| Provide funding match to construct a segment of a new arterial connecting State Route 51. |
Alameda |
CA |
60 |
$9,000,000 |
Streets/Roads |
-184 |
| Reconstruct approximately 1.5 miles of a major collector in Harbor Bay Business Park. |
Alameda |
CA |
28 |
$5,000,000 |
Streets/Roads |
-122 |
| ADA sidewalk rehabilitation. |
Alameda |
CA |
11 |
$3,750,000 |
Streets/Roads |
-125 |
| Construct Phase 2 of the Webster Street Streetscape project, including vintage lighting and street trees. |
Alameda |
CA |
20 |
$3,000,000 |
Streets/Roads |
-157 |
| Reconstruct .35 miles of Fernside Boulevard, including drainage and sidewalk improvements. |
Alameda |
CA |
22 |
$2,011,000 |
Streets/Roads |
-61 |
| Reconstruct approximately 1 mile of Central Avenue, including drainage and sidewalk improvements. |
Alameda |
CA |
21 |
$1,880,000 |
Streets/Roads |
-46 |
| Improve drainage and resurface street, Mariner Square Drive. |
Alameda |
CA |
14 |
$1,250,000 |
Streets/Roads |
-35 |
| Install traffic signals at three locations. |
Alameda |
CA |
14 |
$1,250,000 |
Streets/Roads |
-86 |
| Install accessible signals and pedestrian countdown signals at 58 intersections. |
Alameda |
CA |
14 |
$1,235,000 |
Streets/Roads |
-34 |
| Install 8,500 linear feet of new sidewalks to fill in gaps in pedestrian corridors. |
Alameda |
CA |
17 |
$1,000,000 |
Streets/Roads |
-36 |
| Install curb bulb-outs at Grand Street and San Jose Avenue; install pedestrian curb ramps in front of Lum School; install lighted mid-block cross on Grand Street; improve three public walkways; update crossing signs. |
Alameda |
CA |
10 |
$750,000 |
Streets/Roads |
-49 |
| ADA construction improvements to 100 intersections; add truncated domes and ramps. |
Alameda |
CA |
8 |
$500,000 |
Streets/Roads |
-12 |
| Reconstruct and enhance bicycle trails. |
Alameda |
CA |
11 |
$500,000 |
Streets/Roads |
-123 |
| Plant approximately 500 new trees and remove and replace approximately 150 trees throughout the City. |
Alameda |
CA |
7 |
$300,000 |
Streets/Roads |
-126 |
| Park Street Streetscape improvements, including vintage lighting and street trees, from Lincoln Avenue to Times Way and Webb Street; and Central Avenue to San Jose Avenue. |
Alameda |
CA |
5 |
$200,000 |
Streets/Roads |
-108 |
| Replace riprap and improve outfalls for the Harbor Bay Dike and seawall to protect public access and adjacent residences. |
Alameda |
CA |
30 |
$5,000,000 |
Water |
-33 |
| Use shotcrete to improve the structural stability of the Southshore Lagoon seawalls adjacent to City public access: approximately 3,000 linear feet. |
Alameda |
CA |
19 |
$1,700,000 |
Water |
-26 |
| Install mechanical trash racks to clear debris and reduce flooding at various storm pump stations. |
Alameda |
CA |
10 |
$750,000 |
Water |
-18 |
| Restore the historic Carnegie Free Library for public use as the Community Arts/Planning and Building Center. Relocate the adjacent Foster House to accommodate a proposed addition that will connect the Foster House with the Carnegie Library and provide d |
Alameda |
CA |
50 |
$5,630,000 |
CDBG |
-186 |
| Alameda Landing Phase I: Demolition of existing improvements, relocation of utilites, and environmental remediation of future residential site (subject to CDBG blight and brown field regulations). |
Alameda |
CA |
50 |
$4,750,000 |
CDBG |
-70 |
| ADA park pathway upgrades |
Alameda |
CA |
25 |
$2,500,000 |
CDBG |
-74 |
| Fire Station 5 Rehabilitation (located in low income census tract): roof and windows replacement and walls. |
Alameda |
CA |
11 |
$1,000,000 |
CDBG |
-16 |
| Rehabilitate field - Lincoln Park. |
Alameda |
CA |
11 |
$500,000 |
CDBG |
-79 |
| Replace the fence at Lincoln Park field. |
Alameda |
CA |
11 |
$500,000 |
CDBG |
-86 |
| Upgrade and rehabilitate building interior, including asbestos removal, painting, replacement of carpets and window coverings, and ceiling repairs at the Al DeWitt O' Club at Alameda Point (located in low income census tract). |
