| HVAC Modernization-old Jefferson School |
Pocatello |
ID |
60 |
$1,600,000 |
Schools |
0 |
| Roof Replacement-Highland High School |
Pocatello |
ID |
10 |
$170,000 |
Schools |
4 |
| Modernize each classroom with first-class Instructional technology |
Pocatello |
ID |
10 |
$4,500,000 |
Schools |
-3 |
| Window Replacement-Irving Middle School |
Pocatello |
ID |
5 |
$360,000 |
Schools |
1 |
| Hardware for connection between Learning Center & District WAN |
Glendale Heights |
IL |
2 |
$43,000 |
Schools |
-7 |
| Dist. 16/LCD Projectors in 34 Instructional Areas |
Glendale Heights |
IL |
2 |
$120,000 |
Schools |
-11 |
| Dist. 15/Emergency Intercom System - Reskin School & Winnebago |
Glendale Heights |
IL |
2 |
$60,000 |
Schools |
0 |
| Parking Lot Improvements - 4 Buildings |
Glendale Heights |
IL |
20 |
$1,200,000 |
Schools |
-16 |
| Dist. 16/50 Document Cameras for instructional areas |
Glendale Heights |
IL |
0 |
$42,000 |
Schools |
-12 |
| Dist. 15/Building Renovations - Winnego School |
Glendale Heights |
IL |
15 |
$600,000 |
Schools |
-7 |
| Dist. 15/Safety Improvement - Reskin School |
Glendale Heights |
IL |
0 |
$5,000 |
Schools |
1 |
| 196 HP Computerers (or like), 10 LCD Projectors & Smartboards for Computer Labs |
Glendale Heights |
IL |
6 |
$200,000 |
Schools |
-18 |
| Dist. 16/Upgrade 36 Bathrooms |
Glendale Heights |
IL |
4 |
$500,000 |
Schools |
-5 |
| Moline High School Heating & Cooling Upgrades - Update original 1950's boiler systems and add geothermal heating & air conditioning to provide proper learning environment for 2,400 students. |
Moline |
IL |
50 |
$19,000,000 |
Schools |
-7 |
| Browning Field Lighting - The field lighting is inadequate, at least 40 years old and in poor condition. This athletic field hosts football games, track and field events and soccer games for boys and girls athletics. |
Moline |
IL |
12 |
$250,000 |
Schools |
-14 |
| Indoor Air Quality and Classroom Environment Retros - Improvements included here will provide for better educational environments for all of our at risk preschool and high school students as well as the entire population of one elementary school building. |
Moline |
IL |
50 |
$835,000 |
Schools |
-8 |
| H.S./Cool Tennis Court Improvements - Providing proper maintenance of surfaces for these P.E. and athletic areas is a challenge in our colder climate. These surfaces require repair and resurfacing to keep them safe for students. |
Moline |
IL |
10 |
$150,000 |
Schools |
-13 |
| Throughout, 21st Century Classrooms - In an effort to comply with initiatives consistent with developing 21st century classrooms throughout the District, technology enhancements are required in all District facilities. |
Moline |
IL |
45 |
$2,050,000 |
Schools |
-16 |
| Wilson Middle School Addition - Add on to existing middle school to enlarge capacity to include 6th graders (currently only houses 7th & 8th grades). Would allow for existing elementary buildings to free up classroom space to low class size |
Moline |
IL |
300 |
$24,000,000 |
Schools |
-19 |
| H.S. Electrical Switchgear Replacement - This work replaces critical electrical switchgear on the main electrical service for Moline High School serving 2200 students. |
Moline |
IL |
8 |
$360,000 |
Schools |
-6 |
| Throughout, Security Equipment Installations - The District recently had a crises management plan developed and an audit of our existing facilities completed. Recommendations included installing access control and monitoring equipment to enhance student |
Moline |
IL |
35 |
$850,000 |
Schools |
-9 |
| John Deere Middle School Addition - Add on to existing middle school to enlarge capacity to include 6th graders (currently only housees 7th & 8th grades). Would allow for existing elementary buildings to free up classroom space to lower class size |
Moline |
IL |
300 |
$33,000,000 |
Schools |
-18 |
| Allendale Retaining Wall Repairs - A historically significant retaining wall, built in 1906, bordering a historic structure on a main city thoroughfare is in need of significant repair to save the structure. |
Moline |
IL |
5 |
$100,000 |
Schools |
-9 |
| H.S. Soccor Field Lighting, restrooms, bleachers, etc. - Competition facilities are at a premium and scheduling conflicts often occur. The addition of these facilities will improve access for our 2200 H.S. students. |
Moline |
