| Water pumping transformer replacement. |
Englewood |
CO |
2 |
$106,000 |
Water |
1 |
| Tuckpointing of Water Plant Pumping Station |
Evanston |
IL |
3 |
$250,000 |
Water |
-4 |
| South Mountain Water Pump Station Repair & Replace |
Fayetteville |
AR |
6 |
$207,000 |
Water |
-2 |
| Sewer pump station upgrades, including 15 pumps, an odor control system, and two generator sets, at a total of 8 pump stations |
Fife |
WA |
8 |
$214,000 |
Water |
5 |
| Intertie at Puyallup service territory boundary, including 3,000 feet of 12-inch water main and pump station |
Fife |
WA |
20 |
$980,000 |
Water |
4 |
| Update the infrastructure of the water pumping system for the entire City of Flint River Bank Park. Include habitate restoration and enhanced fish passage |
Flint |
MI |
50 |
$3,000,000 |
Water |
8 |
| Water Storage and Transmission Improvements - NW 2 Ave Tank and High Service Pump Station: This project includes improvements to an existing 1.0 million gallon elevated storage tank and pump station, including repairs, cleaning, and painting of the tank; |
Fort Lauderdale |
FL |
8 |
$3,000,000 |
Water |
2 |
| NW Pressure Zone Pumping Improvements-Rehabilitation of pump stations to improve reliability and increase capacity |
Fort Wayne |
IN |
9 |
$350,000 |
Water |
3 |
| Pump Stations (2) |
Fountain Valley |
CA |
20 |
$5,000,000 |
Water |
12 |
| Eldorado Pump Station Remediation |
Frisco |
TX |
0 |
$10,000,000 |
Water |
1 |
| Gary Sanitary District: Sewage Pumps Replacement |
Gary |
IN |
2 |
$765,000 |
Water |
-2 |
| Gary Sanitary District: Cover Replacements, Explosion Proof Sump Pumps, Install Dual Flame Arrestors, Dual Isolation Valves on Primary Digesters, High level alarm failsafes for digesters, Boiler Replacement Project |
Gary |
IN |
28 |
$4,530,000 |
Water |
-1 |
| Gary Sanitary District: Screening, Grit Removal & Pumping Station |
Gary |
IN |
65 |
$50,099,000 |
Water |
3 |
| Southeast Wastewater Treatment Plant - Project replaces the existing pump stations in southeast Gastonia with a wastewater treatment plant to address extensive growth in this area. |
Gastonia |
NC |
120 |
$13,000,000 |
Water |
6 |
| Water looping - Komer pump station to industrial park |
Glenwood |
IL |
12 |
$750,000 |
Water |
1 |
| Improvements to the Final Effluent Screw Pumps at WWTP |
Grand Rapids |
MI |
20 |
$800,000 |
Water |
-4 |
| Replacement of Pump Motor Starters for Franklin pumps 1 and 3 |
Grand Rapids |
MI |
25 |
$300,000 |
Water |
1 |
| Neff Road Pumping Station Upgrades |
Grosse Pointe |
MI |
16.7 |
$600,000 |
Water |
2 |
| rehabilitate wastewater treatment facility/#1 pump station |
Gunnison |
MS |
8 |
$400,000 |
Water |
1 |
| East State Street Pump Station Upgrade |
Hamilton |
NJ |
5 |
$325,000 |
Water |
-1 |
| Elkton Estates Pump Station Upgrade |
Hamilton |
NJ |
5 |
$225,000 |
Water |
-2 |
| Pump Stations Telemetry |
Hamilton |
NJ |
7 |
$1,700,000 |
Water |
-13 |
| Pumping Station Emergency Isolation Valve Project |
Hampton |
VA |
4 |
$180,000 |
Water |
6 |
| Crossroads Pumping Station |
Hampton |
VA |
20 |
$1,000,000 |
Water |
4 |
| Pumping Station SCADA System Replacement |
Hampton |
VA |
24 |
$1,200,000 |
Water |
4 |
| Pumping Station Emergency Generators/Bypass Equipment |
Hampton |
VA |
30 |
$1,500,000 |
Water |
12 |
| Electrical Upgrades to 40 Terminal Pump Stations and 25 Variable Frequency Drives |
