| Parks |
Pembroke Pines |
FL |
50 |
$3,000,000 |
CDBG |
-11 |
| Miscellaneous improvements to 32 parks |
Pembroke Pines |
FL |
50 |
$2,000,000 |
CDBG |
1 |
| Construction of soccer fields with sports lighting at West Pines Soccer Park & Nature Preserve |
Pembroke Pines |
FL |
40 |
$2,000,000 |
CDBG |
-11 |
| Construction of a central storage facility |
Pembroke Pines |
FL |
25 |
$1,800,000 |
CDBG |
-13 |
| Construction of a special populations center |
Pembroke Pines |
FL |
30 |
$1,000,000 |
CDBG |
-1 |
| Pines Recreation Teen Center Building |
Pembroke Pines |
FL |
30 |
$1,000,000 |
CDBG |
-6 |
| Sports lighting & field renovation at Silver Palms Elementary School |
Pembroke Pines |
FL |
18 |
$450,000 |
CDBG |
-11 |
| Construction of a restroom facility and sidewalks at Walter C. Young Resource Center Athletic Complex |
Pembroke Pines |
FL |
15 |
$175,000 |
CDBG |
-6 |
| Tie Water heaters to AC heat exchange for more efficient operation of both AC & water heat exchange unit. Pre heats reduces costs and extends equipment life for 880 units @ $1200.00 per unit |
Pembroke Pines |
FL |
10 |
$1,056,000 |
Energy |
0 |
| Add thermal storage units to the air cooled 15-ton DX units to reduce energy consumption at peak periods to the 5 Senior Residences buildings 2-15 ton units/building |
Pembroke Pines |
FL |
8 |
$1,000,000 |
Energy |
2 |
| Upgrade the 3500 street lights owned by the city to high efficiency lighting. Each light costs $100.00 to upgrade |
Pembroke Pines |
FL |
10 |
$350,000 |
Energy |
8 |
| Tie water heaters to AC heat exchange to preheat hot water for more efficient operation of both AC and water heater reducing costs and increasing equipment life, 880 units/1,200 per unit. |
Pembroke Pines |
FL |
2 |
$1,056,000 |
Housing |
1 |
| Install thermal storage units to air cooled 15 ton DX units to reduce energy consumption at peak demand times, and utilize off peak cooling for Senior Residences, 5 buildings/10 units |
Pembroke Pines |
FL |
3 |
$1,000,000 |
Housing |
-4 |
| OSSI Records Management System |
Pembroke Pines |
FL |
0 |
$1,500,000 |
Public Safety |
-5 |
| Crime Suppression Patrol Staffing |
Pembroke Pines |
FL |
12 |
$1,201,240 |
Public Safety |
17 |
| P25 Compliant Radios |
Pembroke Pines |
FL |
0 |
$1,000,000 |
Public Safety |
6 |
| Violent Street Crime Task Force |
Pembroke Pines |
FL |
8 |
$800,824 |
Public Safety |
19 |
| Pocket Citation Devices |
Pembroke Pines |
FL |
0 |
$600,000 |
Public Safety |
-13 |
| Equipment and Vehicles for Personnel |
Pembroke Pines |
FL |
0 |
$600,000 |
Public Safety |
-1 |
| Main Public Safety Facility Generator |
Pembroke Pines |
FL |
0 |
$500,000 |
Public Safety |
6 |
| Upgrades Ballistic Protection Vests |
Pembroke Pines |
FL |
0 |
$393,000 |
Public Safety |
11 |
| Patrol Rifles |
Pembroke Pines |
FL |
0 |
$393,000 |
Public Safety |
-241 |
| Lenco Bearcat Armor Vehicles |
Pembroke Pines |
FL |
0 |
$245,000 |
Public Safety |
-18 |
| Automotive License Plate Scanners |
Pembroke Pines |
FL |
0 |
$206,000 |
Public Safety |
-4 |
| Camera System for Public Safety Facilities |
Pembroke Pines |
FL |
0 |
$130,000 |
Public Safety |
5 |
| New water cooled chiller & Thermal Energy Storage units to cool 350,000 sq. ft. and save energy at Howard C. Forman Campus |
Pembroke Pines |
FL |
10 |
$1,000,000 |
Schools |
0 |
| Other Charter School Technology Needs - Smartboards (284) |
Pembroke Pines |
FL |
0 |
$710,000 |
Schools |
-6 |
| Replacement of Charter School Computers (25%) |
Pembroke Pines |
FL |
0 |
$500,000 |
Schools |
-8 |
