| Aquatic Center Deck and Pump repairs |
Pleasanton |
CA |
50 |
$1,200,000 |
CDBG |
-4 |
| EALS/EARS Pump Station |
Pleasanton |
CA |
75 |
$6,300,000 |
Water |
13 |
| Sanitary Sewer Pump Station S-6 |
Pleasanton |
CA |
100 |
$4,290,000 |
Water |
17 |
| Replace raw sewage pumps at Waste Water Treatment Plant |
Port Huron |
MI |
27 |
$825,000 |
Water |
7 |
| Tiffany Pumpstation Upgrade for Drainage |
Port St. Lucie |
FL |
10 |
$1,500,000 |
CDBG |
5 |
| Blackwell Pumpstation Energy Conversion from fossil to electric |
Port St. Lucie |
FL |
20 |
$1,500,000 |
Energy |
-2 |
| Dean Estates Pump Station Upgrades |
Providence |
RI |
5 |
$1,000,000 |
Water |
-4 |
| Rock Canyon Well and Pump House |
Provo |
UT |
8 |
$700,000 |
Water |
0 |
| Environmental Projects
Construct new lime softening treatment structure $1,000,000
Replace chemical feeding equipment and dust collection system $450,000
High service (potable water) pump replacement |
Quincy |
IL |
150 |
$7,069,920 |
Water |
-4 |
| Repair Pump Stations and Water Tanks |
Quincy |
MA |
55 |
$3,000,000 |
Water |
11 |
| Recycled Water Project - expansion of existing system including construction of two reservoirs, a pump station and 3.9 miles of pipeline. |
Redlands |
CA |
0 |
$7,300,000 |
Water |
10 |
| Removal and replacement of existing maintenance-intensive sludge cake pumps in the dewatering building |
Reno |
NV |
32 |
$1,120,600 |
Water |
-17 |
| Flow equalization basin & reuse pumping station upgrades |
Reno |
NV |
157 |
$5,500,000 |
Water |
-17 |
| North Bench Booster Pump Station Rehabilitation |
Salt Lake City |
UT |
8 |
$1,500,000 |
Water |
4 |
| Pump Station No 4 College Replacement; Mastic Ave Main Replacement; N. Water Pump Security; Sneath Pump Station; Standby Power Generator; Tank Seismic Retrofit; Tank No 3 replacement
Water Mains Improvement Program; Well No 15 replacement |
San Bruno |
CA |
307 |
$20,517,000 |
Water |
-3 |
| Construction of 3 water delivery systems to mitigate the surface water impacts of ground water pumping in La Cienaga and the Rio Resuque |
Santa Fe |
NM |
4 |
$2,000,000 |
Water |
4 |
| Construction of a drinking water treatment plant, 5 pump stations and 26 miles of piping. |
Santa Fe |
NM |
225 |
$8,000,000 |
Water |
20 |
| Replace 2MG Water Storage Tank at West Pump station to assure continued water supply and delivery |
Sapulpa |
OK |
20 |
$3,000,000 |
Water |
10 |
| Wilshire Plant Decommissioning: conversion of wastewater treatment plant effluent line to pump sewage to President Street Plan and enhance site to a public park |
Savannah |
GA |
25 |
$1,200,000 |
Water |
-9 |
| Funds to be used for the North Ferry Pump Station upgrade. |
Schenectady |
NY |
7 |
$700,000 |
Water |
9 |
| Replace the antiquated heat pumps with new, more efficient heat pumps in the Greenwood Senior Center. |
Seattle |
WA |
0.75 |
$100,000 |
CDBG |
4 |
| Construction of Generator Station and Buried Feeder line for emergency pumping at main water source for city. |
Seattle |
WA |
26 |
$6,270,000 |
Water |
-2 |
| Shelby County Interstate 64 Regional Water Supply: Construct 22.5 miles of 24 inch transmission main, 10 MGD booster pump station and 1 MG storage tank to provide regional water supplies to Shelbyville, Shelby County, Frankfort, and Franklin County. |
Shelbyville |
KY |
317 |
$39,600,000 |
Water |
28 |
| Amiss WTP New High Service Pumps |
Shreveport |
LA |
28 |
$2,800,000 |
Water |
2 |
| Twelve Mile Bayou Pump Station Improvements |
Shreveport |
LA |
73 |
$7,300,000 |
Water |
1 |
| SIDNEY INDUSTRIAL PARK DEVELOPMENT: This project would make 252 acres of land available for a Mega-Industrial site. Installation of water mains, sewer mains, sewage pump station, drainage and road improvements is necessary to prepare this site for future |
Sidney |
OH |
100 |
$4,608,000 |
Water |
-8 |
| Add Solar cells and equipment to water pumps, wastewater systems. |
Silver City |
NM |
15 |
$7,000,000 |
Energy |
44 |
