |
$275,000 |
Streets/Roads |
-3 |
| Cedar Creek – 0.92 miles (Bates to Heritage Creek)Widen pavement to 18 to 20 feet with 2 foot shoulder and resurface at the locations below: |
Louisville |
KY |
7 |
$250,000 |
Streets/Roads |
1 |
| Rehl Road - retaining wall near Pope Lick Roadways are sliding down adjacent slopes. We will excavate and re-build roadside and improve drainage to stabilize roadways. |
Louisville |
KY |
7 |
$250,000 |
Streets/Roads |
5 |
| Mitchell Hill Road Roadways are sliding down adjacent slopes. We will excavate and re-build roadside and improve drainage to stabilize roadways. |
Louisville |
KY |
10 |
$250,000 |
Streets/Roads |
5 |
| Clark Station Road Bridge Replacement .5 M S |
Louisville |
KY |
15 |
$225,000 |
Streets/Roads |
1 |
| Rehl Rd - 0.40 miles (S. Pope Lick to S. English Station)
Widen pavement to 18 to 20 feet with 2 foot shoulder and resurface at the locations below: |
Louisville |
KY |
7 |
$200,000 |
Streets/Roads |
2 |
| Blevins Gap Bridge Replacement (4410) |
Louisville |
KY |
10 |
$200,000 |
Streets/Roads |
-2 |
| River Road Bridge Replacement (7505) |
Louisville |
KY |
10 |
$200,000 |
Streets/Roads |
35 |
| S. Pope Lick Rd. Bridge Replacement (2213) |
Louisville |
KY |
10 |
$175,000 |
Streets/Roads |
-2 |
| Blevins Gap Bridge Replacement (4021) |
Louisville |
KY |
12 |
$175,000 |
Streets/Roads |
1 |
| South English Station Bridge Replacement (1905) |
Louisville |
KY |
12 |
$175,000 |
Streets/Roads |
1 |
| Seatonville Rd Bridge Replacement (11221) |
Louisville |
KY |
10 |
$155,000 |
Streets/Roads |
0 |
| Urton Lane Bridge Replacement (12509) |
Louisville |
KY |
10 |
$145,000 |
Streets/Roads |
-2 |
| Blevins Gap Bridge Replacement (3907) |
Louisville |
KY |
12 |
$145,000 |
Streets/Roads |
1 |
| Blevins Gap Bridge Replacement (2700) |
Louisville |
KY |
10 |
$140,000 |
Streets/Roads |
1 |
| Broad Run Bridge Replacement (9220)N |
Louisville |
KY |
10 |
$135,000 |
Streets/Roads |
-1 |
| Broad Run Bridge Replacement (9220)S |
Louisville |
KY |
10 |
$135,000 |
Streets/Roads |
-1 |
| Broad Run Bridge Replacement (9403) |
Louisville |
KY |
10 |
$135,000 |
Streets/Roads |
0 |
| Clark Station Road Bridge Replacement (2202) |
Louisville |
KY |
10 |
$125,000 |
Streets/Roads |
-1 |
| Stout Road at Floyds Fork Tributary Bridge Replacement |
Louisville |
KY |
10 |
$125,000 |
Streets/Roads |
-1 |
| Old Taylorsville Road Bridge Replacement (5601) |
Louisville |
KY |
10 |
$100,000 |
Streets/Roads |
-1 |
| West County Waste Water and Treatment Plant Wet Weather Treatment Facility: provides for the construction of a new Wet Weather Treatment Facility, modifications to the new existing, Grit Handling Building, a new aeration basin, six new clarifiers, two new |
Louisville |
KY |
225 |
$37,300,000 |
Water |
9 |
| West County Waste Water and Treatment Plant Pump Station Improvements and Additions: The scope will provide modifications to the Raw Sewage Pump Station (RSPS), a new Screening Facility, a new Wet Weather Pump Station (WWPS |
Louisville |
KY |
250 |
$35,040,000 |
Water |
7 |
| Lead Service Line Renewals: Replace and/or rehabilitate 10,000 lead service lines to improve water quality to homes in Jefferson County |
Louisville |
KY |
200 |
$20,000,000 |
Water |
8 |
| Western Pumping Station Improvement: Will fund a full replacement of seven pumps and revamp electrical service and emergency power to the station. The Western Pumping Station is the first FPS of 16 in Jefferson County to be called into service |
Louisville |
KY |
300 |
$13,000,000 |
Water |
9 |
| Zoo Sewer Repair and Improvements: address repairs to zoo sewer system first identified in 1999; construct an effluent handling/treatment system; build a gray water recycling facility |
Louisville |
KY |
300 |
$13,000,000 |
Water |
11 |
| Interstate 64 Regional Water Supply: Construct 5.4 miles of 36 inch transmission main along I-64 from Gene Snyder Freeway to Shelby County Line to provide regional water service to eastern Jefferson County and western Shelby County. |
Louisville |
KY |
94 |
$11,700,000 |
Water |
9 |
| Shinks Branch Pump Station and Force Main: This project consists of constructing a two million gallon per day pump station and approximately 24,000 liner-feet of force main to convey wastewater to the Cedar Creek Wastewater Treatment Facility. |
Louisville |
KY |
100 |
$10,000,000 |
Water |
4 |
| Hikes Lane Interceptor Sewer: One of a series of large diameter interceptor sewers that will be constructed to relieve basement flooding of hundreds of homes in the Beechwood Village/ Hikes Lane areas during wet weather. |
Louisville |
KY |
300 |
$8,000,000 |
Water |
19 |
| Billtown Road Interceptor: This project consists of the construction of approximately 12,000 linear-feet of 36-inch gravity sewer. This project is a critical component necessary to continue to allow growth and enable development previously unavailable |
Louisville |
KY |
100 |
$7,500,000 |
Water |
3 |
| Interstate 65 Regional Water Supply, Phase III: Construct 9.3 miles of 16-inch transmission main from Chapeze Lane to the Bullitt-Hardin County Line. Project will include construction of a new 5 MGD booster pump station. |
Louisville |
KY |
56 |
$7,000,000 |
Water |
3 |
| Northern Ditch Interceptor Sewer: One of a series of large diameter interceptor sewers that will be constructed to relieve basement flooding of hundreds of homes in the Beechwood Village/ Hikes Lane areas during wet weather. |
Louisville |
KY |
300 |
$7,000,000 |
Water |
7 |
| Water Main Replacement: Replace 9.5 miles of water main to improve water quality, fire hydrant flow and reduce maintenance; work includes replacement of the water main in the Fincastle neighborhood. |
Louisville |
KY |
65 |
$6,500,000 |
Water |
4 |
| Champions Park Development: a design that captures and treats onsite water runoff from surrounding redeveloped roadways. |
Louisville |
KY |
100 |
$6,000,000 |
Water |
1 |
| Interstate 265 Transmission Supply: 2.8 miles of 36-inch transmission main |
Louisville |
KY |
40 |
$5,000,000 |
Water |
4 |
| Ft. Knox/Hardin County Regional Water Supply: Construct 3.2 miles of 24 inch transmission main to supply wholesale water service to Ft Knox and Hardin County |
Louisville |
KY |
36 |
$4,500,000 |
Water |
9 |