| Thermal Energy Storage to improve efficiency of water cooled chiller and save energy at Academic Village; |
Pembroke Pines |
FL |
7 |
$500,000 |
Schools |
-3 |
| Other Charter School Technology Needs - Projectors (204) |
Pembroke Pines |
FL |
0 |
$408,000 |
Schools |
-7 |
| Mobile Computer Labs |
Pembroke Pines |
FL |
0 |
$240,000 |
Schools |
-9 |
| WEST CAMPUS 390 LIGHT SENSORS |
Pembroke Pines |
FL |
4 |
$72,000 |
Schools |
-3 |
| ACADEMIC VILLAGE 375 LIGHT SENSORS |
Pembroke Pines |
FL |
4 |
$70,000 |
Schools |
-2 |
| CENTRAL CAMPUS 220 LIGHT SENSORS |
Pembroke Pines |
FL |
3 |
$41,000 |
Schools |
-2 |
| EAST CAMPUS 200 LIGHT SENSORS |
Pembroke Pines |
FL |
3 |
$38,000 |
Schools |
-3 |
| FSU CAMPUS 105 LIGHT SENSORS |
Pembroke Pines |
FL |
2 |
$20,000 |
Schools |
-3 |
| VILLAGE PRE-K 50 LIGHT SENSORS |
Pembroke Pines |
FL |
1 |
$9,000 |
Schools |
-4 |
| Provide a transportation system for City residents and for those who work in the City. The service will include transportation between a centrally located Transit Hub, where individuals will be dropped off from County or private transportation vehicles. |
Pembroke Pines |
FL |
16 |
$1,053,720 |
Transit |
-11 |
| Replacement of City Transportation Fleet Buses (6) |
Pembroke Pines |
FL |
0 |
$450,000 |
Transit |
-12 |
| Citywide Roadway Resurfacing Project |
Pinecrest |
FL |
50 |
$7,000,000 |
Streets/Roads |
-14 |
| Waterline Expansion Project |
Pinecrest |
FL |
100 |
$12,500,000 |
Water |
3 |
| Stormwater Drainage Project |
Pinecrest |
FL |
30 |
$600,000 |
Water |
-1 |
| Pinecrest Gardens Wastewater System |
Pinecrest |
FL |
5 |
$150,000 |
Water |
4 |
| Transportation - Traffic Signalization at 40th St. and Gateway Blvd. |
Pinellas Park |
FL |
4 |
$523,000 |
Streets/Roads |
-24 |
| Transportation - Installation of Sidewalks and ADA Enhancements to Promote Walking and Help Reduce Vechile Trips |
Pinellas Park |
FL |
4 |
$500,000 |
Streets/Roads |
-3 |
| Transportation - Public Parking Lot at the Pinellas Park Performing Arts Center (Downtown) |
Pinellas Park |
FL |
4 |
$500,000 |
Streets/Roads |
-25 |
| Transportation - Traffic Signalization Improvements at 124th Avenue and Belcher Road |
Pinellas Park |
FL |
2 |
$300,000 |
Streets/Roads |
-6 |
| Longhill Drive Drainage Improvements |
Pinellas Park |
FL |
30 |
$4,245,840 |
CDBG |
-6 |
| Homeland Subdivision Drainage System - To upgrade the existing rural standard open drainage swales to a modern URBAN system. This will provide 150+ residents and businesses with enhanced drainage capabilities and flood protection. Additionally, sidewalk |
Pinellas Park |
FL |
22 |
$3,200,000 |
CDBG |
-7 |
| Sanitary Sewer Liftstation/Force Main Improvements & Sewer Extensions |
Pinellas Park |
FL |
11 |
$1,600,140 |
CDBG |
4 |
| Homeland Subdivision Reclaimed Water Distribution System |
Pinellas Park |
FL |
7 |
$1,000,000 |
CDBG |
-3 |
| Homeland Subdivision Potable Water Distribution System |
Pinellas Park |
FL |
6 |
$895,000 |
CDBG |
3 |
| Sanitary Sewer Liftstation Replacemenmts #9, #23, #40 |
Pinellas Park |
FL |
3 |
$492,500 |
CDBG |
6 |
| Energy - Energy Efficiency Improvements at City Office Buildings |
Pinellas Park |
FL |
7 |
$1,000,000 |
Energy |
-18 |
| Emergency Management - Harden Technical Services Building - To Afford the Public Works Administration Additional Shelter Space and a centralized PW Operations EOC |
Pinellas Park |
FL |
7 |
$1,000,000 |
Public Safety |
-13 |
| Replace 2.5 miles of concrete and grass drainage swales damaged or destroyed due to age (35-40 yrs) with drainage pipe infrastructure. |
Plantation |
FL |
15 |
$1,700,000 |
Streets/Roads |
-3 |
