WARNING: You're looking at a page from the old site. We have relaunched with live stimulus data. Learn more here.


Recent News

Advanced search added: keywords, zip codes, and recipients 11/25/2009

Thanks to the tireless work of developer Peter Snyder, Stimulus Watch 2.0 now has an advanced search capability that will…

Jerry Brito on Washington DC’s Federal News Radio... 11/24/2009

Jerry Brito on Washington DC’s Federal News Radio discussing the new features available on Stimulus Watch 2.0.

We've relaunched with new official data of stimulus projects in your neighborhood! 11/18/2009

Welcome to Stimulus Watch 2.0. While our original site featured proposed stimulus projects taken from the U.S. Conference of Mayors…

OpenRegs.com
Find government regulations by issue or agency. Comment, add links and subscribe to regulations.

Projects in Ellisville, Missouri

Below are the "shovel-ready" projects for which this city submitted in the 2008 U.S. Conference of Mayors report. You can click on a project to read (and add to) its description. You can also discuss the project and vote on whether you believe it is critical or not.

The total cost of all the projects submitted by Ellisville is $3,742,750

Description City State Jobs Cost Program Type Vote Ratio
The proposed project addresses the concrete street deficiencies throughout the City of Ellisville street network ranging from total removal and replacement of the street segments to spot slab removal and replacement. The majority of the pavement failure Ellisville MO 50 $1,450,000 Streets/Roads -2
Complete street replacement and storm water improvements for Vero Lane. The storm water sewers are failing, creating pavement settlement and cracking. Ellisville MO 15 $782,500 Streets/Roads -10
Fairview Lane requires complete removal and replacement with the associated storm sewer improvements. Potholes and storm water backs are frequent as a result of aging infrastructure. Ellisville MO 12 $600,000 Streets/Roads -2
Hilltop Road requires new concrete curb and gutter, complete asphalt street removal and replacement and new storm sewer systems. Utility relocations will be required to accommodate the road improvements. Ellisville MO 10 $520,000 Streets/Roads -4
Complete street replacement and storm water improvements for Debula Dr. The aging infrastructure has created public nuisances such as standing water, water back-ups and cracked pavement. Ellisville MO 15 $390,250 Streets/Roads -1