| Roadway (Strategic City-wide Paving Project) |
Bridgeport |
CT |
600 |
$160,000,000 |
Streets/Roads |
-31 |
| Congress Street Bridge Demolition and Re-construction Project (design-phase completed, project planning complete) – Estimated Cost: $50 million |
Bridgeport |
CT |
400 |
$50,000,000 |
Streets/Roads |
18 |
| Bridgeport City-wide Sidewalk Reconstruction and Installation Project |
Bridgeport |
CT |
50 |
$22,000,000 |
Streets/Roads |
-16 |
| Main Street Streetscape Phase # 2 & 3 |
Bridgeport |
CT |
66 |
$10,000,000 |
Streets/Roads |
-12 |
| Streetscape Improvements 27A Harbor Yard |
Bridgeport |
CT |
100 |
$9,902,970 |
Streets/Roads |
-21 |
| Neighborhood Side Walk/infrastructure Improvement Projects-
Hollow/Madison Av/ Street Scape Improvement Project
East Side Improvement Project-
West Side Street Scape Improvement Project
South End Iranistan and Street improvements |
Bridgeport |
CT |
43 |
$8,500,000 |
Streets/Roads |
-6 |
| Main Street Streetscape Phase #1 Woodside to Trumbull Mall |
Bridgeport |
CT |
60 |
$8,500,000 |
Streets/Roads |
-17 |
| Citywide Traffic Signal Replacement Project |
Bridgeport |
CT |
20 |
$5,900,000 |
Streets/Roads |
-12 |
| City Wide Bridge Repair |
Bridgeport |
CT |
250 |
$5,000,000 |
Streets/Roads |
11 |
| Pleasure Beach Bridge Demolition (removal of disabled bridge to establish direct water transportation) and Fishing Pier Construction Project (design-phase completed, site assembled, project planning complete) |
Bridgeport |
CT |
88 |
$4,500,000 |
Streets/Roads |
11 |
| Downtown/South End Streetscape Connector: Estimated cost: $3, 527,444.70
This project incorporates two separate, but related initiatives to connect the South End, Arena, Ballpark, Ferry, Warnaco Housing and future High Speed Ferry with the Downtown Centr |
Bridgeport |
CT |
40 |
$3,527,440 |
Streets/Roads |
3 |
| Capital Avenue Bridge Rehabilitation |
Bridgeport |
CT |
50 |
$1,000,000 |
Streets/Roads |
2 |
| East Washington Bridge Repair Project (Maintenance Repairs) |
Bridgeport |
CT |
8 |
$130,000 |
Streets/Roads |
2 |
| Ox Brook Flood Control Project (reconstruction of tributaries, construction of new channels, installation of new berm at Elton Rogers Park & new pipe) |
Bridgeport |
CT |
400 |
$45,000,000 |
Water |
-1 |
| City-wide Sewer Separation Project (Bridgeport Water Pollution Control Authority WPCA) / study-phase starting, initial testing underway) |
Bridgeport |
CT |
600 |
$42,000,000 |
Water |
6 |
| City-wide Sewer Separation Project (Bridgeport Water Pollution Control Authority WPCA) / design-phase completed, project planning complete, initial work underway) |
Bridgeport |
CT |
75 |
$12,000,000 |
Water |
2 |
| Bridgeport Harbor Maintenance Dredging |
Bridgeport |
CT |
80 |
$10,000,000 |
Water |
1 |
| City-wide Sewer Separation Project (Bridgeport Water Pollution Control Authority WPCA) Pump Station Upgrades/ design-phase completed, project planning complete, initial work underway) |
Bridgeport |
CT |
40 |
$5,000,000 |
Water |
3 |
| Airport Garage Repair and Rehabilitation |
Bridgeport |
CT |
8 |
$400,000 |
Airport |
-10 |
| Demolition and Remediation of City Property |
Bridgeport |
CT |
300 |
$50,000,000 |
CDBG |
-17 |
| Steel Point Development Street & Utility Improvements (site assembled, design complete) |
Bridgeport |
CT |
400 |
$38,312,600 |
CDBG |
-4 |
| Public Facilities Administration Building / Maintenence Garage Recycling and Sanitation Truck Wash |
