| Purchase and install vehicle detection stations using toll-tag registration tags |
Austin |
TX |
25 |
$6,000,000 |
Streets/Roads |
-639 |
| Purchase and install Variable Message Signs on major highways and arterials to manage special events in Central Austin and provide improved driver information. |
Austin |
TX |
25 |
$5,000,000 |
Streets/Roads |
-194 |
| Purchase and install computer technology necessary to allow web access to existing 200 plus arterial traffic cameras and other traffic information devices |
Austin |
TX |
10 |
$800,000 |
Streets/Roads |
-104 |
| The Waller Creek Tunnel (WCT) Project |
Austin |
TX |
1836 |
$127,500,000 |
Water |
8 |
| Hornsby Bend Biosolids Facility Digester Cleaning and Rehabilitation |
Austin |
TX |
18 |
$20,000,000 |
Water |
6 |
| Boardwalk along Lady Bird Lake: The project will close a 1.3-mile gap in a heavily used pedestrian and bicycle trail system. The trail extension will improve safety and provide additional access to a major bike and pedestrian corridor for the expanding m |
Austin |
TX |
60 |
$18,000,000 |
Water |
-845 |
| Water Reclamation Initiative – Red River to UT Transmission Main -- approximately 21,000 feet of reclaimed water main |
Austin |
TX |
45 |
$13,300,000 |
Water |
1 |
| Rehabilitation of Primary and Final Clarifiers and Sludge Thickeners at the South Area Regional (SAR) WWTP |
Austin |
TX |
32 |
$10,000,000 |
Water |
13 |
| Burnet Rd. Sidewalk Project – Sidewalk on both sides of Burnet Rd from Koenig/Allendale north to US 183 |
Austin |
TX |
250 |
$10,000,000 |
Water |
1 |
| Brazos St, Utility and Road Reconstruction |
Austin |
TX |
150 |
$9,700,000 |
Water |
-12 |
| E. 4th Street Storm Drain Improvements |
Austin |
TX |
256 |
$9,000,000 |
Water |
18 |
| Rosedale Storm Drain Improvements, Phase 1 |
Austin |
TX |
244 |
$8,600,000 |
Water |
4 |
| Spicewood Springs Pump Station Improvements |
Austin |
TX |
20 |
$8,200,000 |
Water |
-12 |
| E. 7th Street Corridor Project (from Pleasant Valley to Pedernales St) to include street reconstruction and drainage/utility upgrades, streetscape amenities (sidewalk, landscaping, lighting), and ADA improvements. |
Austin |
TX |
54 |
$8,120,000 |
Water |
4 |
| Rio Grande from MLK to 29th |
Austin |
TX |
15 |
$8,000,000 |
Water |
-32 |
| Wastewater Pipeline Rehabilitation, Relay and Spot Repair Services Contract |
Austin |
TX |
40 |
$8,000,000 |
Water |
-5 |
| Second Street Road Reconstruction Project |
Austin |
TX |
44 |
$7,500,000 |
Water |
-27 |
| AFD Firehouse Improvement Project: to include sidewalk, ADA ramps, multigender facility conversion, modernization |
Austin |
TX |
30 |
$7,000,000 |
Water |
-15 |
| The Trail Enhancement Plan at Lady Bird Lake. |
Austin |
TX |
30 |
$7,000,000 |
Water |
-88 |
| North Lamar Sidewalk Project –
Sidewalk on both sides of N. Lamar from Rundberg Ln. north to Braker Ln. providing a high priority ADA accessible route |
Austin |
TX |
180 |
$6,500,000 |
Water |
1 |
| Group 4 Southeast Austin Street Reconstruction/Utility Upgrade Project |
Austin |
TX |
47 |
$6,175,000 |
Water |
-12 |
| Wastewater Pipeline Rehabilitation contract for Cured In Place Pipeline (CIPP) Lining |
Austin |
TX |
8 |
$6,000,000 |
Water |
3 |
| Rio Grande Street Reconstruction and Utility Adjustment Project, MLK, Jr. to W. 24th St. |
Austin |
TX |
42 |
$5,500,000 |
