WARNING: You're looking at a page from the old site. We have relaunched with live stimulus data. Learn more here.


Recent News

Advanced search added: keywords, zip codes, and recipients 11/25/2009

Thanks to the tireless work of developer Peter Snyder, Stimulus Watch 2.0 now has an advanced search capability that will…

Jerry Brito on Washington DC’s Federal News Radio... 11/24/2009

Jerry Brito on Washington DC’s Federal News Radio discussing the new features available on Stimulus Watch 2.0.

We've relaunched with new official data of stimulus projects in your neighborhood! 11/18/2009

Welcome to Stimulus Watch 2.0. While our original site featured proposed stimulus projects taken from the U.S. Conference of Mayors…

OpenRegs.com
Find government regulations by issue or agency. Comment, add links and subscribe to regulations.

Projects in Binghamton, New York

Below are the "shovel-ready" projects for which this city submitted in the 2008 U.S. Conference of Mayors report. You can click on a project to read (and add to) its description. You can also discuss the project and vote on whether you believe it is critical or not.

The total cost of all the projects submitted by Binghamton is $20,207,606

Description City State Jobs Cost Program Type Vote Ratio
Robinson Street (Chenango to Fairview) - 4" Mill and Pave with new curb and sidewalk improvements. Binghamton NY 24 $1,273,670 Streets/Roads -11
Main Street rehab- 4" mill and pave with sidewalk and curb replacement as needed. Binghamton NY 20 $1,155,920 Streets/Roads -10
Park Ave (vestal to Morgan) 4" mill and pave plus sidewalk and curb replacement as needed. Binghamton NY 16 $662,688 Streets/Roads 0
Glenwood Avenue (Main to Prospect) - 4" Mill and Pave, with new curb and sidewalk. Binghamton NY 22 $533,650 Streets/Roads 2
South Washington Street Bridge Painting - Rehabilitate and Restore a Historic Steel Truss Bridge. This is a highly used Pedestrian Bridge. Binghamton NY 16 $525,000 Streets/Roads -20
Henry Street (Brandywine to Water) 4" mill and pave plus new curb and sidewalk as needed and trees where appropriate. Binghamton NY 16 $453,884 Streets/Roads -5
Prospect Street (Front to City Line) 4" mill and pave. Binghamton NY 14 $415,341 Streets/Roads -3
High Mast Street Lighting - to improve safety through increased road visibillity and poles being placed further from the driving lanes where poles are often hit. Maintenance is also performed safer and less frequently. Improvement of energy efficiency is Binghamton NY 8 $360,000 Streets/Roads 2
State Street (Hawley to Lewis) 4" mill and pave, curb and sidewalk replacement as needed. Binghamton NY 14 $359,691 Streets/Roads -3
Mary Street ( Morgan to James) 4" mill and pave, new catch basins, new curb and sidewalk as needed. Binghamton NY 14 $320,000 Streets/Roads -7
Frederick Street (Chenango to Brandywine) 4" mill and pave plus curb and sidewalk replacement as needed. Binghamton NY 12 $250,310 Streets/Roads -3
Hawley Street (State to Court) 4" Mill and Pave, with new curb and sidewalks. Will improve a highly visible block in the Downtown Shopping District. Binghamton NY 23 $224,923 Streets/Roads -3
Oak Street (Main to Leroy) 4" mill and pave plus additional catchbasins. Binghamton NY 12 $162,364 Streets/Roads -6
Eldredge Street (Water to Chenango) 4" mill and pave. Binghamton NY 10 $111,552 Streets/Roads -5
South Washington Street (Corbett to Morgan) 4" mill and pave. Binghamton NY 10 $107,819 Streets/Roads -6
Mill Street (Vestal to Conklin) 4" mill and pave. Binghamton NY 8 $63,044 Streets/Roads -6
Small Water Meter replacement "City wide" 14,300 meters will be replaced by new electronic radioread meters. Water conservation will be greatly improved. Binghamton NY 32 $3,932,500 Water -15
Annual Sewer replacement and upgrade. Binghamton NY 26 $2,000,000 Water -4
Annual Water Main replacement and upgrade. Binghamton NY 24 $1,500,000 Water -3
Laurel Ave Stormwater Pump Station extension - this project will extend an ongoing Combined Sewer seperation project for several blocks. Binghamton NY 22 $1,250,000 Water -4
West Side Separation Project (Laurel, Lathrop, Mallard) - Separating combined sewers into sanitary and storm sewer systems. Binghamton NY 16 $688,750 Water -3
Park Channel Floor replacement- The concrete channel was built by the ACOE as a flood control project which acts as a conduit to guide storm water through a densely populated area to the river. During the annual inspection this year the ACOE has determine Binghamton NY 14 $520,000 Water 2
Park Avenue Sanitary Sewer - Sewer separation of existing combined sewer system. Binghamton NY 22 $475,000 Water 0
Large Water Meter replacement and pit upgrades with the addition of Telemetry - The operations become greener. New Back-flow preventors - will improve the Water quality. Binghamton NY 8 $360,000 Water -4
McDonald Avenue Pump Station - Pump station improvements to increase capacity and improve performance, which will support local urban redevelopment in a mixed use neighborhood. Binghamton NY 26 $321,500 Water -7
Rock Bottom Flood Wall - Provide improvements and rehabilitation of an existing structure, integral to the flood water control system. Provide additional capacity for local stormwater management system. Binghamton NY 20 $225,000 Water 1
Rush/Zane Road Storm Sewer - Provide new storm sewer system to control localized flooding caused by stormwater. Binghamton NY 14 $130,000 Water 0
City Hall Elevators renovation. The Elevators are 37 years old and have not been upgraded to be ADA compliant or energy efficient. Binghamton NY 8 $650,000 CDBG -18
Sidewalk and Curb replacement in blighted neighborhoods. Binghamton NY 6 $225,000 CDBG -12
Lloyd Greenman Senior Center- Renovation including new energy efficient HVAC System. Binghamton NY 6 $195,000 CDBG -11
Columbus Park renovation- Upgrades to Bathhouse to make ADA compliant and building improvements including plumbing and electrical upgrades-new fence and bleachers for Little League Field. Fountain re-hab. Binghamton NY 11 $185,000 CDBG -18
First Ward Senior Center - Renovation - including new energy efficient HVAC System. Binghamton NY 5 $170,000 CDBG -11
Sherri-Lindsey Park Pool House renovation - to install a HotWater System for Showers - bring building into ADA compliance- put a roof on the building Binghamton NY 12 $170,000 CDBG -20
City Hall HVAC improvements, including a new energy effficient cooling tower, pumps, and controls. Binghamton NY 5 $120,000 CDBG -14
City Hall - Plumbing improvements including ADA compliance projects. Binghamton NY 4 $110,000 CDBG -17