Bridgeport |
CT |
120 |
$27,080,000 |
CDBG |
-20 |
| Installation of City-wide Broadband Network for Community and Municipal Use |
Bridgeport |
CT |
44 |
$20,000,000 |
CDBG |
-14 |
| Hurricane Barriers & Flood Control Gates Installation Project |
Bridgeport |
CT |
200 |
$20,000,000 |
CDBG |
1 |
| Steel Point Development Infrastructure, Shoreline Replacement Project (Shoreline replacement, new bulk-head construction at Steel Point Development site, this mixed-use development project on a 50 plus acre waterfront parcel is the largest waterfront deve |
Bridgeport |
CT |
275 |
$20,000,000 |
CDBG |
10 |
| East Side Police Precinct Construction Project to house police and community services |
Bridgeport |
CT |
16 |
$5,000,000 |
CDBG |
4 |
| Installation of sewer in Martin Luther King Drive at the site of the Father Panik Village public housing site to enable reconstruction on the site |
Bridgeport |
CT |
26 |
$4,250,000 |
CDBG |
-6 |
| City Hall Annex Repairs and Renovations (Roof Repair) |
Bridgeport |
CT |
200 |
$4,070,000 |
CDBG |
-12 |
| Police Vehicle Storage Building for Emergency Services Unit and specialized and undercover vehicles |
Bridgeport |
CT |
16 |
$4,000,000 |
CDBG |
7 |
| Port Authority Ferry Garage Construction Project (Planned phase of intermodal transportation center project/ transit oriented development / design-phase completed, site assembled, project planning complete) – Estimated Cost: $4 million |
Bridgeport |
CT |
80 |
$4,000,000 |
CDBG |
-2 |
| Citywide Library Renovation & Repair Projects (Roof Repair for Main Library) |
Bridgeport |
CT |
35 |
$3,950,000 |
CDBG |
7 |
| Bridgeport Police Activities League Recreation and Education Center |
Bridgeport |
CT |
15 |
$3,750,000 |
CDBG |
-15 |
| Bridgeport Fire Department Training Facility (Renovation of 2 existing buildings & construction of 4 story tower with burn building/ site assembled, design complete) |
Bridgeport |
CT |
40 |
$3,750,000 |
CDBG |
5 |
| Upgrading water, sewer, and storm drains at the former Pequonnock Village and Marina Apartments public housing site to enable the reconstruction of mixed use project on sites |
Bridgeport |
CT |
23 |
$3,500,000 |
CDBG |
-5 |
| Bridgeport Police Department Narcotics & Vice Facility Building (renovation of building, site assembled, design complete) and Police Evidence Center |
Bridgeport |
CT |
50 |
$3,430,000 |
CDBG |
7 |
| City Hall Repairs and Renovations |
Bridgeport |
CT |
30 |
$2,100,000 |
CDBG |
-16 |
| McLevy Hall Government Building Renovations and Roof Repair |
Bridgeport |
CT |
20 |
$2,000,000 |
CDBG |
-2 |
| Marrakech, Inc. Renovation Project of Senior Center & Affordable Housing Units |
Bridgeport |
CT |
10 |
$1,654,350 |
CDBG |
-2 |
| Bridgeport Fire Department Headquarters Repairs |
Bridgeport |
CT |
20 |
$1,525,000 |
CDBG |
0 |
| Seaview Industrial Park (Site improvements project contract #5) |
Bridgeport |
CT |
20 |
$1,500,000 |
CDBG |
-7 |
| Wonderland of Ice:
Interior Renovations and Code Upgrades |
Bridgeport |
CT |
35 |
$1,500,000 |
CDBG |
-37 |
| Police Department Headquarters Renovation & Upgrade |
Bridgeport |
CT |
50 |
$1,375,000 |
CDBG |
3 |
| Bridgeport Fire Department Engine 15 & 7/11 Repairs |
Bridgeport |
CT |
20 |
$1,355,000 |
CDBG |
2 |
| Cardinal Shehan Center Safety & Energy Conservation Project |
Bridgeport |
CT |
10 |
$1,101,750 |
CDBG |
-3 |