Water |
-10 |
| Little Walnut and Upper Ft Branch Wastewater Line Rehabilitation: replace deteriorated wastewater lines. |
Austin |
TX |
27 |
$5,395,000 |
Water |
5 |
| Retired Lift station, Pump Station and Reservoir Facility Decommissioning |
Austin |
TX |
20 |
$5,000,000 |
Water |
-25 |
| Hornsby Bend Biosolids Facility Sustainability project to rehabilitate numerous components of the plant |
Austin |
TX |
25 |
$5,000,000 |
Water |
-4 |
| Waters Park Interceptor Sewer that includes replacement of approximately 6,000 feet of undersized sewer with 42-inch sewer |
Austin |
TX |
26 |
$5,000,000 |
Water |
4 |
| ADA Title II Handicap Facilities-Compliant Upgrades |
Austin |
TX |
75 |
$5,000,000 |
Water |
-7 |
| S. 1st Street Sidewalk Project |
Austin |
TX |
125 |
$5,000,000 |
Water |
1 |
| Vista Ln Wastewater Line Rehabilitation Project; Replace wastewater lines in coordination with street reconstruction project. |
Austin |
TX |
24 |
$4,822,000 |
Water |
-5 |
| Reservoir Improvements: includes rehabilitation of two of the CityÂ’s existing water reservoirs |
Austin |
TX |
13 |
$4,000,000 |
Water |
-3 |
| Wildhorse N Interceptor Extension North of 290 |
Austin |
TX |
13 |
$4,000,000 |
Water |
-18 |
| Roy G. Guerrero Colorado River Park |
Austin |
TX |
40 |
$4,000,000 |
Water |
-35 |
| Morris Williams Golf Course Renovation: |
Austin |
TX |
70 |
$4,000,000 |
Water |
-149 |
| Crosstown Wastewater Line Rehabilitation: replace and reroute deteriorated wastewater lines. |
Austin |
TX |
18 |
$3,614,000 |
Water |
1 |
| Long Bow Storm Drain Improvements |
Austin |
TX |
20 |
$3,600,000 |
Water |
4 |
| Group 3 Northeast Austin Street Reconstruction/Utility Upgrade Project |
Austin |
TX |
40 |
$3,575,000 |
Water |
-7 |
| Wildhorse Northeast Interceptor Sewer Phase 2 |
Austin |
TX |
12 |
$3,500,000 |
Water |
-11 |
| Standby Generators for Wastewater Lift Stations |
Austin |
TX |
20 |
$3,500,000 |
Water |
-1 |
| Bicycle and Pedestrian Tunnel (Bowie Street Underpass) |
Austin |
TX |
32 |
$3,500,000 |
Water |
0 |
| Group 15: Northwest area – 51st St., Manor Rd., Rogge Ln., Basswood Ln. , Exeter Dr., Overbrook Dr., Overdale Rd., Trafalgar Dr., Wight Cv., |
Austin |
TX |
10 |
$3,443,540 |
Water |
-11 |
| Group 8: Tarrytown Neighborhood – Stamford Ln., Forest Trail, Elton Ln., Vista Ln., Bremen St., McCall Rd., Woodmont Ave., Grswold Ln. & Westover Rd |
Austin |
TX |
10 |
$3,390,240 |
Water |
-22 |
| Co-Generation update at Hornsby Bend Sludge Processing Plant |
Austin |
TX |
10 |
$3,000,000 |
Water |
4 |
| UNO West Campus Areas – Water Lines. Existing water lines are deteriorated and aged |
Austin |
TX |
12 |
$3,000,000 |
Water |
-4 |
| Parmer Lane Interceptor Sewer that includes approx 2,000 feet of 42-inch Open cut and Tunnel Sewer |
Austin |
TX |
15 |
$3,000,000 |
Water |
-8 |
| CBD Alley Improvements |
Austin |
TX |
25 |
$3,000,000 |
Water |
-18 |
| William Cannon New Sidewalk, IH-35 to Pleasant Valley Rd |
Austin |
TX |
110 |
$3,000,000 |
Water |
-7 |
| Relocation of 1500 LF of 16” waterline on FM 2222 @ Bull Creek-to accommodate State Highway improvement project |
Austin |
TX |
8 |
$2,700,000 |
Water |
-12 |
| Bicycle Infrastructure Improvements: a package of ready-to-install bike lanes, shared-use bicycle and pedestrian paths, and minor infrastructure improvements to remove barriers on bike routes. |