IL |
35 |
$400,000 |
Schools |
-15 |
| Moline High School Community Center - Build a new Community Center to include 3 competition size gyms, weight room facility, an indoor running track and Olympic size swimming pool. |
Moline |
IL |
100 |
$8,700,000 |
Schools |
-22 |
| Browning Field Restrooms and Concession Stands - Currently the restrooms and concessions at Browning Field are inadequate for the number of patrons using the facility and offer very limited and poor quality handicapped facilities. |
Moline |
IL |
15 |
$460,000 |
Schools |
-10 |
| Browning Field Visitor Bleachers and Locker Facilities - Visitor bleachers are in excess of 30 years old, are inadequate, are not handicapped accessible and do not meet current safety codes. |
Moline |
IL |
75 |
$5,000,000 |
Schools |
-14 |
| Browning Field West Entrance Improvements - In cooperation with the City of Moline and Park Board, an effort exists to provide an improved community park area which adjoins the School District's Browning Field Complex. |
Moline |
IL |
14 |
$100,000 |
Schools |
-9 |
| Rennovate - Replace worn and aged roofs and tuck point deteriorated masonry at Lincoln and Jefferson Schools |
Ottawa |
IL |
20 |
$719,000 |
Schools |
-1 |
| Security - Provide visitor management, access control, and building security hardware including anti-intruder door hardware |
Ottawa |
IL |
16 |
$762,000 |
Schools |
-4 |
| Expand - Construct OES district storage to free up space and alleviate school building overcrowding |
Ottawa |
IL |
15 |
$800,000 |
Schools |
-7 |
| Security - Provide phones in occupied spaces/classrooms at all OES schools to enhance intruder/disaster response |
Ottawa |
IL |
4 |
$140,000 |
Schools |
-8 |
| Flooded school replacement - replace uninhabitable OES Central School flooded on 9/08 with new school out of flood plain. Provide classrooms for 5th and 6th grades who have none. |
Ottawa |
IL |
140 |
$24,712,000 |
Schools |
115 |
| ADA Accessability - Replace failing wheelchair lifts at Lincoln and Jefferson Schools |
Ottawa |
IL |
4 |
$130,000 |
Schools |
11 |
| Classrooms - Construct classroom addition at Jefferson School to alleviate overcrowding |
Ottawa |
IL |
36 |
$2,800,000 |
Schools |
-2 |
| Rennovate - refinish worn wood flooring at Lincoln School, paint interiors, and repair parking at OES all schools |
Ottawa |
IL |
26 |
$1,425,000 |
Schools |
-170 |
| School Administration Office - This project consists of new access/security system for the building. |
East Chicago |
IN |
0 |
$150,000 |
Schools |
-29 |
| Renovation of Block Jr. High School - This project consists of a new fire system, ADA compliance, swimming pool repairs, and maintenance issues that need to be addressed. The school was originally erected in 1968. |
East Chicago |
IN |
0 |
$3,000,000 |
Schools |
-11 |
| Lincoln Elementary School - This project consists of rebuilding the school. The school was originally erected in 1970. |
East Chicago |
IN |
0 |
$20,000,000 |
Schools |
-14 |
| Central High School - The project consists of a digital phone system, 42" flat screen video monitors, computers and white board technology, computerized textbook inventory system, barcode scanners in the cafeteria, technology 2000 lab, replacement of pres |
East Chicago |
IN |
0 |
$3,000,000 |
Schools |
-34 |
| Reitz High School: Replace aging, insufficient boilers with new high efficiency low maintenance boilers. |
Evansville |
IN |
5 |
$800,000 |
Schools |
7 |
| Install 80 thirty-station wireless laptop carts in all school locations |
Evansville |
IN |
0 |
$2,400,000 |
Schools |
-20 |
| Delaware Elementary School: Replace aging, insufficient boilers with new high efficiency low maintenance boilers. |
Evansville |
IN |
5 |
$800,000 |
Schools |
11 |
| Technology & Innovation Center: Build a new state of the art technology center that is LEED certified. |
Evansville |
IN |
75 |
$3,900,000 |
Schools |
-11 |
| Install 47 thirty-station computer labs in elementary, middle and high schools, including two Project Lead the Way labs and ten business education labs |
Evansville |
IN |
0 |
$1,410,000 |
Schools |
-2 |
| Bosse High School: Replace aging, insufficient boilers with new high efficiency low maintenance boilers. |
Evansville |
IN |
5 |
$800,000 |
Schools |
9 |