| Barnum Museum Renovation and Restoration Project (interior structural repair, environmental upgrade) |
Bridgeport |
CT |
30 |
$1,100,000 |
CDBG |
-9 |
| Fire Company 12 Roof and Facility Repairs |
Bridgeport |
CT |
10 |
$1,000,000 |
CDBG |
1 |
| Parks/ BAYSO ACF Soccer Fields - Construction of 2 new fields Seaside Park, resurface Kennedy & Hedges Stadium |
Bridgeport |
CT |
10 |
$1,000,000 |
CDBG |
-8 |
| YMCA South End Community Center Rehabilitation Project |
Bridgeport |
CT |
12 |
$1,000,000 |
CDBG |
-3 |
| Wheeler Fountain Restoration Project (Plumbing, sitework and paving/ design complete) |
Bridgeport |
CT |
7 |
$855,939 |
CDBG |
-4 |
| Fire Company 3/4 Wood Avenue Repairs and Renovations (Roof Repair) |
Bridgeport |
CT |
10 |
$850,000 |
CDBG |
1 |
| The Marrionville Co-ops Landscaping, Fencing, EnergyImprovements and HVAC repairs, security gates, window repairs, exterior stucco repairs/sealing |
Bridgeport |
CT |
16 |
$850,000 |
CDBG |
-5 |
| McGivney Center Interior Renovation Project (Repair, Roofing & Build out of Teen Center Space) |
Bridgeport |
CT |
8 |
$750,000 |
CDBG |
-6 |
| Sand Salt Building - Construction of new shed (design complete, planning complete) |
Bridgeport |
CT |
20 |
$750,000 |
CDBG |
-3 |
| Animal Shelter Expansion (to increase capacity for housing of animals/ design complete) |
Bridgeport |
CT |
14 |
$700,000 |
CDBG |
-2 |
| Fire Company 6/8 Repairs (Roof Repair and upgrade) |
Bridgeport |
CT |
6 |
$645,000 |
CDBG |
4 |
| Senior Center Repairs and Renovations (Black Rock and Eisenhower Center) |
Bridgeport |
CT |
8 |
$565,000 |
CDBG |
1 |
| West Side Police Precinct Rehab Project |
Bridgeport |
CT |
6 |
$500,000 |
CDBG |
2 |
| Hall Neighborhood House HVAC/ Furnace Boiler System Repair |
Bridgeport |
CT |
8 |
$350,000 |
CDBG |
1 |
| Roberto Clemente Condominiums Repairs Project |
Bridgeport |
CT |
4 |
$300,000 |
CDBG |
-8 |
| The Bridgeport Gateway COOP Inc. Replacement of Central Boiler System |
Bridgeport |
CT |
4 |
$300,000 |
CDBG |
-4 |
| Public Safety Camera System designed for regional transportation hubs and high-crime neighborhoods |
Bridgeport |
CT |
6 |
$300,000 |
CDBG |
5 |
| Stone Ridge II Roof Replacement Project |
Bridgeport |
CT |
6 |
$250,000 |
CDBG |
-2 |
| Wentfield Bathrooms Structure (Park Improvements, design and planning complete) |
Bridgeport |
CT |
4 |
$234,000 |
CDBG |
-5 |
| Charles D. Smith Foundation (Interior repairs, fencing & HVAC installation of community facility in East End) |
Bridgeport |
CT |
8 |
$200,000 |
CDBG |
-6 |
| Boys & Girls Village Renovation Project (170 Bennett Street) |
Bridgeport |
CT |
4 |
$100,000 |
CDBG |
-3 |
| Center for Women & Families Capital Improvements at City's Safe House for battered women & children |
Bridgeport |
CT |
4 |
$100,000 |
CDBG |
9 |
| Bridgeport Area Youth Ministry Facade Upgrade & additional of 2 HVAC units to Industrial Youth Center |
Bridgeport |
CT |
4 |
$75,000 |
CDBG |
-4 |
| Bridgeport Parks Department Luis Marin Park Recreational Enhancements / Water/ Splashpad Playground with landscape furnishings |
Bridgeport |
CT |
8 |
$75,000 |
CDBG |
3 |
| United Cerebral Palsy Center Expansion of lower level MATC / 2326 East Main Street |
Bridgeport |
CT |
8 |
$75,000 |
CDBG |
-4 |
| Washington Park Revitalization Corporation Renovation Project for Alpha Community Services |
Bridgeport |
CT |
3 |
$55,575 |
CDBG |
-4 |
| Regional Network of Programs Renovations |
Bridgeport |
CT |
