| Lake of the Woods Pump Station |
Akron |
OH |
0 |
$805,000 |
Water |
-12 |
| 2nd Street Pump Station |
Akron |
OH |
5 |
$500,000 |
Water |
-1 |
| Lake of the Woods Pump Station |
Akron |
OH |
5 |
$825,000 |
Water |
-5 |
| Water Pump Station Renovations |
Akron |
OH |
6 |
$1,000,000 |
Water |
1 |
| Standby Power at Water Pump Stations |
Akron |
OH |
12 |
$300,000 |
Water |
9 |
| Install mechanical trash racks to clear debris and reduce flooding at various storm pump stations. |
Alameda |
CA |
10 |
$750,000 |
Water |
-18 |
| Post Office Broadway Pump Station and related Martineztown Storm Drainage Improvements |
Albuquerque |
NM |
150 |
$45,000,000 |
Water |
5 |
| Hamilton Street Pump Station - 2MG storage tank located at Hamilton Street pump station located at 505 Monroe Street. The existing pumps in this station are 60 plus years old surplus from Camp Livingston. |
Alexandria |
LA |
15 |
$500,000 |
Water |
-5 |
| James Polk Elementary School-- Replacement of the HVAC systems throughout the facility, including the hot water boilers, central system pumps, hot and chilled water piping, fan coil units in every classroom, air handling units for multipurpose room, cafet |
Alexandria |
VA |
83 |
$6,234,000 |
Schools |
6 |
| John Adams Elementary School--
Replacement of the HVAC systems throughout the facility, including the central pumps, hot and chilled water piping, fan coil units in every classroom, air handling units for gymnasium, auxiliary gym, cafeteria, library, |
Alexandria |
VA |
147 |
$11,059,000 |
Schools |
-2 |
| Minnie Howard School-- Replacement of the HVAC systems throughout the two story classroom wing, the gymnasium wing, and the admin wing of the facility, including the hot water boilers, the air cooled chiller, central system pumps, hot and chilled water pi |
Alexandria |
VA |
147 |
$11,022,000 |
Schools |
-2 |
| Longden Well and Pumphouse Rehabilitation |
Alhambra |
CA |
0 |
$2,000,000 |
Water |
-5 |
| Pump Station and Reservoir Expansion |
Alsip |
IL |
21 |
$800,000 |
Water |
2 |
| Build 30,000 gallon, elevated water storage tank. Modifications to the water treatment plant due to the storage tank include booster pumps and plant piping and control modifications. |
Arlington |
TX |
25 |
$900,000 |
Water |
3 |
| Black Mountain Pumping Station |
Asheville |
NC |
5 |
$100,000 |
Water |
7 |
| Mills River Pumping Station |
Asheville |
NC |
5 |
$200,000 |
Water |
7 |
| North Fork High Pressure Pumping Station |
Asheville |
NC |
5 |
$100,000 |
Water |
5 |
| Walnut Cove Pumping Station |
Asheville |
NC |
5 |
$300,000 |
Water |
-10 |
| Shoal Creek/Whit Davis Rd. Sanitary Sewer Pump Station/Force Main |
Athens |
GA |
30 |
$5,200,000 |
Water |
6 |
| Hemphill Finished Water Pump Station |
Atlanta |
GA |
194 |
$19,400,000 |
Water |
5 |
| Koweta Rd. Water Main & Pumping Station |
Atlanta |
GA |
381 |
$38,061,000 |
Water |
-4 |
| South River Capacity Relief Tunnel and Pumping Station |
Atlanta |
GA |
1117 |
$111,685,000 |
Water |
6 |
| Retired Lift station, Pump Station and Reservoir Facility Decommissioning |
Austin |
TX |
20 |
$5,000,000 |
Water |
-25 |
| Spicewood Springs Pump Station Improvements |
Austin |
TX |
20 |
$8,200,000 |
Water |
-11 |
| Influent Pump Replacement - This project consists of replacing the three influent pumps and control system at the Stearns Road Wastewater Treatment Plant. The pumps were installed in 1975. Since that time the pumps and drive system have become obsolete. |
Bartlett |
IL |
6 |
$315,000 |
Water |
20 |
| Lovett Road Area Multiple Sanitary Sewer Pump Station Upgrades which are part of our SSO elimination program |
Baton Rouge |
LA |
29 |
$3,600,000 |
Water |
3 |
| Pump Station 136 Area Sanitary Sewer Upgrades which is part of our SSO elimination program |
Baton Rouge |
LA |
69 |
$8,500,000 |
Water |
