| Municipal Building Retrofit for Energy Efficiency |
Anchorage |
AK |
15 |
$10,000,000 |
Energy |
-7 |
| Trail Lighting Retrofit |
Anchorage |
AK |
8 |
$2,000,000 |
Energy |
-68 |
| Streetlight Retrofit to Energy-Saving LED Technology |
Anchorage |
AK |
3 |
$7,000,000 |
Energy |
24 |
| Landfill Methane Recovery Project |
Anchorage |
AK |
20 |
$7,000,000 |
Energy |
137 |
| Materials Recovery Facility (Recycling and Re-use) |
Anchorage |
AK |
17 |
$15,000,000 |
Energy |
39 |
| Solar energy production - public buildings/schools |
Anniston |
AL |
108 |
$12,000,000 |
Energy |
23 |
| Abengoa Solar designed 100MW solar parabolic trough electric generation plant |
Anniston |
AL |
3200 |
$600,000,000 |
Energy |
-11 |
| Cooperative Energy Projects |
Anniston |
AL |
1080 |
$120,000,000 |
Energy |
-32 |
| Bio-diesel manufacturing facility. |
Bessemer |
AL |
6 |
$500,000 |
Energy |
7 |
| Conversion of 400 City Vehicles to Natural Gas. |
Bessemer |
AL |
12 |
$1,200,000 |
Energy |
-8 |
| Development of methane production at City landfill. |
Bessemer |
AL |
10 |
$1,700,000 |
Energy |
42 |
| E-85 Fueling Facilities - Construction of fuel distribution facilities to make E-85 fuel available city-wide for the City's fleet vehicles. |
Birmingham |
AL |
50 |
$550,000 |
Energy |
-36 |
| Retro fitting city hall for engergy efficiency and ADA compliance |
Decatur |
AL |
20 |
$2,000,000 |
Energy |
-6 |
| Green Roof Conversions |
Gadsden |
AL |
15 |
$500,000 |
Energy |
0 |
| Energy Retrofit of Historic Downtown Municipal Buildings |
Gadsden |
AL |
75 |
$4,000,000 |
Energy |
7 |
| Library HVAC and Chiller Retrofit |
Huntsville |
AL |
20 |
$400,000 |
Energy |
8 |
| Brahan Spring Park Landscape Management Facility |
Huntsville |
AL |
100 |
$2,000,000 |
Energy |
-32 |
| Natatorium Back Patio Renovation |
Huntsville |
AL |
10 |
$200,000 |
Energy |
-51 |
| Green Cove Fire Station |
Huntsville |
AL |
80 |
$1,700,000 |
Energy |
13 |
| Alternative (Rapid) Fueling Station |
Huntsville |
AL |
80 |
$1,700,000 |
Energy |
1 |
| New Energy Efficient Fleet Building |
Huntsville |
AL |
235 |
$5,000,000 |
Energy |
-1 |
| Greenbrier Fire Station |
Huntsville |
AL |
75 |
$1,660,000 |
Energy |
11 |
| LED Traffic Signalization and Incandescent Lighting Improvements |
Huntsville |
AL |
235 |
$5,000,000 |
Energy |
12 |
| New Green LEED Goldsmith Schiffman Preserve Building |
Huntsville |
AL |
35 |
$750,000 |
Energy |
-15 |
| North Huntsville Public Safety Facility |
Huntsville |
AL |
105 |
$2,200,000 |
Energy |
6 |
| Hays Preserve Building- New Green LEED Building |
Huntsville |
AL |
35 |
$750,000 |
Energy |
-2 |
| Energy Efficiency Upgrades to Calvary Hills and West Side Neighborhood Recreation Centers |
Huntsville |
AL |
100 |
$2,000,000 |
Energy |
-7 |
| City of Mobile: Mobile Gas Corp: Main relocation and renewal for the EADS/Northrop Grumman facilities that will be built on the Brookley Industrial Complex. |
Mobile |
AL |
120 |
$500,000 |
Energy |
3 |
| City of Mobile: Mobile Gas Corp: Multiple Relocation, Renewal, Refurbishment Projects to maintain and upgrade existing gas transfer infrastructure. |
Mobile |
AL |
441 |
$2,941,300 |
Energy |
-6 |
| The City of Mobile and Alabama Power Company, (A Southern Company), "Re-powering an Electric Utility Coal Unit with 100% Biomass"- including the primary electrical generating facility for Mobile, the Barry Steam Plant. |
Mobile |
AL |
193 |
$100,000,000 |
Energy |
-13 |
| Sanitation, Solid Waste and Landfill Development |
Prichard |
AL |
300 |
$12,500,000 |
Energy |
-2 |
| Elevator Equipment Replacements -
The city will install energy efficient elevator equipment in all three buildings in the Pine Bluff Civic Center Complex. |
Pine Bluff |
AR |
5 |
$200,000 |
Energy |
-23 |
| Lights for Walking Trail - The city is requesting funds to install solar-powered character lighting along a walking trail to make it safe and appealing to residents and tourists during evening hours. |
Pine Bluff |
AR |
5 |
$500,000 |
Energy |
-37 |
| Municipal Operations Service Center Solar energy system - Installation of an 112kw solar energy system |
Avondale |
AZ |
50 |
$1,000,000 |
Energy |