3 |
$50,800 |
CDBG |
-4 |
| William Street Condo site work |
Bridgeport |
CT |
6 |
$35,000 |
CDBG |
-6 |
| City of Bridgeport Government Center LEEDS building for Health, Probate, Government, Senior Center, and Library |
Bridgeport |
CT |
600 |
$100,000,000 |
Energy |
-14 |
| East Side & West Side Treatment Plant Waste to Energy Biomass Gassification Energy Production Project |
Bridgeport |
CT |
560 |
$65,000,000 |
Energy |
5 |
| Emergency Center Electrical Generation Project - Fuel Cell & Generator Purchase & Installation |
Bridgeport |
CT |
30 |
$15,275,000 |
Energy |
4 |
| Bridgeport School System & City Public Facilities Efficiency Retrofit Project |
Bridgeport |
CT |
70 |
$15,000,000 |
Energy |
7 |
| Enviornmental Remediation Projects for Neighborhood
Development Initiatives and Waterfront Clean-up |
Bridgeport |
CT |
150 |
$8,300,000 |
Energy |
-6 |
| Up-Grades to Neighborhood Parks/infrastructure Improvements
Washington Park which is in a Historic District, Nanny Goat Park,
Upchurch Park and Newfield Park |
Bridgeport |
CT |
38 |
$4,200,000 |
Energy |
-8 |
| Deforest/JohnsonÂ’s Creek Water Front Project |
Bridgeport |
CT |
11 |
$2,600,000 |
Energy |
-7 |
| Energy improvements to Administrative Offices |
Bridgeport |
CT |
22 |
$1,500,000 |
Energy |
-5 |
| Barnum/Knowlton Urban Access Project |
Bridgeport |
CT |
10 |
$1,000,000 |
Energy |
-4 |
| Seaview/Central Urban Access Water Front Project |
Bridgeport |
CT |
10 |
$1,000,000 |
Energy |
-3 |
| LED Traffic Light Conversion Project |
Bridgeport |
CT |
4 |
$400,000 |
Energy |
9 |
| Construction of health clinic on Albion Street |
Bridgeport |
CT |
23 |
$4,650,780 |
Housing |
-7 |
| Section 504 unit retrofit in all projects |
Bridgeport |
CT |
60 |
$4,128,100 |
Housing |
-9 |
| 14 units of new housing construction on existing foundation |
Bridgeport |
CT |
18 |
$4,000,000 |
Housing |
-11 |
| Kitchen modernizations in PT Barnum, Trumbull Gardens, Harborview, and CF Greene |
Bridgeport |
CT |
55 |
$3,750,000 |
Housing |
-18 |
| ADA renovations to stairways, sidewalks, parking areas, fencing, etc. |
Bridgeport |
CT |
42 |
$3,500,000 |
Housing |
-4 |
| PT Barnum streets and sidewalks replacement |
Bridgeport |
CT |
51 |
$3,500,000 |
Housing |
-10 |
| New boilers at 536 Scattered Site units |
Bridgeport |
CT |
47 |
$3,200,000 |
Housing |
0 |
| PT Barnum stairs replacement |
Bridgeport |
CT |
46 |
$3,098,920 |
Housing |
-13 |
| Section 504 site and common area infrastructure rehabilitation |
Bridgeport |
CT |
32 |
$3,000,000 |
Housing |
-5 |
| Burroughs Community Center Expansion |
Bridgeport |
CT |
60 |
$3,000,000 |
Housing |
1 |
| New boilers at Fireside Court elderly apartments |
Bridgeport |
CT |
40 |
$2,754,800 |
Housing |
0 |
| Housing Preservation Projects- For Owner occupied and historic district properties. |
Bridgeport |
CT |
100 |
$2,600,000 |
Housing |
-11 |
| Renovation of vacated building into housing units for survivors of domestic violence |
Bridgeport |
CT |
16 |
$2,446,860 |
Housing |
-1 |
| 755 Plaisades Ave clinic |
Bridgeport |
CT |
34 |
$2,300,000 |
Housing |
-4 |
| Windows at Harborview Village apartments |
Bridgeport |
CT |
30 |
$2,071,560 |
Housing |
-24 |
| Reconfiguration of Bird Street |
Bridgeport |
CT |
18 |
$1,675,000 |
Housing |
-9 |
| Charles Greene interior stairs replacement |
Bridgeport |
CT |
24 |
$1,600,000 |
Housing |
-15 |
| CCTV System wide |
Bridgeport |
CT |
22 |
