| Goldenview Reservoir (2 million gallons) |
Anchorage |
AK |
125 |
$8,500,000 |
Water |
-25 |
| Five Sanitary Sewer Lift Stations Upgrade |
Anchorage |
AK |
125 |
$5,300,000 |
Water |
11 |
| Asplund Wastewater Treatment Facility - Generator-Electrical Rm and SCADA upgrades |
Anchorage |
AK |
125 |
$6,000,000 |
Water |
2 |
| Eagle River Wastewater Treatment Facility - UV Disinfection Upgrades |
Anchorage |
AK |
100 |
$4,500,000 |
Water |
25 |
| Replace Hillside Water Transmission Main |
Anchorage |
AK |
125 |
$19,500,000 |
Water |
-54 |
| Hiland Road Water Intertie (Phases 2 and 3) |
Anchorage |
AK |
125 |
$16,400,000 |
Water |
-33 |
| Miscellaneous Sewer Rehabilitation Project |
Auburn |
AL |
15 |
$700,000 |
Water |
6 |
| Utility Asset Mapping & Maintenance Project |
Auburn |
AL |
30 |
$1,500,000 |
Water |
-8 |
| Choctafaula Interceptor (Phase II) |
Auburn |
AL |
27 |
$3,500,000 |
Water |
-15 |
| Timberwood Interceptor Reinforcement |
Auburn |
AL |
22 |
$1,000,000 |
Water |
-11 |
| Airport Terminal Sewer Extension |
Auburn |
AL |
20 |
$400,000 |
Water |
-7 |
| Automatic Meter Reading System. GPS equipment, GIS. Replace existing manual metering system. |
Bessemer |
AL |
15 |
$4,929,000 |
Water |
-31 |
| Pump Stations and Pump related upgrades and repairs throughout the City water system. SCADA system & monitors. Replace 15th St. Station. |
Bessemer |
AL |
55 |
$2,250,000 |
Water |
0 |
| Vehicle upgrades and pumping equipment for the water system. |
Bessemer |
AL |
13 |
$1,100,000 |
Water |
-17 |
| Various major Storm Water projects throughout the City (11 total) |
Bessemer |
AL |
44 |
$15,000,000 |
Water |
-1 |
| Install, Upgrade, Repair water lines, both large and small service lines. Install and upgrade metering equipment. Repair, upgrade and install valve equipment. Morgan Rd. Lipscomb. |
Bessemer |
AL |
140 |
$35,500,000 |
Water |
-5 |
| Well drilling for supplemental production and supply during plant face down. |
Bessemer |
AL |
9 |
$2,200,000 |
Water |
-16 |
| Treatment equipment. Laboratoy equipment. Chemicals. Filtering. Safety testing. UV protection. EPA. |
Bessemer |
AL |
32 |
$1,025,000 |
Water |
-5 |
| Widen and resurface seven miles of Morgan Road. Improve drainage. |
Bessemer |
AL |
120 |
$7,500,000 |
Water |
23 |
| Water system related warehouse upgrades. Systems control upgrade. |
Bessemer |
AL |
9 |
$1,000,000 |
Water |
-7 |
| Security & Safety Equipment related to the water system. |
Bessemer |
AL |
27 |
$780,000 |
Water |
-6 |
| Replace Old Water Supply Lines – 6596’ less than 1” pipe. Community Supply 37,430” less than 1.5”. Bessemer, Hueytown, Lipscomb – 727,636’ less than 1.5” to 2” pipe. |
Bessemer |
AL |
95 |
$25,553,000 |
Water |
-6 |
| Waterline metering for Ross Bridge and Alabaster. |
Bessemer |
AL |
6 |
$125,000 |
Water |
-10 |
| Hydrants: Upgrade, Repair, Install new water hydrants City wide. |
Bessemer |
AL |
25 |
$570,000 |
Water |
-5 |
| Resurface and widen Aviation Road. Main access to airport in state of disrepair. |
Bessemer |
AL |
90 |
$5,800,000 |
Water |
-18 |
