| Vesta Pallas E911 Call taking upgrades |
Lynn |
MA |
2 |
$100,000 |
Public Safety |
-3 |
| Emergency Medical Dispatch Electronic Card Systems |
Lynn |
MA |
1 |
$22,000 |
Public Safety |
-4 |
| Fire Dispatch Instant Recorder |
Lynn |
MA |
1 |
$10,000 |
Public Safety |
-3 |
| Rehabilitation of Classical High School |
Lynn |
MA |
50 |
$20,000,000 |
Schools |
-28 |
| Marshall Middle School rehab of roof, exterior, hvac |
Lynn |
MA |
50 |
$5,500,000 |
Schools |
0 |
| Rehabilitation and reuse of O'Keefe School |
Lynn |
MA |
15 |
$1,900,000 |
Schools |
-4 |
| Wellington Circle Improvements, Medford, MA -- Comprehensive reconfiguration, realignment and reconstruction of Wellington Circle (the intersection of Route 16 and Route 28) including grade separation of Rt. 16 and Rt. 28. This project is a significant e |
Malden |
MA |
700 |
$60,000,000 |
Streets/Roads |
-4 |
| Government Center Relocation. Relocation of Malden's municipal offices from their current location at Government Center in order to demolish the building and reconnect the road that it made a dead-end, thereby choking business to the existing retailers. T |
Malden |
MA |
190 |
$15,000,000 |
Streets/Roads |
-28 |
| Florence Street Parking Garage. Construction of a 250-space parking garage on the site of the existing municipal surface parking lot on Florence Street. This facility situated in the city's downtown central business district and civic center will provide |
Malden |
MA |
90 |
$7,200,000 |
Streets/Roads |
-40 |
| Route 60/Commercial St. Pedestrian Overpass. Construction of a pedestrian bridge across Commercial and Centre streets to provide a safe, accessible pedestrian connection between the MBTA's Malden Center Orange Line Station and a 9-acre development site si |
Malden |
MA |
88 |
$7,000,000 |
Streets/Roads |
-18 |
| Pavement Rehabilitation Program (Citywide) -- Repair, rehabilitation and reconstruction of roadway pavements in miscellaneous locations to be determined throughout the city. The work will include crack sealing; replacing deficient roadway patches; millin |
Malden |
MA |
44 |
$3,500,000 |
Streets/Roads |
9 |
| Broadway Sidewalk and Roadway Improvements -- Reconstruction of approximately 4800 linear feet of roadway pavements and sidewalks on Broadway (Route 99) from Salem Street to the Malden/Saugus city line. The work will include replacing deficient roadway p |
Malden |
MA |
44 |
$3,500,000 |
Streets/Roads |
-6 |
| Pleasant St.-Malden Downtown Revitalization Project (Mass. Highway 605173). The City of Malden determined to revitalize a once thriving retail and commercial district proposes to enhance the Pleaant St. downtown area by providing improved pedestrian conne |
Malden |
MA |
31 |
$2,526,000 |
Streets/Roads |
-12 |
| Pleasant Street Parking Deck. Construction of a 2-story 100-space parking deck on the site of the former YMCA in Malden Square. This facility situated in the Central Business District will provide additional parking in the downtown area for patrons and em |
Malden |
MA |
34 |
$1,750,000 |
Streets/Roads |
-17 |
| Parking Garage Rehabilitation. Rehab of the Jackson Street Parking Garage, the CBD Parking Garage and the Mountain Ave. deck including concrete deck repairs and sealing, expansion joint repairs and replacement, painting of structural steel and other misce |
Malden |
MA |
22 |
$1,500,000 |
Streets/Roads |
-14 |
| Malden Downtown Central Business District Revitalization Project Phase II. City of Malden determined to revitalize a once thriving retail and commercial district proposes to enhance the downtown area by providing improved pedestrian connections and street |
Malden |
MA |
31 |
$1,093,950 |
Streets/Roads |
-6 |
| Traffic Signal Improvements Contract -- Replacement and/or renovation of traffic signals and associated equipment at several intersections. |
Malden |
MA |
28 |
$1,000,000 |
