| 96th Street & Keystone Ave. Interchange Construction - The current signalized intersection will be converted to an interchange |
Carmel |
IN |
1500 |
$50,000,000 |
Streets/Roads |
-150 |
| Keystone Avenue at 116th Street and Carmel Drive interchanges-
These intersections will be converted to an interchange and the traffic signal will be eliminated. Construction is scheduled to begin in early 2009. 116th Street and Carmel Drive closures |
Carmel |
IN |
1140 |
$38,000,000 |
Streets/Roads |
-17 |
| Keystone and 131st Street Interchange construction |
Carmel |
IN |
738 |
$24,600,000 |
Streets/Roads |
-71 |
| River Road Reconstruction from 116th Street to 146th Street |
Carmel |
IN |
660 |
$22,000,000 |
Streets/Roads |
-62 |
| Keystone Avenue and 136th Street |
Carmel |
IN |
582 |
$19,400,000 |
Streets/Roads |
-28 |
| 3rd Avenue SW Reconstruction and Esplanade from City Center Drive to 2nd Street SW |
Carmel |
IN |
255 |
$8,500,000 |
Streets/Roads |
-34 |
| Veteran's Way Construction from City Center Drive to Executive Drive |
Carmel |
IN |
255 |
$8,500,000 |
Streets/Roads |
-33 |
| Illinois Street Construction Phase III- 103rd to 116th - Construction of a new 4-lane boulvard |
Carmel |
IN |
240 |
$8,000,000 |
Streets/Roads |
-17 |
| 131st Street Reconstruction From 4th Ave. SW to US-31 |
Carmel |
IN |
210 |
$7,000,000 |
Streets/Roads |
-19 |
| Shelborne Road from north of 116th Street to 131st Street |
Carmel |
IN |
195 |
$6,500,000 |
Streets/Roads |
-13 |
| Rangeline Road Reconstruction from 136th Street to US-31 |
Carmel |
IN |
180 |
$6,000,000 |
Streets/Roads |
-17 |
| 96th Street & Commerce Dr. Project (Carmel/Hamilton Co. Joint Project) - Improvements on 96th between Michigan Rd. & Shelborne |
Carmel |
IN |
150 |
$5,000,000 |
Streets/Roads |
-15 |
| Towne Road Reconstruction - 131st Street to 146th Street creating a 4-lane blvd with multi-use paths, curbs, and storm sewers |
Carmel |
IN |
150 |
$5,000,000 |
Streets/Roads |
-15 |
| 96th St. Improvements – Shelborne Rd. to Towne Rd. (Carmel/Hamilton Co. Joint Project) |
Carmel |
IN |
150 |
$5,000,000 |
Streets/Roads |
-9 |
| 96th and Towne Road Roundabout (Carmel/Hamilton County Joint Project |
Carmel |
IN |
135 |
$4,500,000 |
Streets/Roads |
0 |
| Veterans Way Extension from City Center Drive to Main Street |
Carmel |
IN |
135 |
$4,500,000 |
Streets/Roads |
-17 |
| Carmel Drive and City Center Drive Roundabout Construction |
Carmel |
IN |
120 |
$4,000,000 |
Streets/Roads |
-24 |
| 126th Street from Shelborne Road to Towne Road |
Carmel |
IN |
108 |
$4,000,000 |
Streets/Roads |
-8 |
| Gray Road & 116th Street Roundabout Construction |
Carmel |
IN |
108 |
$3,600,000 |
Streets/Roads |
0 |
| Guilford Road reconstruction from 116th St. to City Center Drive |
Carmel |
IN |
105 |
$3,500,000 |
Streets/Roads |
-11 |
| 131st Street Reconstruction from US-31 to Springmill Rd. |
Carmel |
IN |
105 |
$3,500,000 |
Streets/Roads |
-22 |
| Guilford Road - City Center Drive to 131st Street improvement: indluding roundabout at 131st St., turning lane, storm sewers, curbs |
Carmel |
IN |
105 |
$3,500,000 |
Streets/Roads |
-14 |
| 131st Street parallel multi-use path from Hazel Dell Parkway to Keystone Ave. |
Carmel |
IN |
90 |
$3,000,000 |
Streets/Roads |
-21 |
| Hazel Dell Road miscellaneous improvements between 116th Street and 146th Street |
Carmel |
IN |
78 |
$2,600,000 |
Streets/Roads |
-21 |
| 3rd Ave. SW Reconstruction from Gradel Drive to City Center Drive |