| Install new storage tank for Alabaster service area. |
Bessemer |
AL |
15 |
$2,100,000 |
Water |
-11 |
| Clean, seal, refurbish, and paint existing water tanks. Weld safety equipment. |
Bessemer |
AL |
61 |
$4,477,000 |
Water |
-7 |
| Oak Ridge Phase II - Sanitary sewer to serve an unsewered area of Birmingham. |
Birmingham |
AL |
75 |
$1,500,000 |
Water |
-25 |
| Bridlewood Ditch - Concrete box culvert project to improve drainage. |
Birmingham |
AL |
50 |
$1,200,000 |
Water |
-7 |
| Patton Park Aeration System - Aeration system to aerate lake to prevent algae growth. |
Birmingham |
AL |
15 |
$500,000 |
Water |
-29 |
| Flint sewer rehab project. replace sewer lines to parts of city with sewer problems |
Decatur |
AL |
100 |
$7,000,000 |
Water |
32 |
| Moulton Heights Sewer Extension Project |
Decatur |
AL |
85 |
$5,000,000 |
Water |
1 |
| Miscellaneous Water & Sewer Replacement |
Gadsden |
AL |
70 |
$10,000,000 |
Water |
0 |
| Lookout Mountain Water & Sewer Installation |
Gadsden |
AL |
30 |
$2,000,000 |
Water |
0 |
| Airport Road Water & Sewer Installation to serve new plant |
Gadsden |
AL |
700 |
$2,000,000 |
Water |
10 |
| North Gadsden Water & Sewer Replacement |
Gadsden |
AL |
80 |
$12,000,000 |
Water |
5 |
| Western Area Forcemain Phase III |
Huntsville |
AL |
185 |
$3,916,500 |
Water |
2 |
| Sewer Abatement Infrastructure Projects |
Huntsville |
AL |
35 |
$750,000 |
Water |
-2 |
| Flood Mitigation and Drainage Improvements |
Huntsville |
AL |
220 |
$4,645,000 |
Water |
10 |
| Spring Branch WWTP - Digester Upgrade |
Huntsville |
AL |
47 |
$1,000,000 |
Water |
4 |
| Sanitary Sewer Rehabilitation: Line Replacement |
Huntsville |
AL |
165 |
$3,500,000 |
Water |
8 |
| Flint River Sewer Extension |
Huntsville |
AL |
35 |
$735,000 |
Water |
3 |
| Western Area Interceptor Phase V |
Huntsville |
AL |
200 |
$4,242,000 |
Water |
0 |
| Logan/Vermont Pump Station Upgrade |
Huntsville |
AL |
47 |
$1,000,000 |
Water |
-1 |
| Restore Historic Big Spring Park Drainage Basin |
Huntsville |
AL |
140 |
$3,000,000 |
Water |
7 |
| County Line Road Sewer Extension |
Huntsville |
AL |
30 |
$630,000 |
Water |
6 |
| Western Area 16" Forecemain Phase VI |
Huntsville |
AL |
200 |
$4,200,000 |
Water |
2 |
| Sanitary Sewer Rehabilitation: Test and Seal Chemical Grouting |
Huntsville |
AL |
40 |
$800,000 |
Water |
5 |
| Ware Park Sewer Project |
Huntsville |
AL |
100 |
$2,126,000 |
Water |
-2 |
| Sanitary Sewer Rehabilitation: Pipe Bursting |
Huntsville |
AL |
200 |
$4,200,000 |
Water |
8 |
| Knox Creek Sewer Extension |
Huntsville |
AL |
40 |
$787,500 |
Water |
-1 |
| Sanitary Sewer Rehabilitation: Manhole Rehabilitation for Spring Branch & Aldridge Creek Service Basins |
Huntsville |
AL |
100 |
$2,300,000 |
Water |
6 |
| Western Area Pump Station Phase II |
Huntsville |
AL |
190 |
$4,011,000 |
Water |
3 |
| Chemical Root Control Application for Spring Branch and Aldridge Creek Sanitary Sewer Basins |
Huntsville |
AL |
40 |
$800,000 |
Water |
3 |
| Redstone Arsenal EUL Sewer |
Huntsville |
AL |
330 |
$7,000,000 |