| Water Mains Rehabilitation: Install cathodic protection on 75 miles of water distribution main (ductile and cast iron) to extend pipe life and reduce water main breaks. |
Louisville |
KY |
36 |
$4,500,000 |
Water |
3 |
| Supply Potable Water to Unserved Customers in Jefferson, Bullitt and Oldham County: Extend 7.1 miles of water main to customers in Bullitt and Oldham County to provide unserved customers with a safe reliable source of potable water |
Louisville |
KY |
45 |
$4,500,000 |
Water |
18 |
| Interstate 65 Regional Water Supply, Phase II: Construct 3.0 miles of 24-inch transmission main along the Preston Highway (Hwy 61) from John Harper Highway to the Settlers Point elevated storage tank. |
Louisville |
KY |
33 |
$4,100,000 |
Water |
4 |
| Interstate 65 Regional Water Supply, Phase I: Construct 2.9 miles of 24-inch transmission main from Mud Lane to John Harper Highway and along John Harper Highway to Preston Highway. |
Louisville |
KY |
28 |
$3,500,000 |
Water |
4 |
| Clean and Reline Crescent Hill Raw Water Reservoirs (north and south): Remove accumulated river sediment from the 105 MG raw water reservoirs at Crescent Hill, properly dispose of sediments, and repair synthetic liner once completed |
Louisville |
KY |
24 |
$3,000,000 |
Water |
12 |
| Crescent Hill Softening Basin Renovation: Rehabilitate softening basins at Crescent Hill Water Treatment Plant to comply with 2012 drinking water regulations |
Louisville |
KY |
24 |
$3,000,000 |
Water |
10 |
| Highway 245 Regional Water Supply: Construct 3.6 miles of 16 inch transmission main to provide regional water service to Bullitt and Nelson County |
Louisville |
KY |
20 |
$2,500,000 |
Water |
2 |
| Crescent Hill Slate Roof Replacement: Replace slate roof on 100 year old Crescent Hill Pump Station |
Louisville |
KY |
25 |
$2,500,000 |
Water |
-1 |
| Zorn Pump Station Power System Renovation: Replace aging 13KV and 480 Volt power system at Zorn Pump Station #2 and #3 to improve reliability and reduce maintenance |
Louisville |
KY |
25 |
$2,500,000 |
Water |
7 |
| Highway 480 Regional Water Storage: Construct new drinking water storage tank on Highway 480 in Bullitt County to provide regional water service in Bullitt and Nelson County. |
Louisville |
KY |
16 |
$2,000,000 |
Water |
2 |
| Regional Water Storage: Construct new drinking water storage tank on Highway in Bullitt County to provide regional water service in Bullitt and Nelson County |
Louisville |
KY |
16 |
$2,000,000 |
Water |
-1 |
| Chapeze Road – Highway 245 Main Extension: Construct 2.8 miles of 16-inch transmission main in Chapeze Lane from I-65 east and south to Highway 245, and along Highway 145 to Happy Hollow Road. |
Louisville |
KY |
10 |
$1,200,000 |
Water |
2 |
| Water Quality Lab Information System: Upgrade existing water quality lab information system to comply with regulatory reporting and future drinking water regulations. |
Louisville |
KY |
2 |
$1,000,000 |
Water |
2 |
| Transylvania Beach Sewers: Install sewers to 20 homes currently on septic tanks along Transylvania Beach. Eliminating septic tanks in this wellhead protection area will protect Louisville's drinking water supply from source water contamination. |
Louisville |
KY |
10 |
$1,000,000 |
Water |
5 |
| Historic Zorn Pump Station #1 Building and Site Improvements: Rehabilitate the exterior of the historic pump station and construct site improvements to improve drainage, access, parking. |
Louisville |
KY |
12 |
$1,000,000 |
Water |
-9 |
| Radio and Data Communications System Upgrade: Upgrade the two-way radio and data communication system for water utility and emergency operations. New digital system will link to MetroSafe Emergency Radio communications system. Current system becomes obs |
Louisville |
KY |
4 |
$500,000 |
Water |
6 |
| Water System Security Access: Upgrade controlled access system with digital video, controlled electronic access, and proximity readers. System will enhance security at water treatment plants, pumping stations, distribution centers, and corporate office. |
Louisville |
KY |
4 |
$500,000 |
Water |
1 |
| Crittenden Drive Relocation: The relocation of Crittenden Drive from just south of I-264 (Watterson Expressway) to the Chautauqua Maintenance hangar is necessary to facilitate the construction of a taxiway parallel to the west runway at Louisville Interna |
Louisville |
KY |
500 |
$27,500,000 |
Airport |
13 |
| T-Hangar Construction: construction of T-hangers at Bowman Field to replace existing units with updated and modern facilities for the population base at this facility |
Louisville |
KY |
175 |
$2,500,000 |
Airport |
2 |
| Aircraft Apron Reconstruction: addresses the reconstruction of various aircraft aprons at Bowman Field, an airport that reduces the air traffic of smaller propeller aircraft at Louisville International Airport |
Louisville |
KY |
30 |
$600,000 |
Airport |
1 |
| Midfield Access Road Upgrade: upgrade the midfield access road by installing drainage pipes, curbs and gutter sections to secure the shoulder and adjacent security fence |
Louisville |
KY |
16 |
$300,000 |
Airport |
-3 |
| Airfield Electrical Ductbank Relocation: relocate electrical cables and a ductbank containing a number of circuits for the airfield lighting system to ensure access to facilities |
Louisville |
KY |
10 |
$200,000 |
Airport |
3 |
| Park Hill Corridor Improvement Plan– Plan addresses how to improve the corridor to make it more functionally appealing for existing businesses and residents with the intent of attracting more: connect and widen streets when appropriate; improve truck and |
Louisville |
KY |
2200 |
$22,500,000 |
CDBG |
-10 |
| Street Resurfacing: Proposed funding would allow for 143 miles of roads to be resurfaced in CDBG eligible areas within one season, which is approximately 8 months out of the year. |
Louisville |
KY |
1200 |
$10,000,000 |
CDBG |
5 |
| Belvedere Restoration – Reinforce plaza structure to accommodate increased loading conditions, waterproof existing structural slabs and remove and reinstall concrete pavers. |
Louisville |
KY |
92 |
$8,000,000 |
CDBG |
1 |
| PW&A Fleet Services Division Design/Build Renovation & construction project to consolidate the Fleet services division into a new facility on Millers Lane |
Louisville |
KY |
198 |
$8,000,000 |
CDBG |
-7 |
| Code Alleviation Activities: assist owner-occupants with eliminating exterior code violations.