Alameda |
CA |
11 |
$500,000 |
CDBG |
-41 |
| Resurface basketball courts at Washington, Leydecker, and McKinley parks. |
Alameda |
CA |
8 |
$375,000 |
CDBG |
-86 |
| Resurface tennis courts at Washington, Leydecker, and McKinley parks. |
Alameda |
CA |
8 |
$375,000 |
CDBG |
-93 |
| Upgrade the pathways, lighting, and landscaping at Neptune Park. |
Alameda |
CA |
8 |
$350,000 |
CDBG |
-52 |
| ADA upgrade of restroom facility and lobby at Alameda Point Gymnasium (located in low income census tract). |
Alameda |
CA |
7 |
$300,000 |
CDBG |
-35 |
| Replace the fence at Washington Park field. |
Alameda |
CA |
7 |
$300,000 |
CDBG |
-58 |
| ADA upgrades to restroom facility at Encincal Boat ramp. |
Alameda |
CA |
6 |
$250,000 |
CDBG |
-38 |
| ADA upgrades to restroom facility at Grand Street Boat ramp. |
Alameda |
CA |
6 |
$250,000 |
CDBG |
-41 |
| Replace windows and trim at City Hall. |
Alameda |
CA |
6 |
$250,000 |
CDBG |
-59 |
| Replace windows and trim at the Veterans Memorial Building. |
Alameda |
CA |
6 |
$250,000 |
CDBG |
-7 |
| Upgrade building interior and refinish 360,000 sq. ft. of gynmasium floor at Alameda Point Gym (located in low income census tract). |
Alameda |
CA |
4 |
$200,000 |
CDBG |
-50 |
| Resurfacing basketball courts in Longfellow Park (located in low income census tract). |
Alameda |
CA |
3 |
$125,000 |
CDBG |
-62 |
| Resurfacing tennis court in Longfellow Park (located in low income census tract). |
Alameda |
CA |
3 |
$125,000 |
CDBG |
-71 |
| Rehabilitate the skate board park. |
Alameda |
CA |
2 |
$100,000 |
CDBG |
-177 |
| Install solar panels on roof of the Main Library. |
Alameda |
CA |
13 |
$1,200,000 |
Energy |
-12 |
| Install solar hot water heating system to supplement the operation of a new energy efficient hot water system at Anne B. Diament. |
Alameda |
CA |
2 |
$100,000 |
Energy |
-21 |
| Replace kitchen, bath cabinets and counters in all the 186 units of the Independence Plaza. |
Alameda |
CA |
12 |
$1,320,000 |
Housing |
-194 |
| Replace siding, windows, and sliding glass doors with energy efficient glazing in all units at Anne B. Diament. |
Alameda |
CA |
13 |
$1,300,000 |
Housing |
-37 |
| Replace the interior flooring of all the Housing Authority units. |
Alameda |
CA |
12 |
$1,200,000 |
Housing |
-59 |
| Repaint the interior of all Housing Authority units. |
Alameda |
CA |
10 |
$1,000,000 |
Housing |
-59 |
| Replace kitchen and bath cabinets, counters, and electrical sub panels at Esperanza. |
Alameda |
CA |
10 |
$1,000,000 |
Housing |
-67 |
| Replace roofs and gutters on all buildings at Esperanza. |
Alameda |
CA |
10 |
$725,000 |
Housing |
-40 |
| Replace, at Independence Plaza, two ponds, remove lawn, and re-landscape with drought tolerant native plants. |
Alameda |
CA |
10 |
$500,000 |
Housing |
-66 |
| Replace asphalt parking lots (7 total) and driveways at Esperanza. |
Alameda |
CA |
8 |
$350,000 |
Housing |
-35 |
| Repaint all exterior siding and trim; restain fences and gates at Eagle Village. |
Alameda |
CA |
4 |
$200,000 |
Housing |
-32 |
| Repair all exterior siding and trim, and restain fences and gates at Parrot Village. |
Alameda |
CA |
4 |
$200,000 |
Housing |
-34 |
| Replace the first floor kitchen and bath cabinets, including the community room at Anne B. Diament. |
Alameda |
CA |
4 |
$200,000 |
Housing |
-43 |
| Construct a new 22-space parking lot at the rear of the Independence Plaza complex. |
Alameda |
CA |
5 |
$200,000 |
Housing |
-48 |
| Replace the boiler system, at Anne B. Diament, with a high-efficiency boiler for hydroponic heating system. |
Alameda |
CA |
2 |
$125,000 |
Housing |
-22 |
| Install bus shelters and related improvements at 18 locations throughout the City. |
Alameda |
CA |
6 |
$250,000 |
Transit |
-10 |