0 |
| South Waste Water Treatment Plant Dry Weather Flow Immediate Action Improvements-Trickling Filter, re-circulation pump station, and sludge handling improvements |
Baton Rouge |
LA |
341 |
$42,000,000 |
Water |
20 |
| Wastewater Pump Station Replacement |
Battle Creek |
MI |
40 |
$3,000,000 |
Water |
13 |
| 2009: Well Pumping Equipment |
Beloit |
WI |
2 |
$82,000 |
Water |
-4 |
| 2010: Well Pumping Equipment. |
Beloit |
WI |
2 |
$84,000 |
Water |
-9 |
| Vehicle upgrades and pumping equipment for the water system. |
Bessemer |
AL |
13 |
$1,100,000 |
Water |
-17 |
| Pump Stations and Pump related upgrades and repairs throughout the City water system. SCADA system & monitors. Replace 15th St. Station. |
Bessemer |
AL |
55 |
$2,250,000 |
Water |
0 |
| City Hall HVAC improvements, including a new energy effficient cooling tower, pumps, and controls. |
Binghamton |
NY |
5 |
$120,000 |
CDBG |
-14 |
| Laurel Ave Stormwater Pump Station extension - this project will extend an ongoing Combined Sewer seperation project for several blocks. |
Binghamton |
NY |
22 |
$1,250,000 |
Water |
-4 |
| McDonald Avenue Pump Station - Pump station improvements to increase capacity and improve performance, which will support local urban redevelopment in a mixed use neighborhood. |
Binghamton |
NY |
26 |
$321,500 |
Water |
-7 |
| Phase I New Force Main from East Plant Site to Regional Plant, new force main LS at SE 6th Ave., new LS at SE 6th Ave. - New regional sewage force main and pumping station to provide future capacity and redundancy of critical infrastructure |
Boynton Beach |
FL |
84 |
$6,320,000 |
Water |
-35 |
| City-wide Sewer Separation Project (Bridgeport Water Pollution Control Authority WPCA) Pump Station Upgrades/ design-phase completed, project planning complete, initial work underway) |
Bridgeport |
CT |
40 |
$5,000,000 |
Water |
3 |
| Domestic well including drilling, well house, pump, motor, and 1000 LF of 12” water line |
Bridgeport |
WA |
8 |
$390,000 |
Water |
8 |
| Fire Pump Units (2) |
Brockton |
MA |
0 |
$1,000,000 |
Public Safety |
8 |
| Smith/Hummel Sanitary Sewer - Phase 2 - install 54" sanitary sewer on Smith Road and a 36" sanitary sewer on Hummel Road, includes modifications to the Fry Road Pump Station and the storage chamber on Smith Road. |
Brook Park |
OH |
15 |
$2,865,700 |
Water |
13 |
| Construct new deep water supply well to replace existing well that has failed, and connect to Village treatment plant and pumping station. |
Buda |
IL |
17 |
$600,000 |
CDBG |
9 |
| New Low Service Pumps – rehabilitation of existing low service pumps including a new pump for operational performance and energy savings |
Buffalo |
NY |
105 |
$3,500,000 |
Water |
5 |
| Storage and Pump Stations – Rehabilitation of existing storage tanks and pump stations |
Buffalo |
NY |
150 |
$5,000,000 |
Water |
8 |
| New High Service Pumps – installation of new high service pumps for operational performance and energy savings |
Buffalo |
NY |
180 |
$7,000,000 |
Water |
9 |
| Construction of a new deep water well for the purpose of removing elevated level of radium from the water supply. Provide booster pump, filtration, and transmission water main for newly acquired well to water treatment plant as back up. |
Bureau Junction |
IL |
27 |
$940,000 |
Water |
6 |
| Reservoir Pump Efficiency Upgrades |
Burnsville |
MN |
4 |
$360,000 |
Water |
-1 |
| Kilroy Sewage Pumping Station Force Main Replacement: Replace existing 14” diameter sewage force main. |
Canton |
IL |
10 |
$750,000 |
Water |
6 |
| Water Treatment Plant Improvements: Increase capacity via a new treatment facility to replace existing 1938 WPA plant. Upgrades include installation of a new clarifier, filters, pumping station, chemical feed system, an upgrade of the piping system and |
Canton |
IL |
50 |