Austin |
TX |
24 |
$2,600,000 |
Water |
-5 |
| Central Business District Alleys – Water Lines. |
Austin |
TX |
10 |
$2,500,000 |
Water |
-8 |
| Upper Waller Wastewater Line Rehabilitation 32nd to 35th / Evans: replace deteriorated wastewater lines. |
Austin |
TX |
13 |
$2,500,000 |
Water |
0 |
| Shaw Lane Site Drainage and Levee Improvements to contain 100-year storm |
Austin |
TX |
21 |
$2,500,000 |
Water |
-8 |
| Pleasant Valley Road Extension |
Austin |
TX |
60 |
$2,500,000 |
Water |
-12 |
| Bicycle, Shared Path, Connected Trails, and Sidewalk Projects |
Austin |
TX |
90 |
$2,500,000 |
Water |
17 |
| Odor Control Facility for Crosstown Sewer at Walnut Creek WWTP and 5 other interceptor sewer locations |
Austin |
TX |
8 |
$2,400,000 |
Water |
-7 |
| Chaparral Trail / Wykeham Dr Wastewater Line Improvements: reroute deteriorated wastewater lines from easements. |
Austin |
TX |
11 |
$2,387,000 |
Water |
-3 |
| Davis Bldg Roof Replacements |
Austin |
TX |
20 |
$2,300,000 |
Water |
-21 |
| Pfluger Bicycle & Pedestrian Bridge Extension |
Austin |
TX |
21 |
$2,300,000 |
Water |
-6 |
| Athletic Field Irrigation System Improvements. The Parks and Recreation Department operates youth athletic fields throughout the City of Austin. |
Austin |
TX |
25 |
$2,300,000 |
Water |
-37 |
| Hoeke Lane Low Water Crossing Upgrade |
Austin |
TX |
32 |
$2,300,000 |
Water |
-7 |
| Willowbrook and Ohlen Rd Wastewater Line Rehabilitation Project: replace and reroute deteriorated wastewater lines. |
Austin |
TX |
12 |
$2,254,000 |
Water |
0 |
| Relocation of 6,000 LF of 16” waterline on FM 2304 – Ravenscroft to FM 1625 to accommodate State Highway Improvement project by Texas Department of Transportation |
Austin |
TX |
7 |
$2,200,000 |
Water |
-13 |
| Group 6 Street Reconstruction Project |
Austin |
TX |
37 |
$2,086,000 |
Water |
-19 |
| Rehabilitation of Wastewater Manholes contract |
Austin |
TX |
10 |
$2,000,000 |
Water |
-7 |
| Replacement of existing Inoperable Water Valves within AustinÂ’s water Distribution system |
Austin |
TX |
12 |
$2,000,000 |
Water |
4 |
| W.23rd Street Streetscape and Stormwater Improvements |
Austin |
TX |
25 |
$2,000,000 |
Water |
-10 |
| Todd Lane Roadway Improvements |
Austin |
TX |
50 |
$2,000,000 |
Water |
-9 |
| Wells Branch Roadway Project |
Austin |
TX |
60 |
$2,000,000 |
Water |
4 |
| Westgate Blvd from Cameron Loop to Cohoba Dr. |
Austin |
TX |
65 |
$2,000,000 |
Water |
2 |
| SAR WWTP Scum Processing Improvements |
Austin |
TX |
6 |
$1,800,000 |
Water |
-5 |
| Guerrero Park Main |
Austin |
TX |
7 |
$1,800,000 |
Water |
-20 |
| South Austin Regional Wastewater Treatment Plant HVAC Replacement |
Austin |
TX |
8 |
$1,800,000 |
Water |
4 |
| Water Reclamation Initiative Ph 1B East 51st Street Transmission Main |
Austin |
TX |
9 |
$1,800,000 |
Water |
-5 |
| ABIA Extension -- approximately 8,000 feet of 16” reclaimed water main to serve the Austin-Bergstrom International Airport |
Austin |
TX |
10 |
$1,800,000 |
Water |
-6 |
| Oak Lawn Storm Drain |
Austin |
TX |
20 |
$1,800,000 |
Water |
-7 |
| WPDR O&M Maintenance Facility [Green Design] |
Austin |
TX |
30 |
$1,800,000 |
Water |
-11 |
| Group 1 Phase 2 Street Reconstruction and Utility Adjustment Project |
Austin |
TX |
37 |
$1,741,970 |
Water |
-7 |
| Bannockburn Storm Drain Improvements |
