| Sanitary sewer master plan projects and rehabilitation of system. |
Indianapolis |
IN |
160 |
$33,624,500 |
Water |
118 |
| Federal consent decree projects for sewer improvements. |
Indianapolis |
IN |
120 |
$24,424,600 |
Water |
62 |
| Septic Tank Elimination Projects for sewer improvements and elimination of sanitary sewers. |
Indianapolis |
IN |
90 |
$20,767,100 |
Water |
62 |
| Cultural trail bike paths and pedestrian ways. |
Indianapolis |
IN |
150 |
$50,500,000 |
CDBG |
-377 |
| After 30 years, Monument Circle and Market Street improvements, including brick streets, sidewalks, street trees, electrical conduit, irrigation, pedestrian lighting, banner poles and benches have seriously declined. |
Indianapolis |
IN |
150 |
$30,000,000 |
CDBG |
-29 |
| Top 30 Thoroughfares |
Indianapolis |
IN |
150 |
$28,475,000 |
CDBG |
36 |
| The CanalÂ’s Ohio Street and Vermont Street Basins and other infrastructure have deteriorated and need replacement or significant repair in order to maximize this world-class asset. |
Indianapolis |
IN |
50 |
$10,000,000 |
CDBG |
-17 |
| Top 30 Residentials |
Indianapolis |
IN |
50 |
$7,889,000 |
CDBG |
-66 |
| Operations Equipment Purchases |
Indianapolis |
IN |
35 |
$7,190,000 |
CDBG |
-15 |
| Just beyond the new Lucas Oil Stadium, streetscape infrastructure improvements are needed from Georgia to Morris streets and from Pennsylvania to West streets to enhance public safety. Specifically, lighting, paving, landscaping and sidewalks need to be |
Indianapolis |
IN |
25 |
$5,000,000 |
CDBG |
-24 |
| Green Infrastructure/Green Street Elements: Money would be used to fund green infrastructure and green street elements in currently scheduled transportation projects. As new infrastructure and transportation elements come online, we need to include money |
Indianapolis |
IN |
10 |
$4,000,000 |
CDBG |
-19 |
| Sidewalks and curbs |
Indianapolis |
IN |
15 |
$3,000,000 |
CDBG |
40 |
| Street lights and other street furniture, including newsbox modulars; Refurbish or replace deteriorated. Add new as needed. |
Indianapolis |
IN |
15 |
$3,000,000 |
CDBG |
-3 |
| ADA Ramp Installations |
Indianapolis |
IN |
10 |
$2,000,000 |
CDBG |
0 |
| Alley Program |
Indianapolis |
IN |
10 |
$2,000,000 |
CDBG |
8 |
| Contractor Crack Sealing |
Indianapolis |
IN |
10 |
$2,000,000 |
CDBG |
-6 |
| Replace and reposition 200 planters. Add additional planters in key areas. |
Indianapolis |
IN |
10 |
$2,000,000 |
CDBG |
-79 |
| Local Bridge Rehabilitations |
Indianapolis |
IN |
7 |
$1,500,000 |
CDBG |
33 |
| Bike Lanes |
Indianapolis |
IN |
5 |
$1,000,000 |
CDBG |
11 |
| Traffic Signal System Improvements |
Indianapolis |
IN |
5 |
$1,000,000 |
CDBG |
8 |
| Refurbish poles and sign boxes of 10-year old system. Add new signs as needed. |
Indianapolis |
IN |
2 |
$400,000 |
CDBG |
-9 |
| Continually repair and replace hardware, irrigation and materials in 12 gardens and gateways, including 1-70/Illinois, West Street and Capitol Gateways. |
Indianapolis |
IN |
1 |
$100,000 |
CDBG |
-20 |
| Energy audits and retrofits on all City owned buildings; Alternative energy and materials in city processes; Energy efficient lighting for streetlights and traffic lights; Energy efficient vehicles for City Fleets |
Indianapolis |
IN |
20 |
$4,000,000 |
Energy |
21 |
| Green Building Seed Money: In order to increase the number of buildings with green elements and LEED certified buildings, incentives are needed to encourage the increased investment of developers when building green/LEED buildings. An increase in the num |
Indianapolis |
IN |
10 |
$2,000,000 |
Energy |
5 |
| AFIS - automated fingerprint information system - replacement |
Indianapolis |
IN |
1 |
$1,252,810 |
Public Safety |
-3 |
| Street Cameras |
Indianapolis |
IN |
3 |
$600,000 |
Public Safety |
-97 |
| Shot Spotters |
Indianapolis |
IN |
1 |
$250,000 |
Public Safety |
-225 |
| Design and replace HVAC system at administration and maintenance facility at 1501 West Washington Street pursuant to the facility maintenance plan. |
Indianapolis |
IN |
20 |
$6,000,000 |
Transit |
-20 |
| Replace computer hardware/software - obtain/install new digital telephone system, convert to new blade server system, replace uninterupted power supplies all devices, install dedicated electric generator with automated transfer swith, replace desktop comp |
Indianapolis |
IN |
10 |
$3,000,000 |
Transit |
-17 |
| Rehab bus facility grounds - Expand front parking lot, resurface, reseal or replace existing parking lots, redo landscaping with low maintenance plantings, replace perimeter fencing and lighting and curbs and sidewalks. |
Indianapolis |
IN |
8 |
$2,500,000 |
Transit |
-27 |
| Rehab bus facility lighting - replace with more energy efficient lighting and control systems, redo maintenance and bus cleaning areas with more work conducive lighting. |
Indianapolis |
IN |
8 |
$2,500,000 |
Transit |
-5 |
| Replace and reconfigure bus lifts and bus exhaust system pursuant to the facility maintenance plan. |
Indianapolis |
IN |
8 |
$2,500,000 |
Transit |
0 |
| Rehab bus facility flooring and plumbing, drains, etc. |
Indianapolis |
IN |
6 |
$2,000,000 |
Transit |
-7 |
| Obtain miscellaneous shop equipment - including automated tire pressure reading equipment, nitrogen generator, brake lathes, bus refridgeration maintenance equipment, computer diagnostic equipment, wheel allignment equipment, tire changing equipment, floo |
Indianapolis |
IN |
3 |
$1,000,000 |
Transit |
-14 |
| Replace ten supervisor vehicles with domestic hybrid sedans and obtain 2 Segways for downtown road supervisors use. |
Indianapolis |
IN |
2 |
$600,000 |
Transit |
-116 |
| Implement Wellness Plan Initiatives - Design/reconfigure facility to create an inhouse employee workout facility, obtain workout equipment, cardiac defibrillator,etc. |
Indianapolis |
IN |
1 |
$250,000 |
Transit |
-99 |