| Positions needed to support additional technology listed above (interactive white boards, projectors, sound enhancement systems, and document cameras in classrooms; 30-station computer labs in 47 schools; 80 30-station wireless laptop carts; |
Evansville |
IN |
9 |
$0 |
Schools |
-7 |
| Software licensing for these 4,110 new computers (Microsoft Office Suite) @ $50.00 |
Evansville |
IN |
0 |
$205,500 |
Schools |
-723 |
| Reitz High School Stadium: Install artificial turf in place of lawn turf for water conservation and maintenance free care. |
Evansville |
IN |
8 |
$800,000 |
Schools |
-34 |
| Installation and implementation of an on-demand digital content and streaming video system for all buildings in district. This system includes hardware and software and will eliminate the need for TV sets for classrooms |
Evansville |
IN |
0 |
$400,000 |
Schools |
-10 |
| Central High School Stadium: Install artificial turf in place of lawn turf for water conservation and maintenance free care. |
Evansville |
IN |
8 |
$800,000 |
Schools |
-43 |
| Install interactive white boards, projectors, sound enhancement systems, and document cameras in 1,500 classrooms @ $7,000 per classroom (includes labor of $900 per room to be done by specially qualified installers) |
Evansville |
IN |
0 |
$10,500,000 |
Schools |
-39 |
| Bosse Enlow Field Stadium: Install artificial turf in place of lawn turf for water conservation and maintenance free care. |
Evansville |
IN |
8 |
$800,000 |
Schools |
-33 |
| Install computers (300) for support personnel in each school |
Evansville |
IN |
0 |
$300,000 |
Schools |
-17 |
| School Infrastructure 23 Elementary Schools 8 Middle Schools |
Fort Wayne |
IN |
900 |
$301,100,000 |
Schools |
-26 |
| Installation of various computer technology needed at Hobart Middle School |
Hobart |
IN |
90 |
$1,200,000 |
Schools |
7 |
| Technology Upgrades at four Hobart Elementary Schools |
Hobart |
IN |
80 |
$2,600,000 |
Schools |
7 |
| Construction of swimming pool at Hobart High School |
Hobart |
IN |
50 |
$7,000,000 |
Schools |
-49 |
| Replace floors and roofs at four Hobart Elementary Schools |
Hobart |
IN |
40 |
$2,500,000 |
Schools |
8 |
| Fitness track installation at Hobart Middle School |
Hobart |
IN |
10 |
$500,000 |
Schools |
-10 |
| Washington Alternative School |
Kokomo |
IN |
40 |
$3,000,000 |
Schools |
2 |
| Modernization of Maple Cres Middle |
Kokomo |
IN |
40 |
$3,000,000 |
Schools |
-2 |
| Modernization of Central Middle School. This historic facility, located in the heart of downtown Kokomo, has been chosen as the new site of Kokomo-Center School Corporation's administration offices, as well as an expanded middle school. HOwever, there are |
Kokomo |
IN |
526 |
$35,000,000 |
Schools |
-22 |
| Darrough Chapel Early Childhood Center |
Kokomo |
IN |
40 |
$3,000,000 |
Schools |
0 |
| Kokomo High School |
Kokomo |
IN |
260 |
$20,000,000 |
Schools |
-8 |
| Sycamore Elementary |
Kokomo |
IN |
30 |
$2,500,000 |
Schools |
-1 |
| Boulevard Elementary |
Kokomo |
IN |
150 |
$12,000,000 |
Schools |
-8 |
| Memorial Gym |
Kokomo |
IN |
30 |
$2,500,000 |
Schools |
-14 |
| Lafayette Park Elementary |
Kokomo |
IN |
50 |
$4,000,000 |
Schools |
0 |
| Elwood Haynes Elementary |
Kokomo |
IN |
30 |
$2,500,000 |
Schools |
0 |
| Bon Air Elementary |
Kokomo |
IN |
50 |
$4,000,000 |
Schools |
-2 |
| Pettit Park Elementary |
Kokomo |
IN |
20 |
$1,500,000 |
Schools |
-2 |
| Improving/enhancing Safety |
Bowling Green |
KY |
24 |
$200,000 |
Schools |
1 |
| Asbestos Abatement |
Bowling Green |
KY |
24 |
$250,000 |
Schools |
6 |
| Monitoring System District Wide |
Bowling Green |
KY |
4 |
$100,000 |
Schools |
-9 |
| HVAC Work |
Bowling Green |
KY |
36 |
$1,000,000 |
Schools |
-3 |
| Christian County Middle School: The City of Hopkinsville is proposing the construction of middle school to include grade 6 thru 8 for 800 students to replace the existing school built in 1959. |
Hopkinsville |
KY |
90 |
$22,600,000 |
Schools |
10 |
| Hopkinsville High School Re-roofing: The City of Hopkinsville is proposing to replace the deteriorated roof over gymnasium of an existing grade 9-12 high school. |
Hopkinsville |
KY |
9 |
$603,000 |
Schools |
10 |
| Hopkinsville Middle School Re-roofing: The City of Hopkinsville is proposing to replace section of roof over classrooms in an existing grade 6-8 middle school. |
Hopkinsville |
KY |
7 |
$520,000 |
Schools |
4 |