Target areas include the Smoketown, Shelby Park, Phoenix Hill, Shawnee, California, Oakdale, Portland, & Shagbark/Shanks Lane neighborhoods. |
Louisville |
KY |
50 |
$7,000,000 |
CDBG |
-4 |
| Alley Paving: Proposed funding would allow for 62 miles of alleys in CDBG eligible areas to be paved. |
Louisville |
KY |
500 |
$4,000,000 |
CDBG |
-7 |
| Emergency Repair Activities: rehabilitate single unit residences in “emergency situations” determined by Louisville Metro Housing & Community Development. Target areas include the Smoketown, Shelby Park, Phoenix Hill, Shawnee, California, Oakdale, Portlan |
Louisville |
KY |
300 |
$3,500,000 |
CDBG |
-2 |
| Main Branch Library Rehabilitation: Convert & restore east wing to childrenÂ’s area; rebuild plaza walkways; repair and clean exterior of buildings; renovate public service spaces; replace HVAC systems in 1908 building; remodel book sorting area & delivery |
Louisville |
KY |
76 |
$2,700,000 |
CDBG |
19 |
| Construct a new West Entry and paths along the Algonquin Pavilion |
Louisville |
KY |
35 |
$2,500,000 |
CDBG |
-9 |
| Riverside Landing Water Supply, Electric Supply, Septic System, and Paving |
Louisville |
KY |
50 |
$2,500,000 |
CDBG |
-1 |
| Shawnee Branch Library Rehabilitation: Rehab and restore existing 7,000 square foot historic WPA-era library and add 3,000 square feet of new library space. |
Louisville |
KY |
98 |
$2,100,000 |
CDBG |
12 |
| Engine 2, 22, 6, 15 Apparatus |
Louisville |
KY |
0 |
$2,000,000 |
CDBG |
5 |
| Weatherization Activities: stabilize existing housing stock by replacing energy systems including but not limited to, furnaces, water heaters, duct work, and carbon dioxide and smoke detectors. Target areas include the Smoketown, Shelby Park, Phoenix Hill |
Louisville |
KY |
50 |
$2,000,000 |
CDBG |
4 |
| Sidewalks: Proposed funding would allow for replacement of approximately 50,000 linear feet of sidewalk in CDBG eligible areas. |
Louisville |
KY |
200 |
$2,000,000 |
CDBG |
-3 |
| Retrofitting owner-occupied houses of low-income households: repainting interior and exterior walls with ceramic insulating paint; including attic insulation to R-38; addition of storm windows and doors; caulking/weatherstripping |
Louisville |
KY |
300 |
$1,800,000 |
CDBG |
-4 |
| Home repair activities of low-income households: various home improvement activities for critical and non-critical home improvements for persons from low-income households. |
Louisville |
KY |
800 |
$1,600,000 |
CDBG |
-1 |
| City Hall Exterior Restoration – Limestone cleaning and tuckpointing & window painting |
Louisville |
KY |
28 |
$1,400,000 |
CDBG |
-17 |
| Portland Branch Library Renovation: Repair and restore exterior; remodel and restore interior of historic Carnegie library. |
Louisville |
KY |
68 |
$1,400,000 |
CDBG |
12 |
| Memorial Auditorium Exterior Restoration – Exterior Restoration consisting of Limestone cleaning and tuckpointing & window painting |
Louisville |
KY |
28 |
$1,250,000 |
CDBG |
-6 |
| Metro Hall Exterior Restoration – Exterior Stone Restoration , Stucco Repair & Masonry Coating. |
Louisville |
KY |
36 |
$1,200,000 |
CDBG |
-9 |
| Installation of flat floor multi-purpose auditorium and program space at Main Branch Library: replace oversized windows with energy efficient, historically appropriate windows; remove any asbestos adhesive and replace ceiling materials; replace lighting |
Louisville |
KY |
72 |
$1,050,000 |
CDBG |
10 |
| Lead Abatement Activities: reduce lead hazards in single-unit and multi-unit residences, focusing on the Smoketown, Shelby Park, Phoenix Hill, Shawnee, California, Oakdale, Portland, & Shagbark/Shanks Lane neighborhoods. |
Louisville |
KY |
20 |
$1,000,000 |
CDBG |
3 |
| Truck 1 Apparatus |
Louisville |
KY |
0 |
$925,000 |
CDBG |
-7 |
| Western Branch Library Rehabilitation: Renovate interior of historic Carnegie library and convert meeting room into African-American archive space and study center. |
Louisville |
KY |
26 |
$800,000 |
CDBG |
-7 |
| Buechel Area Business Improvement District- Sidewalk, landscape and other streetscape improvements; drainage improvements; all work is meant to improve corridor to attract more business. Approximately 4,900 linear feet |
Louisville |
KY |
16 |
$650,000 |
CDBG |
2 |
| Urban Government Center – 810 Building Elevator Replacement – Replace existing elevators (3) equipment and controls. |
Louisville |
KY |
24 |
$625,000 |
CDBG |
-5 |
| University Corridor Redevelopment - Sidewalk, landscape and other streetscape improvements; land acquisition; street lane improvements to accommodate cars, trucks, pedestrians and bikes; all work is meant to connect University to surrounding neighborhood. |
Louisville |
KY |
14 |
$600,000 |
CDBG |
-1 |
| LMPD Headquarters Roof Replacement – Replace existing built-up roof w/ a new roof |
Louisville |
KY |
12 |
$500,000 |
CDBG |
-1 |
| Hall of Justice Escalator Replacement – Replace existing escalators (2) equipment and controls. |
Louisville |
KY |
14 |
$500,000 |
CDBG |
-6 |
| West Market Street Corridor Improvements- Sidewalk, landscape and other streetscape improvements; land acquisition; to improve the availability of neighborhood serving retail. Approximately 7,000 linear feet |
Louisville |
KY |
14 |
$500,000 |
CDBG |
1 |
| LMPD Headquarters Repair and Restoration - Granite and marble exterior restoration and window replacement. |
Louisville |
KY |
15 |
$500,000 |
CDBG |
-24 |
| Tree planting 1000 trees in CDBG eligible parks |
Louisville |
KY |
20 |
$500,000 |
CDBG |
9 |
| City Hall Annex Roof Replacement – Replace multiple existing built-up roofs w/ new built-up roofs. |
