| BURKHARDT ROAD IMPROVEMENTS (LLOYD EXPWY. TO LINCOLN AVE.)
Project will alleviate vehicular congestion and improve safety through the construction of added travel lanes and associated improvements on Burkhardt Road between State Route 66 (Lloyd Expressway |
Evansville |
IN |
0 |
$4,737,170 |
Streets/Roads |
18 |
| PIGEON CREEK GREENWAY PASSAGE - INDUSTRIAL CORRIDOR PH 4 – VIADUCT The Industrial Corridor Phase 4 is a viaduct along the Pigeon Creek. Due to poor soil conditions a viaduct will need to be constructed to ensure proper access along the creek. |
Evansville |
IN |
28 |
$2,800,000 |
Streets/Roads |
-13 |
| PIGEON CREEK GREENWAY PASSAGE - INDUSTRIAL CORRIDOR PHASE 2 - PEDESTRIAN/BICYCLE TRAIL The Industrial Corridor Phase 2 is the continuation of the Pigeon Creek Greenway Passage. Phase 2 starts at Franklin Street and follows the Pigeon Creek to Lamasco Park |
Evansville |
IN |
25 |
$2,400,000 |
Streets/Roads |
-13 |
| LINCOLN AVENUE ROAD IMPROVEMENTS (KIRKWOOD DR. TO CITY LIMITS)
Project includes road and drainage improvements to the existing two-lane pavement, as well as widening to accommodate bicyclists; |
Evansville |
IN |
0 |
$1,120,500 |
Streets/Roads |
-18 |
| PIGEON CREEK GREENWAY PASSAGE - INDUSTRIAL CORRIDOR PHASE 3 – PEDESTRIAN/BICYCLE TRAIL The Industrial Corridor Phase 3 continues the Greenway Passage from Phase 2 and follows along the Pigeon Creek levee to Louisiana Street. |
Evansville |
IN |
8 |
$750,000 |
Streets/Roads |
-12 |
| BUENA VISTA ROAD IMPROVEMENTS (FULTON AVE. TO EAST)
Project includes pavement reconstruction and improved geometrics at the intersection of Fulton Avenue and Buena Vista Road, as well as replacement of failing retaining wall structures at that intersectio |
Evansville |
IN |
0 |
$550,000 |
Streets/Roads |
3 |
| SOUTHEAST AVENUE AND BROOKSIDE DRIVE SEWER SEPARATION AND DRAINIAGE IMPROVEMENT PROJECT
The Southeast Boulevard & Brookside Drive Sewer Separation Project is located on the south side of the City of Evansville, east of Ohio River. |
Evansville |
IN |
0 |
$24,722,000 |
Water |
13 |
| CASS AVENUE SEWER SEPARATION AND DRAINAGE IMPROVEMENT PROJECT
The Cass Avenue Sewer Separation Project is located on the south side of City of Evansville, east of the Ohio River. |
Evansville |
IN |
0 |
$19,468,000 |
Water |
7 |
| EASTVIEW DRAINAGE IMPROVEMENT PROJECT
The project will construct a new storm sewer trunkline from the K-3 Lift Station ponding area to the intersection of Michael Avenue and Margybeth Avenue. The existing trunkline would be removed. |
Evansville |
IN |
0 |
$5,500,000 |
Water |
5 |
| DIAMOND AVENUE DRAINAGE IMPROVEMENTS - PHASE IV
Provides drainage relief and separation of storm water from the combined sewer system through the installation of a large diameter storm sewer in the area approximately bounded by Diamond Avenue, Evans Ave |
Evansville |
IN |
0 |
$4,900,000 |
Water |
2 |
| MT. AUBURN SEPTIC TANK ELIMINATION
The Mt. Auburn Neighborhood topography consists of steep highland and floodplains. This topography has led to the potential of on-site wastewater system failures. In short, while the roadways exist above floodplain eleve |
Evansville |
IN |
0 |
$4,500,000 |
Water |
-3 |
| JEANETTE DRAINAGE IMPROVEMENT PROJECT
The project will construct a new 15-inch storm pipe along Hicks Drive. This sewer line would drain to a 36-inch storm sewer that would run west to Jeanette Avenue. At Jeanette Avenue the sewer would be upsized |
Evansville |
IN |
0 |
$3,500,000 |
Water |
3 |
| DIAMOND AVENUE DRAINAGE IMPROVEMENTS - PHASE III
Provides drainage relief and separation of storm water from the combined sewer system through the installation of a large diameter storm sewer in the area approximately bounded by Diamond Avenue, Evans Ave |
Evansville |
IN |
0 |
$2,900,000 |
Water |
6 |
| DIAMOND AVENUE DRAINAGE IMPROVEMENTS - PHASE I
