WARNING: You're looking at a page from the old site. We have relaunched with live stimulus data. Learn more here.


Recent News

Advanced search added: keywords, zip codes, and recipients 11/25/2009

Thanks to the tireless work of developer Peter Snyder, Stimulus Watch 2.0 now has an advanced search capability that will…

Jerry Brito on Washington DC’s Federal News Radio... 11/24/2009

Jerry Brito on Washington DC’s Federal News Radio discussing the new features available on Stimulus Watch 2.0.

We've relaunched with new official data of stimulus projects in your neighborhood! 11/18/2009

Welcome to Stimulus Watch 2.0. While our original site featured proposed stimulus projects taken from the U.S. Conference of Mayors…

OpenRegs.com
Find government regulations by issue or agency. Comment, add links and subscribe to regulations.

Projects in Cocoa Beach, Florida

Below are the "shovel-ready" projects for which this city submitted in the 2008 U.S. Conference of Mayors report. You can click on a project to read (and add to) its description. You can also discuss the project and vote on whether you believe it is critical or not.

The total cost of all the projects submitted by Cocoa Beach is $42,688,000

Description City State Jobs Cost Program Type Vote Ratio
Ocean Beach Blvd. use native plants/energy-efficient lighting. Intended to aid in controlling runoff to Indian River lagoon. (design phase complete) Cocoa Beach FL 50 $2,000,000 Streets/Roads -12
Re- line 500 manholes 8 ft. depth @ $250/ft. Cocoa Beach FL 20 $1,000,000 Streets/Roads -37
Slipline/replace stormwater lines 10,000 ft. @ $40/linear foot Cocoa Beach FL 10 $400,000 Streets/Roads -2
Asphalt rejuvination - City-wide project to extend life of existing paving Cocoa Beach FL 10 $350,000 Streets/Roads -3
SR 520 Landscaping & Irrigation - Intended to aid in controlling runoff to Indian River lagoon Cocoa Beach FL 10 $250,000 Streets/Roads -17
Completion of Sidewalk /Bike Path Master Plan Cocoa Beach FL 10 $150,000 Streets/Roads -32
Improvements to six (6) process systems: (1) Influent Handling Facilities (2) Biological Treatment Units (3) Clarifiers (4) Filters (5) Chlorine contact (6) Residuals Handling (Study & preliminary costing done) Cocoa Beach FL 50 $10,938,000 Water 4
Sewer System Rehabilitation - Rehabilitation of systems serving Lift Stations #4, #6 & #7 (Specific upgrades required are identified) Cocoa Beach FL 20 $3,000,000 Water 5
Engineering evaluation of ASR site at PAFB. Construct 500,000 GPD irrigation system. Cocoa Beach FL 20 $750,000 Water -28
Infiltration & Inflow Assessment - Comprehensive survey of system to prioritize work required Cocoa Beach FL 5 $500,000 Water -8
Lift Station # 4 Conversion - Major upgrade to "wet pit" status Cocoa Beach FL 20 $400,000 Water 2
Rebuild and/or replace six (6) high service pumps (Equipment identified & replacements specified) Cocoa Beach FL 10 $250,000 Water 5
Administration facility solar powered/LEED certified energy-efficient lighting (property acquired/needs assessment study done) )(must receive funding early 2009 to complete by end of 2010) Cocoa Beach FL 50 $8,000,000 CDBG -51
Vehicle storage building - solar powered/LEED certified Intended to extend vehicle life by corrosion reduction Cocoa Beach FL 10 $150,000 CDBG -25
Equipment Storage building - solar powered/LEED certified Intended to extend vehicle life by corrosion reduction Cocoa Beach FL 5 $50,000 CDBG -19
Install solar power grid. Provide power to some City facilities & sell remainder to grid. (Installation areas identified & available) Cocoa Beach FL 10 $500,000 Energy 7
Public Safety (combined police/fire) facility,solar powered/LEED certified energy-efficient lighting (property acquired/needs assessment done)(must receive funding early 2009 to complete by end of 2010) Cocoa Beach FL 100 $12,000,000 Public Safety 65
Construct Fire Station # 2 solar powered/LEED certified energy-efficient lighting (property acquired/needs assessment done))(must receive funding early 2009 to complete by end of 2010) Cocoa Beach FL 70 $2,000,000 Public Safety 3