| Harden Street Reconfiguration Phase II |
Columbia |
SC |
40 |
$25,000,000 |
Streets/Roads |
-43 |
| Main Street Reconfiguration Phase III |
Columbia |
SC |
20 |
$15,000,000 |
Streets/Roads |
-45 |
| North Main Street Reconfiguration Phase 1B |
Columbia |
SC |
20 |
$13,000,000 |
Streets/Roads |
-33 |
| Water:Canal WTP HS Pump and RW Pump Replacement |
Columbia |
SC |
25 |
$25,000,000 |
Water |
13 |
| Sewer:54” and 48” Outfall Rehabilitation |
Columbia |
SC |
20 |
$13,000,000 |
Water |
2 |
| Metro Wastewater Treatment Plant Digester Gas Utilization
The project proposes to make repairs to the anaerobic digesters, digester gas system and multiple hearth incinerators in order to maximize the beneficial use of digester gas and minimize the use o |
Columbia |
SC |
30 |
$10,248,500 |
Water |
17 |
| Sewer:Main Rehabilitation |
Columbia |
SC |
15 |
$7,000,000 |
Water |
13 |
| Water:Rehabilitation: Replacement |
Columbia |
SC |
15 |
$6,000,000 |
Water |
9 |
| Water:Rehabilitation:Clean and Line Pipe |
Columbia |
SC |
15 |
$4,000,000 |
Water |
8 |
| Sewer:Crane Creek Outfall Replacement |
Columbia |
SC |
20 |
$4,000,000 |
Water |
4 |
| Sewer:North Columbia Pump Station Rehabilitation |
Columbia |
SC |
10 |
$3,000,000 |
Water |
8 |
| Sewer:Main Replacement |
Columbia |
SC |
20 |
$3,000,000 |
Water |
7 |
| Sewer:Mill Creek Force Main Replacement |
Columbia |
SC |
20 |
$2,500,000 |
Water |
5 |
| Sewer:Broad River Pump Station Rehabilitation |
Columbia |
SC |
10 |
$2,000,000 |
Water |
8 |
| Sewer:Saluda River Pump Station Rehabilitation |
Columbia |
SC |
10 |
$2,000,000 |
Water |
4 |
| Sewer:Saluda River Force Main Replacement |
Columbia |
SC |
15 |
$2,000,000 |
Water |
5 |
| Water:Valve and Hydrant Replacement |
Columbia |
SC |
5 |
$1,500,000 |
Water |
-1 |
| Domestic Water Conservation
The project proposes to reduce domestic water consumption in all City facilities by replacing or retrofitting all standard water fixtures with High Efficiency Systems. Projected annual savings $15,130 |
Columbia |
SC |
25 |
$278,773 |
Water |
-6 |
| Runway 11/29 Keel Section Reconstruction |
Columbia |
SC |
85 |
$13,694,400 |
Airport |
4 |
| Rehabilitate Airport Perimeter Roads (West Side) |
Columbia |
SC |
35 |
$3,649,520 |
Airport |
-19 |
| Rehabilitate Airport Perimeter Roads (East Side) |
Columbia |
SC |
30 |
$2,493,750 |
Airport |
-18 |
| Construct New Stub Taxiway |
Columbia |
SC |
55 |
$2,424,720 |
Airport |
-9 |
| Residential Sound Insulation Project – Phase 2 |
Columbia |
SC |
40 |
$1,225,000 |
Airport |
-23 |
| Rehab Taxiways “GG”, “HH” and “N” |
Columbia |
SC |
55 |
$1,153,920 |
Airport |
-3 |
| Construct New Utilities and Service Road to West Cargo Area |
Columbia |
SC |
30 |
$1,135,390 |
Airport |
-7 |
| Install New Perimeter Security Fencing |
Columbia |
SC |
20 |
$657,548 |
Airport |
-8 |
| City of Columbia Comprehensive Parks Renewal Project for the Benefit of Low Income Census Tract Neighborhoods. Rosewood Parks, Earlewood Parks, Finlay Park, Hyatt Park, Drew Park, Greenview Park. |
Columbia |
SC |
500 |
$20,000,000 |
CDBG |
-95 |
| Columbia Housing Development Corp. BridgePointe Infrastructure. |
Columbia |
SC |
200 |
$4,500,000 |
CDBG |
-29 |