$1,523,670 |
Housing |
-16 |
| Replacement of roofs at the Scattered Site projects |
Bridgeport |
CT |
22 |
$1,500,000 |
Housing |
-3 |
| Trumbull Gardens sewer system reconstruction |
Bridgeport |
CT |
22 |
$1,500,000 |
Housing |
0 |
| Windows for housing at Fireside Court elderly housing and Scattered Sites 536 units. |
Bridgeport |
CT |
22 |
$1,500,000 |
Housing |
-3 |
| Site improvement to Morris Ave and construction of warehouse |
Bridgeport |
CT |
18 |
$1,350,000 |
Housing |
-7 |
| Replacement of siding and storm water handling system at Trumbull Gardens |
Bridgeport |
CT |
18 |
$1,256,330 |
Housing |
-6 |
| Marina Village public housing project replacement roofs |
Bridgeport |
CT |
18 |
$1,251,620 |
Housing |
-1 |
| Gary Crook Center modernization and consolidation of offices |
Bridgeport |
CT |
15 |
$1,032,000 |
Housing |
-2 |
| Marina Village security lighting |
Bridgeport |
CT |
14 |
$941,653 |
Housing |
-18 |
| Adams and Olive Street building restoration |
Bridgeport |
CT |
13 |
$875,156 |
Housing |
-6 |
| Charles Greene public housing new roofs |
Bridgeport |
CT |
11 |
$725,000 |
Housing |
-1 |
| Trumbull Gardens building 11 elevators repairs |
Bridgeport |
CT |
10 |
$650,000 |
Housing |
-3 |
| Sidewalk improvements at Marina Village |
Bridgeport |
CT |
14 |
$650,000 |
Housing |
-5 |
| Harborview security modifications and front entrance repairs |
Bridgeport |
CT |
9 |
$605,000 |
Housing |
-2 |
| Vacancy reduction in unoccupied units |
Bridgeport |
CT |
8 |
$550,000 |
Housing |
-11 |
| Telecommunications and software update |
Bridgeport |
CT |
7 |
$500,000 |
Housing |
-5 |
| Fireside electrical meter upgrades |
Bridgeport |
CT |
7 |
$480,000 |
Housing |
-7 |
| Iranistan Ave building rehabilitation into public housing units |
Bridgeport |
CT |
6 |
$437,373 |
Housing |
-4 |
| PT Barnum security lighting |
Bridgeport |
CT |
6 |
$434,373 |
Housing |
-2 |
| Storm doors at various public housing sites |
Bridgeport |
CT |
6 |
$400,000 |
Housing |
-7 |
| Installation of bus shelters at PT Barnum, Fireside Court, CF Greene, Harborview Village, and Marina Village |
Bridgeport |
CT |
7 |
$265,000 |
Housing |
-7 |
| Restoration of retaining walls and fencing at Trumbull Gardens |
Bridgeport |
CT |
4 |
$226,321 |
Housing |
-6 |
| Charles Greene security lighting |
Bridgeport |
CT |
3 |
$175,368 |
Housing |
-2 |
| Poplar Street public housing project elevator replacement |
Bridgeport |
CT |
2 |
$125,000 |
Housing |
-5 |
| Addition of funding for 200 Coleman Street LEEDS construction of 3 public housing units |
Bridgeport |
CT |
1 |
$50,000 |
Housing |
-4 |
| School Resource Officers and Neighborhood Policing Officers to Support Community Policing Initiatives |
Bridgeport |
CT |
90 |
$22,500,000 |
Public Safety |
-6 |
| City-wide Public Safety Mesh Wireless Network |
Bridgeport |
CT |
15 |
$5,000,000 |
Public Safety |
1 |
| Expansion of City's Video Monitoring System |
Bridgeport |
CT |
6 |
$3,000,000 |
Public Safety |
0 |
| Expansion of Emergency Services Unit |
Bridgeport |
CT |
12 |
$3,000,000 |
Public Safety |
2 |
| Provide local funding for the new 210,000 sf Multi Magnet High School to aid in over crowding and provide a facility that is environmentally sound and matches the curriculum. The curriculum includes infromation Technology, Zoology, and Aerospace programs |
Bridgeport |
CT |
850 |
$12,300,000 |
Schools |
-1 |
