| Reconstruction of Madison & Montgomery Streets between Fairfax and St Asaph Streets. Theses streets partially lie over an abandoned landfilled canal. Subbase will need to be stabilized, in addition to some full and partial depth roadway reconstruction. |
Alexandria |
VA |
102 |
$7,500,000 |
Streets/Roads |
-104 |
| Pave all streets in historic Old Town, Alexandria within the following grid: Waterfront to Franklin Street, to St. Asaph Street to Pendleton Street to the waterfront. |
Alexandria |
VA |
28 |
$2,100,000 |
Streets/Roads |
-112 |
| Pave -- overlay the concrete streets at the I-395 overpasses on Duke Street and King Street and Eisenhower Avenue from Bluestone Road to Holmes Run Bridge. |
Alexandria |
VA |
20 |
$1,500,000 |
Streets/Roads |
-38 |
| Pave King Street from the Waterfront to King Steet Metro Station in Historic Old Town, Alexandria. |
Alexandria |
VA |
16 |
$1,200,000 |
Streets/Roads |
-52 |
| Replace all guard rail ends to meet the current safety standards of State and Federal requirements. |
Alexandria |
VA |
12 |
$900,000 |
Streets/Roads |
-18 |
| Storm Sewer improvement project to alleviate localized flooding at the intersection of Braddock Road and West Street. This project would also remove storm water from City combined sewer. |
Alexandria |
VA |
320 |
$24,000,000 |
Water |
15 |
| Security and energy upgrades at Wastewater Treatment Facility |
Alexandria |
VA |
120 |
$9,000,000 |
Water |
-5 |
| Remediation of infiltration/inflow conditions for portions of the sanitary sewer system in the Holmes Run Sewershed. |
Alexandria |
VA |
100 |
$7,500,000 |
Water |
13 |
| Replacement of aging bulkhead at Windmill Park along Potomac River. |
Alexandria |
VA |
73 |
$5,500,000 |
Water |
-30 |
| Perform channel maintenance in Backlick Run and Holmes Run from the R/R bridge to Park Drive. |
Alexandria |
VA |
46 |
$3,500,000 |
Water |
-10 |
| Transformer and switch gear replacement at Wastewater Treatment Facility |
Alexandria |
VA |
40 |
$3,000,000 |
Water |
0 |
| Commonwealth Sewer Rehabilitation and Repair |
Alexandria |
VA |
33 |
$2,500,000 |
Water |
15 |
| Chemical system upgrade at Wastewater Treatment Facility |
Alexandria |
VA |
27 |
$2,000,000 |
Water |
3 |
| Reline three miles of storm sewer pipe on the West End of Alexandria. |
Alexandria |
VA |
24 |
$1,800,000 |
Water |
-5 |
| Construction of stormwater bypass to alleviate localized flooding at the intersection of Key Drive and Francis Hammond Parkway. |
Alexandria |
VA |
20 |
$1,500,000 |
Water |
3 |
| Construct a two-mile, linear, non-motorized transportation corridor in Potomac Yard, to connect Braddock Road Metro with Four Mile Run Park. |
Alexandria |
VA |
53 |
$4,000,000 |
CDBG |
-40 |
| Rehabilitate or replace sidewalks for seven blocks on King Street (from the Waterfront Unit block to Washington Street) in historic Old Town Alexandria. |
Alexandria |
VA |
46 |
$3,450,000 |
CDBG |
-147 |
| Rehabilitate or replace sections of the Mount Vernon Trail in Old Town Alexandria to provide connections to Washington, DC and George Washington's Mount Vernon estate. |
Alexandria |
VA |
13 |
$1,000,000 |
CDBG |
5 |
| Construct the Eisenhower Avenue Shared Use Path
Underpass (Phase 1A). |
Alexandria |
VA |
10 |
$750,000 |
CDBG |
-8 |
| Energy Retrofit -- Wastewater Treatment Facility |
Alexandria |
VA |
80 |
$6,000,000 |
Energy |
1 |
| Green roof -- Wastewater Treatment Facility |
Alexandria |
VA |
27 |
$2,000,000 |
Energy |
-20 |
| Addition of microturbine co-generators at 5 City Recreation Centers and at City Hall to mitigate power congestion and facilitate clean energy generation in each area. |
Alexandria |
VA |
27 |
$2,000,000 |
Energy |
50 |
| Convert all of the CityÂ’s existing incandescent traffic signal displays to LED lamps. Converting to more efficient LED lamps will reduce energy consumption by an estimated 90%. Converting to LED displays should save an estimated 11,826 KWH annually. Thi |
Alexandria |
VA |
11 |
$800,000 |
Energy |
20 |
| Substantial Rehabilitation of 80 substandard public housing units including building, site and interior due to building age and deterioration. |
Alexandria |
VA |
23 |
$1,762,570 |
Housing |
-25 |
| Ladrey Senior High-Rise Building (170 units for seniors and dicable):
Substantial replacement and repair of building envelope, structure and systems due to age, wear and tear |
Alexandria |
VA |
12 |
$875,000 |
Housing |
10 |
| Scattered Sites II, W. Braddock Rd.: Substantial rehabilitation of site, including erosion control and building structures (affordable housing units). |
Alexandria |
VA |
7 |
$515,917 |
Housing |
-6 |
