| Asplund Wastewater Treatment Facility - Generator-Electrical Rm and SCADA upgrades |
Anchorage |
AK |
125 |
$6,000,000 |
Water |
3 |
| Eagle River Wastewater Treatment Facility - UV Disinfection Upgrades |
Anchorage |
AK |
100 |
$4,500,000 |
Water |
25 |
| Replace Hillside Water Transmission Main |
Anchorage |
AK |
125 |
$19,500,000 |
Water |
-54 |
| Hiland Road Water Intertie (Phases 2 and 3) |
Anchorage |
AK |
125 |
$16,400,000 |
Water |
-33 |
| Goldenview Reservoir (2 million gallons) |
Anchorage |
AK |
125 |
$8,500,000 |
Water |
-25 |
| Five Sanitary Sewer Lift Stations Upgrade |
Anchorage |
AK |
125 |
$5,300,000 |
Water |
11 |
| Utility Asset Mapping & Maintenance Project |
Auburn |
AL |
30 |
$1,500,000 |
Water |
-8 |
| Choctafaula Interceptor (Phase II) |
Auburn |
AL |
27 |
$3,500,000 |
Water |
-15 |
| Timberwood Interceptor Reinforcement |
Auburn |
AL |
22 |
$1,000,000 |
Water |
-11 |
| Airport Terminal Sewer Extension |
Auburn |
AL |
20 |
$400,000 |
Water |
-7 |
| Miscellaneous Sewer Rehabilitation Project |
Auburn |
AL |
15 |
$700,000 |
Water |
6 |
| Replace Old Water Supply Lines – 6596’ less than 1” pipe. Community Supply 37,430” less than 1.5”. Bessemer, Hueytown, Lipscomb – 727,636’ less than 1.5” to 2” pipe. |
Bessemer |
AL |
95 |
$25,553,000 |
Water |
-6 |
| Security & Safety Equipment related to the water system. |
Bessemer |
AL |
27 |
$780,000 |
Water |
-6 |
| Water system related warehouse upgrades. Systems control upgrade. |
Bessemer |
AL |
9 |
$1,000,000 |
Water |
-7 |
| Resurface and widen Aviation Road. Main access to airport in state of disrepair. |
Bessemer |
AL |
90 |
$5,800,000 |
Water |
-18 |
| Hydrants: Upgrade, Repair, Install new water hydrants City wide. |
Bessemer |
AL |
25 |
$570,000 |
Water |
-5 |
| Waterline metering for Ross Bridge and Alabaster. |
Bessemer |
AL |
6 |
$125,000 |
Water |
-10 |
| Clean, seal, refurbish, and paint existing water tanks. Weld safety equipment. |
Bessemer |
AL |
61 |
$4,477,000 |
Water |
-8 |
| Install new storage tank for Alabaster service area. |
Bessemer |
AL |
15 |
$2,100,000 |
Water |
-11 |
| Pump Stations and Pump related upgrades and repairs throughout the City water system. SCADA system & monitors. Replace 15th St. Station. |
Bessemer |
AL |
55 |
$2,250,000 |
Water |
0 |
| Automatic Meter Reading System. GPS equipment, GIS. Replace existing manual metering system. |
Bessemer |
AL |
15 |
$4,929,000 |
Water |
-31 |
| Install, Upgrade, Repair water lines, both large and small service lines. Install and upgrade metering equipment. Repair, upgrade and install valve equipment. Morgan Rd. Lipscomb. |
Bessemer |
AL |
140 |
$35,500,000 |
Water |
-5 |
| Various major Storm Water projects throughout the City (11 total) |
Bessemer |
AL |
44 |
$15,000,000 |
Water |
-1 |
| Vehicle upgrades and pumping equipment for the water system. |
Bessemer |
AL |
13 |
$1,100,000 |
Water |
-17 |
| Widen and resurface seven miles of Morgan Road. Improve drainage. |
Bessemer |
AL |
120 |
$7,500,000 |
Water |
23 |