Carmel |
IN |
75 |
$2,500,000 |
Streets/Roads |
-14 |
| 106th Street Multi-Use Path Project - Phase I (Carmel Engineering/Carmel Water Joint Project) |
Carmel |
IN |
60 |
$2,000,000 |
Streets/Roads |
-15 |
| 106th and Ditch Road Roundabout (Carmel/Hamilton County Joint Project |
Carmel |
IN |
60 |
$2,000,000 |
Streets/Roads |
-17 |
| 136th Street & Gray Rd. Roundabout Construction |
Carmel |
IN |
54 |
$1,800,000 |
Streets/Roads |
-20 |
| 126th Street & Gray Rd. Roundabout Construction |
Carmel |
IN |
54 |
$1,800,000 |
Streets/Roads |
-19 |
| 131st Street & Gray Rd. Roundabout Construction |
Carmel |
IN |
54 |
$1,800,000 |
Streets/Roads |
-15 |
| Hazel Dell Pkwy & 116th Street Roundabout Construction |
Carmel |
IN |
53 |
$1,750,000 |
Streets/Roads |
-20 |
| Old Meridian Street & Carmel Drive Roundabout Construction |
Carmel |
IN |
53 |
$1,750,000 |
Streets/Roads |
-8 |
| Towne Road & 116th Street Roundabout Construction |
Carmel |
IN |
53 |
$1,750,000 |
Streets/Roads |
-13 |
| 106th Street & Towne Rd. Roundabout |
Carmel |
IN |
45 |
$1,500,000 |
Streets/Roads |
-13 |
| 111th Street & Pennsylvania Street roundabout |
Carmel |
IN |
45 |
$1,500,000 |
Streets/Roads |
-14 |
| 106th Street & Hazel Dell Pkwy Roundabout` |
Carmel |
IN |
45 |
$1,500,000 |
Streets/Roads |
-21 |
| 111th St. & College Ave. Roundabout |
Carmel |
IN |
39 |
$1,300,000 |
Streets/Roads |
-8 |
| Towne Road Multi-Use Path Project - Phase I - 106th to 116th and 116th Street Path Connections to Parks |
Carmel |
IN |
36 |
$1,200,000 |
Streets/Roads |
-14 |
| 141st Street & Shelborne roundabout |
Carmel |
IN |
30 |
$1,000,000 |
Streets/Roads |
-13 |
| 106th Street & Shelborne roundabout |
Carmel |
IN |
30 |
$1,000,000 |
Streets/Roads |
-16 |
| Southwest Clay Township Miscellaneous Drainage Improvements in Satisfaction of Annexation Agreement (Carmel/Hamilton County Joint Project) |
Carmel |
IN |
27 |
$900,000 |
Streets/Roads |
-5 |
| New 36" Water Transmission Line Installation and Construction of New Water Plant to Serve expanding western Carmel |
Carmel |
IN |
1500 |
$50,000,000 |
Water |
9 |
| Waste Water Treatment Plant Upgrade |
Carmel |
IN |
300 |
$20,000,000 |
Water |
33 |
| Wind Turbine Project |
Carmel |
IN |
25 |
$4,000,000 |
Water |
-19 |
| City Center Parking Structure Phase II |
Carmel |
IN |
360 |
$12,000,000 |
CDBG |
-31 |
| City Center Parking Structure Phase I |
Carmel |
IN |
240 |
$8,000,000 |
CDBG |
-26 |
| Central Park 116th Street Entrance - Construction of entrance and interior park roadway to better access existing facilities |
Carmel |
IN |
135 |
$4,500,000 |
CDBG |
-36 |
| Park Maintenance Building Construction - New Maintenance Building to allow Carmel Parks to consolidate all maintenance operations in one location |
Carmel |
IN |
105 |
$3,500,000 |
CDBG |
-42 |
| Hazel Dell Park Phase III - Includes construction of shelters, trails, and bridge connection to adjacent park on opposite side of White River |
Carmel |
IN |
105 |
$3,500,000 |
CDBG |
-29 |
| Founders Park Phase II Construction - including playground equipment, shelter house, restrooms, and community building. |
Carmel |
IN |
90 |
$3,000,000 |
CDBG |
-22 |
| Central Park Aquatic Center Phase II - Constrution of additional water slide and wave pool. |
Carmel |
IN |
75 |
$2,500,000 |
CDBG |
-84 |
| Central Park Meeting House - Reconstruction of existing meeting house and construction of new parking area. |
Carmel |
IN |
75 |
$2,300,000 |
CDBG |
-27 |