| Building Envelope and Infrastructure Replacement and Repairs to nine (9) Scattered Sites Public Housing affordable housing due age, wear and deterioration. |
Alexandria |
VA |
5 |
$390,000 |
Housing |
-3 |
| Cameron Valle Scatered Sites II:
Substantial structural repairs to building foundations, structure, and building envelope due to age and effects of erosion. Total of fifteen (15) public housing homes. |
Alexandria |
VA |
5 |
$375,550 |
Housing |
-17 |
| Substantial Rehabilitation of 38 Affordable housing units for seniors and disable persons at Park Place . |
Alexandria |
VA |
4 |
$323,000 |
Housing |
8 |
| Substantial Rehabilitation of 15 Affordable housing units, building & site due to old age and substandard conditions. |
Alexandria |
VA |
3 |
$234,089 |
Housing |
-5 |
| Scattered Sites II - Saxony Place Substantial rehabilitation of five (5) affordable hoiusing units due to age, wear and deterioration. |
Alexandria |
VA |
2 |
$162,500 |
Housing |
-9 |
| NBPD SRO Program |
Alexandria |
VA |
3 |
$210,000 |
Public Safety |
-28 |
| Wireless Network Encryption for Mobile Computer transmissions |
Alexandria |
VA |
2 |
$118,000 |
Public Safety |
-23 |
| Computer Crimes Equipment and Technology to conduct forensic analysis on electronic devices. |
Alexandria |
VA |
1 |
$90,000 |
Public Safety |
-4 |
| T3 Motion electric Vehicles |
Alexandria |
VA |
1 |
$33,000 |
Public Safety |
-101 |
| Moving radar for motorcycles (10 units) |
Alexandria |
VA |
1 |
$32,000 |
Public Safety |
-68 |
| Firearms Diagnostic Unit |
Alexandria |
VA |
1 |
$26,000 |
Public Safety |
-43 |
| John Adams Elementary School--
Replacement of the HVAC systems throughout the facility, including the central pumps, hot and chilled water piping, fan coil units in every classroom, air handling units for gymnasium, auxiliary gym, cafeteria, library, |
Alexandria |
VA |
147 |
$11,059,000 |
Schools |
-2 |
| Minnie Howard School-- Replacement of the HVAC systems throughout the two story classroom wing, the gymnasium wing, and the admin wing of the facility, including the hot water boilers, the air cooled chiller, central system pumps, hot and chilled water pi |
Alexandria |
VA |
147 |
$11,022,000 |
Schools |
-2 |
| James Polk Elementary School-- Replacement of the HVAC systems throughout the facility, including the hot water boilers, central system pumps, hot and chilled water piping, fan coil units in every classroom, air handling units for multipurpose room, cafet |
Alexandria |
VA |
83 |
$6,234,000 |
Schools |
6 |
| Emergency Generators:
Installation of emergency
generators and automatic changeover switches to allow the operation of school facilities as shelters in the event of power outages. Critical building systems to be powered by the emergency generator wou |
Alexandria |
VA |
23 |
$1,700,000 |
Schools |
6 |
| Elementary Classroom Mobile Laptop Carts :
This project is for the implementation of mobile laptop carts at 13 elementary schools. Currently, classrooms compete for 25 stand alone workstations in the schoolsÂ’ computer labs. This transition would place 2 |
Alexandria |
VA |
15 |
$1,104,000 |
Schools |
-67 |
| School Bus Two Way Communication System
Virginia State law was changed as of July 1, 2008, and school bus drivers are not allowed to operate cell phones while driving their vehicles. This project would provide a two way radio system. School bus drive |
Alexandria |
VA |
5 |
$400,000 |
Schools |
-23 |
| Purchase additional buses for Alexandria Transit Company (DASH) to defray replacement costs of new buses, and forestall fare increases that would otherwise be imposed on residents. |
Alexandria |
VA |
73 |
$5,500,000 |
Transit |
-15 |
| Purchase four hybrid-vehicle converted trolleys and initiate City-run trolley service to replace existing contractor service. Trolley available as a free service 10 a.m. to 10 p.m. daily in Alexandria historic Old Town district. Bus build and hybrid retro |
Alexandria |
VA |
32 |
$2,400,000 |
Transit |
-62 |
| Purchase and install foldable bicycle racks for all DASH buses to improve multi-modal transportation options. |
Alexandria |
VA |
5 |
$400,000 |
Transit |
-23 |
| -WATER Install approximately 6000 linear ft of 8" water line on Livingstone Street and Colonial Avenue between Washington Avenue and Billingsley and Taggert connecting to existing 8" looped mains at ends
-6800 linear feet of replacement water main on Ban |
Colonial Beach |
VA |
30 |
$3,480,000 |
Water |
7 |
| New Police Facility. This 5400 square ft. facility will replace the current facility which was built in 1940. The existing facility floods during heavy rains and ADA accessibility is inadequate, at best.