Louisville |
KY |
28 |
$450,000 |
CDBG |
-6 |
| City Hall Roof Replacement – Replace numerous roofs on historic city hall |
Louisville |
KY |
28 |
$450,000 |
CDBG |
0 |
| Expansion of the Automotive Service Facility to improve service to the EMS Fleet |
Louisville |
KY |
20 |
$410,000 |
CDBG |
1 |
| Memorial Auditorium Roof Replacement – Replace existing roof w/ new roof |
Louisville |
KY |
24 |
$400,000 |
CDBG |
-1 |
| Preston Corridor Streetscape – Sidewalk, landscape and other streetscape improvements to improve the availability of neighborhood serving retail. Approximately 3,400 linear feet |
Louisville |
KY |
8 |
$350,000 |
CDBG |
-6 |
| Elevator Installation at Fire Headquarters: Construction of an elevator shaft, elevator, and vestibule at Louisville Division of Fire Headquarters to allow ADA access to second floor and basement. |
Louisville |
KY |
15 |
$350,000 |
CDBG |
-3 |
| Repair and refurbish York Street Entrance at lobby at the Main Branch Library: repair and repaint plaster walls; clean historic murals; make minimal repairs to marble floor and walls; repair electrical system; replace lighting with energy efficient fixtur |
Louisville |
KY |
32 |
$350,000 |
CDBG |
10 |
| Metro Corrections Headquarters Roof Replacement – Replace existing original built-up roof w/ a new built-up roof |
Louisville |
KY |
12 |
$300,000 |
CDBG |
-3 |
| Hampton House Exterior Restoration - Tuckpointing, painting, cornice & porch repair, and new standing seam roof on a Public Health Department outreach center. |
Louisville |
KY |
17 |
$250,000 |
CDBG |
-1 |
| City Hall Elevator Replacement – Replace existing elevators (2) equipment and controls. |
Louisville |
KY |
20 |
$250,000 |
CDBG |
-1 |
| Metro Hall Elevator Replacement – Replace existing elevators (2) equipment and controls. |
Louisville |
KY |
20 |
$250,000 |
CDBG |
3 |
| 617 West Jefferson Roof Replacement and Skylight Restoration Replace existing built-up roof w/ a new roof and restore historic skylight. |
Louisville |
KY |
22 |
$250,000 |
CDBG |
-5 |
| Fiscal Court Building Lobby Renovation – Public Lobby renovation to improve ADA access to elevators and restrooms. |
Louisville |
KY |
26 |
$250,000 |
CDBG |
-4 |
| Urban Government Center – 850 Building Roof Replacement – Replace existing built-up roof w/ a new roof. |
Louisville |
KY |
20 |
$200,000 |
CDBG |
-1 |
| Science Center Annex Elevator Replacement – Replace existing elevator equipment and controls. |
Louisville |
KY |
15 |
$150,000 |
CDBG |
-2 |
| City Hall Annex Elevator Replacement – Replace existing elevator equipment and controls. |
Louisville |
KY |
15 |
$125,000 |
CDBG |
-3 |
| Construct a methane production facility on the zoo campus that is powered by methane gas from animal waste. |
Louisville |
KY |
750 |
$15,000,000 |
Energy |
12 |
| Recycling Program Enhancement Equipment: Purchase and distribution of 100,000 programmable recycling carts to enhance recycling participation & thereby reduce landfill volumes. |
Louisville |
KY |
100 |
$7,000,000 |
Energy |
3 |
| Zoo Energy Efficiency Improvements
Replace single pane windows, install insulation and improve heat delivery systems; install green roofs; enhance the water and energy efficiencies to the collection life support systems |
Louisville |
KY |
250 |
$5,000,000 |
Energy |
6 |
| Air Pollution Control Headquarters Renovation Renovation and new construction to consolidate the local air pollution regulatory agency into a centrally located facility. Green building practices, solar collection and a geothermal HVAC system will be inclu |
Louisville |
KY |
120 |
$2,800,000 |
Energy |
-1 |
| Mary T. Meager Aquatic Facility Retrofit including energy efficient HVAC, solar water heating system and building insulation |
Louisville |
KY |
25 |
$2,600,000 |
Energy |
254 |
| Retrofit Golf Clubhouses including solar water heating systems, efficient lighting, geothermal HVAC, building insulation, etc. at Shawnee, Seneca, Bobby Nichols, Cherokee, Crescent Hill, Sun Valley and Iroquois Parks |
Louisville |
KY |
40 |
$2,100,000 |
Energy |
-71 |
| Hall of Justice HVAC Replacement - Replace the existing energy inefficient and unreliable HVAC system with a new HVAC system designs providing higher energy efficiency, reduced carbon emissions, enhanced comfort and reduced first cost and operating expens |
Louisville |
KY |
40 |
$2,000,000 |
Energy |
2 |
| Metro Louisville Solar Street Lighting – Replacement of existing electric street lighting to solar powered street lights |
Louisville |
KY |
40 |
$2,000,000 |
Energy |
17 |
| Park Hill Green Strategies
•Building – Update Metro-owned building to green retro-fit; include renewable energy techniques
•Rhodia Site (Metro-owned property)– Brownfield/storm water management demonstration area
•Urban forests as carbon sequestratio |
Louisville |
KY |
30 |
$1,650,000 |
Energy |
-2 |
| Memorial Auditorium HVAC Replacement – Replace the existing energy inefficient and unreliable HVAC system with a new HVAC system designs providing higher energy efficiency, reduced carbon emissions, enhanced comfort and reduced first cost and operating ex |
Louisville |
KY |
36 |
$1,500,000 |
Energy |
-3 |
| Metro Development Center Solar Panel System: install south facing solar panels for the building. The panels will be used to supply domestic hot water for the building. Additionally , solar panels will be utilized to produce electricity for the building. |
Louisville |
KY |
28 |
$1,000,000 |
Energy |
3 |
| Urban Gov. Center 810 Green Roof - Replace the existing built-up roof w/ a new Green Roof;Â promoting environmental sustainability and environmentally beneficial initiatives. Green roofs help capture storm water run-off that otherwise would enter the sewer |
