WARNING: You're looking at a page from the old site. We have relaunched with live stimulus data. Learn more here.


Recent News

Advanced search added: keywords, zip codes, and recipients 11/25/2009

Thanks to the tireless work of developer Peter Snyder, Stimulus Watch 2.0 now has an advanced search capability that will…

Jerry Brito on Washington DC’s Federal News Radio... 11/24/2009

Jerry Brito on Washington DC’s Federal News Radio discussing the new features available on Stimulus Watch 2.0.

We've relaunched with new official data of stimulus projects in your neighborhood! 11/18/2009

Welcome to Stimulus Watch 2.0. While our original site featured proposed stimulus projects taken from the U.S. Conference of Mayors…

OpenRegs.com
Find government regulations by issue or agency. Comment, add links and subscribe to regulations.

Projects in Bridgeport, Connecticut

Below are the "shovel-ready" projects for which this city submitted in the 2008 U.S. Conference of Mayors report. You can click on a project to read (and add to) its description. You can also discuss the project and vote on whether you believe it is critical or not.

The total cost of all the projects submitted by Bridgeport is $1,044,515,308

Description City State Jobs Cost Program Type Vote Ratio
Roadway (Strategic City-wide Paving Project) Bridgeport CT 600 $160,000,000 Streets/Roads -31
Congress Street Bridge Demolition and Re-construction Project (design-phase completed, project planning complete) – Estimated Cost: $50 million Bridgeport CT 400 $50,000,000 Streets/Roads 18
Bridgeport City-wide Sidewalk Reconstruction and Installation Project Bridgeport CT 50 $22,000,000 Streets/Roads -16
Main Street Streetscape Phase # 2 & 3 Bridgeport CT 66 $10,000,000 Streets/Roads -12
Streetscape Improvements 27A Harbor Yard Bridgeport CT 100 $9,902,970 Streets/Roads -21
Neighborhood Side Walk/infrastructure Improvement Projects- Hollow/Madison Av/ Street Scape Improvement Project East Side Improvement Project- West Side Street Scape Improvement Project South End Iranistan and Street improvements Bridgeport CT 43 $8,500,000 Streets/Roads -6
Main Street Streetscape Phase #1 Woodside to Trumbull Mall Bridgeport CT 60 $8,500,000 Streets/Roads -17
Citywide Traffic Signal Replacement Project Bridgeport CT 20 $5,900,000 Streets/Roads -12
City Wide Bridge Repair Bridgeport CT 250 $5,000,000 Streets/Roads 11
Pleasure Beach Bridge Demolition (removal of disabled bridge to establish direct water transportation) and Fishing Pier Construction Project (design-phase completed, site assembled, project planning complete) Bridgeport CT 88 $4,500,000 Streets/Roads 11
Downtown/South End Streetscape Connector: Estimated cost: $3, 527,444.70 This project incorporates two separate, but related initiatives to connect the South End, Arena, Ballpark, Ferry, Warnaco Housing and future High Speed Ferry with the Downtown Centr Bridgeport CT 40 $3,527,440 Streets/Roads 3
Capital Avenue Bridge Rehabilitation Bridgeport CT 50 $1,000,000 Streets/Roads 2
East Washington Bridge Repair Project (Maintenance Repairs) Bridgeport CT 8 $130,000 Streets/Roads 2
Ox Brook Flood Control Project (reconstruction of tributaries, construction of new channels, installation of new berm at Elton Rogers Park & new pipe) Bridgeport CT 400 $45,000,000 Water -1
City-wide Sewer Separation Project (Bridgeport Water Pollution Control Authority WPCA) / study-phase starting, initial testing underway) Bridgeport CT 600 $42,000,000 Water 6
City-wide Sewer Separation Project (Bridgeport Water Pollution Control Authority WPCA) / design-phase completed, project planning complete, initial work underway) Bridgeport CT 75 $12,000,000 Water 2
Bridgeport Harbor Maintenance Dredging Bridgeport CT 80 $10,000,000 Water 1