The Town is strategically located on the banks of |
Colonial Beach |
VA |
20 |
$500,000 |
Public Safety |
19 |
| Replace Fall Hill Avenue Bridge over I-95 and lane widening of Fall Hill Avenue between I-95 and Carl D. Silver Parkway |
Fredericskburg |
VA |
46 |
$11,500,000 |
Streets/Roads |
2 |
| Street Reconstruction or Rehabilitation - City Wide |
Fredericskburg |
VA |
8 |
$2,000,000 |
Streets/Roads |
-3 |
| Pathways - Virginia Central Railway |
Fredericskburg |
VA |
8 |
$1,880,000 |
Streets/Roads |
-38 |
| Rehabilitation of U.S. 1 Bridge over Hazel Run |
Fredericskburg |
VA |
4 |
$970,000 |
Streets/Roads |
1 |
| Rehabiliation of the U.S. 1 Bridge Over State Route 3 |
Fredericskburg |
VA |
4 |
$950,000 |
Streets/Roads |
3 |
| Replacement of the Fall Hill Avenue Bridge over the Rappahannock Canal |
Fredericskburg |
VA |
4 |
$941,600 |
Streets/Roads |
12 |
| Rehabilitation of U.S. 1 Bridge over the Rappahannock Canal |
Fredericskburg |
VA |
3 |
$750,000 |
Streets/Roads |
11 |
| Pathways - Rappahannock River Heritage Trail |
Fredericskburg |
VA |
3 |
$700,000 |
Streets/Roads |
-22 |
| Pathways - Embrey Dam / Rappahannock Canal |
Fredericskburg |
VA |
2 |
$520,000 |
Streets/Roads |
-20 |
| Princess Anne Street Intersection Improvements - Traffic and Pedestrian Safety |
Fredericskburg |
VA |
2 |
$500,000 |
Streets/Roads |
-11 |
| Pedestrian Safety and Traffic Signal Improvements - City-wide |
Fredericskburg |
VA |
2 |
$500,000 |
Streets/Roads |
-4 |
| Pathways - Cowan Boulevard Connector |
Fredericskburg |
VA |
1 |
$175,000 |
Streets/Roads |
-15 |
| Wastewater Treatment Plant Upgrades |
Fredericskburg |
VA |
16 |
$4,000,000 |
Water |
8 |
| Riverfront Park |
Fredericskburg |
VA |
16 |
$4,000,000 |
CDBG |
-49 |
| New Court Building - Replacement of Three Existing Courts in downtown - LEED Certified |
Fredericskburg |
VA |
300 |
$60,000,000 |
Energy |
-59 |
| Resurfacing Throughout the City, Including Arterial, Collector and Residential Roads |
Hampton |
VA |
300 |
$15,000,000 |
Streets/Roads |
-13 |
| Mercury Boulevard Resurfacing and Rehabilitation |
Hampton |
VA |
130 |
$6,500,000 |
Streets/Roads |
-29 |
| Span Wire to Master Arm Conversions Upgrades (10 Conversions Total) |
Hampton |
VA |
41 |
$2,050,000 |
Streets/Roads |
-14 |
| Little England Phase 3&4 Drainage Improvements |
Hampton |
VA |
40 |
$2,000,000 |
Streets/Roads |
-7 |
| Coliseum North Quality Basin |
Hampton |
VA |
35 |
$1,725,000 |
Streets/Roads |
-15 |
| Intersection Improvements Throughout the City |
Hampton |
VA |
22 |
$1,100,000 |
Streets/Roads |
-4 |
| Canal Repairs |
Hampton |
VA |
20 |
$1,000,000 |
Streets/Roads |
-5 |
| Rawood Stormwater Detention |
Hampton |
VA |
14 |
$710,000 |
Streets/Roads |
-6 |
| Existing/Substandard Guardrail Replacement/Upgrades |