Provides drainage relief and separation of storm water from the combined sewer system through the installation of a large diameter storm sewer in the area approximately bounded by Diamond Avenue, Heidelbach |
Evansville |
IN |
0 |
$2,800,000 |
Water |
3 |
| DIAMOND AVENUE DRAINAGE IMPROVEMENTS - PHASE II
Provides drainage relief and separation of storm water from the combined sewer system through the installation of a large diameter storm sewer in the area approximately bounded by Diamond Avenue, Heidelbach |
Evansville |
IN |
0 |
$2,800,000 |
Water |
1 |
| ALVORD SEWER REPAIR
Failing joints in a 60-inch reinforced concrete sewer under Alvord Boulevard has created voids under the pavement causing road failures. Repair would involve replacing joint seals in 5,000 feet of 60-inch reinforced concrete sewer. |
Evansville |
IN |
0 |
$2,000,000 |
Water |
8 |
| WEINBACH/BOEKE/LLOYD DRAINAGE IMPROVEMENTS
Project will alleviate long-standing drainage problems near the intersection of Division Street and Boeke Road through the installation of a large diameter storm sewer that will be connected to the Weinbach Aven |
Evansville |
IN |
0 |
$1,600,000 |
Water |
7 |
| WEINBACH/KECK DRAINAGE IMPROVEMENTS
Provides drainage relief and separation of storm water from the combined sewer system through the installation of storm sewers in the area approximately bounded by Diamond Avenue, Weinbach Avenue, U.S. 41 and State Rou |
Evansville |
IN |
0 |
$1,100,000 |
Water |
6 |
| STATE HOSPITAL LAKES DRAINAGE IMPROVEMENTS
Project involves increasing the storage capacity of the lakes at the Evansville State Hospital; in conjunction with recently completed improvements, provides drainage relief to the residential areas along Colony |
Evansville |
IN |
0 |
$585,000 |
Water |
4 |
| SEPTIC TANK ELIMINATION ON CAVE AVENUE
Construction of a gravity sewer and lift station to service 100 homes on failing septic systems on the west side of Evansville. |
Evansville |
IN |
0 |
$500,000 |
Water |
6 |
| SEPTIC TANK ELIMINATION ON FICKAS ROAD
Construction of a gravity sewer and lift station to service twelve homes on failing septic systems on the east side of Evansville. |
Evansville |
IN |
0 |
$125,000 |
Water |
1 |
| FULTON AVENUE/RIVERSIDE DRIVE STREETSCAPE ENHANCEMENTS
The State of Indiana is funding and reconstructing the interchange at Fulton Avenue and the Lloyd Expressway. This cost is estimated at $32 million. |
Evansville |
IN |
43 |
$5,300,000 |
CDBG |
-11 |
| DOWNTOWN TRAFFIC SIGNALIZATION MODERNIZATION PROJECT- Traffic flow into, within and around downtown Evansville will be improved through this project. After conducting a Downtown Traffic Survey and two Public Forums, the City intends to implement numero |
Evansville |
IN |
36 |
$4,600,000 |
CDBG |
-25 |
| STRAIGHTEN MAIN STREET SERPENTINE-When Main Street was closed to traffic and became a pedestrian mall, a brick serpentine roadway with no curbs was installed. |
Evansville |
IN |
36 |
$4,500,000 |
CDBG |
-72 |
| FRONT DOOR PRIDE NEIGHBORHOOD STREET AND STREETSCAPE IMPROVEMENT- The infrastructure in the Front Door Pride neighborhood is in dire need of repair and improvement. The Neighborhood Stabilization Program funds along with the existing CDBG and HOME fund |
Evansville |
IN |
34 |
$4,300,000 |
CDBG |
-17 |
| DOWNTOWN GATEWAYS AND WAY-FINDING SIGNAGE -To improve ability to navigate and locate destinations in Downtown Evansville, the City intends to create a hierarchy of gateways into Downtown and create districts with a system of way-finding signage. This p |
Evansville |
IN |
22 |
$2,800,000 |
CDBG |
-23 |
| SIDEWALK REPLACEMENT
Project utilizes the Barrett Law (IC 36-9-36) and, under a municipal ordinance adopted in 2004, enables property owners to petition the City and participate in the cost of replacing sidewalks adjacent to their property |