City-wide Sewer Separation Project (Bridgeport Water Pollution Control Authority WPCA) Pump Station Upgrades/ design-phase completed, project planning complete, initial work underway) Bridgeport CT 40 $5,000,000 Water 3
Airport Garage Repair and Rehabilitation Bridgeport CT 8 $400,000 Airport -10
Demolition and Remediation of City Property Bridgeport CT 300 $50,000,000 CDBG -17
Steel Point Development Street & Utility Improvements (site assembled, design complete) Bridgeport CT 400 $38,312,600 CDBG -4
Public Facilities Administration Building / Maintenence Garage Recycling and Sanitation Truck Wash Bridgeport CT 120 $27,080,000 CDBG -20
Installation of City-wide Broadband Network for Community and Municipal Use Bridgeport CT 44 $20,000,000 CDBG -14
Hurricane Barriers & Flood Control Gates Installation Project Bridgeport CT 200 $20,000,000 CDBG 1
Steel Point Development Infrastructure, Shoreline Replacement Project (Shoreline replacement, new bulk-head construction at Steel Point Development site, this mixed-use development project on a 50 plus acre waterfront parcel is the largest waterfront deve Bridgeport CT 275 $20,000,000 CDBG 10
East Side Police Precinct Construction Project to house police and community services Bridgeport CT 16 $5,000,000 CDBG 4
Installation of sewer in Martin Luther King Drive at the site of the Father Panik Village public housing site to enable reconstruction on the site Bridgeport CT 26 $4,250,000 CDBG -6
City Hall Annex Repairs and Renovations (Roof Repair) Bridgeport CT 200 $4,070,000 CDBG -12
Police Vehicle Storage Building for Emergency Services Unit and specialized and undercover vehicles Bridgeport CT 16 $4,000,000 CDBG 7
Port Authority Ferry Garage Construction Project (Planned phase of intermodal transportation center project/ transit oriented development / design-phase completed, site assembled, project planning complete) – Estimated Cost: $4 million Bridgeport CT 80 $4,000,000 CDBG -2
Citywide Library Renovation & Repair Projects (Roof Repair for Main Library) Bridgeport CT 35 $3,950,000 CDBG 7
Bridgeport Police Activities League Recreation and Education Center Bridgeport CT 15 $3,750,000 CDBG -15
Bridgeport Fire Department Training Facility (Renovation of 2 existing buildings & construction of 4 story tower with burn building/ site assembled, design complete) Bridgeport CT 40 $3,750,000 CDBG 5
Upgrading water, sewer, and storm drains at the former Pequonnock Village and Marina Apartments public housing site to enable the reconstruction of mixed use project on sites Bridgeport CT 23 $3,500,000 CDBG -5
Bridgeport Police Department Narcotics & Vice Facility Building (renovation of building, site assembled, design complete) and Police Evidence Center Bridgeport CT 50 $3,430,000 CDBG 7
City Hall Repairs and Renovations Bridgeport CT 30 $2,100,000 CDBG -16
McLevy Hall Government Building Renovations and Roof Repair Bridgeport CT 20 $2,000,000 CDBG -2
Marrakech, Inc. Renovation Project of Senior Center & Affordable Housing Units Bridgeport CT 10 $1,654,350 CDBG -2
Bridgeport Fire Department Headquarters Repairs Bridgeport CT 20 $1,525,000 CDBG 0
Seaview Industrial Park (Site improvements project contract #5) Bridgeport CT 20 $1,500,000 CDBG -7
Wonderland of Ice: Interior Renovations and Code Upgrades Bridgeport CT 35 $1,500,000 CDBG -37
Police Department Headquarters Renovation & Upgrade Bridgeport CT 50 $1,375,000 CDBG 3
Bridgeport Fire Department Engine 15 & 7/11 Repairs Bridgeport CT 20 $1,355,000 CDBG 2
Cardinal Shehan Center Safety & Energy Conservation Project Bridgeport CT 10 $1,101,750 CDBG -3
Barnum Museum Renovation and Restoration Project (interior structural repair, environmental upgrade) Bridgeport CT 30 $1,100,000 CDBG -9
Fire Company 12 Roof and Facility Repairs Bridgeport CT 10 $1,000,000 CDBG 1
Parks/ BAYSO ACF Soccer Fields - Construction of 2 new fields Seaside Park, resurface Kennedy & Hedges Stadium Bridgeport CT 10 $1,000,000 CDBG -8
