| City of Acworth, Ga. Repave/repair various streets |
Acworth |
GA |
30 |
$1,500,000 |
Streets/Roads |
-39 |
| City of Acworth, Ga. Construct road enbankment support walls |
Acworth |
GA |
25 |
$1,250,000 |
Streets/Roads |
-26 |
| City of Acworth, Ga. Const./Repair parking,laydown,delivery support complex |
Acworth |
GA |
25 |
$1,000,000 |
Streets/Roads |
-13 |
| Construct for pedestrian connectivity, sidewalks; various locations |
Acworth |
GA |
10 |
$200,000 |
Streets/Roads |
-29 |
| Kimball Bridge Road (Bridge Replacement) - (GDOT) |
Alpharetta |
GA |
60 |
$3,000,000 |
Streets/Roads |
17 |
| Citywide Milling & Resurfacing |
Alpharetta |
GA |
48 |
$2,400,000 |
Streets/Roads |
-29 |
| Webb Bridge Road and Shirley Bridge Road (Intersection) - (GDOT) |
Alpharetta |
GA |
30 |
$1,510,000 |
Streets/Roads |
-14 |
| Rucker Road (4 separate sections - see CIP Input Form) |
Alpharetta |
GA |
30 |
$1,500,000 |
Streets/Roads |
-12 |
| Kimball Bridge Road and Waters Road (Intersection) - (GDOT) |
Alpharetta |
GA |
27 |
$1,337,000 |
Streets/Roads |
-4 |
| Windward Parkway Signal Interconnect and Timing (GDOT) |
Alpharetta |
GA |
23 |
$1,150,000 |
Streets/Roads |
-38 |
| North Point Parkway Signal Interconnect and Timing (GDOT) |
Alpharetta |
GA |
21 |
$1,070,000 |
Streets/Roads |
-27 |
| North Point Parkway (Encore Parkway to Haynes Bridge Road) |
Alpharetta |
GA |
14 |
$700,000 |
Streets/Roads |
-13 |
| Douglas Road Pedestrian Bridge and Sidewalk |
Alpharetta |
GA |
11 |
$550,000 |
Streets/Roads |
46 |
| Webb Bridge Road (Westwind subdivision to Webb Bridge Way) |
Alpharetta |
GA |
10 |
$510,000 |
Streets/Roads |
-14 |
| Old Milton Parkway Pedestrian Bridge |
Alpharetta |
GA |
10 |
$500,000 |
Streets/Roads |
-27 |
| Bethany Road and Mayfield Road (Intersection) |
Alpharetta |
GA |
10 |
$500,000 |
Streets/Roads |
-12 |
| State Route 9 (Upper Hembree Road to Northfall) |
Alpharetta |
GA |
9 |
$450,000 |
Streets/Roads |
-9 |
| Mid-Broadwell Road Phase-III (Fire Station 5 to Wieland property) |
Alpharetta |
GA |
7 |
$350,000 |
Streets/Roads |
-6 |
| Douglas Road (Nasser Avenue to McGinnis Ferry Road) |
Alpharetta |
GA |
7 |
$350,000 |
Streets/Roads |
-1 |
| Morris Road and Old Milton Parkway (Intersection) |
Alpharetta |
GA |
7 |
$350,000 |
Streets/Roads |
-5 |
| Encore Parkway (North Point Parkway to GA 400) |
Alpharetta |
GA |
7 |
$340,000 |
Streets/Roads |
-11 |
| Citywide Traffic Control Equipment |
Alpharetta |
GA |
6 |
$300,000 |
Streets/Roads |
-5 |
| Citywide Traffic Striping and Signage |
Alpharetta |
GA |
6 |
$300,000 |
Streets/Roads |
-1 |
| Broadwell Road (Rucker Road to Cathedral Drive) |
Alpharetta |
GA |
6 |
$300,000 |
Streets/Roads |
-7 |
| Windward Parkway (North Point Parkway to Windward Plaza) |
Alpharetta |
GA |
6 |
$300,000 |
Streets/Roads |
-6 |
| Mid-Broadwell Road and Bethany Road (Intersection) |
Alpharetta |
GA |
5 |
$250,000 |
Streets/Roads |
-7 |
| Mid-Broadwell Road Phase-IV (Wieland property to Bethany Road) |
Alpharetta |
GA |
5 |
$240,000 |
Streets/Roads |
-5 |
| Bethany Road (Chelsey Lane to Chantilly Drive) |
Alpharetta |
GA |
4 |
$200,000 |
Streets/Roads |
-7 |
| Windward Parkway and North Point Parkway (Intersection) |
Alpharetta |
GA |
4 |
$175,000 |
Streets/Roads |
-5 |
| Marconi Drive (Windward Pkwy to proposed Big Creek Greenway parking lot) |
Alpharetta |
GA |
3 |
$160,000 |
Streets/Roads |
-12 |
| Broadwell Road and Rucker Road (Intersection) |
Alpharetta |
GA |
3 |
$150,000 |
Streets/Roads |
-4 |
| Citywide Loop Detector Maintenance |
Alpharetta |
GA |
3 |
$150,000 |
Streets/Roads |
-12 |