| Central Park Phase II - Includes construction of shelters, restroom building, and playground including spray park |
Carmel |
IN |
45 |
$1,500,000 |
CDBG |
-23 |
| Inter Urban Trail - Construction of trail and reconstruction of existing rail bridge. |
Carmel |
IN |
30 |
$1,000,000 |
CDBG |
-23 |
| Communication Center Construction - Emergency Operations Center which houses the Emergency Management and Public Safety Communications Command & Controls |
Carmel |
IN |
360 |
$12,000,000 |
Public Safety |
6 |
| Carmel Police Station and City Court Building Construction |
Carmel |
IN |
150 |
$6,000,000 |
Public Safety |
-27 |
| Carmel Fire Station No. 43 Construction |
Carmel |
IN |
120 |
$4,000,000 |
Public Safety |
13 |
| Carmel Fire Station No. 44 Construction |
Carmel |
IN |
120 |
$4,000,000 |
Public Safety |
17 |
| Citywide Video System |
Carmel |
IN |
25 |
$2,000,000 |
Public Safety |
-73 |
| Fire Engine Purchase - 2 New Fire Engines |
Carmel |
IN |
60 |
$2,000,000 |
Public Safety |
32 |
| Mobile Video System |
Carmel |
IN |
3 |
$400,000 |
Public Safety |
-42 |
| Public Transportation Garage Construction and Purchase of New Vehicles |
Carmel |
IN |
150 |
$5,000,000 |
Transit |
-25 |
| Mill Street Road Reconstruction Project from Elmore Street to South BLVD |
Crawfordsville |
IN |
500 |
$2,000,000 |
Streets/Roads |
-10 |
| Broadwy Improvements, including intersections, 93rd to SR231 |
Crown Point |
IN |
200 |
$22,000,000 |
Streets/Roads |
35 |
| West Street Reconstruction |
Crown Point |
IN |
28 |
$850,000 |
Streets/Roads |
-7 |
| North Street Improvements Servicing New I-65 Interchance |
Crown Point |
IN |
16 |
$500,000 |
Streets/Roads |
10 |
| Court Street Resurfacing |
Crown Point |
IN |
10 |
$300,000 |
Streets/Roads |
-9 |
| Additional Above Ground Storage |
Crown Point |
IN |
20 |
$2,000,000 |
Water |
4 |
| Northwest Sewer Expansion |
Crown Point |
IN |
10 |
$1,000,000 |
Water |
18 |
| Cline Avenue Extension - Reconstruction of existing interchange to add approximately 1500' of new bridge and a 4 lane boulevard to connect Broadway and Guthrie Street intersection to a new bridge over Cline Avenue (SR 912) to the existing interchange prov |
East Chicago |
IN |
100 |
$24,000,000 |
Streets/Roads |
-17 |
| Main Street Reconstruction - This work shall include but not limited to a new HMA pavement; textured concrete pavement; concrete sidewalk; storm and sanitary sewers; concrete curb & gutters; new traffic signal at the intersection; landscaping; and ornamen |
East Chicago |
IN |
75 |
$6,000,000 |
Streets/Roads |
-6 |
| Broadway Reconstruction; Michigan to Guthrie - This work shall include but not limited to new HMA pavement; textured concrete pavement; concrete sidewalk; storm and sanitary sewers; concrete curb & gutters; new traffic signal at the intersection; landscap |
East Chicago |
IN |
75 |
$6,000,000 |
Streets/Roads |
-13 |
| Traffic Signal Modernization and replacement of signal interconnection - The project includes transit pre-emption, bus shelters, bike lockers at the South Shore Station, and new ADA sidewalk ramps. |
East Chicago |
IN |
50 |
$2,374,000 |
Streets/Roads |
-7 |
| Northcote Avenue Reconstruction Project - This project shall include half mile roadway reconstruction including new pavement concrete curb and gutter, concrete sidewalk, ornamental street lighting, and sewer seperation of existing combined sewers. |
East Chicago |
IN |
40 |
$1,450,000 |
Streets/Roads |
-1 |