| Sibley Pump Station Rehabilitation |
South Holland |
IL |
5 |
$133,000 |
Water |
2 |
| sanitary pumping station rehabilation and upgrades |
Southfield |
MI |
4 |
$1,000,000 |
Water |
1 |
| Vacuum Pump Liftstation Replacements (5) |
St. Cloud |
MN |
25 |
$2,000,000 |
Water |
2 |
| Town's Main Lift Station is being upgraded due to capacity being reached. A new building will be constructed along with new pumps and controls. |
St. John |
IN |
43 |
$1,300,000 |
Water |
15 |
| Wharf Street Pump Station Replacement |
St. Louis |
MO |
30 |
$1,000,000 |
Water |
11 |
| Sanitary Sewer Project - Lift Station 3 and Forcemain Rehabilitation. This work consists of the rehabilitation (new pumps and controls) of Lift Station #3 and forcemain |
St. Louis Park |
MN |
10 |
$475,000 |
Water |
-2 |
| Water Treatment Plan Adjustable Speed Drive (VFD) Pump Upgrades. This work involves adding the balance of missing adjustable speed drive (VFD's) to the high service pumps at city Water Treatment Plants. |
St. Louis Park |
MN |
10 |
$150,000 |
Water |
-3 |
| Storm Sewer Lift Station Pump Repairs |
Sterling Heights |
MI |
10 |
$250,000 |
Water |
3 |
| Delta Water Supply Project will include the construction of an intake facility and pump station, 11 miles of new pipeline to convey the delta water to a new water treatment plan. |
Stockton |
CA |
170 |
$200,000,000 |
Water |
21 |
| Wastewater Treatment Plant Equipment Upgrade (This project will replace aging and failed rotor, influent pump, and valve equipment at the City's sewer plant) |
Streator |
IL |
10 |
$375,000 |
Water |
20 |
| Water and sewer improvements - Renovation and replacement of water distribution and wastewater collection system, including sewer pump stations, for entire town. |
Sumner |
MS |
15 |
$650,000 |
CDBG |
10 |
| The proposed project would install new HVAC systems in both the Beacon and Lighthouse Senior Centers replacing the existing steam boiler heat and replacing them with more efficient heat pumps in order to provide both heat and cooling. |
Tacoma |
WA |
15 |
$700,000 |
Energy |
5 |
| PS4103 Force Main Replacement. Replacement of the Pump Station 4103 Force Main under the Hylebos Waterway by directional Drilling. This project will also provide upgrades at Pump Stations 4102 and 4103, including provisions for third pumps at each stati |
Tacoma |
WA |
30 |
$1,900,000 |
Water |
-2 |
| Pump Station 70 Construction |
Tallahassee |
FL |
8 |
$540,000 |
Water |
3 |
| Pump Station 53 Construction |
Tallahassee |
FL |
10 |
$750,000 |
Water |
6 |
| replacement/upgrade of piping and pumps at City's wastewater pump stations located throughout city. Project would ensure reliability of operaton and prevent failure resulting in contamination |
Tamarac |
FL |
12 |
$800,000 |
Water |
12 |
| Morrison Pump Station Rehabilitation.
Project provides for rehablitation and upgrade of existing wastewater pumping station. |
Tampa |
FL |
16 |
$300,000 |
Water |
0 |
| San Carlos Pump Station Wet Well & Screen Room Rehabilitation. Project provides for the restoration of existing pump station components including concrete repair, ducts, alarms and skylights. |
Tampa |
FL |
16 |
$300,000 |
Water |
-8 |
| Gomez Pump Station Rehabilitation.
Project provides for rehablitation and upgrade of existing wastewater pumping station. |
Tampa |
FL |
22 |
$400,000 |
Water |
7 |
| 42nd Street Pump Station Rehabilitation. Project provides for rehablitation and upgrade of existing wastewater pumping station. |
Tampa |
FL |
34 |
$600,000 |
Water |
0 |
| Sewer System Evaluation Study - Manhole Rehabilitation - Phase 1.
The project consists of the rehabilitation of approximately 100 manholes in the Krause Pumping Station basin. The rehabilitation will involve the application of a structural coating, rest |
Tampa |
FL |
42 |
$750,000 |
Water |
-19 |
| Raw Water return pipeline and pump |
Thornton |
CO |
170 |
$17,000,000 |
Water |
-4 |
| Water Pumping Station Improvements.
