| Buildout of contract 2 for Southern Connector/Champlain Parkway; roadway to relieve current neighborhood traffic impacts |
Burlington |
VT |
288 |
$12,000,000 |
Streets/Roads |
-17 |
| Downtown streetscape improvement on the side streets extending from outdoor pedestrian mall/Church Street |
Burlington |
VT |
192 |
$8,000,000 |
Streets/Roads |
-31 |
| Improving access to Waterfront: Parking deck in Pease Grain lot |
Burlington |
VT |
144 |
$6,000,000 |
Streets/Roads |
-33 |
| Other major thoroughfare road improvements:Winooski Ave improvements between Main Street and Pearl Street |
Burlington |
VT |
144 |
$6,000,000 |
Streets/Roads |
-8 |
| Improving access to Waterfront: Site work at the Moran Center at Waterfront Park |
Burlington |
VT |
96 |
$4,000,000 |
Streets/Roads |
-21 |
| Other major thoroughfare road improvements: Main Street improvements between St. Paul St and Winooski Ave |
Burlington |
VT |
72 |
$3,000,000 |
Streets/Roads |
-1 |
| Improving access to Waterfront:Funicular to Waterfront |
Burlington |
VT |
30 |
$2,500,000 |
Streets/Roads |
-31 |
| Improving access to Waterfront: Depot Street (from North Ave to Waterfront) streetscape |
Burlington |
VT |
48 |
$2,000,000 |
Streets/Roads |
-6 |
| Improving access to Waterfront: Battery Street improvements |
Burlington |
VT |
43 |
$1,800,000 |
Streets/Roads |
-9 |
| Main Wastewater Plant Solids Dewatering Upgrade |
Burlington |
VT |
48 |
$2,000,000 |
Water |
5 |
| Winooski River Siphon Crossing |
Burlington |
VT |
42 |
$1,700,000 |
Water |
-2 |
| Mouth of the River Sewer Project |
Burlington |
VT |
24 |
$1,000,000 |
Water |
7 |
| Water Main Replacement, South Cove Road |
Burlington |
VT |
18 |
$750,000 |
Water |
1 |
| Combined Sewer Overflow Reduction |
Burlington |
VT |
18 |
$750,000 |
Water |
11 |
| Water Plant Equipment/Instrumentation Upgrade |
Burlington |
VT |
8 |
$350,000 |
Water |
-2 |
| Aviation Technical Center |
Burlington |
VT |
216 |
$9,000,000 |
Airport |
77 |
| Expansion of Airport Industrial Park |
Burlington |
VT |
48 |
$2,000,000 |
Airport |
-9 |
| Retrofit of manufacturing site/building (Blodgett) |
Burlington |
VT |
180 |
$10,000,000 |
CDBG |
-25 |
| Waterfront Bike path reconstruction |
Burlington |
VT |
84 |
$3,500,000 |
CDBG |
-9 |
| Redevelopment of decommissioned (Moran) waterfront power plant |
Burlington |
VT |
80 |
$3,000,000 |
CDBG |
-9 |
| Business loans |
Burlington |
VT |
26 |
$2,000,000 |
CDBG |
3 |
| Median work on Main Street to funnel pedestrians to appropriate crossings, maintain traffic visibility, and serve as gateway to city for visitors. |
Burlington |
VT |
29 |
$1,200,000 |
CDBG |
-9 |
| Construct ADA-accessible curb ramps |
Burlington |
VT |
26 |
$1,100,000 |
CDBG |
7 |
| Structural improvements to downtown (College Street) parking garage |
Burlington |
VT |
24 |
$1,000,000 |
CDBG |
4 |
| Complete build-out of bike lanes and related amenities in the City |
Burlington |
VT |
24 |
$1,000,000 |
CDBG |
-2 |
| Upper story redevelopment downtown |
Burlington |
VT |
18 |
$1,000,000 |
CDBG |
-9 |
| Church Street (downtown business district) improvements: street crossing improvements, benches, trees, brick cobbles, bike racks, canopies, banner system and north and south gateways |
Burlington |
VT |
22 |
$925,000 |
CDBG |
-13 |
| Memorial Auditorium rehab: replacement needed for bleachers and portable seating system, and electrical upgrade |
Burlington |
VT |
2 |
$780,000 |
CDBG |
2 |
| Brownfields clean up |
Burlington |
VT |
9 |
$500,000 |
CDBG |
6 |
| CarShare VT (non-profit car-sharing program) start-up capital to purchase 8 vehicles and hire 4 staff; |
Burlington |
VT |
4 |
$450,000 |
CDBG |
-2 |
| Waterfront tent and speaker system needed for events |
Burlington |
VT |
0 |
$250,000 |
CDBG |
-37 |
| vacant retail renovations |
Burlington |
VT |
2 |
$200,000 |
CDBG |
-14 |
| District energy pilot project |
Burlington |
VT |
225 |
$15,000,000 |
Energy |
-7 |
| Business Energy Efficiency Program |
Burlington |
VT |
65 |
$5,000,000 |
Energy |
2 |
| Compressed natural gas public fueling station |
Burlington |
VT |
0 |
$2,000,000 |
Energy |
1 |
| Public building energy retrofit |
Burlington |
VT |
26 |
$2,000,000 |
Energy |
5 |
| Moran Center energy efficiency and alternative energy development |
Burlington |