Hampton |
VA |
32 |
$1,600,000 |
Water |
2 |
| Memorial Hospital large capacity cesspool replacement, including installation of pump and connection to municipal sewer |
Hawaii County |
HI |
7 |
$1,000,000 |
Water |
8 |
| Pua Sewage Pump Station replacement of aging wastewater pumps, control and monitoring systems. Failure of the station could result in a sewage spill of 3 million gallons per day. |
Hawaii County |
HI |
30 |
$1,800,000 |
Water |
14 |
| Replace aging sewer system and road repair. Washington, Clinton, sewer pumping stations |
Hempstead |
NY |
30 |
$10,000,000 |
Water |
9 |
| MAIN STREET WATERLINE & PUMP STATION |
Herriman |
UT |
16 |
$2,000,000 |
Water |
4 |
| Rehabilitation and Reconstruction of the Barrington Square Sanitary Lift Station
Description: The Lift Station shows serious corrosion of the piping, valves, pumps, wet well and dry well
structures. The rehabilitation project includes the conversion of |
Hoffman Estates |
IL |
5 |
$1,000,000 |
Water |
2 |
| Floridan Wells F10 & F13 Wellhead Piping, Pumps and Vaults (DCA project) |
Hollywood |
FL |
0 |
$1,400,000 |
Water |
-1 |
| High Service Pump Facility Rehabilitation and Upgrade |
Hollywood |
FL |
0 |
$2,000,000 |
Water |
-1 |
| Influent Pump Station Repairs |
Hollywood |
FL |
0 |
$300,000 |
Water |
-1 |
| New 14,000 gpm High Service Pump (HSP) |
Hollywood |
FL |
0 |
$500,000 |
Water |
0 |
| RAS Pump Stations Repairs and Upgrades |
Hollywood |
FL |
0 |
$270,000 |
Water |
-1 |
| Reactor Feed Pumps Replacement at the Residuals Facility |
Hollywood |
FL |
0 |
$3,000,000 |
Water |
-3 |
| Replace PS E-07 Pumps |
Hollywood |
FL |
0 |
$600,000 |
Water |
-1 |
| Replace PS N-02 Pumps |
Hollywood |
FL |
0 |
$448,000 |
Water |
-1 |
| Replace PS N-03 Pumps, Force Main and Gravity Piping |
Hollywood |
FL |
0 |
$478,000 |
Water |
-2 |
| Replace PS N-04 Pumps, Force Main and Gravity Piping |
Hollywood |
FL |
0 |
$1,158,000 |
Water |
-1 |
| Replacement of the Reclaimed Water Pumps |
Hollywood |
FL |
0 |
$50,000 |
Water |
0 |
| Sludge Cake Pumps Repl and Misc Repairs |
Hollywood |
FL |
0 |
$4,400,000 |
Water |
-1 |
| Upgrade the Existing MS Feed Pumps to VFD |
Hollywood |
FL |
0 |
$650,000 |
Water |
-1 |
| West Hollywood Pumping and Storage Facility |
Hollywood |
FL |
0 |
$4,000,000 |
Water |
-3 |
| Wrt & Wstwtr Telemetry: Purchase & installation of telemetry equipmt. Telemetry in all pumps station sends flow/performance data & alarm situations to a central location that increase reliability & control before, during & after a disaster. |
Homestead |
FL |
20 |
$1,500,000 |
Water |
1 |
| Headworks and Pre-treatment: Construction of screening, de-gritting and pumping facilities at existing Wastewater Treatment plant. Will provide added efficiency to the current treatment process at the plant resulting in better quality effluent. |
Homestead |
FL |
140 |
$20,000,000 |
Water |
-4 |
| Fort DeRussy Wastewater Pump Station |
Honolulu |
HI |
4 |
$350,000 |
Water |
4 |
| Lualualei Wastewater Pump Station Force Main - Design Phase |
Honolulu |
HI |
5 |
$1,000,000 |
Water |
2 |
| Wahiawa WWTP Influent Pump Station and Equalization Facility |
Honolulu |
HI |
20 |
$6,500,000 |
Water |
2 |