| Assisted Living Housing Facility for Disabled Low Income Census tract Neighborhood 25 Units. |
Columbia |
SC |
125 |
$3,750,000 |
CDBG |
5 |
| Village at Rivers Edge Infrastructure. |
Columbia |
SC |
100 |
$2,000,000 |
CDBG |
-33 |
| Burton Hgts. Neighborhood Redevelopment Community Center - Low Income Census Tract. |
Columbia |
SC |
50 |
$500,000 |
CDBG |
-20 |
| City of Columbia Homeless Shelter Facility Improvements - Road Construction of Ã‚Ë Mile Facility Improvements. |
Columbia |
SC |
50 |
$500,000 |
CDBG |
-2 |
| South Edisto Park - Rosewood Low Income Census Tract Neighborhood S. Edisto Ave. |
Columbia |
SC |
50 |
$500,000 |
CDBG |
-19 |
| Bethel Bishop Chappelle Community Center. |
Columbia |
SC |
25 |
$333,000 |
CDBG |
-38 |
| Water and Shaw Streets Redev. |
Columbia |
SC |
5 |
$70,000 |
CDBG |
-7 |
| Photovoltaic Electric Power Generation- Parking Garages
The project proposes to retrofit existing parking garages with a combination of photovoltaic arrays and light-emitting diode lighting fixtures. Projected annual savings $31,688 |
Columbia |
SC |
25 |
$2,575,870 |
Energy |
-5 |
| Build-out of hydrogen fueling station with natural gas fueling capacity |
Columbia |
SC |
5 |
$2,500,000 |
Energy |
-6 |
| Lighting System Improvements:The project proposes to install new lighting systemsthat will provide a high quality visual environment that is energy efficient, low maintenance, and cost effective. Existing T12 lighting systems will be replaced with new T8 |
Columbia |
SC |
24 |
$2,140,910 |
Energy |
-4 |
| Installation of on-site hydrogen dispensers for fork-lift hydrogen battery applications. |
Columbia |
SC |
10 |
$2,100,000 |
Energy |
-28 |
| New HVAC System at City Hall
The project proposes to replace the water cooled system and split system AC units and the associated steam boiler and cooling tower with a variable refrigerant flow zoning system. The system will provide simultaneous heatin |
Columbia |
SC |
25 |
$1,346,700 |
Energy |
-19 |
| Upgrade Elevators at Washington Square Administration building
The project proposes to modernize and improve the operations of three elevators. The building is used as an administration building where the Public has access to pay utilities bills, license |
Columbia |
SC |
10 |
$766,006 |
Energy |
-22 |
| HVAC Equipment Upgrades
The project proposes to replace existing units with like type energy efficient heat pumps in Park and Recreation Buildings and Fire Stations. Projected annual energy savings $34,147 |
Columbia |
SC |
25 |
$624,876 |
Energy |
8 |
| Energy Management System/ Controls Upgrade. The project proposes to install new Energy Management Systems and modify existing EMS in facilities throughout the City. Projected annual energy savings $44,809 |
Columbia |
SC |
25 |
$531,564 |
Energy |
14 |
| Installation of on-site hydrogen back0up power systems for area cell towers. |
Columbia |
SC |
10 |
$400,000 |
Energy |
-18 |
| Photovoltaic Electric Power Generation at Fire Stations
The project proposes to install a solar photovoltaic electric power system at each Fire Station. The system will provide 1.0kilowatt of electricity to power 120-volt electric loads. Projected annua |
Columbia |
SC |
15 |
$137,877 |
Energy |
1 |