| Lacy Elementary Re-roofing: The City of Hopkinsville is proposing to replace last phase of deteriorated roof of Lacy Elementary School which is an existing K-5th grade elementary school. |
Hopkinsville |
KY |
5 |
$192,000 |
Schools |
2 |
| Major Renovation--Bryan Station Middle School |
Lexington |
KY |
200 |
$16,983,200 |
Schools |
20 |
| New Construction--Lafayette High School Football Stadium |
Lexington |
KY |
200 |
$6,500,000 |
Schools |
25 |
| Major Renovation--Arlington Elementary School |
Lexington |
KY |
200 |
$13,206,300 |
Schools |
12 |
| New Construction--Equine Agriscience Education Center |
Lexington |
KY |
200 |
$7,500,000 |
Schools |
-8 |
| New Construction/Major Renovation--Central School Bus Garage |
Lexington |
KY |
200 |
$5,676,680 |
Schools |
9 |
| Major Renovation--Russell Cave Elementary School |
Lexington |
KY |
200 |
$6,905,070 |
Schools |
5 |
| Major Renovation--Leestown Middle School |
Lexington |
KY |
200 |
$18,227,600 |
Schools |
10 |
| Major Renovation--Cassidy Elementary School |
Lexington |
KY |
200 |
$13,827,800 |
Schools |
12 |
| Field Elementary Construction: Construction of playtorium and renovation of existing Gym to new Media Center and renovation of existing media center to Art/Resource rooms and associated work |
Louisville |
KY |
62 |
$1,707,750 |
Schools |
3 |
| Kammerer Middle School Phase 1 Renovation: HVAC replacement or upgrade, roofing, ceiling & lights in corridors & classrooms, windows, painting, paving, floor tile replacement, office renovation, and lock conversion. |
Louisville |
KY |
112 |
$6,681,500 |
Schools |
5 |
| Mill Creek Elementary: Removal of portables, classroom conversion of existing media center, roofing, ceiling & lights in corridors & classrooms, windows, paving, painting, floor tile replacement, and lock conversion. |
Louisville |
KY |
62 |
$2,119,450 |
Schools |
-1 |
| Wilkerson Tradition Elementary: Removal of portables, classroom conversion of existing media center, roofing, ceiling & lights in corridors & classrooms, windows, paving, painting, floor tile replacement, and lock conversion. |
Louisville |
KY |
62 |
$1,844,600 |
Schools |
3 |
| Cochrane School Elementary: Removal of portables, classroom conversion of existing media center, roofing; refurbishing of ceiling & lights in corridors & classrooms, windows, paving, painting, floor tile replacement, and lock conversion. |
Louisville |
KY |
62 |
$1,849,200 |
Schools |
2 |
| Wheatley Elementary: Removal of portables, classroom conversion of existing media center, roofing, ceiling & lights in corridors & classrooms, windows, paving, painting, floor tile replacement, and lock conversion. New Elevator |
Louisville |
KY |
65 |
$2,099,900 |
Schools |
1 |
| Middletown Elementary: Removal of portables, classroom conversion of existing media center, roofing, ceiling & lights in corridors & classrooms, windows, paving, painting, floor tile replacement, and lock conversion. |
Louisville |
KY |
62 |
$2,018,250 |
Schools |
8 |
| Wheeler Elementary: Removal of portables, classroom conversion of existing media center, roofing, ceiling & lights in corridors & classrooms, windows, paving, painting, floor tile replacement, and lock conversion. |
Louisville |
KY |
62 |
$1,711,200 |
Schools |
3 |
| Wellington Elementary: Removal of portables, classroom conversion of existing media center, roofing, ceiling & lights in corridors & classrooms, windows, paving, painting, floor tile replacement, lock conversion, and elevator. |
Louisville |
KY |
65 |
$3,007,250 |
Schools |
5 |
| King Elementary: Removal of portables, classroom conversion of existing media center, roofing, ceiling & lights in corridors & classrooms, windows, paving, painting, floor tile replacement, and lock conversion. |
Louisville |
KY |
62 |
$1,702,000 |
Schools |
10 |
| Purchase of school buses older than the 14-year replacement cycle: includes 154 66-passenger regular buses, 38 52-passenger buses with ECE and A/C, 18 passenger buses with lifts and five 22-passenger ECE buses |
Louisville |
KY |
430 |
$15,745,000 |
Schools |
11 |
| Watterson Elementary : Removal of portables, classroom conversion of existing media center, roofing, ceiling & lights in corridors & classrooms, windows, paving, painting, floor tile replacement, and lock conversion and restroom addition. |
Louisville |
KY |
62 |
$3,377,550 |
Schools |
3 |