YMCA South End Community Center Rehabilitation Project Bridgeport CT 12 $1,000,000 CDBG -3
Wheeler Fountain Restoration Project (Plumbing, sitework and paving/ design complete) Bridgeport CT 7 $855,939 CDBG -4
Fire Company 3/4 Wood Avenue Repairs and Renovations (Roof Repair) Bridgeport CT 10 $850,000 CDBG 1
The Marrionville Co-ops Landscaping, Fencing, EnergyImprovements and HVAC repairs, security gates, window repairs, exterior stucco repairs/sealing Bridgeport CT 16 $850,000 CDBG -5
McGivney Center Interior Renovation Project (Repair, Roofing & Build out of Teen Center Space) Bridgeport CT 8 $750,000 CDBG -6
Sand Salt Building - Construction of new shed (design complete, planning complete) Bridgeport CT 20 $750,000 CDBG -3
Animal Shelter Expansion (to increase capacity for housing of animals/ design complete) Bridgeport CT 14 $700,000 CDBG -2
Fire Company 6/8 Repairs (Roof Repair and upgrade) Bridgeport CT 6 $645,000 CDBG 4
Senior Center Repairs and Renovations (Black Rock and Eisenhower Center) Bridgeport CT 8 $565,000 CDBG 1
West Side Police Precinct Rehab Project Bridgeport CT 6 $500,000 CDBG 2
Hall Neighborhood House HVAC/ Furnace Boiler System Repair Bridgeport CT 8 $350,000 CDBG 1
Roberto Clemente Condominiums Repairs Project Bridgeport CT 4 $300,000 CDBG -8
The Bridgeport Gateway COOP Inc. Replacement of Central Boiler System Bridgeport CT 4 $300,000 CDBG -4
Public Safety Camera System designed for regional transportation hubs and high-crime neighborhoods Bridgeport CT 6 $300,000 CDBG 5
Stone Ridge II Roof Replacement Project Bridgeport CT 6 $250,000 CDBG -2
Wentfield Bathrooms Structure (Park Improvements, design and planning complete) Bridgeport CT 4 $234,000 CDBG -5
Charles D. Smith Foundation (Interior repairs, fencing & HVAC installation of community facility in East End) Bridgeport CT 8 $200,000 CDBG -6
Boys & Girls Village Renovation Project (170 Bennett Street) Bridgeport CT 4 $100,000 CDBG -3
Center for Women & Families Capital Improvements at City's Safe House for battered women & children Bridgeport CT 4 $100,000 CDBG 9
Bridgeport Area Youth Ministry Facade Upgrade & additional of 2 HVAC units to Industrial Youth Center Bridgeport CT 4 $75,000 CDBG -4
Bridgeport Parks Department Luis Marin Park Recreational Enhancements / Water/ Splashpad Playground with landscape furnishings Bridgeport CT 8 $75,000 CDBG 3
United Cerebral Palsy Center Expansion of lower level MATC / 2326 East Main Street Bridgeport CT 8 $75,000 CDBG -4
Washington Park Revitalization Corporation Renovation Project for Alpha Community Services Bridgeport CT 3 $55,575 CDBG -4
Regional Network of Programs Renovations Bridgeport CT 3 $50,800 CDBG -4
William Street Condo site work Bridgeport CT 6 $35,000 CDBG -6
City of Bridgeport Government Center LEEDS building for Health, Probate, Government, Senior Center, and Library Bridgeport CT 600 $100,000,000 Energy -14
East Side & West Side Treatment Plant Waste to Energy Biomass Gassification Energy Production Project Bridgeport CT 560 $65,000,000 Energy 5
Emergency Center Electrical Generation Project - Fuel Cell & Generator Purchase & Installation Bridgeport CT 30 $15,275,000 Energy 4
Bridgeport School System & City Public Facilities Efficiency Retrofit Project Bridgeport CT 70 $15,000,000 Energy 7
Enviornmental Remediation Projects for Neighborhood Development Initiatives and Waterfront Clean-up Bridgeport CT 150 $8,300,000 Energy -6
Up-Grades to Neighborhood Parks/infrastructure Improvements Washington Park which is in a Historic District, Nanny Goat Park, Upchurch Park and Newfield Park Bridgeport CT 38 $4,200,000 Energy -8
Deforest/JohnsonÂ’s Creek Water Front Project Bridgeport CT 11 $2,600,000 Energy -7
Energy improvements to Administrative Offices Bridgeport CT 22 $1,500,000 Energy -5
Barnum/Knowlton Urban Access Project Bridgeport CT 10 $1,000,000 Energy -4
Seaview/Central Urban Access Water Front Project Bridgeport CT 10 $1,000,000 Energy -3