| Treatment equipment. Laboratoy equipment. Chemicals. Filtering. Safety testing. UV protection. EPA. |
Bessemer |
AL |
32 |
$1,025,000 |
Water |
-5 |
| Well drilling for supplemental production and supply during plant face down. |
Bessemer |
AL |
9 |
$2,200,000 |
Water |
-16 |
| Oak Ridge Phase II - Sanitary sewer to serve an unsewered area of Birmingham. |
Birmingham |
AL |
75 |
$1,500,000 |
Water |
-25 |
| Bridlewood Ditch - Concrete box culvert project to improve drainage. |
Birmingham |
AL |
50 |
$1,200,000 |
Water |
-7 |
| Patton Park Aeration System - Aeration system to aerate lake to prevent algae growth. |
Birmingham |
AL |
15 |
$500,000 |
Water |
-29 |
| Flint sewer rehab project. replace sewer lines to parts of city with sewer problems |
Decatur |
AL |
100 |
$7,000,000 |
Water |
32 |
| Moulton Heights Sewer Extension Project |
Decatur |
AL |
85 |
$5,000,000 |
Water |
1 |
| Miscellaneous Water & Sewer Replacement |
Gadsden |
AL |
70 |
$10,000,000 |
Water |
0 |
| Lookout Mountain Water & Sewer Installation |
Gadsden |
AL |
30 |
$2,000,000 |
Water |
0 |
| Airport Road Water & Sewer Installation to serve new plant |
Gadsden |
AL |
700 |
$2,000,000 |
Water |
10 |
| North Gadsden Water & Sewer Replacement |
Gadsden |
AL |
80 |
$12,000,000 |
Water |
5 |
| Sanitary Sewer Rehabilitation: Line Replacement |
Huntsville |
AL |
165 |
$3,500,000 |
Water |
8 |
| Spring Branch WWTP - Digester Upgrade |
Huntsville |
AL |
47 |
$1,000,000 |
Water |
4 |
| Sewer Abatement Infrastructure Projects |
Huntsville |
AL |
35 |
$750,000 |
Water |
-2 |
| Western Area 16" Forecemain Phase VI |
Huntsville |
AL |
200 |
$4,200,000 |
Water |
2 |
| Restore Historic Big Spring Park Drainage Basin |
Huntsville |
AL |
140 |
$3,000,000 |
Water |
7 |
| Logan/Vermont Pump Station Upgrade |
Huntsville |
AL |
47 |
$1,000,000 |
Water |
-1 |
| Flint River Sewer Extension |
Huntsville |
AL |
35 |
$735,000 |
Water |
3 |
| Sanitary Sewer Rehabilitation: Pipe Bursting |
Huntsville |
AL |
200 |
$4,200,000 |
Water |
8 |
| Ware Park Sewer Project |
Huntsville |
AL |
100 |
$2,126,000 |
Water |
-2 |
| Sanitary Sewer Rehabilitation: Test and Seal Chemical Grouting |
Huntsville |
AL |
40 |
$800,000 |
Water |
5 |
| County Line Road Sewer Extension |
Huntsville |
AL |
30 |
$630,000 |
Water |
6 |
| Redstone Arsenal EUL Sewer |
Huntsville |
AL |
330 |
$7,000,000 |
Water |
-5 |
| Western Area Pump Station Phase II |
Huntsville |
AL |
190 |
$4,011,000 |
Water |
2 |
| Sanitary Sewer Rehabilitation: Manhole Rehabilitation for Spring Branch & Aldridge Creek Service Basins |
Huntsville |
AL |
100 |
$2,300,000 |
Water |
5 |
| Knox Creek Sewer Extension |
Huntsville |
AL |
40 |
$787,500 |
Water |
-1 |
| Sewer Capacity Assurance Program and Expansion |
Huntsville |
AL |
260 |
$5,500,000 |
Water |
5 |
| Western Area Interceptor Phase IV |
Huntsville |
AL |
190 |
$4,095,000 |
Water |
1 |
| Sanitary Sewer Rehabilitation: Cured In Place Pipe Installation |
Huntsville |
AL |
65 |
$1,400,000 |
Water |
3 |
| Chemical Root Control Application for Spring Branch and Aldridge Creek Sanitary Sewer Basins |