| Resurface 35 residential streets in the Sunrise Heights and Mirror Lake subdivisions using mill and recycling pavement process. |
Plantation |
FL |
10 |
$1,350,000 |
Streets/Roads |
-3 |
| Construct a vehicular bridge/pedestrian crossing to replace an existing bridge connecting a park with a school/parking lot. |
Plantation |
FL |
10 |
$1,000,000 |
Streets/Roads |
-5 |
| Sanitary sewer collection system rehab, Plantation Gardens, Phase II |
Plantation |
FL |
45 |
$8,300,000 |
Water |
2 |
| Potable water distribution system Plantation Park water main rehabilitation project |
Plantation |
FL |
20 |
$3,000,000 |
Water |
6 |
| Pine Island Park drainage improvement project for playing fields and parking lots. |
Plantation |
FL |
10 |
$1,800,000 |
Water |
-2 |
| Regional wastewater treatment plant, primary odor control system rehabilitation |
Plantation |
FL |
10 |
$1,750,000 |
Water |
1 |
| Regional wastewater treatment plant, prelimminary treatment building rehabilitation |
Plantation |
FL |
10 |
$1,545,000 |
Water |
1 |
| Storm water protection project that would reinforce, extend and enhance an existing berm providing stormwater protection to Plantation Acres. |
Plantation |
FL |
5 |
$800,000 |
Water |
-2 |
| Renovation and expansion of an existing community center that would be used primarily for senior programs and activities |
Plantation |
FL |
20 |
$2,500,000 |
CDBG |
1 |
| Move approximately 2 miles of overhead utility lines underground to promote electric reliability and economic security in our community. This would enhance reliability, reduce frequency and severity of outages due to hurricanes, reduce operating and maint |
Plantation |
FL |
15 |
$2,000,000 |
CDBG |
10 |
| North Acres Park Development to include wetlands, boardwalk, picnic structures, restrooms and playground equipment. |
Plantation |
FL |
15 |
$1,200,000 |
CDBG |
1 |
| Methane Gas Conversion-Methane gas is a by-product from treating wastewater. The gas would be cleaned, scrubbed, and compressed to be used as electric power to operate equipment in the wastewater plant |
Plantation |
FL |
10 |
$1,500,000 |
Energy |
42 |
| Conversion of 100 city vehicles to CNG and construction of a CNG refueling station. |
Plantation |
FL |
5 |
$750,000 |
Energy |
5 |
| Install 150 solar walkway lights for pathways within five city parks. |
Plantation |
FL |
5 |
$180,000 |
Energy |
-4 |
| Energy saver pool cover system to minimize heat loss and reduce water costs and preserve chemicals. |
Plantation |
FL |
1 |
$50,000 |
Energy |
-4 |
| Variable Frequency Drive (VFD) and chemical controller for pool pump motor protection and energy savings to interface with systems controler. |
Plantation |
FL |
1 |
$25,000 |
Energy |
0 |
| Install (4) 1350 gallon water tanks to collect rain water for re-use as make-up water for (1) olympic size pool. |
Plantation |
FL |
1 |
$15,000 |
Energy |
3 |
| Create a city-wide WiFi network to enable Public Safety (Police, Fire and EMS) to access the wireless network for Computer Aided Dispatch and to access and create data in the field. |
Plantation |
FL |
15 |
$22,000,000 |
Public Safety |
-10 |
| Fire Station #1. Replace existing aging station with a 12,000 sq ft structure with four aparatus bays |
Plantation |
FL |
25 |
$4,000,000 |
Public Safety |
-2 |
| Fire Training Center with four aparatus bays 12,000 sqare feet |
Plantation |
FL |
25 |
$4,000,000 |
Public Safety |
-6 |
| Construct a fortified bunker to house all Information Technology servers and associated hardware for all city equipment including Police, Fire and Emergency Management. Facility will also be used for additional office space, general storage, etc. |
