WARNING: You're looking at a page from the old site. We have relaunched with live stimulus data. Learn more here.


Recent News

Advanced search added: keywords, zip codes, and recipients 11/25/2009

Thanks to the tireless work of developer Peter Snyder, Stimulus Watch 2.0 now has an advanced search capability that will…

Jerry Brito on Washington DC’s Federal News Radio... 11/24/2009

Jerry Brito on Washington DC’s Federal News Radio discussing the new features available on Stimulus Watch 2.0.

We've relaunched with new official data of stimulus projects in your neighborhood! 11/18/2009

Welcome to Stimulus Watch 2.0. While our original site featured proposed stimulus projects taken from the U.S. Conference of Mayors…

OpenRegs.com
Find government regulations by issue or agency. Comment, add links and subscribe to regulations.

Projects in Vermont

Below are the "shovel-ready" projects the mayors of this state submitted in the 2008 U.S. Conference of Mayors report. You can click on a project to read (and add to) its description. You can also discuss the project and vote on whether you believe it is critical or not. For a more local view, you can drill down to projects in a particular city. Just choose a city from the following list.

The total of cost of all the projects submitted by Vermont is $145,075,439

View a specific city in Vermont: Burlington

Description City State Jobs Cost Program Type Vote Ratio
Buildout of contract 2 for Southern Connector/Champlain Parkway; roadway to relieve current neighborhood traffic impacts Burlington VT 288 $12,000,000 Streets/Roads -17
Downtown streetscape improvement on the side streets extending from outdoor pedestrian mall/Church Street Burlington VT 192 $8,000,000 Streets/Roads -31
Improving access to Waterfront: Parking deck in Pease Grain lot Burlington VT 144 $6,000,000 Streets/Roads -33
Other major thoroughfare road improvements:Winooski Ave improvements between Main Street and Pearl Street Burlington VT 144 $6,000,000 Streets/Roads -8
Improving access to Waterfront: Site work at the Moran Center at Waterfront Park Burlington VT 96 $4,000,000 Streets/Roads -21
Other major thoroughfare road improvements: Main Street improvements between St. Paul St and Winooski Ave Burlington VT 72 $3,000,000 Streets/Roads -1
Improving access to Waterfront:Funicular to Waterfront Burlington VT 30 $2,500,000 Streets/Roads -31
Improving access to Waterfront: Depot Street (from North Ave to Waterfront) streetscape Burlington VT 48 $2,000,000 Streets/Roads -6
Improving access to Waterfront: Battery Street improvements Burlington VT 43 $1,800,000 Streets/Roads -9
Main Wastewater Plant Solids Dewatering Upgrade Burlington VT 48 $2,000,000 Water 5
Winooski River Siphon Crossing Burlington VT 42 $1,700,000 Water -2
Mouth of the River Sewer Project Burlington VT 24 $1,000,000 Water 7
Water Main Replacement, South Cove Road Burlington VT 18 $750,000 Water 1
Combined Sewer Overflow Reduction Burlington VT 18 $750,000 Water 11
Water Plant Equipment/Instrumentation Upgrade Burlington VT 8 $350,000 Water -2
Aviation Technical Center Burlington VT 216 $9,000,000 Airport 77
Expansion of Airport Industrial Park Burlington VT 48 $2,000,000 Airport -9
Retrofit of manufacturing site/building (Blodgett) Burlington VT 180 $10,000,000 CDBG -25
Waterfront Bike path reconstruction Burlington VT 84 $3,500,000 CDBG -9
Redevelopment of decommissioned (Moran) waterfront power plant Burlington VT 80 $3,000,000 CDBG -9
Business loans Burlington VT 26 $2,000,000 CDBG 3
Median work on Main Street to funnel pedestrians to appropriate crossings, maintain traffic visibility, and serve as gateway to city for visitors. Burlington VT 29 $1,200,000 CDBG -9
Construct ADA-accessible curb ramps Burlington VT 26 $1,100,000 CDBG 7
Structural improvements to downtown (College Street) parking garage Burlington VT 24 $1,000,000 CDBG 4
Complete build-out of bike lanes and related amenities in the City Burlington VT 24 $1,000,000 CDBG -2
Upper story redevelopment downtown Burlington VT 18 $1,000,000 CDBG -9
Church Street (downtown business district) improvements: street crossing improvements, benches, trees, brick cobbles, bike racks, canopies, banner system and north and south gateways Burlington VT 22 $925,000 CDBG -13
Memorial Auditorium rehab: replacement needed for bleachers and portable seating system, and electrical upgrade Burlington VT 2 $780,000 CDBG 2
Brownfields clean up Burlington VT 9 $500,000 CDBG 6