Huntsville |
AL |
40 |
$800,000 |
Water |
3 |
| Flood Mitigation and Drainage Improvements |
Huntsville |
AL |
220 |
$4,645,000 |
Water |
10 |
| Western Area Forcemain Phase III |
Huntsville |
AL |
185 |
$3,916,500 |
Water |
2 |
| Sanitary Sewer Rehabilitation: Sanitary Sewer EvaluationSurveys (SSES) |
Huntsville |
AL |
55 |
$1,200,000 |
Water |
0 |
| Big Cove Sewer Rehabilitation |
Huntsville |
AL |
40 |
$800,000 |
Water |
5 |
| Western Area Interceptor Phase V |
Huntsville |
AL |
200 |
$4,242,000 |
Water |
0 |
| City of Mobile: PWD: Drainage Infrastructure: Little Stickney Phase IV: Underground and Concrete Culvert Drainage Improvements. |
Mobile |
AL |
30 |
$2,500,000 |
Water |
6 |
| City of Mobile: Public Works: 19 infrastructure projects directly related to rehabilitating aging water and sewer infrastructure, complying with sewer overflow issues, and promoting source water protection. |
Mobile |
AL |
1400 |
$36,000,000 |
Water |
40 |
| City of Mobile: PWD: Drainage Infrastructure: Ice House Branch Phase II: Channel Improvements from Bankhead Street to 200Â’ south of Senator Street. |
Mobile |
AL |
30 |
$1,100,000 |
Water |
10 |
| City of Mobile: Board of Water and Sewer Commissioners: Multiple projects ranging from repair and rehabilitation to full replacement of existing gravity sanitary sewer infrastructure to combat sanitary sewer overflows (SSOs), upgrades to sanitary sewer li |
Mobile |
AL |
320 |
$178,310,000 |
Water |
36 |
| City of Mobile: PWD: Drainage Infrastructure: Conception Street Underground Drainage System Repairs and Improvements. |
Mobile |
AL |
30 |
$1,400,000 |
Water |
5 |
| City of Mobile: PWD: Drainage Infrastructure: Government Street Drainage Improvements Phase IV: Road Widening and Drainage Improvements. |
Mobile |
AL |
45 |
$4,000,000 |
Water |
16 |
| City of Mobile: PWD: Drainage Infrastructure: Bayou Street Underground Drainage System Rehabilitation and Improvements. |
Mobile |
AL |
20 |
$300,000 |
Water |
7 |
| City of Mobile: PWD: Drainage Infrastructure: Florida Street Phase II: Underground Drainage Improvements . |
Mobile |
AL |
35 |
$2,500,000 |
Water |
10 |
| City of Mobile:PWD: Drainage Infrastructure: Carlisle Drive Phase IV - Channel Improvements: Overlook to Carlisle Drive. |
Mobile |
AL |
30 |
$1,200,000 |
Water |
13 |
| Citywide Water & Sewer System Upgrades |
Prichard |
AL |
500 |
$50,000,000 |
Water |
7 |
| 158 Coridor Water & Sewer Line Expansion |
Prichard |
AL |
500 |
$22,500,000 |
Water |
0 |
| Woodland Forest Drainage Project - Constant flooding in the heavily residential area of Woodland Forest will be minimized when this project is complete. This project will emphasis "green techniques" in solving the drainage problem in the area. |
Tuscaloosa |
AL |
70 |
$5,000,000 |
Water |
-12 |
| North Regional Sewer Pump Station - This station will serve the metropolitan area north of the river. The regional pump station will serve areas around Lake Tuscaloosa, thus eliminating the need for septic tanks in existing and new homes. |
Tuscaloosa |