| SRF Phase VII: The proposed project will involve five sewer extensions along US68/80B and US41A; include 15 new pump stations and upgrading four existing pump stations which will provide sewer service to unserved areas allowing residential and commercial |
Hopkinsville |
KY |
50 |
$21,500,000 |
Water |
8 |
| City-Wide Flood Control Program - Various flood control projects throughout City to manage stormwater drainage, pumping and detention to prevent flooding. |
Houston |
TX |
4420 |
$221,000,000 |
Water |
199 |
| Retrofit City Facilities to allow participation in next generation Demand Response Programs. (create A/B circuits on lighting circuits, install timeclock & controls on fountain pumps, oil pumps, etc.) |
Huntington Beach |
CA |
25 |
$1,000,000 |
Energy |
-6 |
| Upgrade water pumping equipment by installing 2 pumps and engines. Result will improve reliability and save energy. |
Huntington Beach |
CA |
20 |
$2,000,000 |
Water |
9 |
| Install security systems at water pumping and storage facilities, wastewater pumping facilities, & flood control pump stations |
Huntington Beach |
CA |
25 |
$2,500,000 |
Water |
-12 |
| Upgrade 20 flood station pumps and engines to improve reliability and energy savings. |
Huntington Beach |
CA |
40 |
$10,000,000 |
Water |
15 |
| Storm drain pump station construction- construct a higher capacity storm water pump station to replace the existing undersized 40 + year old station. |
Huntington Beach |
CA |
45 |
$4,500,000 |
Water |
27 |
| Logan/Vermont Pump Station Upgrade |
Huntsville |
AL |
47 |
$1,000,000 |
Water |
-1 |
| Western Area Pump Station Phase II |
Huntsville |
AL |
190 |
$4,011,000 |
Water |
3 |
| Addition of alternative energy to power low wattage devices at pump stations |
Hurst |
TX |
3 |
$260,000 |
Energy |
4 |
| Fluoridation treatment facility - Project provides for fluoridation of pumped groundwater to match fluoridated imported water supply and enhance water quality. |
Inglewood |
CA |
40 |
$1,500,000 |
Water |
-2 |
| Water Treatment Plant Expansion -
Project expands current capacity of 8.3 MGD to 12 MGD to provide ability to pump/produce/treat more groundwater and reduce dependence upon imported water supply. Project also replaces current use of chlorine gas |
Inglewood |
CA |
40 |
$2,300,000 |
Water |
2 |
| Pump Station System Improvements: Hackberry and Northgate Pump Stations |
Irving |
TX |
4 |
$1,250,000 |
CDBG |
0 |
| Pump Station System Improvements: Hackberry and Northgate Pump Stations |
Irving |
TX |
4 |
$1,250,000 |
Water |
-1 |
| Jackson Zoo - Administration Building needs painting, restroom work and the heat pump replaced |
Jackson |
MS |
0 |
$6,950 |
CDBG |
4 |
| Landfill Phase Construction Including Leachate Pumping System Upgrades |
Janesville |
WI |
12 |
$1,170,000 |
Energy |
-3 |
| Hayselton pump station |
Jefferson City |
MO |
10 |
$1,000,000 |
Water |
6 |
| Replacement of old and worn pump and motors that can not be repaired. |
Kalamazoo |
MI |
10 |
$70,000 |
Water |
6 |
| Design and construct a sewer from the Tertiary Mudwell into the Recycle Pump Station. |
Kalamazoo |
MI |
15 |
$75,000 |
Water |
2 |
| Perform well drilling/installations, development, testing, well pump and motor installations. |
Kalamazoo |
MI |
25 |
$300,000 |
Water |
1 |
| Install new tertiary screw pump with the open design in place of existing. |
Kalamazoo |
MI |
30 |
$500,000 |
Water |
4 |
