WARNING: You're looking at a page from the old site. We have relaunched with live stimulus data. Learn more here.


Recent News

Advanced search added: keywords, zip codes, and recipients 11/25/2009

Thanks to the tireless work of developer Peter Snyder, Stimulus Watch 2.0 now has an advanced search capability that will…

Jerry Brito on Washington DC’s Federal News Radio... 11/24/2009

Jerry Brito on Washington DC’s Federal News Radio discussing the new features available on Stimulus Watch 2.0.

We've relaunched with new official data of stimulus projects in your neighborhood! 11/18/2009

Welcome to Stimulus Watch 2.0. While our original site featured proposed stimulus projects taken from the U.S. Conference of Mayors…

OpenRegs.com
Find government regulations by issue or agency. Comment, add links and subscribe to regulations.

Projects in Hallandale Beach, Florida

Below are the "shovel-ready" projects for which this city submitted in the 2008 U.S. Conference of Mayors report. You can click on a project to read (and add to) its description. You can also discuss the project and vote on whether you believe it is critical or not.

The total cost of all the projects submitted by Hallandale Beach is $60,200,000

Description City State Jobs Cost Program Type Vote Ratio
NE 8th and 10th Ave. Two-way Conversion In order to meet the traffic needs of the community, the City is planning to convert these two on-way streets into two-way streets. Both streets are approximately 4,000 feet in length. Hallandale Beach FL 10 $1,500,000 Streets/Roads -12
Water Treatment Plant Expansion The City has completed the first pahse of a water treatment plant and the design and infrastructure is in place to add additional capacity of nine million additional gallons of treated water. Hallandale Beach FL 30 $47,000,000 Water 9
Relocation of City Production Wells Because of the destructive effects of saltwater intrusion, the City has lost most of its production wells. relocation of wells is required to ensure the CityÂ’s future water supply. It is anticipated the new wells wil Hallandale Beach FL 10 $3,000,000 Water 2
Water Main Replacement Undersized water mains throughout the City need to be replaced by larger ones. The total length requiring replacement is approximately 20,000 feet. Hallandale Beach FL 15 $3,000,000 Water 2
Northeast Quadrant Drainage Improvements The CityÂ’s Northeast Quadrant has been subject to repetitive flooding and is in need of extensive drainage improvements. This project is designed to greatly mitigate the flooding. It will include both installati Hallandale Beach FL 20 $2,000,000 CDBG 0
Subaqueous Water Main Crossings (Intracoastal) In order to meet current needs and accommodate future growth, two subaqueous 16” water mains must be installed. The combined total length of the crossings is approximately 1,000 feet. An additional 6,500 fe Hallandale Beach FL 25 $2,000,000 CDBG -1
Subaqueous Forcemain Crossing (Intracoastal) In order to protect against potential failure of a very old forcemain and in order to accommodate future growth,one subaqueous 20” forcemain measuring approximately 9,500 feet must be installed. Hallandale Beach FL 20 $1,000,000 CDBG -2
Atlantic Shores Blvd. Water Quality and Drainage Improvements For three years the City has sought unsuccessfully to obtain funding for this project, which will have the dual benefit of improving drainage and stormwater quality. The project entails a seg Hallandale Beach FL 7 $700,000 CDBG -5