Louisville |
KY |
30 |
$1,000,000 |
Energy |
0 |
| SW Government Center Geothermal HVAC
Replace the existing energy inefficient and unreliable HVAC system with a new geothermal heat pump system; thus lowering the heating bills for the building up to 50 percent and lowering cooling bills up to 30 percent |
Louisville |
KY |
24 |
$900,000 |
Energy |
1 |
| Youth Detention Services Chiller Replacement – Replace the existing energy inefficient and unreliable equipment with a new equipment providing higher energy efficiency, reduced carbon emissions, enhanced comfort and reduced first cost and operating expens |
Louisville |
KY |
20 |
$800,000 |
Energy |
2 |
| Urban Government Center 850 Geothermal HVAC Replace the existing energy inefficient and unreliable HVAC system with a new geothermal heat pump system. thus lowering the heating bills for the building up to 50 percent and lowering cooling bills up to 30 pe |
Louisville |
KY |
24 |
$800,000 |
Energy |
2 |
| Metro Archives & LMPD Property Building Green Roof – Replace the existing built-up roof w/ a new Green Roof; promoting environmental sustainability and environmentally beneficial initiatives. Green roofs help capture storm water run-off that otherwise wou |
Louisville |
KY |
28 |
$785,000 |
Energy |
-1 |
| 617 West Jefferson HVAC Replacement - Replace the existing energy inefficient and unreliable HVAC system with a new HVAC system designs providing higher energy efficiency, reduced carbon emissions, enhanced comfort and reduced first cost and operating exp |
Louisville |
KY |
22 |
$750,000 |
Energy |
-1 |
| Central Government Building Geothermal HVAC Replace the existing energy inefficient and unreliable HVAC system with a new geothermal heat pump system; thus lowering the heating bills for the building up to 50 percent and lowering cooling bills up to 30 pe |
Louisville |
KY |
24 |
$750,000 |
Energy |
2 |
| Fairdale Health Center Geothermal HVAC and Playtorium – Replace the existing energy inefficient and unreliable HVAC systems with new geothermal heat pump systems, thus lowering the heating bills for the building up to 50% & lowering cooling bills up to 30 |
Louisville |
KY |
30 |
$580,000 |
Energy |
1 |
| Newburg Community Center Geothermal HVAC-Replace the existing energy inefficient and unreliable HVAC system with a new geothermal heat pump system; thus lowering the heating bills for the building up to 50 percent and lowering cooling bill |
Louisville |
KY |
20 |
$550,000 |
Energy |
1 |
| Energy Efficient Street Lamps
•Replace 200 low functioning VISCO streetlights with HADCO poles with energy efficient LED lamps and long lasting glass or acrylic globes – |
Louisville |
KY |
10 |
$500,000 |
Energy |
5 |
| LMPD Headquarters Air Handling Unit & Chiller replacement - Replace the existing energy inefficient and unreliable HVAC system with a new HVAC system designs providing higher energy efficiency, reduced carbon emissions, enhanced comfort and reduced first |
Louisville |
KY |
15 |
$500,000 |
Energy |
-1 |
| Metro Hall Annex Boiler Replacement - Replace existing inefficient 5 boilers & misc HVAC with a new HVAC system designs providing higher energy efficiency, reduced carbon emissions, enhanced comfort and reduced first cost and operating expenses. |
Louisville |
KY |
15 |
$500,000 |
Energy |
-1 |
| Old Jail Boiler & Unit Replacement – Replace the existing energy inefficient and unreliable HVAC system with a new HVAC system designs providing higher energy efficiency, reduced carbon emissions, enhanced comfort and reduced first cost and operating expe |
Louisville |
KY |
18 |
$500,000 |
Energy |
-3 |
| Metro Development Center Cooling Tower and Unit Replacement - Replace the existing energy inefficient and unreliable HVAC system with a new HVAC system designs providing higher energy efficiency, reduced carbon emissions, enhanced comfort and reduced firs |
Louisville |
KY |
15 |
$450,000 |
Energy |
0 |
| LMHW Lab Building AHU & Boiler Replacement Replace the existing energy inefficient and unreliable HVAC system with a new HVAC system designs providing higher energy efficiency, reduced carbon emissions, enhanced comfort and reduced first cost and operatin |
Louisville |
KY |
15 |
$400,000 |
Energy |
-1 |
| City Hall Annex HVAC Replacement – Replace the existing energy inefficient and unreliable HVAC system with a new HVAC system designs providing higher energy efficiency, reduced carbon emissions, enhanced comfort and reduced first cost and operating expens |
Louisville |
KY |
20 |
$400,000 |
Energy |
-1 |
| Science Center Annex Green Roof - replace the existing built-up roof w/ a new Green Roof; promoting environmental sustainability and environmentally beneficial initiatives. Green roofs help capture storm water run-off that otherwise would enter the sewer |
Louisville |
KY |
22 |
$300,000 |
Energy |
1 |
| Science Center Green Roof - Replace the existing built-up roof w/ a new Green Roof; promoting environmental sustainability and environmentally beneficial initiatives. Green roofs help capture storm water run-off that otherwise would enter the sewer system |
Louisville |
KY |
22 |
$280,000 |
Energy |
4 |
| Convert 200 vehicles (tractors and trucks) to use alternative fuel mix |
Louisville |
KY |
5 |
$240,000 |
Energy |
-5 |
| Newburg Branch Library: Add photovoltaic solar panels as electric power source. |
Louisville |
KY |
18 |
$200,000 |
Energy |
12 |