$6,000,000 |
Water |
0 |
| Emergency Water Pumps |
Carrollton |
TX |
1000 |
$3,000,000 |
Water |
16 |
| Casper Events CEnter Energy Savings Improvements (HVAC, Boiler, Air Handlers, Pumps) |
Casper |
WY |
35 |
$4,900,000 |
Energy |
-26 |
| Playground Road Pump Station Replacement Design |
Charleston |
SC |
6 |
$400,000 |
Water |
-1 |
| Pump Station Rehabilitation Project Phase 1 |
Charleston |
SC |
13 |
$986,000 |
Water |
8 |
| Pump Station 84 Upgrade |
Charleston |
SC |
42 |
$3,035,700 |
Water |
7 |
| Division Pump Station. The installation would include an 80 KVA Diesel Generator, with assiciated weatherproff sound attenuated enclusre, integral light fixture, (for security), ATS (automatic transfer switch) and relat |
Chicago Heights |
IL |
0 |
$80,000 |
Energy |
-5 |
| East End Pump Station. The installation would include a 100 KVA Diesel Generator, with associated weatherproof sound attenuated enclosure integral light fixture, for security), ATS (automatic transfer switch), and relat |
Chicago Heights |
IL |
0 |
$150,000 |
Energy |
-3 |
| State Street Pump Station The installation would include a 275 Diesel Generator. |
Chicago Heights |
IL |
0 |
$160,000 |
Energy |
-5 |
| Lowe Pump Station. The installation would indlude a 325 KVA Diesel Generator, with associated weatherproof sound attenuated enclosure, integral light fixture (for security), ATS (automatic tranfer switch), and related |
Chicago Heights |
IL |
50 |
$220,000 |
Energy |
-6 |
| Lansing Pump Station. a. The installation would include a 450 KVA Diesel Generator, with associated weatherprof sound attenuated enclosure, integral light fixture (for security), ASS (automatic transfer switch), and |
Chicago Heights |
IL |
60 |
$280,000 |
Energy |
-3 |
| Generator Installation of Pump Stations and Lift Stations |
Chicago Heights |
IL |
10 |
$1,080,000 |
Water |
-12 |
| NEW WATER PUMPING STATION
The Town of CiceroÂ’s propose project would consist of a pumping station on the side of the Town including an additional City of Chicago water connection. This will provide better fire flow rates for existing commercial |
Cicero |
IL |
560 |
$14,000,000 |
Water |
-11 |
| Hengehold 2nd Pump Station Elimination. Eliminate Hengehold PS and construct 1,500 linear feet of sewer. |
Cincinnati |
OH |
7 |
$551,000 |
Water |
-4 |
| Placid Meadows Pump Station Elimination. Eliminate Placid Meadows PS and construct 1,400 linear feet of sewer. |
Cincinnati |
OH |
7 |
$600,000 |
Water |
-7 |
| Foley Forest Pump Station Upgrade, Dellwood Estates & North Bay Village Pump Station Eliminations Ph. 2. Consolidates three old pump stations into one new pump station and construct 1,000 linear feet of gravity sewer and 1,200 linear feet of force main. |
Cincinnati |
OH |
11 |
$1,300,000 |
Water |
0 |
| Winton 1 & 2 and Sherwood Pump Station Consolidation. Consolidates three old pump stations into one new pump station and construct 4,000 linear feet of gravity sewer and 6,000 linear feet of force main. |
Cincinnati |
OH |
11 |
$2,899,000 |
Water |
-2 |
| Pump Station 65 Force Main Reroute |
Clearwater |
FL |
0 |
$820,000 |
Water |
-8 |
| Martin Avenue Sanitary Sewer Pump Station replacement |
Clifton |
NJ |
0 |
$500,000 |
Water |
-13 |
| Rebuild and/or replace
six (6) high service pumps
(Equipment identified & replacements specified) |
Cocoa Beach |
FL |
10 |
$250,000 |
Water |
5 |
| Southern Delivery System - water delivery pipeline, pump station |
Colorado Springs |
CO |
45 |
$38,000,000 |
Water |
15 |
| Mezzanine Level Catwalk-Water Plant and West Ash Pumping Stations |
Columbia |
MO |
3 |
$300,000 |
Water |
-5 |
| Gans Creek Pump Station |
Columbia |
MO |
7 |
$2,100,000 |
Water |
5 |
| Convert 3-way Valves to 2-way w/VSD Pumping at Washington Square Administration Building