| Replace the three existing bar screens in the Raw Pump Building. |
Kalamazoo |
MI |
50 |
$773,000 |
Water |
8 |
| Replacement of deteriorated equipment and facilities at Water Reclamation Plant, including Raw Sewage Pumps, Site Heat loop system and other major equipment. |
Kalamazoo |
MI |
50 |
$1,000,000 |
Water |
13 |
| Upgrade existing lift stations including pump replacement and repairs, standby generators, maintaining approaches, and building repairs. Also, upgrading Virginia Avenue and Burke Court ejector station. |
Kalamazoo |
MI |
50 |
$515,000 |
Water |
6 |
| Water Pumping Station Improvements and replacement of building station structures and equipment. |
Kalamazoo |
MI |
100 |
$900,000 |
Water |
3 |
| Replacement of Water Pumping Station #8. |
Kalamazoo |
MI |
300 |
$3,500,000 |
Water |
11 |
| Pump Station 61 and 66 Pump Station Rehab/Replace |
Kansas City |
KS |
5 |
$350,000 |
Water |
-2 |
| Pump Station 41 Force Main Force Main Replacement |
Kansas City |
KS |
8 |
$1,000,000 |
Water |
0 |
| 18th St Pump station Stormwater Pump Station |
Kansas City |
KS |
60 |
$10,000,000 |
Water |
7 |
| Wastewater Facility Projects - For the Turkey Creek Pump Station and White aloe Pump Station rehab |
Kansas City |
MO |
147 |
$12,300,000 |
Water |
17 |
| Pump Station #3 Upgrade |
Kileen |
TX |
1 |
$200,000 |
Water |
1 |
| City Well No. 11 Pumping Equipment |
Kingman |
AZ |
25 |
$600,000 |
Water |
7 |
| Temperature Control at WTP/Collector Well for Pumps |
Lake Havasu City |
AZ |
10 |
$200,000 |
Water |
1 |
| North Havasu Pump Station Tanks |
Lake Havasu City |
AZ |
25 |
$1,000,000 |
Water |
4 |
| Installation of emergency bypass pumping systems at 18 lift station sites. |
Lake Station |
IN |
10 |
$360,000 |
Water |
3 |
| Repairs to Existing Pump Houses |
Lake Station |
IN |
60 |
$240,000 |
Water |
2 |
| Fire Pumper Replacement X 4 @ 350,000.00 each |
Laredo |
TX |
100 |
$1,400,000 |
Public Safety |
5 |
| Interceptor Manhole Rehabilitation - This project consists of by-pass pumping, cleaning, patching and sealing of 100 manholes along the City's main interceptor sewer pipe. The scope of the project includes the installation of an epoxy based coating |
Largo |
FL |
30 |
$1,650,000 |
Water |
6 |
| raw water pump intake |
lewiston |
ID |
0 |
$1,300,000 |
Water |
3 |
| Sewer Pump Station Upgrades |
Lewiston |
ME |
2.5 |
$270,000 |
Water |
-7 |
| Day Treatment; Flooring and Water Heat Pumps |
Lexington |
KY |
10 |
$74,000 |
CDBG |
0 |
| Variable Frequency Drive Replacement at eight Schedule A pumping stations |
Lexington |
KY |
2 |
$120,000 |
Water |
5 |
| Old Frankfort Pike (Town Branch) Pump Station and Force Main Rehabilitation |
Lexington |
KY |
4 |
$2,000,000 |
Water |
18 |
| Phase 3 Screw Pump Replacement |
Lexington |
KY |
5 |
$1,300,000 |
Water |
4 |
| Venture Court Pump Station conversion |
Lexington |
KY |
10 |
$225,000 |
Water |
-3 |
| Solar powered fountain pumps at 4 locations |
Lincoln |
NE |
0.2 |
$15,000 |
Energy |
-32 |
| Pumping Plant ImprovementsNew Bar Screen - Jamison Road P.S. |
Little Rock |
AR |
0 |
$16,000 |
Water |
-4 |
| Pumping Plant ImprovementsReplace Wet Well Covers Jamison PS |
Little Rock |
AR |
0 |
$25,000 |
Water |
-3 |
| Pumping Plant Improvementsz: Woodland Ridge Pump Station Telemetry |
Little Rock |
AR |
0 |
$25,000 |
Water |
-5 |