| 617 West Jefferson Green Plumbing Project - replace domestic water heater with solar water, replace plumbing fixtures w/low water capacity fixtures and install grey water cistern to collect roof storm water for grey water toilet flushing. |
Louisville |
KY |
22 |
$150,000 |
Energy |
-1 |
| Controllers for tennis court lights at 15 locations totaling 77 courts to restrict lighting to periods of actual use |
Louisville |
KY |
2 |
$100,000 |
Energy |
2 |
| The building of a 2-story community center for seniors for non sports related activities at the Liberty Green Housing Redevelopment |
Louisville |
KY |
30 |
$3,350,000 |
Housing |
-7 |
| Upgrading elevators at the Dosker Manor Senior Living Center |
Louisville |
KY |
5 |
$2,200,200 |
Housing |
6 |
| Demolition of 16 public housing units at the Iroquois Public Housing Project |
Louisville |
KY |
200 |
$1,328,000 |
Housing |
21 |
| Stove, and gas line conversion to electric for Parkway Place, a 600 unit Public Housing Apartment structure located at 13th and Hill |
Louisville |
KY |
20 |
$900,000 |
Housing |
-16 |
| Replacement of the parapets (post and guardrail like structures) on the Dosker Manor Senior Living Center, a structure with over 685 units. |
Louisville |
KY |
5 |
$400,000 |
Housing |
-2 |
| Upgrading elevators at Avenue Plaza Senior Living Center |
Louisville |
KY |
5 |
$400,000 |
Housing |
0 |
| The construction of three lease-to-own houses |
Louisville |
KY |
20 |
$375,000 |
Housing |
-42 |
| Roof replacement on the Tonini Building, a historic structure owned by the Housing Authority |
Louisville |
KY |
6 |
$320,000 |
Housing |
-2 |
| Replacement of the roof on the Vine Street public housing unit with a green roof |
Louisville |
KY |
10 |
$300,000 |
Housing |
-1 |
| Replacement of the windows at St. Martins, a public housing apartment unit on the national history registry |
Louisville |
KY |
5 |
$296,200 |
Housing |
-6 |
| Renovation and conversion of the remains of DuValle Liquors, a liquor store purchased by the Housing Authority to remove blight |
Louisville |
KY |
10 |
$250,000 |
Housing |
-13 |
| Renovation and Conversion of 537 East Breckenridge back to a single family home |
Louisville |
KY |
20 |
$225,000 |
Housing |
-22 |
| Replace the emergency notification intercom system at Lourdes Hall, a 62 unit Senior Living Facility |
Louisville |
KY |
3 |
$200,000 |
Housing |
2 |
| Cabinet replacement at 200 scattered site locations |
Louisville |
KY |
12 |
$200,000 |
Housing |
-21 |
| Roof replacement at 50 scattered site locations |
Louisville |
KY |
12 |
$200,000 |
Housing |
0 |
| Roof replacement on the Bishops Lane Senior Living Facility |
Louisville |
KY |
12 |
$190,000 |
Housing |
3 |
| Drainage and sewer line replacement at Parkway Place, a 600 unit Public Housing Apartment structure located at 13th and Hill |
Louisville |
KY |
2 |
$150,000 |
Housing |
2 |
| Generator replacement on the Bishops Lane Senior Living Facility |
Louisville |
KY |
2 |
$150,000 |
Housing |
1 |
| Replace the generator at Lourdes Hall, a 62 unit Senior Living Facility |
Louisville |
KY |
2 |
$150,000 |
Housing |
2 |
| Roof replacement at Public Housing Apartment units (550 Apartments) |
Louisville |
KY |
12 |
$150,000 |
Housing |
-2 |
| Concrete stair replacement at Public Housing Apartment units (550 Apartments) |
Louisville |
KY |
5 |
$100,000 |
Housing |
-8 |
| Public Safety Radios – Metro Louisville is currently constructing the infrastructure for an 800 Mhz interoperable radio system for first responders. After this system is completed the radios must be purchased & programmed to provide common radio frequenci |
Louisville |
KY |
700 |
$11,000,000 |
Public Safety |
14 |
| Ashland Fire Station 10 Construction of a new 4-bay District Fire Station consisting of twelve sleeping rooms, offices, lounge, and support spaces. This facility will also include a fueling center. |
Louisville |
KY |
153 |
$4,000,000 |
Public Safety |
14 |
| Mobile Data Terminals (MDTs) for Police Vehicles: LMPD needs to replace 350 MDTs to outfit new patrol vehicles and upgrade older equipment. MDTs are used by officers to view and respond to calls for service, paperless reporting, electronic citations, view |
Louisville |
KY |
0 |
$2,557,000 |
Public Safety |
10 |
| COPS Hiring Grants (50 Officers): LMPD would like to hire to full authorized strength of 1257 sworn personnel, then hire an additional 50 officers funded by COPS hiring grants. |
Louisville |
KY |
50 |
$2,443,520 |
Public Safety |
21 |
| Firearms Training Center (FTC) Expansion: LMPD is currently expanding FTC from a 12 lane facility to a 24 lane facility. The expansion is necessary to accommodate a merged police force and several other peer agencies. |
Louisville |
KY |
99 |
$1,800,000 |
Public Safety |
4 |
| Dash-Mounted Mobile Video Cameras for Police Patrol Vehicles: LMPD installs dash-mounted video cameras in marked police vehicles to record interactions between officers and citizens. The current model uses digital recording technology and interfaces wit |
Louisville |
KY |
0 |
$780,000 |
Public Safety |
13 |
| LMPD/LMCD Jail Smoke Evacuation/HVAC System Renovate and install new code required, life safety smoke evacuation system for inmate housing on the third floor of the police headquarters building. This project will also replace existing HVAC system w/ a new |
Louisville |
KY |
20 |
$750,000 |
Public Safety |
-13 |
| Louisville Fire Academy Addition – a new a multi-purpose building w/ two additional classrooms will be added to the campus |
Louisville |
KY |
44 |
$500,000 |
Public Safety |
5 |
| TASER Cameras: LMPD has 1120 Taser Electronic Control Weapons deployed to officers. Taser International offers an upgrade that replaces the standard battery with a battery and camera. The camera captures the interaction between the officer and suspect, |