| Columbus ADA Renovations. Renovate and existing Elementary School to meet ADA Code requirements |
Bridgeport |
CT |
300 |
$8,850,000 |
Schools |
-1 |
| Replace Doors and Windows. Existing Windows and doors need to be upgraded to thermopane units and replace old corroded doors at Blackrock, Blackham, Beardsley, Central, Cross, Harding, Hallen, Longfellow, Park City, Skane and Bassick Schools |
Bridgeport |
CT |
75 |
$6,990,000 |
Schools |
-2 |
| Columbus energy efficiency renovations to include Window replacement and HVAC upgrades |
Bridgeport |
CT |
50 |
$6,500,000 |
Schools |
-1 |
| Replace Heating Controls systems in Blackrock, Beardsley, Edison, Hallen, Blackham, Hooker, JFK Campus High Horizon, Multi Cultural, Read, Roosevelt, Whittier and Wintrop Schools |
Bridgeport |
CT |
75 |
$4,000,000 |
Schools |
1 |
| Provide local funding to construct a Discovery magnet School. This facility is 70,000 sf with 500 students. This school will operate in conjunction witht he Discovery Museum. |
Bridgeport |
CT |
600 |
$3,050,000 |
Schools |
-4 |
| Upgrade HVAC System to include energy efficient Boilers and air handling units. Schools include Curiale, Central, Whittier, Sheridan, Marin, Park City, JFK. |
Bridgeport |
CT |
50 |
$2,800,000 |
Schools |
-2 |
| Auxiliary Classrooms at Central High School to provide additional teaching space to meet the accreditation issues within the high school. This project would provide relief from the existing over crowding situation |
Bridgeport |
CT |
400 |
$2,750,000 |
Schools |
6 |
| Replace roofs at Bassick High School and the Maintenance Garage |
Bridgeport |
CT |
20 |
$2,400,000 |
Schools |
2 |
| Upgrade electrical systems to meet current Technology requirements within the schools. School include: Hallen, Longfellow, Madison Harding Wintrop, Blackham, Bearsdley, Whittier. |
Bridgeport |
CT |
70 |
$1,195,000 |
Schools |
1 |
| Replace plumbing fixtures and mixing valves in Winthrop, Bassick, Roosevelt, Whittier schools. |
Bridgeport |
CT |
30 |
$350,000 |
Schools |
1 |
| Transit Authority Maintenance and Administration Facility Project: Expand Administration and Maintenance Facility to accommodate growth, improve efficiency, improve working conditions and develop into a sustainable facility including reducing carbon footp |
Bridgeport |
CT |
80 |
$14,000,000 |
Transit |
2 |
| Port Authority Ferry Garage Construction Project (Planned phase of intermodal transportation center project/ transit oriented development / design-phase completed, site assembled, project planning complete) – Estimated Cost: $4 million |
Bridgeport |
CT |
80 |
$4,000,000 |
Transit |
-1 |
| Transit Authority Bus Terminal Project: Provide additional protection from the elements on the platforms of the new bus terminal |
Bridgeport |
CT |
30 |
$3,900,000 |
Transit |
-2 |
| Transit Authority Bus Emissions Reduction Project: Re-power 40 buses to solve turbo failure problem and reduce vehicle emissions |
Bridgeport |
CT |
20 |
$2,800,000 |
Transit |
-1 |
| Transit Garage Expansion Project |
Bridgeport |
CT |
20 |
$2,500,000 |
Transit |
-1 |
| Transit Authority Shelter Installation Project: Install 100 shelters at bus stops – 50 replace existing shelters, 50 installed at stops without shelters |
Bridgeport |
CT |
20 |
$1,400,000 |
Transit |
-4 |
| Fare Box Replacement (replacing 65 fare boxes for increase in regional fare coordination |
Bridgeport |
CT |
4 |
$1,045,000 |
Transit |
-3 |