CarShare VT (non-profit car-sharing program) start-up capital to purchase 8 vehicles and hire 4 staff; Burlington VT 4 $450,000 CDBG -2
Waterfront tent and speaker system needed for events Burlington VT 0 $250,000 CDBG -37
vacant retail renovations Burlington VT 2 $200,000 CDBG -14
District energy pilot project Burlington VT 225 $15,000,000 Energy -7
Business Energy Efficiency Program Burlington VT 65 $5,000,000 Energy 2
Compressed natural gas public fueling station Burlington VT 0 $2,000,000 Energy 1
Public building energy retrofit Burlington VT 26 $2,000,000 Energy 5
Moran Center energy efficiency and alternative energy development Burlington VT 13 $1,000,000 Energy -4
Solar Cities Initiative: pilot project to establish several solar electric generating locations across City Burlington VT 7 $770,000 Energy 14
“DEED” start-up project to establish loan fund for home energy efficiency and alternative energy projects; long-term loans connected to property and not property owner, as incentive for energy projects regardless of how long property is owned. Burlington VT 4 $250,000 Energy 14
Garage lighting energy retrofit Burlington VT 2 $100,000 Energy -7
230 St. Paul Street-Decker Towers:Heating System Conversion to Gas, Tub Drains/Faucet Repair, Parking Lot Asphalt Repairs, Stucco Siding Replacement Burlington VT 0 $866,244 Housing -7
Hillside Terrace: Exterior Painting, Kitchen Cabinets/Countertops/Sink Replacements, Tub/Shower unit Replacements, Walkway/Driveway Repairs, French Door Replacements Burlington VT 0 $264,491 Housing -19
10 North Champlain Street-Champlain Apts: Range Replacements, Kitchen Renovations, Closet Door Upgrades Burlington VT 0 $255,300 Housing -15
669 Riverside Avenue: Bathroom Flooring Replacement, Handicap Ramp Replacement, Refrigerator Replacement Toilet Replacement Burlington VT 0 $103,620 Housing -11
1554 North Avenue-Franklin Square: Fire Alarm Upgrade, Roof Trim Painting Burlington VT 0 $100,784 Housing -11
Portable Radios. Complete a project that has been underway to bring all radios to APCO P25 compliance for interoperability. Requires the purchase of 70 additional portable radios at $3,000 each Burlington VT 0 $210,000 Public Safety -2
Community Service Officer Burlington VT 2 $120,000 Public Safety -21
Social Service Practitioner (Law Enforcement Support). Creation of two new positions specializing in mental health and substance abuse intervention to respond during the initial call/emergency. A collateral effect of this program would be to reduce the nu Burlington VT 2 $120,000 Public Safety -6
Volunteers in Service to Policing Coordinator. Creation of one position to coordinate and supervise the Volunteers in Service to Policing Program. By creating a new civilian position, sworn law enforcement resources would be freed from this responsibility Burlington VT 1 $60,000 Public Safety -14
Flynn Elementary School: mechanical HVAC equipment replacement; replace three 1950s boilers with high efficiency water boilers; install heat recovery rooftop units; remove asbestos insulation; install new controls Burlington VT 23 $1,720,000 Schools 8
City high school construction and improvements: 1964 auditorium needs to be updated for a high school of 1200 students; various code violations addressed; will put in over 800 new seats, new electrical, new lighting, new HVAC systems; ADA accessibility Burlington VT 20 $1,500,000 Schools 13
Accessibility/ADA improvements at one elementary and one middle school (Edmunds) Burlington VT 20 $1,500,000 Schools 11
Replace 1950s boilers, mechanical HVAC equipment replacement and install heat recovery rooftop units at one elementary school (Barnes) Burlington VT 19 $1,400,000 Schools 10
Wheeler Elementary School: remove existing univentilators; install heat recovery units; new controls and converters; convert existing steam boilers to hot water. Burlington VT 19 $1,330,000 Schools -3
Hunt Middle School: repair failing exterior brick walls Burlington VT 16 $1,200,000 Schools 0
Energy efficiency improvements at one elementary school (Barnes) Burlington VT 9 $750,000 Schools 9
Flynn Elementary School: new roof and insulation Burlington VT 2 $200,000 Schools 9
Full construction of Downtown Transit Center Burlington VT 240 $10,000,000 Transit -26
Purchase of 12 clean diesel transit buses Burlington VT 0 $4,000,000 Transit 1
Installation of Intelligent Transportation System for transit system Burlington VT 0 $3,000,000 Transit 2
Construction of transit shelters Burlington VT 12 $500,000 Transit -2