Louisville |
KY |
0 |
$425,544 |
Public Safety |
-9 |
| Records Management System (RMS) upgrade: add additional software to interface with records management system. One program will allow more efficient tracking of purchases by pawn brokers and scrap metal dealers. This will allow investigators to track possi |
Louisville |
KY |
0 |
$410,400 |
Public Safety |
2 |
| Fire Headquarters Elevator - Install new elevator for Handicapped Access to 2nd Floor |
Louisville |
KY |
18 |
$270,000 |
Public Safety |
-7 |
| LMPD Mounted Patrol Renovation & Addition - Modernization of the original park riding stable barn into a headquarters for the mounted patrol. |
Louisville |
KY |
12 |
$200,000 |
Public Safety |
-6 |
| Valley High School Phase 1 Renovation & construction of a new auditorium with gymnasium: HVAC replacement or upgrade, roofing, ceiling & lights in corridors & classrooms, windows, painting, paving, floor tile replacement, office renovation, and lock conve |
Louisville |
KY |
112 |
$23,581,500 |
Schools |
-5 |
| Southern HS Phase 1 Renovation: HVAC replacement or upgrade, roofing, ceiling & lights in corridors & classrooms, windows, lock conversion. |
Louisville |
KY |
112 |
$16,008,000 |
Schools |
3 |
| Purchase of school buses older than the 14-year replacement cycle: includes 154 66-passenger regular buses, 38 52-passenger buses with ECE and A/C, 18 passenger buses with lifts and five 22-passenger ECE buses |
Louisville |
KY |
430 |
$15,745,000 |
Schools |
11 |
| Noe Middle School Phase 1 Renovation: HVAC replacement or upgrade, roofing, ceiling & lights in corridors & classrooms, windows, painting, paving, floor tile replacement, office renovation, lock conversion, and elevator replacement. |
Louisville |
KY |
115 |
$9,407,000 |
Schools |
6 |
| Kammerer Middle School Phase 1 Renovation: HVAC replacement or upgrade, roofing, ceiling & lights in corridors & classrooms, windows, painting, paving, floor tile replacement, office renovation, and lock conversion. |
Louisville |
KY |
112 |
$6,681,500 |
Schools |
5 |
| Watterson Elementary : Removal of portables, classroom conversion of existing media center, roofing, ceiling & lights in corridors & classrooms, windows, paving, painting, floor tile replacement, and lock conversion and restroom addition. |
Louisville |
KY |
62 |
$3,377,550 |
Schools |
3 |
| Smyrna Elementary: Removal of portables, classroom conversion of existing media center, roofing, ceiling & lights in corridors & classrooms, windows, paving, painting, floor tile replacement, lock conversion and elevator. |
Louisville |
KY |
65 |
$3,320,050 |
Schools |
3 |
| Roosevelt Perry Elementary: Removal of portables, classroom conversion of existing media center, roofing, ceiling & lights in corridors & classrooms, windows, paving, painting, floor tile replacement, lock conversion, and elevator. |
Louisville |
KY |
65 |
$3,059,000 |
Schools |
6 |
| Wellington Elementary: Removal of portables, classroom conversion of existing media center, roofing, ceiling & lights in corridors & classrooms, windows, paving, painting, floor tile replacement, lock conversion, and elevator. |
Louisville |
KY |
65 |
$3,007,250 |
Schools |
5 |
| Trunnell Elementary: Removal of portables, classroom conversion of existing media center, roofing, ceiling & lights in corridors & classrooms, windows, paving, painting, floor tile replacement, and lock conversion. |
Louisville |
KY |
62 |
$2,507,000 |
Schools |
3 |
| Sanders Elementary: Removal of portables, classroom conversion of existing media center, roofing, ceiling & lights in corridors & classrooms, windows, paving, painting, floor tile replacement, and lock conversion. |
Louisville |
KY |
62 |
$2,390,850 |
Schools |
2 |
| Rangeland Elementary: Removal of portables, classroom conversion of existing media center, roofing, ceiling & lights in corridors & classrooms, windows, paving, painting, floor tile replacement, and lock conversion. |
Louisville |
KY |
62 |
$2,282,750 |
Schools |
3 |
| Wilt Elementary: Removal of portables, roofing, window replacement, floor tile, painting, Ceiling & lights in corridors & classrooms, paving, and lock conversion. |
Louisville |
KY |
62 |
$2,179,250 |
Schools |
1 |
| Greenwood Elementary: Removal of portables, classroom conversion of existing media center, roofing, ceiling & lights in corridors & classrooms, windows, paving, painting, floor tile replacement, & lock conversion; Purchasing of a new elevator. |
Louisville |
KY |
65 |
$2,156,250 |
Schools |
0 |
| Mill Creek Elementary: Removal of portables, classroom conversion of existing media center, roofing, ceiling & lights in corridors & classrooms, windows, paving, painting, floor tile replacement, and lock conversion. |
Louisville |
KY |
62 |
$2,119,450 |
Schools |
-1 |
| Kennedy Montessori Elementary: Removal of portables, classroom conversion of existing media center, roofing, ceiling & lights in corridors & classrooms, windows, paving, painting, floor tile replacement, and lock conversion. |
Louisville |
KY |
62 |
$2,107,950 |
Schools |
3 |
| Wheatley Elementary: Removal of portables, classroom conversion of existing media center, roofing, ceiling & lights in corridors & classrooms, windows, paving, painting, floor tile replacement, and lock conversion. New Elevator |
Louisville |
KY |
65 |
$2,099,900 |
Schools |
1 |
| Middletown Elementary: Removal of portables, classroom conversion of existing media center, roofing, ceiling & lights in corridors & classrooms, windows, paving, painting, floor tile replacement, and lock conversion. |