| 151st Street Reconstruction Project - This project shall include half mile of roadway reconstruction, including new pavement, concrete curb and gutter, concrete sidewalk, a multi-use path, and ornamental street lighting. Sewer improvements shall include s |
East Chicago |
IN |
40 |
$1,450,000 |
Streets/Roads |
-11 |
| Tod Avenue Reconstruction Project - This project shall include half mile of roadway reconstruction, including new pavement, concrete curb and gutter, concrete sidewalk, a multi-use path, and ornamental street lighting. Sewer improvements shall include sep |
East Chicago |
IN |
40 |
$1,450,000 |
Streets/Roads |
-6 |
| Magoun Avenue Reconstruction Project - This project shall include half mile of roadway reconstruction, including new pavement, concrete curb and gutter, concrete sidewalk, a multi-use path, and ornamental street lighting. Sewer improvements shall include |
East Chicago |
IN |
40 |
$1,450,000 |
Streets/Roads |
-7 |
| Baring Avenue Reconstruction Project - This project shall include half mile of roadway reconstruction, including new pavement, concrete curb and gutter, concrete sidewalk, a multi-use path, and ornamental street lighting. Sewer improvements shall include |
East Chicago |
IN |
40 |
$1,450,000 |
Streets/Roads |
-5 |
| 145th Reconstruction Project - This project shall include half mile of roadway reconstruction, including new pavement, concrete curb and gutter, concrete sidewalk, a multi-use path, and ornamental street lighting. Sewer improvements shall include seperati |
East Chicago |
IN |
40 |
$1,450,000 |
Streets/Roads |
-6 |
| Neighborhood Ornmental Lighting Project - That includes the placement of new light poles, controller cabinets, handholes throughout various streets in the city. |
East Chicago |
IN |
30 |
$1,233,000 |
Streets/Roads |
-18 |
| Chicago Avenue; Cline to Kennedy Avenue - Traffic Signal Modernization and replacement of signal interconnect. This project includes transit pre-emption, bus shelters, ornamental lighting, and new ADA sidewalk ramps. |
East Chicago |
IN |
40 |
$1,200,000 |
Streets/Roads |
-8 |
| East Columbus Drive Beautification Project - This project once completed will bring new thematic lighting, landmark elements at the city limit and key intersections, pedestrian/bike pathways, as well as traffic generators, and way finding signage. |
East Chicago |
IN |
30 |
$1,150,000 |
Streets/Roads |
-19 |
| Bike Trail - This project consists of construction of a multi-purpose trail along the Grand Calumet River. It will be joining three city's. It will involve new pavement, sidewalks, ornamental lighting, and site elements. |
East Chicago |
IN |
20 |
$1,100,000 |
Streets/Roads |
-31 |
| Indianapolis Blvd. Widening; between Carrol and McShane - This project shall consist of curb reconstruction and auxiliary and/or parking lane widening at various locations along Indianapolis Blvd. |
East Chicago |
IN |
40 |
$1,000,000 |
Streets/Roads |
-2 |
| East Chicago Water Treatment Plant - Construction of a new membrane Filtration Plant to replace the city's existing plant, which has outlived it's life expectancy. |
East Chicago |
IN |
130 |
$54,400,000 |
Water |
21 |
| 145th Street Lift Station Improvements - The replacement and upgrade of bar screens, pumps and controlls at an existing stormwater lifting station. |
East Chicago |
IN |
10 |
$1,500,000 |
Water |
10 |
| Bar Screen Replacement Project - The purchase and installation of new bar screens, washing systems, and screenings compaction system at the Wastewater Treatment Plant. |