Water |
-5 |
| Sanitary Sewer Rehabilitation: Cured In Place Pipe Installation |
Huntsville |
AL |
65 |
$1,400,000 |
Water |
3 |
| Western Area Interceptor Phase IV |
Huntsville |
AL |
190 |
$4,095,000 |
Water |
1 |
| Big Cove Sewer Rehabilitation |
Huntsville |
AL |
40 |
$800,000 |
Water |
5 |
| Sewer Capacity Assurance Program and Expansion |
Huntsville |
AL |
260 |
$5,500,000 |
Water |
5 |
| Sanitary Sewer Rehabilitation: Sanitary Sewer EvaluationSurveys (SSES) |
Huntsville |
AL |
55 |
$1,200,000 |
Water |
2 |
| City of Mobile:PWD: Drainage Infrastructure: Carlisle Drive Phase IV - Channel Improvements: Overlook to Carlisle Drive. |
Mobile |
AL |
30 |
$1,200,000 |
Water |
13 |
| City of Mobile: PWD: Drainage Infrastructure: Little Stickney Phase IV: Underground and Concrete Culvert Drainage Improvements. |
Mobile |
AL |
30 |
$2,500,000 |
Water |
6 |
| City of Mobile: PWD: Drainage Infrastructure: Ice House Branch Phase II: Channel Improvements from Bankhead Street to 200Â’ south of Senator Street. |
Mobile |
AL |
30 |
$1,100,000 |
Water |
10 |
| City of Mobile: Public Works: 19 infrastructure projects directly related to rehabilitating aging water and sewer infrastructure, complying with sewer overflow issues, and promoting source water protection. |
Mobile |
AL |
1400 |
$36,000,000 |
Water |
40 |
| City of Mobile: PWD: Drainage Infrastructure: Conception Street Underground Drainage System Repairs and Improvements. |
Mobile |
AL |
30 |
$1,400,000 |
Water |
5 |
| City of Mobile: Board of Water and Sewer Commissioners: Multiple projects ranging from repair and rehabilitation to full replacement of existing gravity sanitary sewer infrastructure to combat sanitary sewer overflows (SSOs), upgrades to sanitary sewer li |
Mobile |
AL |
320 |
$178,310,000 |
Water |
38 |
| City of Mobile: PWD: Drainage Infrastructure: Bayou Street Underground Drainage System Rehabilitation and Improvements. |
Mobile |
AL |
20 |
$300,000 |
Water |
7 |
| City of Mobile: PWD: Drainage Infrastructure: Government Street Drainage Improvements Phase IV: Road Widening and Drainage Improvements. |
Mobile |
AL |
45 |
$4,000,000 |
Water |
16 |
| City of Mobile: PWD: Drainage Infrastructure: Florida Street Phase II: Underground Drainage Improvements . |
Mobile |
AL |
35 |
$2,500,000 |
Water |
10 |
| Citywide Water & Sewer System Upgrades |
Prichard |
AL |
500 |
$50,000,000 |
Water |
6 |
| 158 Coridor Water & Sewer Line Expansion |
Prichard |
AL |
500 |
$22,500,000 |
Water |
-1 |
| Woodland Forest Drainage Project - Constant flooding in the heavily residential area of Woodland Forest will be minimized when this project is complete. This project will emphasis "green techniques" in solving the drainage problem in the area. |
Tuscaloosa |
AL |
70 |
$5,000,000 |
Water |
-12 |
| North Regional Sewer Pump Station - This station will serve the metropolitan area north of the river. The regional pump station will serve areas around Lake Tuscaloosa, thus eliminating the need for septic tanks in existing and new homes. |
Tuscaloosa |
AL |
50 |