Austin |
TX |
20 |
$1,600,000 |
Water |
-10 |
| South Austin Regional Wastewater Treatment Plant - New Roof for Secondary Treatment Building |
Austin |
TX |
10 |
$1,500,000 |
Water |
-4 |
| Intersection/Safety Improvement Projects (various locations) |
Austin |
TX |
20 |
$1,500,000 |
Water |
3 |
| Brodie Lane Sidewalk Project – Sidewalk on both sides of Brodie Ln. from Travis County line north to Slaughter |
Austin |
TX |
40 |
$1,500,000 |
Water |
-8 |
| Onion Creek Soccer Complex. The Onion Creek Soccer Complex includes 10 soccer fields and 5 additional acres that represent 25 total acres of irrigated area |
Austin |
TX |
14 |
$1,400,000 |
Water |
-77 |
| Hancock Golf Course Irrigation System Improvements. The Hancock Golf Course is currently irrigating 30 acres of turf grass with potable water. This project will provide a new irrigation system utilizing reclaimed water. |
Austin |
TX |
16 |
$1,300,000 |
Water |
-60 |
| Great Northern Dam Modernization |
Austin |
TX |
20 |
$1,300,000 |
Water |
-7 |
| 32nd St Street Reconstruction/Utility Upgrade Project |
Austin |
TX |
35 |
$1,275,000 |
Water |
-6 |
| Onion Creek SSO Rehabilitation Project to replace and reroute deteriorated wastewater lines |
Austin |
TX |
6 |
$1,229,000 |
Water |
0 |
| South Area Regional WWTP (SAR) Preliminary Treatment Building Improvements |
Austin |
TX |
6 |
$1,200,000 |
Water |
-4 |
| South Area Regional WWTP (SAR) Replace fine pore diffusers in one train including the air piping grid in the aeration basins. |
Austin |
TX |
6 |
$1,200,000 |
Water |
-11 |
| Pemberton Heights PH 1 - Existing 2500 LF water line is deteriorated and aged. |
Austin |
TX |
5 |
$1,000,000 |
Water |
0 |
| Water and wastewater pipeline relocations to accommodate City of AustinÂ’s Pleasant Valley Road Bike Route project to add 10Â’ bike and pedestrian route. |
Austin |
TX |
14 |
$1,000,000 |
Water |
-2 |
| Davis/Deer Ln. from Brodie Ln. to Corran Ferry |
Austin |
TX |
75 |
$1,000,000 |
Water |
6 |
| Lakewood Drive Low Water Crossing Upgrade |
Austin |
TX |
20 |
$950,000 |
Water |
-8 |
| Lundelius-McDaniel Water Quality Pond |
Austin |
TX |
24 |
$900,000 |
Water |
-5 |
| Raul Alvarez Disc Golf Course: This project will develop a 36-hole disc golf course that will be environmentally and financially sustainable. |
Austin |
TX |
4 |
$886,000 |
Water |
-2578 |
| Govalle / Crosstown Various Segments Wastewater Line Rehabilitation: replace deteriorated wastewater lines. |
Austin |
TX |
5 |
$863,000 |
Water |
4 |
| Blunn-Warehouse Row Water Quality (WQ) Pond |
Austin |
TX |
24 |
$850,000 |
Water |
-4 |
| Woodhollow Dam Pond Maintenance |
Austin |
TX |
15 |
$830,000 |
Water |
-7 |
| Thaxton Road Culvert Improvement |
Austin |
TX |
15 |
$760,000 |
Water |
-4 |
| S. Congress Ave Wastewater Upgrade: upsize wastewater line for additional capacity. |
Austin |
TX |
4 |
$750,000 |
Water |
4 |
| Thoroughbred Farms WWTP improvements |
Austin |
TX |
7 |
$750,000 |
Water |
-33 |
| High Point Cove Storm Drain Improvements |
Austin |
TX |
12 |
$750,000 |
Water |
-4 |
| Prince Valiant – Storm Drain Improvements |
Austin |
TX |
12 |
$750,000 |
Water |
-6 |
| Dixie Dr. Erosion Voluntary Buyouts (Demolition) |
Austin |
TX |
10 |
$740,000 |
Water |
-4 |
| Parkway Project |
Austin |
TX |
15 |
$650,000 |
Water |
-7 |
| Williamson Creek IH35 & Ben White WQ pond, Ph. 2 |