LED Traffic Light Conversion Project Bridgeport CT 4 $400,000 Energy 9
Construction of health clinic on Albion Street Bridgeport CT 23 $4,650,780 Housing -7
Section 504 unit retrofit in all projects Bridgeport CT 60 $4,128,100 Housing -9
14 units of new housing construction on existing foundation Bridgeport CT 18 $4,000,000 Housing -11
Kitchen modernizations in PT Barnum, Trumbull Gardens, Harborview, and CF Greene Bridgeport CT 55 $3,750,000 Housing -18
ADA renovations to stairways, sidewalks, parking areas, fencing, etc. Bridgeport CT 42 $3,500,000 Housing -4
PT Barnum streets and sidewalks replacement Bridgeport CT 51 $3,500,000 Housing -10
New boilers at 536 Scattered Site units Bridgeport CT 47 $3,200,000 Housing 0
PT Barnum stairs replacement Bridgeport CT 46 $3,098,920 Housing -13
Section 504 site and common area infrastructure rehabilitation Bridgeport CT 32 $3,000,000 Housing -5
Burroughs Community Center Expansion Bridgeport CT 60 $3,000,000 Housing 1
New boilers at Fireside Court elderly apartments Bridgeport CT 40 $2,754,800 Housing 0
Housing Preservation Projects- For Owner occupied and historic district properties. Bridgeport CT 100 $2,600,000 Housing -11
Renovation of vacated building into housing units for survivors of domestic violence Bridgeport CT 16 $2,446,860 Housing -1
755 Plaisades Ave clinic Bridgeport CT 34 $2,300,000 Housing -4
Windows at Harborview Village apartments Bridgeport CT 30 $2,071,560 Housing -24
Reconfiguration of Bird Street Bridgeport CT 18 $1,675,000 Housing -9
Charles Greene interior stairs replacement Bridgeport CT 24 $1,600,000 Housing -15
CCTV System wide Bridgeport CT 22 $1,523,670 Housing -16
Replacement of roofs at the Scattered Site projects Bridgeport CT 22 $1,500,000 Housing -3
Trumbull Gardens sewer system reconstruction Bridgeport CT 22 $1,500,000 Housing 0
Windows for housing at Fireside Court elderly housing and Scattered Sites 536 units. Bridgeport CT 22 $1,500,000 Housing -3
Site improvement to Morris Ave and construction of warehouse Bridgeport CT 18 $1,350,000 Housing -7
Replacement of siding and storm water handling system at Trumbull Gardens Bridgeport CT 18 $1,256,330 Housing -6
Marina Village public housing project replacement roofs Bridgeport CT 18 $1,251,620 Housing -1
Gary Crook Center modernization and consolidation of offices Bridgeport CT 15 $1,032,000 Housing -2
Marina Village security lighting Bridgeport CT 14 $941,653 Housing -18
Adams and Olive Street building restoration Bridgeport CT 13 $875,156 Housing -6
Charles Greene public housing new roofs Bridgeport CT 11 $725,000 Housing -1
Trumbull Gardens building 11 elevators repairs Bridgeport CT 10 $650,000 Housing -3
Sidewalk improvements at Marina Village Bridgeport CT 14 $650,000 Housing -5
Harborview security modifications and front entrance repairs Bridgeport CT 9 $605,000 Housing -2
Vacancy reduction in unoccupied units Bridgeport CT 8 $550,000 Housing -11
Telecommunications and software update Bridgeport CT 7 $500,000 Housing -5
Fireside electrical meter upgrades Bridgeport CT 7 $480,000 Housing -7
Iranistan Ave building rehabilitation into public housing units Bridgeport CT 6 $437,373 Housing -4
PT Barnum security lighting Bridgeport CT 6 $434,373 Housing -2
Storm doors at various public housing sites Bridgeport CT 6 $400,000 Housing -7
Installation of bus shelters at PT Barnum, Fireside Court, CF Greene, Harborview Village, and Marina Village Bridgeport CT 7 $265,000 Housing -7
Restoration of retaining walls and fencing at Trumbull Gardens Bridgeport CT 4 $226,321 Housing -6
Charles Greene security lighting Bridgeport CT 3 $175,368 Housing -2
Poplar Street public housing project elevator replacement Bridgeport CT 2 $125,000 Housing -5
Addition of funding for 200 Coleman Street LEEDS construction of 3 public housing units Bridgeport CT 1 $50,000 Housing -4