VT |
13 |
$1,000,000 |
Energy |
-4 |
| Solar Cities Initiative: pilot project to establish several solar electric generating locations across City |
Burlington |
VT |
7 |
$770,000 |
Energy |
14 |
| “DEED” start-up project to establish loan fund for home energy efficiency and alternative energy projects; long-term loans connected to property and not property owner, as incentive for energy projects regardless of how long property is owned. |
Burlington |
VT |
4 |
$250,000 |
Energy |
14 |
| Garage lighting energy retrofit |
Burlington |
VT |
2 |
$100,000 |
Energy |
-7 |
| 230 St. Paul Street-Decker Towers:Heating System Conversion to Gas, Tub Drains/Faucet Repair, Parking Lot Asphalt Repairs, Stucco Siding Replacement |
Burlington |
VT |
0 |
$866,244 |
Housing |
-7 |
| Hillside Terrace: Exterior Painting, Kitchen Cabinets/Countertops/Sink Replacements, Tub/Shower unit Replacements, Walkway/Driveway Repairs, French Door Replacements |
Burlington |
VT |
0 |
$264,491 |
Housing |
-19 |
| 10 North Champlain Street-Champlain Apts: Range Replacements, Kitchen Renovations, Closet Door Upgrades |
Burlington |
VT |
0 |
$255,300 |
Housing |
-15 |
| 669 Riverside Avenue: Bathroom Flooring Replacement, Handicap Ramp Replacement, Refrigerator Replacement Toilet Replacement |
Burlington |
VT |
0 |
$103,620 |
Housing |
-11 |
| 1554 North Avenue-Franklin Square: Fire Alarm Upgrade, Roof Trim Painting |
Burlington |
VT |
0 |
$100,784 |
Housing |
-11 |
| Portable Radios. Complete a project that has been underway to bring all radios to APCO P25 compliance for interoperability. Requires the purchase of 70 additional portable radios at $3,000 each |
Burlington |
VT |
0 |
$210,000 |
Public Safety |
-2 |
| Community Service Officer |
Burlington |
VT |
2 |
$120,000 |
Public Safety |
-21 |
| Social Service Practitioner (Law Enforcement Support). Creation of two new positions specializing in mental health and substance abuse intervention to respond during the initial call/emergency. A collateral effect of this program would be to reduce the nu |
Burlington |
VT |
2 |
$120,000 |
Public Safety |
-6 |
| Volunteers in Service to Policing Coordinator. Creation of one position to coordinate and supervise the Volunteers in Service to Policing Program. By creating a new civilian position, sworn law enforcement resources would be freed from this responsibility |
Burlington |
VT |
1 |
$60,000 |
Public Safety |
-14 |
| Flynn Elementary School: mechanical HVAC equipment replacement; replace three 1950s boilers with high efficiency water boilers; install heat recovery rooftop units; remove asbestos insulation; install new controls |
Burlington |
VT |
23 |
$1,720,000 |
Schools |
8 |
| City high school construction and improvements: 1964 auditorium needs to be updated for a high school of 1200 students; various code violations addressed; will put in over 800 new seats, new electrical, new lighting, new HVAC systems; ADA accessibility |
Burlington |
VT |
20 |
$1,500,000 |
Schools |
13 |
| Accessibility/ADA improvements at one elementary and one middle school (Edmunds) |
Burlington |
VT |
20 |
$1,500,000 |
Schools |
11 |
| Replace 1950s boilers, mechanical HVAC equipment replacement and install heat recovery rooftop units at one elementary school (Barnes) |
Burlington |
VT |
19 |
$1,400,000 |
Schools |
10 |
| Wheeler Elementary School: remove existing univentilators; install heat recovery units; new controls and converters; convert existing steam boilers to hot water. |
Burlington |
VT |
19 |
$1,330,000 |
Schools |
-3 |
| Hunt Middle School: repair failing exterior brick walls |
Burlington |
VT |
16 |
$1,200,000 |
Schools |
0 |
| Energy efficiency improvements at one elementary school (Barnes) |
Burlington |
VT |
9 |
$750,000 |
Schools |
9 |
| Flynn Elementary School: new roof and insulation |
Burlington |
VT |
2 |
$200,000 |
Schools |
9 |
| Full construction of Downtown Transit Center |
Burlington |
VT |
240 |
$10,000,000 |
Transit |
-26 |
| Purchase of 12 clean diesel transit buses |
Burlington |
VT |
0 |
$4,000,000 |
Transit |
1 |
| Installation of Intelligent Transportation System for transit system |
Burlington |
VT |
0 |
$3,000,000 |
Transit |
2 |
| Construction of transit shelters |
Burlington |
VT |
12 |
$500,000 |
Transit |
-2 |