Includes Pumps,SCADA,Emergency Generator, Chlorine System, Etc. |
Thornton |
IL |
0 |
$1,800,000 |
Water |
8 |
| 183rd Street Pump Station Rehab. |
Tinley Park |
IL |
16 |
$160,000 |
Water |
-4 |
| Patterson Pass Water Booster Pump Station replacement, CIP 7597 |
Tracy |
CA |
15 |
$1,000,000 |
Water |
-5 |
| North Regional Sewer Pump Station - This station will serve the metropolitan area north of the river. The regional pump station will serve areas around Lake Tuscaloosa, thus eliminating the need for septic tanks in existing and new homes. |
Tuscaloosa |
AL |
50 |
$3,000,000 |
Water |
15 |
| Day Road Booster Pump Station Electrical Upgrade - replace, upgrade, and relocate a failing electrical panel at the Day Road booster pump station for the Water Distribution System. The electrical system has reached the useful end of its life cycle. |
Ventura |
CA |
4 |
$150,000 |
Water |
3 |
| Booster Pump Station Fixed Emergency Power - Installation of two permanent emergency/backup generators to provide the ability to automatically run water distribution system pump stations during extended power outages at strategic locations. |
Ventura |
CA |
15 |
$500,000 |
Water |
3 |
| North Virginia Beach 61st Street Pump Station |
Virginia Beach |
VA |
83 |
$20,000,000 |
CDBG |
-2 |
| Rosemont Forest Pump Station |
Virginia Beach |
VA |
83 |
$8,000,000 |
CDBG |
8 |
| Central Plant Pumps Modernization |
Virginia Beach |
VA |
13 |
$225,000 |
Energy |
6 |
| Silina Corvette Pump Station #511 |
Virginia Beach |
VA |
15 |
$500,000 |
Water |
3 |
| Regency Apartments Pump Station #260 |
Virginia Beach |
VA |
18 |
$1,000,000 |
Water |
4 |
| Lake Edward West Pump Station #343 |
Virginia Beach |
VA |
19 |
$1,000,000 |
Water |
2 |
| Green Run Garden Pump Station #547 |
Virginia Beach |
VA |
20 |
$1,500,000 |
Water |
6 |
| Green Run/Crimson Holly Pump Station #549 |
Virginia Beach |
VA |
20 |
$1,000,000 |
Water |
5 |
| College Park Providence Road Pump Station #425 Abandonment and SS Realignment |
Virginia Beach |
VA |
30 |
$2,800,000 |
Water |
7 |
| Packard Music Hall HVAC System replacement project - energy star air handlers, chillers, water tower; plumbing, pumps, etc. |
Warren |
OH |
65 |
$1,329,600 |
CDBG |
-10 |
| 422 Pump Station Project - Enable the City to enhance pumping pressures along the 422 corridor |
Warren |
OH |
20 |
$1,500,000 |
Water |
7 |
| 480 Volt Electical Switch gear project - Upgrade electric service to Filtration Plant to allow for increased pumpage requirements |
Warren |
OH |
25 |
$2,000,000 |
Water |
4 |
| Westward Repump Station |
West Palm Beach |
FL |
18 |
$2,200,000 |
Water |
-2 |
| Valley Forge Pump Station |
West Palm Beach |
FL |
24 |
$2,975,000 |
Water |
0 |
| The Rivers Area Water Storage Tank and Pump Station: This community health and safety project is planned and designed to construct a 1.9 million gallon water storage tank and a 4 million gallon per day pump station housed in a masonry building. |
West Sacramento |
CA |
90 |
$4,500,000 |
Water |
-7 |
| Main Drain Pump Station: The Main Drain Pump Station project consists of the reconstruction of a master planned storm drainage pump station which is needed to service the Southport area of the City of West Sacramento. It is located at the engineered end o |
West Sacramento |
CA |
320 |
$16,000,000 |
Water |
2 |
| Chitty High Service Pumping Station - Standby Power |
Winston-Salem |
NC |
160 |
$51,000,000 |
Water |
20 |
| Dix Road Sewer Pump Station Rehabilitation |
Woburn |
MA |
9 |
$969,000 |
Water |
5 |
| Sanitary Lift Station By-pass Improvements and Pump Rebuild Project |
Woodridge |
IL |
2 |
$20,000 |
Water |
1 |
| 6th Street Stormwater Pumpstation and forcemain |
Yazoo City |
MS |
25 |
$2,000,000 |
CDBG |
3 |
| Class A Pumper & 75 ft ladder Truck |
Yazoo City |
MS |
2 |
$1,000,000 |
Public Safety |
23 |
| 24th Street Water Storage Tanks and High-Speed Booster Pump Station |
Yuma |
AZ |
42 |
$13,800,000 |
Water |
-1 |