$3,000,000 |
Water |
15 |
| Sewer Line Replacement - Crossover, Cliffs to 36" Transmission |
Fayetteville |
AR |
15 |
$1,721,550 |
Water |
-7 |
| Water Line Replacement - Overcrest & Mockingbird Area |
Fayetteville |
AR |
15 |
$1,179,900 |
Water |
-6 |
| Benson Mountain Pressure Plane Water Storage Tank |
Fayetteville |
AR |
6 |
$161,000 |
Water |
-4 |
| Water Line Replacement - Hwy 16E White River Bridge |
Fayetteville |
AR |
8 |
$520,950 |
Water |
-2 |
| Water Line Replacement - Jackson, Kings, Columbus |
Fayetteville |
AR |
15 |
$1,135,050 |
Water |
-3 |
| Paint Baxter Water Tanks |
Fayetteville |
AR |
5 |
$644,000 |
Water |
-30 |
| Sewer Lift Station Backup Power Generators |
Fayetteville |
AR |
8 |
$460,000 |
Water |
-1 |
| Water Line Replacement - Holly & Sang Area |
Fayetteville |
AR |
15 |
$1,429,450 |
Water |
-2 |
| Replace Meter Vault, U of A Farms East on Garland |
Fayetteville |
AR |
4 |
$46,000 |
Water |
-8 |
| Water/Sewer Installation on Shiloh, North of Dorothy Jeanne |
Fayetteville |
AR |
6 |
$263,350 |
Water |
-5 |
| Water Line Replacement - Dinsmore Trail |
Fayetteville |
AR |
15 |
$1,130,450 |
Water |
-6 |
| Water Loop, Holland Dr (Farmington) |
Fayetteville |
AR |
6 |
$507,150 |
Water |
-2 |
| Sewer Replacement - Elkins Outfall Line |
Fayetteville |
AR |
15 |
$1,742,250 |
Water |
2 |
| Water Line Replacement - Lafayette, West-College |
Fayetteville |
AR |
6 |
$56,350 |
Water |
-2 |
| Sewer Line Replacement - Happy Hollow, 4th to 36" Transmission |
Fayetteville |
AR |
15 |
$1,452,450 |
Water |
-6 |
| Innovative Biosolids Processing Method |
Fayetteville |
AR |
25 |
$8,000,000 |
Water |
-14 |
| South Mountain Water Pump Station Repair & Replace |
Fayetteville |
AR |
6 |
$207,000 |
Water |
-2 |
| Construction of drainage improvements in Mill Creek from Cavanaugh Rd. downstream to South 28th St. and realignment of South 28th St. with U.S. Highway 71B |
Fort Smith |
AR |
20 |
$4,000,000 |
Water |
3 |
| Wastewater Supervisory Control and Data Acquisition System |
Fort Smith |
AR |
8 |
$600,000 |
Water |
4 |
| Neighborhood Water System and Fire Protection Improvements |
Fort Smith |
AR |
16 |
$3,400,000 |
Water |
2 |
| Sub-Basin 10 Wastewater Collection System Rehabilitation |
Fort Smith |
AR |
15 |
$1,500,000 |
Water |
3 |
| Lake Fort Smith Water Treatment Plant 4 million Gallon Clearwell Storage |
Fort Smith |
AR |
40 |
$4,400,000 |
Water |
13 |
| Midland Avenue 30-inch Water Transmission Line Construction |
Fort Smith |
AR |
15 |
$3,570,000 |
Water |
5 |
| Lake Fort Smith Water Treatment Plant Backwash Lagoon Expansion |
Fort Smith |
AR |
23 |
$3,500,000 |
Water |
10 |
| Construction of Neighborhood Storm Drainage Improvements in 3 areas: Barrington Lane/Hillsboro Lane; Dallas and 96th Street; Ballman Road |
Fort Smith |
AR |
12 |
$200,000 |
Water |
5 |
| Sunnymeade Basin Relief Sewer - Phase 3 |
Fort Smith |
AR |
20 |
$1,800,000 |
Water |
6 |
| Construction of detention pond and drainage channel improvements, Hon Avenue north of Park Ave. |
Fort Smith |
AR |
12 |
$600,000 |
Water |
2 |