Evansville |
IN |
0 |
$2,000,000 |
CDBG |
7 |
| BOAT RAMPS IMPROVEMENTS – INSTALL PRE-CAST CONCRETE
Renovate Angel Mounds and Dogtown Boat Ramps by installing new concrete sections. The existing ramps are over 30 years old and the water edge of the ramps has deteriorated and has become a problem |
Evansville |
IN |
15 |
$1,500,000 |
CDBG |
172 |
| ADA IMPROVEMENTS TO PARKS – RESTROOM MODIFICATIONS, SIDEWALKS RAMPS & PARKING
Modify and upgrade all public Park restrooms to accommodate handicapped patrons; designate parking spaces and ensure all sidewalks have ramps for handicapped access. |
Evansville |
IN |
10 |
$1,000,000 |
CDBG |
8 |
| CURB RAMP CONSTRUCTION
Project involves the construction of curb ramps compliant with the Americans with Disabilities Act and arose out of a Voluntary Compliance Agreement entered into with the Federal Highway Administration in 2002 |
Evansville |
IN |
0 |
$840,000 |
CDBG |
4 |
| KLEYMEYER SOFTBALL COMPLEX – SPORTS RENOVATION
The Kleymeyer Softball Complex was developed in the 1970s over a former landfill. The softball fields, backstops, dugouts, parking lot and concession stand/restrooms need to be renovated |
Evansville |
IN |
4 |
$350,000 |
CDBG |
-18 |
| GARVIN PARK SHELTER – NEW/CONVERT SHELTER
Convert or build a new shelter to be available for all months of the year. The current shelters or open air and are available only from April to November. |
Evansville |
IN |
1 |
$125,000 |
CDBG |
5 |
| WESSELMAN PARK SHELTER – NEW/CONVERT SHELTER
A new or converted shelter in Wesselman Park will provide for more reunions, wedding receptions and parties for the public. Currently, we have two duplex shelters that are open air. |
Evansville |
IN |
1 |
$125,000 |
CDBG |
1 |
| WESSELMAN PARK ELECTRICAL IMPROVEMENTS – PARK LIGHTS AND TRANSFORMERS
Upgrade the electrical system throughout the park. Underground power lines are over 25 years old and were not put in conduit. The park experiences power outages |
Evansville |
IN |
3 |
$250,000 |
Energy |
7 |
| Caldwell Homes security fencing |
Evansville |
IN |
8 |
$121,000 |
Housing |
-16 |
| Buckner Towers parking lot resurfacing |
Evansville |
IN |
8 |
$117,000 |
Housing |
-10 |
| Kennedy Towers parking lot resurfacing |
Evansville |
IN |
8 |
$117,000 |
Housing |
-8 |
| Schnute Apartments covered entrance |
Evansville |
IN |
6 |
$104,000 |
Housing |
-11 |
| White Oak Manor covered entrance |
Evansville |
IN |
6 |
$104,000 |
Housing |
-7 |
| Fulton Square Apartments security fencing |
Evansville |
IN |
8 |
$87,000 |
Housing |
-7 |
| White Oak Manor domestic water storage tanks |
Evansville |
IN |
4 |
$62,900 |
Housing |
-6 |
| Schnute Apartments domestic water storage tanks |
Evansville |
IN |
5 |
$62,900 |
Housing |
-2 |
| Kennedy Towers building entry replacement |
Evansville |
IN |
3 |
$56,000 |
Housing |
-6 |
| Buckner Towers boiler replacement |
Evansville |
IN |
4 |
$45,000 |
Housing |
3 |
| Kennedy Towers boiler replacement |
Evansville |
IN |
4 |
$45,000 |
Housing |
2 |
| Buckner Towers domestic hot water boiler replacement |
Evansville |
IN |
4 |
$31,000 |
Housing |
3 |
| Kennedy Towers domestic hot water boiler replacement |
Evansville |
IN |
4 |
$31,000 |
Housing |
2 |
| Laptops in all cars (122 laptops & docking stations) |
Evansville |
IN |
0 |
$1,220,000 |
Public Safety |
-27 |
| Salaries, benefits, uniforms & equipment for additional officers to serve proposed annexation areas. |
Evansville |
IN |
9 |
$606,681 |
Public Safety |
9 |
| Video Cameras in all marked cars. |
Evansville |
IN |
0 |
$570,000 |
Public Safety |
11 |
| Outdoor Firing Range. |
Evansville |
IN |
0 |
$500,000 |
Public Safety |
-8 |
| Upgrade connectivity at 3 Satellite offices. |
Evansville |
IN |
0 |
$120,000 |
Public Safety |
-1 |
| License Plate Recognition Software in 4 cars. |
Evansville |
IN |
0 |
$120,000 |