| Citywide Stormwater/Drainage Repair |
Alpharetta |
GA |
9 |
$450,000 |
Water |
8 |
| Lantern Ridge Court (Stormwater) |
Alpharetta |
GA |
3 |
$145,000 |
Water |
3 |
| Old Roswell Road (Drainage) |
Alpharetta |
GA |
2 |
$100,000 |
Water |
2 |
| Webb Bridge Park Community Center |
Alpharetta |
GA |
364 |
$18,190,000 |
CDBG |
-221 |
| Wills Park Pool Renovation |
Alpharetta |
GA |
171 |
$8,560,000 |
CDBG |
-154 |
| Community Center Phase-III |
Alpharetta |
GA |
139 |
$6,955,000 |
CDBG |
-90 |
| Alpharetta Adult Activity Center Expansion |
Alpharetta |
GA |
4 |
$200,000 |
CDBG |
-39 |
| North Park and Wills Park Playground Replacement |
Alpharetta |
GA |
2 |
$100,000 |
CDBG |
-28 |
| Wills Park Picnic Shelter Replacement |
Alpharetta |
GA |
2 |
$80,000 |
CDBG |
-52 |
| Department Fleet (police vehicles Qty: 125; fire vehicles Qty: 9) |
Alpharetta |
GA |
0 |
$4,645,000 |
Public Safety |
-30 |
| Indoor Shooting Range |
Alpharetta |
GA |
22 |
$1,100,000 |
Public Safety |
-264 |
| Rehab Vehicle (Qty: 1) |
Alpharetta |
GA |
0 |
$440,000 |
Public Safety |
-28 |
| Rescue Vehicles (Qty: 2) |
Alpharetta |
GA |
0 |
$400,000 |
Public Safety |
14 |
| Remote Observation and Surveillance Equipment |
Alpharetta |
GA |
0 |
$300,000 |
Public Safety |
-22 |
| Fire Station (1-4) Ventilation System |
Alpharetta |
GA |
3 |
$180,000 |
Public Safety |
3 |
| Fire Station (1-4) Floor Refinishing |
Alpharetta |
GA |
2 |
$130,000 |
Public Safety |
-28 |
| Weapons Replacement |
Alpharetta |
GA |
0 |
$127,500 |
Public Safety |
-25 |
| Automated Tone Alert System |
Alpharetta |
GA |
2 |
$100,000 |
Public Safety |
-9 |
| Electronic Fingerprinting Equipment |
Alpharetta |
GA |
0 |
$65,000 |
Public Safety |
-3 |
| Self-Contained Breathing Apparatus (SCBA) Air Bottles |
Alpharetta |
GA |
0 |
$40,000 |
Public Safety |
-6 |
| Off-Road Medical Response Vehicle (Qty: 1) |
Alpharetta |
GA |
0 |
$30,000 |
Public Safety |
7 |
| Barnett Shoals Road/ Old Lexington Road Intersection:
The realignment of Old Lexington Road to intersect with Barnett Shoals Road at a traditional 90-degree angle with the installation of a traffic signal. |
Athens |
GA |
12 |
$1,110,000 |
Streets/Roads |
-35 |
| Mitchell Bridge Road/Athens West Parkway Intersection:
The realignment of the existing three-legged intersection to a four-legged intersection with the newly constructed street, The Preserve, serving as the fourth leg of the intersection. Included in th |
Athens |
GA |
12 |
$950,000 |
Streets/Roads |
-19 |
| Mitchell Bridge Road Widening:
The widening of Mitchell Bridge Road between the Atlanta Highway and Athens West Parkway to a consistent 3-lane cross section to allow for a continuous center, two-way left-turn lane. |
Athens |
GA |
12 |
$700,000 |
Streets/Roads |
-13 |
| Construct three (3) miles of sidewalks |
Athens |
GA |
3 |
$505,000 |
Streets/Roads |
-6 |
| Fowler Mill Drive Bridge Deck Replacement:
The replacement of the bridge deck of the Fowler Mill Drive bridge over Little Bear Creek to address excessive corrosion on the underside of the existing steel bridge deck. |
Athens |
GA |
6 |
$300,000 |
Streets/Roads |
18 |
| Shoal Creek/Whit Davis Rd. Sanitary Sewer Pump Station/Force Main |
Athens |
GA |
30 |
$5,200,000 |
Water |
6 |
| Access Bridge to North Oconee WRF |
Athens |
GA |
20 |
$4,500,000 |
Water |
-25 |
| Renovate Existing Building for Public Utilities Customer Service Center |
Athens |
GA |
40 |
$2,800,000 |
Water |
-26 |
| Extend Public Water Mains along public roadways not currently served by public water service |
Athens |
GA |
15 |
$2,000,000 |
Water |