Streets/Roads |
-4 |
| Centre Street/Route 60 Commercial St. intersection improvements. Geometric improvements and upgrade to traffic signal equipment at this location to improve level of service and safety. |
Malden |
MA |
14 |
$750,000 |
Streets/Roads |
-7 |
| Citywide Beautification Project Contract 2009-T-1 -- Continuation of citywide tree planting and landscaping program. Five hundred street trees would be planted under this project. |
Malden |
MA |
28 |
$500,000 |
Streets/Roads |
-27 |
| Salem Street/Overlook Ridge Drive/Route 1 Access Reconstruction City of Malden in conjunction with City of Revere -- Arterial roadway construction including site work, milling, pavement, curbs and sidewalks. Project intended to provide new access connect |
Malden |
MA |
170 |
$10,000 |
Streets/Roads |
4 |
| Replacement of approx. 1,000 lead residential and commercial/industrial service connections with new copper tubing. |
Malden |
MA |
36 |
$4,500,000 |
Water |
12 |
| Public Works Improvements Program Contract 2009-H/W-2. Replacement of approx. 5,000LF of circa-1900 unlined cast iron water mains with new cement-lined ductile iron pipe, including replacement of approx. 150 lead residential and commercial/industrial serv |
Malden |
MA |
32 |
$3,200,000 |
Water |
10 |
| Public Works Improvements Program Contract 2009-H/W-1. Replacement of approx. 5,000 LF of circa-1900 unlined cast iron water mains with new cement-lined ductile iron pipe, including replacement of approx. 150 lead residential and commercial/industrial ser |
Malden |
MA |
32 |
$3,200,000 |
Water |
9 |
| Public Works Improvement Program Contract 2009-S-2 (Citywide Sewer Rehabilitation). Rehabilitation and/or replacement of approx. 12,500 LF of wastewater collection and conveyance piping including in-situ lining, replacement/spot repair of structurally def |
Malden |
MA |
32 |
$2,500,000 |
Water |
0 |
| Public Works Improvements Program Contract 2009-S-1 (Citywide Sewer Rehabilitation). Rehab and/or replacement of approx. 12,500 LF of wastewater collection and conveyance piping including in-situ lining, replacement of structurally deficient vitrified cla |
Malden |
MA |
32 |
$2,500,000 |
Water |
1 |
| Municipal Drainage System Rehabililtation Program (Citywide). Clean and rehab portions of the city's municipal storm drain system at locations throughout the city. The municipal drainage system consists of approx. 80 miles of drainage pipes and culverts a |
Malden |
MA |
18 |
$1,500,000 |
Water |
6 |
| South Broadway Park Renovation-
Renovation of South Broadway Park including replacing the existing natural grass baseball field and multi-use rectangular laying field in the outfield with new infilled synthetic turf; a new sports lighting system; reconf |
Malden |
MA |
80 |
$6,300,000 |
CDBG |
-37 |
| Waitt's Mount Renovation - Comprehensive renovation of Waitt's Mount including: general clearing, grubbing and site clean up; improved access road and visitor parking; interpretive parking signage; new walking trails and paths; a new tot lot and shade she |
Malden |
MA |
76 |
$5,800,000 |
CDBG |
-20 |
| Macdonald Stadium Renovation - Renovation of Macdonald Stadium including replacing the existing natural grass playing surface with new infilled synthetic turf, reconstructing the existing running track with a new 6-lane equal quadrant resilient track, |
Malden |
MA |
56 |
$4,400,000 |
CDBG |
-38 |
| Roosevelt Park Renovation - Renovation of Roosevelt Park including replacing the existing natural grass softball/baseball field and multi-use rectangular playing field int he outfield with new infilled synthetic turf; a new sports lighting system; |
Malden |
MA |
22 |
$1,500,000 |
CDBG |
-29 |
| Miller Park Renovation - Phase II
Miscellaneous improvements to Miller Park including: general clearing, grubbing and site clean up; replacing safety surfacing at existing play equipment; a new aquatic playground including required utilities and control |