| Convert 3-way Valves to 2-way w/VSD Pumping at Washington Square Administration Building
The project proposes to replace the 3-way chilled water valves with new 2-way control vales and installing Variable Frequency Drive on the chilled water circulation |
Columbia |
SC |
5 |
$23,678 |
Energy |
-6 |
| Projected annual energy savings $244,247 |
Columbia |
SC |
0 |
$0 |
Energy |
9 |
| Columbia Housing Authority - Final Phases of Rosewood Hills Housing Development Infrastructure. |
Columbia |
SC |
75 |
$1,000,000 |
Housing |
-34 |
| Broad River Terrace Affordable Housing Community. |
Columbia |
SC |
50 |
$500,000 |
Housing |
-44 |
| Redevelopment of Latimar Manor Affordable Housing Community. |
Columbia |
SC |
50 |
$500,000 |
Housing |
-16 |
| Police Officers Salary & fringe benefits, uniforms & equipment, Patrol vehicles & Equipment |
Columbia |
SC |
75 |
$7,266,450 |
Public Safety |
42 |
| CCTV Surveillance System Section 6 and Surveillance Officers |
Columbia |
SC |
4 |
$2,905,610 |
Public Safety |
-22 |
| SROs & Patrol Vehicles & equipment, SRO Officers slary, uniforms & equipment |
Columbia |
SC |
19 |
$1,840,830 |
Public Safety |
5 |
| Records Management System |
Columbia |
SC |
0 |
$1,400,000 |
Public Safety |
-13 |
| Warrant/Mental Health Transport, corporal and police officers, uniforms & equipment, office furniture, gas & petroleum Products, vehicle repair/service & supply, warrant filing system, unmarked police vehicles |
Columbia |
SC |
9 |
$604,170 |
Public Safety |
8 |
| Purpose:Attempt to combat the safety concerns created by the increasing numbers of homeless persons in the Main Street, Vista and Five Points areas.5 - Previously sworn law enforcement officers @$47,668 (including fringe)Total cost: $238,340-Methodology-T |
Columbia |
SC |
6 |
$302,562 |
Public Safety |
0 |
| Police AVL Project |
Columbia |
SC |
0 |
$230,000 |
Public Safety |
-22 |
| License Recognition Software Project |
Columbia |
SC |
0 |
$200,000 |
Public Safety |
-16 |
| Tasers |
Columbia |
SC |
0 |
$198,550 |
Public Safety |
-40 |
| Outfit command Star One (mobile unit), LCD projection screen/monitor, outdoor lighting equipent, mobile 800 MHZ radios, digital recording equipment, mobile dispatching consoles, toughbooks, satelite telephones, portable/mobile security cameras |
Columbia |
SC |
0 |
$85,300 |
Public Safety |
-14 |
| IT System Administrator |
Columbia |
SC |
1 |
$64,000 |
Public Safety |
-16 |
| Automated HVAC Controls for Schools. Provide energy controls for mechnical systems at schools |
Columbia |
SC |
200 |
$7,500,000 |
Schools |
3 |
| Energy Efficient Lighting and Controls. Replaces old lights and balasts for new energy efficient type with time controls fo energy savings. |
Columbia |
SC |
150 |
$5,000,000 |
Schools |
9 |
| Purchase and Install Projectors & SmartBoards. Installs new teaching tool for classroom instruction |
Columbia |
SC |
50 |
$4,833,000 |
Schools |
-5 |
| Replace Mechanical Units in 2 schools. |
Columbia |
SC |
45 |
$3,000,000 |
Schools |
-1 |
| Wireless access for schools. Proivde better access to students in classrooms. |
Columbia |
SC |
20 |
$751,000 |
Schools |
-4 |
| Server Consolidation. Purchase new servers and retire/consolidate school servers. |
Columbia |
SC |
5 |
$695,000 |
Schools |
-5 |