Austin |
TX |
16 |
$610,000 |
Water |
-5 |
| West Bank Lift Rehab |
Austin |
TX |
4 |
$600,000 |
Water |
-3 |
| Little Walnut / Buttermilk – Phase II Wastewater Line Rehabilitation: replace deteriorated wastewater lines. |
Austin |
TX |
3 |
$556,000 |
Water |
1 |
| Lift Station RTU Telemetry Replacement Project |
Austin |
TX |
2 |
$540,000 |
Water |
-3 |
| SAR WWTP Valve and Gate replacement |
Austin |
TX |
4 |
$500,000 |
Water |
-3 |
| 24” Force Main Rehabilitation & 12” Force Main Rehabilitation |
Austin |
TX |
5 |
$500,000 |
Water |
-1 |
| ILA with Williamson County {Pond Springs Rd} |
Austin |
TX |
10 |
$500,000 |
Water |
-6 |
| Metric Dam Modernization |
Austin |
TX |
10 |
$500,000 |
Water |
0 |
| Havana Street – Storm Drain Improvements |
Austin |
TX |
12 |
$500,000 |
Water |
-1 |
| Fort Branch Erosion /Flood Control Voluntary Buyouts (Demolition) |
Austin |
TX |
14 |
$500,000 |
Water |
-5 |
| Package Plant Hypochlorite System to generate liquid or gas chlorine on site. |
Austin |
TX |
3 |
$480,000 |
Water |
-5 |
| West Bouldin Creek Integrated Water Quality Project |
Austin |
TX |
12 |
$480,000 |
Water |
4 |
| The assessment of over 800 properties that may have abandoned underground storage tanks (UST). |
Austin |
TX |
9 |
$450,000 |
Water |
3 |
| Blunn Creek Water Quality Project |
Austin |
TX |
12 |
$420,000 |
Water |
5 |
| Replace doors in Hornsby Bend, Walnut and SAR WWTP facilities w/Chemproof(fiberglass door) |
Austin |
TX |
5 |
$360,000 |
Water |
-13 |
| SAR WWTP roof replacement for the Secondary Treatment building |
Austin |
TX |
4 |
$350,000 |
Water |
-3 |
| Storm Drain Improvements [W. 22 Ë at Pearl St.] |
Austin |
TX |
10 |
$300,000 |
Water |
0 |
| Carver Historic Museum Interior Renovation. |
Austin |
TX |
0 |
$290,000 |
Water |
-45 |
| Relocation of 500 LF of 8” waterline on Old Manor Road @ Walnut Creek to accommodate State Highway improvement project |
Austin |
TX |
1 |
$200,000 |
Water |
-4 |
| Capitol Metro/COA MLK Storm Drain Improvements |
Austin |
TX |
4 |
$137,000 |
Water |
-7 |
| Adjustment of 4 water valves and one blow-off drain line to grade in order to accommodate Loop 360 @ Westlake Drive State Highway Improvement project |
Austin |
TX |
1 |
$50,000 |
Water |
-8 |
| Demolition on Santa Rita St. {E. 4th/Perdenales LF} |
Austin |
TX |
6 |
$25,000 |
Water |
-8 |
| Overflow Parking Lot 1600-1800 spaces to accommodate need for local growth and diminishing excess parking capacity at Austin Bergstrom Intl Airport. |
Austin |
TX |
75 |
$11,700,000 |
Airport |
-66 |
| Airfield Joint Sealant and General Aviation Apron Rehabilitation |
Austin |
TX |
50 |
$7,500,000 |
Airport |
-8 |
| Airport Access Road Overhead Signage Improvements to improve on site traveling efficiency for the public. |
Austin |
TX |
25 |
$3,800,000 |
Airport |
-22 |
| Rehabilitate Airside Taxiway shoulders to reduce airfield foreign object debris |
Austin |
TX |
25 |
$3,000,000 |
Airport |
-2 |
| Replacement of non function PV modules |
Austin |
TX |
30 |
$3,500,000 |
Energy |
-5 |
| Walnut Creek Wastewater Treatment Plant - Energy efficiency upgrades |
Austin |
TX |
15 |
$2,500,000 |
Energy |
5 |
| Technicenter Building System Improvements Project |
Austin |
TX |
25 |
$1,800,000 |
Energy |
-13 |
| Replace existing fluorescent lamps with new energy efficient lamps |