Public Safety |
-12 |
| Record Room Civilian Supervisors. |
Evansville |
IN |
3 |
$105,000 |
Public Safety |
-8 |
| Patrol Rifles for all 124 Patrol Officers. |
Evansville |
IN |
0 |
$99,200 |
Public Safety |
8 |
| Addition Liaison Officer in Catholic High School (currently 2 schools share one officer) |
Evansville |
IN |
1 |
$76,350 |
Public Safety |
-4 |
| Cell phones for all officers. There are 285 officers, 118 currently have cell phones. |
Evansville |
IN |
0 |
$73,920 |
Public Safety |
-24 |
| Tasers for all Patrol Officers. Only 55 of 124 officers currently have department-owned tasers. |
Evansville |
IN |
0 |
$51,750 |
Public Safety |
-5 |
| Funding for Weed & Seed South Coordinator position |
Evansville |
IN |
1 |
$46,147 |
Public Safety |
-19 |
| Additional Secretary in Investigations. |
Evansville |
IN |
1 |
$41,768 |
Public Safety |
-7 |
| Funding for the Offender Reentry Program |
Evansville |
IN |
0 |
$39,000 |
Public Safety |
-5 |
| Install interactive white boards, projectors, sound enhancement systems, and document cameras in 1,500 classrooms @ $7,000 per classroom (includes labor of $900 per room to be done by specially qualified installers) |
Evansville |
IN |
0 |
$10,500,000 |
Schools |
-39 |
| Technology & Innovation Center: Build a new state of the art technology center that is LEED certified. |
Evansville |
IN |
75 |
$3,900,000 |
Schools |
-11 |
| Install 80 thirty-station wireless laptop carts in all school locations |
Evansville |
IN |
0 |
$2,400,000 |
Schools |
-20 |
| Install 47 thirty-station computer labs in elementary, middle and high schools, including two Project Lead the Way labs and ten business education labs |
Evansville |
IN |
0 |
$1,410,000 |
Schools |
-2 |
| Bosse High School: Replace aging, insufficient boilers with new high efficiency low maintenance boilers. |
Evansville |
IN |
5 |
$800,000 |
Schools |
9 |
| Delaware Elementary School: Replace aging, insufficient boilers with new high efficiency low maintenance boilers. |
Evansville |
IN |
5 |
$800,000 |
Schools |
11 |
| Reitz High School: Replace aging, insufficient boilers with new high efficiency low maintenance boilers. |
Evansville |
IN |
5 |
$800,000 |
Schools |
7 |
| Bosse Enlow Field Stadium: Install artificial turf in place of lawn turf for water conservation and maintenance free care. |
Evansville |
IN |
8 |
$800,000 |
Schools |
-33 |
| Central High School Stadium: Install artificial turf in place of lawn turf for water conservation and maintenance free care. |
Evansville |
IN |
8 |
$800,000 |
Schools |
-43 |
| Reitz High School Stadium: Install artificial turf in place of lawn turf for water conservation and maintenance free care. |
Evansville |
IN |
8 |
$800,000 |
Schools |
-34 |
| Installation and implementation of an on-demand digital content and streaming video system for all buildings in district. This system includes hardware and software and will eliminate the need for TV sets for classrooms |
Evansville |
IN |
0 |
$400,000 |
Schools |
-10 |
| Install computers (300) for support personnel in each school |
Evansville |
IN |
0 |
$300,000 |
Schools |
-17 |
| Software licensing for these 4,110 new computers (Microsoft Office Suite) @ $50.00 |
Evansville |
IN |
0 |
$205,500 |
Schools |
-723 |
| Positions needed to support additional technology listed above (interactive white boards, projectors, sound enhancement systems, and document cameras in classrooms; 30-station computer labs in 47 schools; 80 30-station wireless laptop carts; |
Evansville |
IN |
9 |
$0 |
Schools |
-7 |
| PIGEON CREEK GREENWAY PASSAGE - INDUSTRIAL CORRIDOR PH 4 – VIADUCT
The Industrial Corridor Phase 4 is a viaduct along the Pigeon Creek. Due to poor soil conditions a viaduct will need to be constructed to ensure proper access along the creek. |
Evansville |
IN |
0 |
$2,800,000 |
Transit |
-9 |