Hampton |
VA |
11 |
$540,000 |
Streets/Roads |
-4 |
| Underwater Repairs to Bridges |
Hampton |
VA |
10 |
$500,000 |
Streets/Roads |
24 |
| E Street Improvements in Copeland Industrial Park |
Hampton |
VA |
8 |
$400,000 |
Streets/Roads |
-8 |
| Traffic Sign Replacement Throughout the City |
Hampton |
VA |
6 |
$300,000 |
Streets/Roads |
-32 |
| Traffic Signal Retimings Throughout the City |
Hampton |
VA |
5 |
$260,000 |
Streets/Roads |
-15 |
| Pembroke Avenue/Queen Street Drainage Improvements, Phase 2 |
Hampton |
VA |
5 |
$250,000 |
Streets/Roads |
-2 |
| Infrastructure Repair to the City's Sewer System to Comply with State and Federal Mandates |
Hampton |
VA |
1430 |
$71,500,000 |
Water |
16 |
| Back River Dredging/Factory Point Restoration |
Hampton |
VA |
100 |
$5,000,000 |
Water |
26 |
| Electrical Upgrades to 40 Terminal Pump Stations and 25 Variable Frequency Drives |
Hampton |
VA |
32 |
$1,600,000 |
Water |
2 |
| Collection System Hydraulic Model Project |
Hampton |
VA |
32 |
$1,600,000 |
Water |
-4 |
| Pumping Station Emergency Generators/Bypass Equipment |
Hampton |
VA |
30 |
$1,500,000 |
Water |
12 |
| Pumping Station SCADA System Replacement |
Hampton |
VA |
24 |
$1,200,000 |
Water |
4 |
| Crossroads Pumping Station |
Hampton |
VA |
20 |
$1,000,000 |
Water |
4 |
| Fats, Oils, Greases (FOG) Abatement Program - Start Up Costs for This Mandated Program |
Hampton |
VA |
5 |
$225,000 |
Water |
-9 |
| Pumping Station Emergency Isolation Valve Project |
Hampton |
VA |
4 |
$180,000 |
Water |
6 |
| Old Hampton Community Center |
Hampton |
VA |
180 |
$9,000,000 |
CDBG |
-82 |
| Pembroke Avenue Streetscape in Buckroe |
Hampton |
VA |
33 |
$1,650,000 |
CDBG |
-23 |
| Phoebus Waterfront Improvements |
Hampton |
VA |
29 |
$1,450,000 |
CDBG |
-26 |
| Crossroads Parking Lots |
Hampton |
VA |
28 |
$1,375,000 |
CDBG |
-30 |
| Newtown Learning Center |
Hampton |
VA |
20 |
$1,000,000 |
CDBG |
-18 |
| Newmarket Creek Trail, Phase 1 |
Hampton |
VA |
16 |
$800,000 |
CDBG |
-31 |
| Buckroe Soccer Fields, Phase 2 |
Hampton |
VA |
10 |
$500,000 |
CDBG |
-38 |
| Mercury Boulevard/Mallory Street Streetscape |
Hampton |
VA |
10 |
$500,000 |
CDBG |
-18 |
| Kecoughtan Corridor Streetscape at the City Line |
Hampton |
VA |
8 |
$400,000 |
CDBG |
-12 |
| Queen Street/Lincoln Street Connector Road |
Hampton |
VA |
4 |
$200,000 |
CDBG |
-8 |
| Big Bethel Road Fire Station |
Hampton |
VA |
60 |
$3,000,000 |
Energy |
2 |
| Upgrade Traffic Signals to All LED Throughout the City |
Hampton |
VA |
7 |
$325,000 |
Energy |
-13 |
| Roof Replacement for Lincoln Park Low-Rise |
Hampton |
VA |
6 |
$1,031,000 |
Housing |
-34 |
| Carpet Replacement for Lincoln Park High-Rise |
Hampton |
VA |
6 |
$153,400 |
Housing |
-87 |