Louisville |
KY |
62 |
$2,018,250 |
Schools |
8 |
| Cochrane School Elementary: Removal of portables, classroom conversion of existing media center, roofing; refurbishing of ceiling & lights in corridors & classrooms, windows, paving, painting, floor tile replacement, and lock conversion. |
Louisville |
KY |
62 |
$1,849,200 |
Schools |
2 |
| Wilkerson Tradition Elementary: Removal of portables, classroom conversion of existing media center, roofing, ceiling & lights in corridors & classrooms, windows, paving, painting, floor tile replacement, and lock conversion. |
Louisville |
KY |
62 |
$1,844,600 |
Schools |
3 |
| Johnsontown Road Elementary: Removal of portables, classroom conversion of existing media center, roofing, ceiling & lights in corridors & classrooms, windows, paving, painting, floor tile replacement, and lock conversion. |
Louisville |
KY |
62 |
$1,806,650 |
Schools |
3 |
| Wheeler Elementary: Removal of portables, classroom conversion of existing media center, roofing, ceiling & lights in corridors & classrooms, windows, paving, painting, floor tile replacement, and lock conversion. |
Louisville |
KY |
62 |
$1,711,200 |
Schools |
3 |
| Field Elementary Construction: Construction of playtorium and renovation of existing Gym to new Media Center and renovation of existing media center to Art/Resource rooms and associated work |
Louisville |
KY |
62 |
$1,707,750 |
Schools |
3 |
| King Elementary: Removal of portables, classroom conversion of existing media center, roofing, ceiling & lights in corridors & classrooms, windows, paving, painting, floor tile replacement, and lock conversion. |
Louisville |
KY |
62 |
$1,702,000 |
Schools |
10 |
| Hite Elementary: Removal of portables, roofing, window replacement, floor tile, painting, ceiling & lights in corridors & classrooms, paving, and lock conversion. |
Louisville |
KY |
62 |
$1,535,250 |
Schools |
6 |
| Expand Hybrid Bus Fleet - Purchase of (20) additional hybrid buses to bring fleet total to 32 for expanded express and local service. Hybrid buses are over 20% more fuel efficient, and emit 30% fewer pollutants than standard diesel buses. |
Louisville |
KY |
84 |
$10,500,000 |
Transit |
16 |
| TARC Maintenance Annex - Construct Union Station (plans approved & ready to go) annex to expand and upgrade maintenance and training facilities. Project includes, green roof, bio-swale, grey water system, LEED Silver certification and innovative 12 volt |
Louisville |
KY |
91 |
$6,000,000 |
Transit |
15 |
| Purchase diesel fuel to offset increased service demand |
Louisville |
KY |
53 |
$4,000,000 |
Transit |
-13 |
| Park Hill Transit Improvements (economic development) – Develop a Park Hill-University of Louisville circulation route that provides better mobility for workers/residents/students to connect to jobs and the University campus with possible linkage to futur |
Louisville |
KY |
15 |
$3,500,000 |
Transit |
-5 |
| Park Hill At-Grade Rail Crossing Improvements: Improve safety and accommodate car and truck traffic at four crossings, includes protective lights and gates. Project helps improve access to Park Hill industrial corridor |
Louisville |
KY |
20 |
$3,000,000 |
Transit |
3 |
| Intermodal Transit Center – Central: This project involves Louisville Metro Central Business District intermodal transit station one facility This new transit center will provide access to TARC routes, local taxi, bicycle parking and storage, and transit |
Louisville |
KY |
120 |
$3,000,000 |
Transit |
3 |
| Intermodal Transit Center – Satellite: This project involves two satellite Louisville Metro intermodal transit stations. New transit centers will provide access to TARC routes, local taxi, bicycle parking and storage, and transit oriented retail at street |
Louisville |
KY |
120 |
$3,000,000 |
Transit |
3 |
| TARC Bus Storage Building Solar Roof - Replace 30 year old built up roofing on 144,000 sq. ft. bus storage building at Union Station with high albedo “white†roof and 80 kW photovoltaic system. |
Louisville |
KY |
40 |
$1,972,000 |
Transit |
4 |
| Replace Deteriorated Sidewalks and Curbs: Improve safety and accommodate pedestrian traffic at four priority blocks targeting deteriorated sidewalks and curbs in bad condition and as pedestrian traffic to the new Arena increases. The poor conditions will |
Louisville |
KY |
10 |
$1,375,000 |
Transit |
-8 |
| Broadway Division Bus Storage Building Renovation – Replace 57,000 s.f. roof system with green roof, replace failed overhead doors, clean and paint exterior walls, replace electrical panels, lighting, repair paving, and add fire alarm system. |
Louisville |
KY |
17 |
$1,000,000 |
Transit |
1 |
| Riverwalk Multi-modal Facility Reconstruction: Project involves bank stabilization along Ohio River & reconstruction of multi-modal facility that expands access to neighborhoods and bus services. |
Louisville |
KY |
80 |
$1,000,000 |
Transit |
5 |
| Union Station Baggage Building Renovation - Renovate currently uninhabitable second floor of historic building adjacent to Union Station. Includes refurbishing windows and doors, adding HVAC, insulation, refurbish slate and architectural metal roofing, an |
Louisville |
KY |
9 |
$500,000 |
Transit |
-1 |
| Union Station Energy Efficiency Project – Replace highly inefficient and failing chiller, boiler, system controls, refurbish fan coil units, and refurbish windows in 1890 landmark building. |
Louisville |
KY |
8 |
$450,000 |
Transit |
4 |
| KIPDA Vanpool Program - 20 Ticket to Ride vehicles to promote additional vanpooling to regional employers |
Louisville |
KY |
3 |
$420,000 |
Transit |