The project proposes to replace the 3-way chilled water valves with new 2-way control vales and installing Variable Frequency Drive on the chilled water circulation |
Columbia |
SC |
5 |
$23,678 |
Energy |
-6 |
| HVAC Equipment Upgrades
The project proposes to replace existing units with like type energy efficient heat pumps in Park and Recreation Buildings and Fire Stations. Projected annual energy savings $34,147 |
Columbia |
SC |
25 |
$624,876 |
Energy |
8 |
| Sewer:Broad River Pump Station Rehabilitation |
Columbia |
SC |
10 |
$2,000,000 |
Water |
8 |
| Sewer:North Columbia Pump Station Rehabilitation |
Columbia |
SC |
10 |
$3,000,000 |
Water |
8 |
| Sewer:Saluda River Pump Station Rehabilitation |
Columbia |
SC |
10 |
$2,000,000 |
Water |
4 |
| Water:Canal WTP HS Pump and RW Pump Replacement |
Columbia |
SC |
25 |
$25,000,000 |
Water |
13 |
| Morrison Road Pump Station Elimination - extension of gravity sanitary sewer to eliminate the need for a wastewater pump station nearing the end of its useful life |
Concord |
NC |
6 |
$316,000 |
Water |
2 |
| Pump Station Upgrades |
Coral Gables |
FL |
40 |
$4,000,000 |
Water |
9 |
| Charter Oak Reservoir Pump Enclosures -- Construct permanenet enclosures for water circulation pumps. |
Covina |
CA |
5 |
$30,000 |
Water |
-3 |
| Cypress Reservoir Pump Enclosures -- Construct permanent enclosures for water circulation pumps. |
Covina |
CA |
5 |
$45,000 |
Water |
-4 |
| Forestdale Reservoir Pump Enclosures -- Construct permanent enclosures for water circulation pumps. |
Covina |
CA |
5 |
$30,000 |
Water |
-4 |
| Rancho La Merced Reservoir Pump Enclosures -- Construct permanenet enclosures for water circulation pumps. |
Covina |
CA |
5 |
$20,000 |
Water |
-3 |
| Rancho Simi Reservoir Pump Enclosures -- Construct permanenet enclosures for water circulation pumps. |
Covina |
CA |
5 |
$35,000 |
Water |
-3 |
| Installation of geothermal heat pumps at the proposed site of the Texas Horse Park |
Dallas |
TX |
30 |
$150,000 |
Energy |
-30 |
| Renovation of Bomberger Pool which was built in 1956. Includes: 1) Filling the diving well, reinforcing the perimeter walls with shot Crete 2) Replacing the concrete pool deck 3) Upgrading or installing new pumps, piping and filtration system 4) Remodel t |
Dayton |
OH |
5 |
$350,000 |
CDBG |
-7 |
| Tech Town Solar Farm for Geothermal Heating: Constructing a 4-acre solar farm designed to provide electricity to power geothermal pumps to heat & cool 3 new buildings in Tech Town. Approximately 556 post-construction positions will be created through this |
Dayton |
OH |
50 |
$3,500,000 |
Energy |
6 |
| Southern Tier Pump Station Improvements |
Des Moines |
IA |
25 |
$5,000,000 |
Water |
-11 |
| Schaefer Highway, pump station |
Detroit |
MI |
30 |
$1,260,000 |
Streets/Roads |
1 |
| Milwaukee pump station |
Detroit |
MI |
32 |
$1,350,000 |
Streets/Roads |
5 |
| Seldon pump station |
Detroit |
MI |
32 |
$1,350,000 |
Streets/Roads |
0 |
| Woodingham pump station |
Detroit |
MI |
32 |
$1,350,000 |
Streets/Roads |
-1 |
| Jefferson outlet, pump station |
Detroit |
MI |
35 |
$2,200,000 |
Streets/Roads |
6 |
| 145th Street Lift Station Improvements - The replacement and upgrade of bar screens, pumps and controlls at an existing stormwater lifting station. |
East Chicago |
IN |
10 |
$1,500,000 |
Water |
10 |
| Upgrade Water Pump System |
East Orange |
NJ |
47 |
$980,000 |
CDBG |
2 |
| Upgrade at Trenton Avenue Pump Station |
Elizabeth |
NJ |
20 |
$1,000,000 |
Water |
-5 |
| Mattano Park Pump Station Rehabilitation |
Elizabeth |
NJ |
40 |
$2,000,000 |
Water |
-2 |
| South Second Street Pump Station Rehabilitation |
Elizabeth |
NJ |
40 |
$2,000,000 |
Water |
-1 |
| Verona Avenue Pump Station |
Elizabeth |
NJ |
200 |
$10,000,000 |
Water |
-1 |
| Dowd Avenue Pump Station |
Elizabeth |
NJ |
800 |
$40,000,000 |
Water |
1 |