9 |
| Trail Creek #3 & #4 Interceptor Sewer Project |
Athens |
GA |
40 |
$2,000,000 |
Water |
5 |
| Dredge Lagoon @ Water Treatment Plant |
Athens |
GA |
10 |
$1,000,000 |
Water |
12 |
| Retrofit Clarifiers @ Middle Oconee WRF |
Athens |
GA |
10 |
$1,000,000 |
Water |
2 |
| Cobb Street stormwater project to alleviate flooding throughout the Cobbham neighborhood street network and surrounding properties |
Athens |
GA |
3 |
$955,000 |
Water |
2 |
| Cleveland Avenue stormwater project to alleviate flooding of Cleveland Avenue and surrounding properties (including the Railroad) |
Athens |
GA |
3 |
$400,000 |
Water |
2 |
| Boulevard stormwater project to alleviate flooding along Boulevard and adjacent properties |
Athens |
GA |
3 |
$340,000 |
Water |
2 |
| Poplar Street/Branch Street stormwater project to alleviate flooding of the roadway and surrounding properties |
Athens |
GA |
3 |
$305,000 |
Water |
-2 |
| Apron Rehabilitation Project Phase II |
Athens |
GA |
75 |
$856,000 |
Airport |
1 |
| Obstruction Clearing Runway 9 |
Athens |
GA |
20 |
$363,000 |
Airport |
-2 |
| ACC Library Expansion |
Athens |
GA |
100 |
$16,000,000 |
CDBG |
-36 |
| Construct new Evidence and forensic facility behind PD |
Athens |
GA |
45 |
$4,900,000 |
CDBG |
2 |
| Rocksprings Park Revitalization |
Athens |
GA |
50 |
$4,000,000 |
CDBG |
-77 |
| Diversion Center |
Athens |
GA |
50 |
$4,000,000 |
CDBG |
-15 |
| Police HQ Renovation |
Athens |
GA |
75 |
$4,000,000 |
CDBG |
-34 |
| ENSAT Expansion |
Athens |
GA |
50 |
$4,000,000 |
CDBG |
-19 |
| Convert 50 police cars to run on U.S. natural gas and build requisite fueling stations |
Athens |
GA |
12 |
$1,400,000 |
CDBG |
-76 |
| Bishop Park Ballfield Lighting Upgrade |
Athens |
GA |
25 |
$800,000 |
CDBG |
-64 |
| Holland Sports Complex Lighting Upgrade |
Athens |
GA |
25 |
$750,000 |
CDBG |
-40 |
| Satterfield Park Lighting Upgrade |
Athens |
GA |
20 |
$700,000 |
CDBG |
-27 |
| Purchase 10 hybrid vehicles |
Athens |
GA |
0 |
$300,000 |
CDBG |
-78 |
| Library Carpet Installation |
Athens |
GA |
30 |
$250,000 |
CDBG |
-29 |
| Taylor Grady Interior / Exterior - Painting |
Athens |
GA |
10 |
$115,000 |
CDBG |
-28 |
| Courthouse Interior / Exterior - Painting |
Athens |
GA |
10 |
$113,000 |
CDBG |
-18 |
| Energy Management Control System Jail |
Athens |
GA |
40 |
$900,000 |
Energy |
-17 |
| Jail Roof Replacement |
Athens |
GA |
40 |
$464,000 |
Energy |
13 |
| Energy Management Control System Courthouse |
Athens |
GA |
25 |
$450,000 |
Energy |
-10 |
| Energy Management Control System Dougherty St. Building |
Athens |
GA |
20 |
$350,000 |
Energy |
-5 |
| Energy Management Control System Satula Building |
Athens |
GA |
20 |
$350,000 |
Energy |
-3 |
| Library Cooling Tower & Chillers - HVAC Replacement |
Athens |
GA |
15 |
$263,000 |
Energy |
33 |
| Mental Health Building Roof Replacement |
Athens |
GA |
25 |
$205,000 |
Energy |
-4 |
| Fire Station # 6 Roof Replacement |
Athens |
GA |
20 |
$138,000 |
Energy |
18 |
| Fire Station #2 Roof Replacement |
Athens |
GA |
20 |
$138,000 |
Energy |
14 |
| Courthouse Boiler HVAC Replacement |
Athens |
GA |
5 |
$133,000 |
Energy |
1 |
| Courthouse Air Handler, Supply Fan , Evaporator Coil - HVAC Replacement |
Athens |
GA |
10 |
$100,000 |
Energy |
-2 |
| Police Roof Top Units - HVAC Replacement |
Athens |
GA |
10 |
$88,000 |
Energy |
-1 |
| Costa Building Roof Replacement |
Athens |
GA |
15 |
$85,000 |
Energy |
-2 |
| Fleet Management Roof Replacement |
Athens |
GA |
15 |
$84,000 |
Energy |
-7 |
| Civic Hall Roof Replacement |
Athens |
GA |
15 |
$81,000 |
Energy |
-7 |