Austin |
TX |
15 |
$1,500,000 |
Energy |
-12 |
| Solar Photovoltaic System |
Austin |
TX |
12 |
$570,000 |
Energy |
8 |
| Residential and commercial solar development |
Austin |
TX |
6 |
$300,000 |
Energy |
22 |
| Solar Photovoltaic Systems in public facilities, businesses and residences |
Austin |
TX |
5 |
$250,000 |
Energy |
29 |
| Building Commissioning Training for operators and managers of public and private sector commercial facilities |
Austin |
TX |
35 |
$250,000 |
Energy |
-12 |
| Zilker Botanical Garden Trail Lighting Project |
Austin |
TX |
36.5 |
$175,000 |
Energy |
-59 |
| Lamar Street Bridge Lighting Project |
Austin |
TX |
12 |
$100,000 |
Energy |
3 |
| Public Safety Training Facility |
Austin |
TX |
198 |
$25,000,000 |
Public Safety |
-41 |
| Municipal Court/APD/ NE Substation |
Austin |
TX |
226 |
$6,240,000 |
Public Safety |
2 |
| Austin Independent School District - Upgrading classroom technology |
Austin |
TX |
40 |
$20,000,000 |
Schools |
18 |
| Austin Independent School District - Providing access for low income students to broadband communications from home |
Austin |
TX |
40 |
$15,000,000 |
Schools |
-134 |
| Austin Independent School District - Electrical power load balancing - 35 schools, 1 facility |
Austin |
TX |
61 |
$3,325,950 |
Schools |
12 |
| Austin Safe Routes To School supplemental funding: monies will be spent to supplement city/school infrastructure monies |
Austin |
TX |
60 |
$3,000,000 |
Schools |
-13 |
| Austin Independent School District - Roofing repairs - 4 schools |
Austin |
TX |
55 |
$2,980,460 |
Schools |
28 |
| Austin Independent School District - Campus renovations - 3 schools |
Austin |
TX |
35 |
$1,879,070 |
Schools |
0 |
| Austin Independent School District - Heating, ventilation and air-conditioning - 4 schools |
Austin |
TX |
17 |
$935,649 |
Schools |
26 |
| Austin Independent School District - Health and safety-related renovations and repairs - 15 schools |
Austin |
TX |
10 |
$565,481 |
Schools |
15 |
| Capital Metro - Phase II Expansion of MetroRail Red Line |
Austin |
TX |
5875 |
$190,000,000 |
Transit |
36 |
| Upgrade existing MetroRail commuter rail line |
Austin |
TX |
400 |
$80,000,000 |
Transit |
18 |
| Austin Urban Rail Project: purchase vehicles and maintenance equipment |
Austin |
TX |
0 |
$60,000,000 |
Transit |
1 |
| Capital Metro - Replacement and expansion of bus fleet (purchase of 101 buses) |
Austin |
TX |
15 |
$36,000,000 |
Transit |
-13 |
| Capital Metro - New South IH-35 Park and Ride |
Austin |
TX |
522 |
$11,100,000 |
Transit |
-2 |
| Capital Metro - Rails with Trails (Hike and Bike trail along Redline ROW) |
Austin |
TX |
324 |
$6,900,000 |
Transit |
67 |
| Purchase and install Transit Fare & Parking Management Kiosks |
Austin |
TX |
50 |
$5,000,000 |
Transit |
-25 |
| Capital Metro - Expansion of Intelligent Transportation System (ITS) Technologies |
Austin |
TX |
235 |
$5,000,000 |
Transit |
4 |
| Capital Metro - Replacement of paratransit vehicle fleet (purchase of 74 vehicles) |
Austin |
TX |
10 |
$4,000,000 |
Transit |
2 |
| Capital Metro - New Manor Park and Ride |
Austin |
TX |
132 |
$2,800,000 |
Transit |
-18 |
| 20 Signals (various locations) |
Austin |
TX |
0 |
$2,400,000 |
Transit |
-47 |
| Capital Metro - Bus Stop Signage project |
Austin |
TX |
49 |
$1,040,000 |
Transit |
-26 |