Malden |
MA |
14 |
$450,000 |
CDBG |
-4 |
| Ferryway Park Renovation - Renovation of Ferryway Park including re-grading and additions and extension of site drainage systems to allow proper drainage of the playing surface, reconstruction of the existing natural grass softball/baseball field and mult |
Malden |
MA |
14 |
$285,000 |
CDBG |
-11 |
| Jenkins Auditorium Performing Arts Center at Malden High School. Renovation and modernization of the existing 1930-era art deco styled Jenkins Auditorium at Malden High School to create a 1600 seat performing arts center for school and after-hour cultural |
Malden |
MA |
90 |
$6,000,000 |
Schools |
-31 |
| Pavement Management - 100 road miles |
Northampton |
MA |
30 |
$15,000,000 |
Streets/Roads |
-5 |
| Manhan Rail Trail - 2.4 miles |
Northampton |
MA |
18 |
$3,100,000 |
Streets/Roads |
34 |
| Milton Street Repaving |
Northampton |
MA |
24 |
$1,500,000 |
Streets/Roads |
-5 |
| Hinckley Street Repaving |
Northampton |
MA |
24 |
$1,000,000 |
Streets/Roads |
16 |
| Replace Cast Iron and Asbestos Cement Water Mains - 20 miles |
Northampton |
MA |
15 |
$6,000,000 |
Water |
16 |
| Repalcement of Sewer Mains |
Northampton |
MA |
10 |
$4,000,000 |
Water |
13 |
| Slip lining sewer mains |
Northampton |
MA |
5 |
$1,000,000 |
Water |
8 |
| Installation of Zinc Orthophosphate Chemical Feed at Water Treatment Plant |
Northampton |
MA |
8 |
$700,000 |
Water |
2 |
| Upgrade well chlorination equipment at two wells |
Northampton |
MA |
12 |
$695,000 |
Water |
11 |
| Flood Control - Dike, levee and pump station upgrades |
Northampton |
MA |
6 |
$500,000 |
Water |
11 |
| Utility and Road replacement for cross town connector |
Quincy |
MA |
300 |
$5,000,000 |
Streets/Roads |
3 |
| Replacement of all Water Mains that are 75 years or older. |
Quincy |
MA |
900 |
$30,000,000 |
Water |
24 |
| Implementation of a city wide, fixed radio, Automated Meter Reading System. Project includes meters, transmitters, software and antennas. |
Quincy |
MA |
150 |
$9,000,000 |
Water |
-17 |
| Repair Pump Stations and Water Tanks |
Quincy |
MA |
55 |
$3,000,000 |
Water |
11 |
| Woburn Public Library Addition |
Woburn |
MA |
16 |
$20,000,000 |
Streets/Roads |
-27 |
| Forest Park Cemetery Project |
Woburn |
MA |
9 |
$4,200,000 |
Streets/Roads |
-22 |
| Main Street Roadway andSidewalk Reconstruction |
Woburn |
MA |
8 |
$2,400,000 |
Streets/Roads |
-2 |
| Magazine Hill Parking Lot Project |
Woburn |
MA |
6 |
$2,000,000 |
Streets/Roads |
0 |
| Woburn Bike Loop Project |
Woburn |
MA |
8 |
$1,610,000 |
Streets/Roads |
-29 |
| Water Treatment Plant Addition and Tank |
Woburn |
MA |
37.5 |
$24,500,000 |
Water |
13 |
| Area 3 Sewer Rehabilitation-Repairs to 30,000 ft of sewer mains |
Woburn |
MA |
26 |
$2,445,000 |
Water |
13 |
| Cleaning and Relining Project Year 4 |
Woburn |
MA |
8 |
$1,400,000 |
Water |
6 |
| Hart Street Drainage Improvements |
Woburn |
MA |
6 |
$1,400,000 |
Water |
18 |
| Dix Road Sewer Pump Station Rehabilitation |
Woburn |
MA |
9 |
$969,000 |
Water |
5 |
| Residential Water Meter Replacement Project |
Woburn |
MA |
10 |
$550,000 |
Water |
-8 |
| Dix Road Private Source Removal |
Woburn |
MA |
5 |
$445,000 |
Water |
0 |
| Watermain Improvement Project |
Woburn |
MA |
8 |
$310,000 |
Water |
8 |
| Leland Site Remediation |
Woburn |
MA |
20 |
$3,000,000 |
CDBG |
-8 |
| Main Street Corridor Traffic Signal Upgrades |
Woburn |
MA |
3 |
$1,100,000 |
Public Safety |
-11 |
| Police Station Roof Replacement |
Woburn |
MA |
8 |
$350,000 |
Public Safety |
1 |
| Kennedy Middle School Roof Replacement |
Woburn |
MA |
9 |
$1,650,000 |
Schools |
13 |
| Plympton School Rehabilitation |
Woburn |
MA |
12 |
$1,550,000 |
Schools |
-12 |
| Joyce Middle School Roof Replacement |
Woburn |
MA |
8 |
$1,250,000 |
Schools |
6 |