AL |
50 |
$3,000,000 |
Water |
15 |
| Water Loop, Holland Dr (Farmington) |
Fayetteville |
AR |
6 |
$507,150 |
Water |
-2 |
| Innovative Biosolids Processing Method |
Fayetteville |
AR |
25 |
$8,000,000 |
Water |
-14 |
| Sewer Line Replacement - Happy Hollow, 4th to 36" Transmission |
Fayetteville |
AR |
15 |
$1,452,450 |
Water |
-6 |
| Water Line Replacement - Lafayette, West-College |
Fayetteville |
AR |
6 |
$56,350 |
Water |
-2 |
| Water Line Replacement - Overcrest & Mockingbird Area |
Fayetteville |
AR |
15 |
$1,179,900 |
Water |
-6 |
| Sewer Line Replacement - Crossover, Cliffs to 36" Transmission |
Fayetteville |
AR |
15 |
$1,721,550 |
Water |
-7 |
| South Mountain Water Pump Station Repair & Replace |
Fayetteville |
AR |
6 |
$207,000 |
Water |
-2 |
| Water Line Replacement - Jackson, Kings, Columbus |
Fayetteville |
AR |
15 |
$1,135,050 |
Water |
-3 |
| Water Line Replacement - Hwy 16E White River Bridge |
Fayetteville |
AR |
8 |
$520,950 |
Water |
-2 |
| Benson Mountain Pressure Plane Water Storage Tank |
Fayetteville |
AR |
6 |
$161,000 |
Water |
-4 |
| Water Line Replacement - Holly & Sang Area |
Fayetteville |
AR |
15 |
$1,429,450 |
Water |
-2 |
| Sewer Lift Station Backup Power Generators |
Fayetteville |
AR |
8 |
$460,000 |
Water |
-1 |
| Paint Baxter Water Tanks |
Fayetteville |
AR |
5 |
$644,000 |
Water |
-30 |
| Water Line Replacement - Dinsmore Trail |
Fayetteville |
AR |
15 |
$1,130,450 |
Water |
-6 |
| Water/Sewer Installation on Shiloh, North of Dorothy Jeanne |
Fayetteville |
AR |
6 |
$263,350 |
Water |
-5 |
| Replace Meter Vault, U of A Farms East on Garland |
Fayetteville |
AR |
4 |
$46,000 |
Water |
-8 |
| Sewer Replacement - Elkins Outfall Line |
Fayetteville |
AR |
15 |
$1,742,250 |
Water |
2 |
| Construction of Neighborhood Storm Drainage Improvements in 3 areas: Barrington Lane/Hillsboro Lane; Dallas and 96th Street; Ballman Road |
Fort Smith |
AR |
12 |
$200,000 |
Water |
5 |
| Sunnymeade Basin Relief Sewer - Phase 2 |
Fort Smith |
AR |
20 |
$1,500,000 |
Water |
4 |
| Construction of detention pond and drainage channel improvements, Hon Avenue north of Park Ave. |
Fort Smith |
AR |
12 |
$600,000 |
Water |
2 |
| Construction of drainage improvements in Mill Creek from Cavanaugh Rd. downstream to South 28th St. and realignment of South 28th St. with U.S. Highway 71B |
Fort Smith |
AR |
20 |
$4,000,000 |
Water |
3 |
| Disposal of Water Treatment Plant residuals |
Fort Smith |
AR |
10 |
$450,000 |
Water |
6 |
| Neighborhood Water System and Fire Protection Improvements |
Fort Smith |
AR |
16 |
$3,400,000 |
Water |
2 |
| Wastewater Supervisory Control and Data Acquisition System |
Fort Smith |
AR |
8 |
$600,000 |
Water |
4 |
| Lake Fort Smith Water Treatment Plant 4 million Gallon Clearwell Storage |
Fort Smith |
AR |
40 |
$4,400,000 |
Water |
13 |
| Sub-Basin 10 Wastewater Collection System Rehabilitation |
Fort Smith |
AR |
15 |
$1,500,000 |
Water |
3 |
| Lake Fort Smith Water Treatment Plant Backwash Lagoon Expansion |
Fort Smith |
AR |
23 |
$3,500,000 |
Water |
10 |