School Resource Officers and Neighborhood Policing Officers to Support Community Policing Initiatives Bridgeport CT 90 $22,500,000 Public Safety -6
City-wide Public Safety Mesh Wireless Network Bridgeport CT 15 $5,000,000 Public Safety 1
Expansion of City's Video Monitoring System Bridgeport CT 6 $3,000,000 Public Safety 0
Expansion of Emergency Services Unit Bridgeport CT 12 $3,000,000 Public Safety 2
Provide local funding for the new 210,000 sf Multi Magnet High School to aid in over crowding and provide a facility that is environmentally sound and matches the curriculum. The curriculum includes infromation Technology, Zoology, and Aerospace programs Bridgeport CT 850 $12,300,000 Schools -1
Columbus ADA Renovations. Renovate and existing Elementary School to meet ADA Code requirements Bridgeport CT 300 $8,850,000 Schools -1
Replace Doors and Windows. Existing Windows and doors need to be upgraded to thermopane units and replace old corroded doors at Blackrock, Blackham, Beardsley, Central, Cross, Harding, Hallen, Longfellow, Park City, Skane and Bassick Schools Bridgeport CT 75 $6,990,000 Schools -2
Columbus energy efficiency renovations to include Window replacement and HVAC upgrades Bridgeport CT 50 $6,500,000 Schools -1
Replace Heating Controls systems in Blackrock, Beardsley, Edison, Hallen, Blackham, Hooker, JFK Campus High Horizon, Multi Cultural, Read, Roosevelt, Whittier and Wintrop Schools Bridgeport CT 75 $4,000,000 Schools 1
Provide local funding to construct a Discovery magnet School. This facility is 70,000 sf with 500 students. This school will operate in conjunction witht he Discovery Museum. Bridgeport CT 600 $3,050,000 Schools -4
Upgrade HVAC System to include energy efficient Boilers and air handling units. Schools include Curiale, Central, Whittier, Sheridan, Marin, Park City, JFK. Bridgeport CT 50 $2,800,000 Schools -2
Auxiliary Classrooms at Central High School to provide additional teaching space to meet the accreditation issues within the high school. This project would provide relief from the existing over crowding situation Bridgeport CT 400 $2,750,000 Schools 6
Replace roofs at Bassick High School and the Maintenance Garage Bridgeport CT 20 $2,400,000 Schools 2
Upgrade electrical systems to meet current Technology requirements within the schools. School include: Hallen, Longfellow, Madison Harding Wintrop, Blackham, Bearsdley, Whittier. Bridgeport CT 70 $1,195,000 Schools 1
Replace plumbing fixtures and mixing valves in Winthrop, Bassick, Roosevelt, Whittier schools. Bridgeport CT 30 $350,000 Schools 1
Transit Authority Maintenance and Administration Facility Project: Expand Administration and Maintenance Facility to accommodate growth, improve efficiency, improve working conditions and develop into a sustainable facility including reducing carbon footp Bridgeport CT 80 $14,000,000 Transit 2
Port Authority Ferry Garage Construction Project (Planned phase of intermodal transportation center project/ transit oriented development / design-phase completed, site assembled, project planning complete) – Estimated Cost: $4 million Bridgeport CT 80 $4,000,000 Transit -1
Transit Authority Bus Terminal Project: Provide additional protection from the elements on the platforms of the new bus terminal Bridgeport CT 30 $3,900,000 Transit -2
Transit Authority Bus Emissions Reduction Project: Re-power 40 buses to solve turbo failure problem and reduce vehicle emissions Bridgeport CT 20 $2,800,000 Transit -1
Transit Garage Expansion Project Bridgeport CT 20 $2,500,000 Transit -1
Transit Authority Shelter Installation Project: Install 100 shelters at bus stops – 50 replace existing shelters, 50 installed at stops without shelters Bridgeport CT 20 $1,400,000 Transit -4
Fare Box Replacement (replacing 65 fare boxes for increase in regional fare coordination Bridgeport CT 4 $1,045,000 Transit -3