East Chicago |
IN |
9 |
$609,000 |
Water |
8 |
| Wind Turbin Project - The installation of a wind turbin to supplement the Wastewater Treatment Plant power supply. |
East Chicago |
IN |
7 |
$210,000 |
Water |
-2 |
| Solar Mixers Project - The installation of three solar powered mixers in a CSO basin at the Wastewater Treatment Plant. |
East Chicago |
IN |
7 |
$200,000 |
Water |
2 |
| This work shall include but not limited to new HMA pavement, textured concrete pavement, concrete sidewalk, storm and sanitary sewers, concrete curb & gutters; new traffic signal at the intersections; landscaping; and ornamental street lighting. |
East Chicago |
IN |
75 |
$6,000,000 |
CDBG |
-14 |
| Lincoln Elementary School - This project consists of rebuilding the school. The school was originally erected in 1970. |
East Chicago |
IN |
0 |
$20,000,000 |
Schools |
-14 |
| Renovation of Block Jr. High School - This project consists of a new fire system, ADA compliance, swimming pool repairs, and maintenance issues that need to be addressed. The school was originally erected in 1968. |
East Chicago |
IN |
0 |
$3,000,000 |
Schools |
-11 |
| Central High School - The project consists of a digital phone system, 42" flat screen video monitors, computers and white board technology, computerized textbook inventory system, barcode scanners in the cafeteria, technology 2000 lab, replacement of pres |
East Chicago |
IN |
0 |
$3,000,000 |
Schools |
-35 |
| School Administration Office - This project consists of new access/security system for the building. |
East Chicago |
IN |
0 |
$150,000 |
Schools |
-29 |
| BURKHARDT ROAD IMPROVEMENTS (LLOYD EXPWY. TO LINCOLN AVE.)
Project will alleviate vehicular congestion and improve safety through the construction of added travel lanes and associated improvements on Burkhardt Road between State Route 66 (Lloyd Expressway |
Evansville |
IN |
0 |
$4,737,170 |
Streets/Roads |
18 |
| PIGEON CREEK GREENWAY PASSAGE - INDUSTRIAL CORRIDOR PH 4 – VIADUCT The Industrial Corridor Phase 4 is a viaduct along the Pigeon Creek. Due to poor soil conditions a viaduct will need to be constructed to ensure proper access along the creek. |
Evansville |
IN |
28 |
$2,800,000 |
Streets/Roads |
-13 |
| PIGEON CREEK GREENWAY PASSAGE - INDUSTRIAL CORRIDOR PHASE 2 - PEDESTRIAN/BICYCLE TRAIL The Industrial Corridor Phase 2 is the continuation of the Pigeon Creek Greenway Passage. Phase 2 starts at Franklin Street and follows the Pigeon Creek to Lamasco Park |
Evansville |
IN |
25 |
$2,400,000 |
Streets/Roads |
-13 |
| LINCOLN AVENUE ROAD IMPROVEMENTS (KIRKWOOD DR. TO CITY LIMITS)
Project includes road and drainage improvements to the existing two-lane pavement, as well as widening to accommodate bicyclists; |
Evansville |
IN |
0 |
$1,120,500 |
Streets/Roads |
-18 |
| PIGEON CREEK GREENWAY PASSAGE - INDUSTRIAL CORRIDOR PHASE 3 – PEDESTRIAN/BICYCLE TRAIL The Industrial Corridor Phase 3 continues the Greenway Passage from Phase 2 and follows along the Pigeon Creek levee to Louisiana Street. |
Evansville |
IN |
8 |
$750,000 |
Streets/Roads |
-12 |
| BUENA VISTA ROAD IMPROVEMENTS (FULTON AVE. TO EAST)
Project includes pavement reconstruction and improved geometrics at the intersection of Fulton Avenue and Buena Vista Road, as well as replacement of failing retaining wall structures at that intersectio |
Evansville |
IN |
0 |
$550,000 |
Streets/Roads |
3 |