Plantation |
FL |
15 |
$2,350,000 |
Public Safety |
2 |
| Purchase replacement 100+ foot aerial apparatus |
Plantation |
FL |
5 |
$1,200,000 |
Public Safety |
-3 |
| In-car dash cameras (175@$5,500) |
Plantation |
FL |
4 |
$962,500 |
Public Safety |
1 |
| Five additional police officers and equipment to create Special Operation Crimes Unit |
Plantation |
FL |
5 |
$500,000 |
Public Safety |
6 |
| Mobile Command Unit |
Plantation |
FL |
3 |
$500,000 |
Public Safety |
2 |
| Upgrade current public safety radio system |
Plantation |
FL |
2 |
$232,000 |
Public Safety |
4 |
| Relocate Public Safety Dispatch into more secure area of Police Department Building. |
Plantation |
FL |
5 |
$113,000 |
Public Safety |
0 |
| Strengthen a 400 foot Public Safety communications tower to enable installation of additional Public Safety antennas and cameras. |
Plantation |
FL |
2 |
$25,000 |
Public Safety |
3 |
| Construct a 500 space park and ride parking facility that would connect with trolley transportation in Midtown Plantation, Broward County Transit and proposed FDOT rapid transit along the I-595 corridor. |
Plantation |
FL |
100 |
$12,500,000 |
Transit |
-10 |
| Rehabilitation of exisiting roadways (NW 84th Avenue and NW 78th Avenue) into Transit Greenways providing narrower streets, pedestrian and bicycle walkways and paths with street furniture |
Plantation |
FL |
100 |
$6,900,000 |
Transit |
0 |
| Construction of transit stops in Midtown Plantation including various signage and wayfinding signage. |
Plantation |
FL |
3 |
$140,000 |
Transit |
-8 |
| Becker Road Widening (4 lanes) - Segment 3 from Albcore to Paley Road (1.2 miles) |
Port St. Lucie |
FL |
124 |
$12,000,000 |
Streets/Roads |
-34 |
| Becker Road Widening (4 lanes) - Segment 2 from Tacoma St. to Albacore St. (0.90 miles) |
Port St. Lucie |
FL |
93 |
$9,000,000 |
Streets/Roads |
-24 |
| Floresta Drive Widening (4 lanes) - segment 1 from Southbend Blvd. to Port St. Lucie Blvd. (0.70 miles.) |
Port St. Lucie |
FL |
72 |
$7,000,000 |
Streets/Roads |
-18 |
| Becker Road Widening (4 lanes) - Segment 4 from Paley Road to Florida's Turnpike (0.50 miles) |
Port St. Lucie |
FL |
52 |
$5,000,000 |
Streets/Roads |
-13 |
| Overlay 70 miles, major collectors and secondary roads |
Port St. Lucie |
FL |
50 |
$4,000,000 |
Streets/Roads |
2 |
| Citywide sidewalks @designated School sites 6 miles |
Port St. Lucie |
FL |
30 |
$3,000,000 |
Streets/Roads |
31 |
| Traffic Signals (one new & 3 up-grades) from span-wire to current hurricane wind load requirements. Includes the installation of mast arms, video detection, traffic monitoring equipment and associated enhancements. |
Port St. Lucie |
FL |
54 |
$2,950,000 |
Streets/Roads |
5 |
| Large Culvert Replacement 20 locations, arterials & majors |
Port St. Lucie |
FL |
40 |
$2,500,000 |
Streets/Roads |
6 |
| E 8 Canal 1.5 miles |
Port St. Lucie |
FL |
30 |
$2,000,000 |
Streets/Roads |
-6 |
| Howard Creek Drainage Improvements 5000 linear feet |
Port St. Lucie |
FL |
30 |
$1,500,000 |
Streets/Roads |
13 |
| Swale Drainage Improvements 6 miles |
Port St. Lucie |
FL |
20 |
$1,000,000 |
Streets/Roads |
12 |
| Expand Traffic Monitoring System for efficient management of traffic flow throughout the city. Includes the installation of conduit fiber optic cable, traffic monitoring cameras and associated enhancements. |
Port St. Lucie |
FL |
46 |
$850,000 |
Streets/Roads |
0 |
| Kingsway Waterway Drainage Repairs |
Port St. Lucie |
FL |
20 |
$750,000 |
Streets/Roads |
8 |