21 |
| Northwest Public Safety Facility 50kw solar energy system |
Avondale |
AZ |
35 |
$500,000 |
Energy |
3 |
| City Facility comprehensive energy management retrofit- to add motion activate switches, replace T-12 and incandescent lights with T-8 and CFL; Replace low efficient AC units |
Avondale |
AZ |
25 |
$1,000,000 |
Energy |
-7 |
| LED Streetlight Pilot Program- To change out our street lights to LED fixtures |
Avondale |
AZ |
20 |
$4,000,000 |
Energy |
-15 |
| Energy Packages to go to first time home buyers who purchase foreclosed homes as part of the Neighborhood Stabilization Program |
Avondale |
AZ |
20 |
$180,000 |
Energy |
-6 |
| City Hall Retrofitting/Parking Structures w/Solar Power Regeneration Energy Savings Project |
Lake Havasu City |
AZ |
130 |
$7,280,000 |
Energy |
-3 |
| Community Center, Treatment Plant Retrofitting/Parking Structures w/Solar Power Regeneration Energy Savings Project |
Lake Havasu City |
AZ |
120 |
$6,800,000 |
Energy |
8 |
| Police Facility Solar Panels |
Lake Havasu City |
AZ |
75 |
$400,000 |
Energy |
6 |
| PWMFRetrofitting/Parking Structures w/Solar Power Regeneration Energy Savings Project |
Lake Havasu City |
AZ |
60 |
$3,400,000 |
Energy |
2 |
| SCADA System for Natural Gas Distribution System |
Mesa |
AZ |
0 |
$400,000 |
Energy |
3 |
| Gas Main and Water Service Replacement in Quarter Section 21C Neighborhood |
Mesa |
AZ |
0 |
$3,000,000 |
Energy |
-3 |
| Gas Gate Station #3 and 8" High Pressure Gas Main on Power Road; Pecos Road to Baseline Road |
Mesa |
AZ |
0 |
$3,356,000 |
Energy |
2 |
| Add solar panels to two existing parking structures with covered parking at municipal office complex |
Peoria |
AZ |
8 |
$300,000 |
Energy |
14 |
| Recalk/seal expansion joints in five municipal buildings at 135,000 square feet |
Peoria |
AZ |
5 |
$150,000 |
Energy |
-3 |
| Add covered parking to two existing parking structure along with solar panels |
Peoria |
AZ |
80 |
$3,000,000 |
Energy |
3 |
| City Hall Campus Central Plant Upgrade |
Peoria |
AZ |
45 |
$3,600,000 |
Energy |
-7 |
| Energy efficiency for three public aquatic centers - replace existing motors with variable frequency drive, install VFD on HVAC units, add motion activate switches, replace lights with CFL, replace pool covers to minimize heat loss. |
Peoria |
AZ |
20 |
$250,000 |
Energy |
11 |
| Install alternative fueling station and fleet shop upgrades (natural gas or hydrogen) |
Peoria |
AZ |
11 |
$2,500,000 |
Energy |
10 |
| Solar electric system for Peoria Fire Station - pilot program |
Peoria |
AZ |
8 |
$400,000 |
Energy |
14 |
| SR85 Solar Energy Project |
Phoenix |
AZ |
0 |
$50,000,000 |
Energy |
2 |
| City Solar Conversion - Construction and installation of photovoltaic systems on city owned facilities for combined energy output of 2.5 megawatts of solar energy. |
Scottsdale |
AZ |
180 |
$12,000,000 |
Energy |
39 |
| Electric Powered Vehicles - Traffic Control |
South Tucson |
AZ |
2 |
$25,000 |
Energy |
-10 |
| Energy Efficient Downtown Central Energy Plant |
Tucson |
AZ |
0 |
$45,000,000 |
Energy |
-21 |
| Install solar panels on roof of the Main Library. |
Alameda |
CA |
13 |
$1,200,000 |
Energy |
-12 |
| Install solar hot water heating system to supplement the operation of a new energy efficient hot water system at Anne B. Diament. |
Alameda |
CA |
2 |
$100,000 |
Energy |
-21 |
| LED Traffic Signal Lights - 75 locations: Change from incandescent bulbs to low emitting diodes (LED) for decreased electrical costs. |
Alhambra |
CA |
0 |
$1,000,000 |
Energy |
-12 |
| Anaheim Solar Flair (Solar Panel placement on city facilities and commercial sites) |
Anaheim |
CA |
690 |
$24,000,000 |
Energy |
-52 |
| Water and Energy Efficiency Retrofitting Projects |
Anaheim |
CA |
522 |
$18,750,000 |
Energy |
10 |
| Anaheim Convention Center - Water and Energy Efficiency and Solar Power Retrofitting Project |
Anaheim |
CA |
290 |
$10,000,000 |
Energy |
-30 |
| Hydroelectric Turbine at Walnut Canyon |
Anaheim |
CA |
29 |
$1,000,000 |
Energy |
32 |
| Construction of Running Track using recycled rubberized tire material or similar recycled product for the main surface. This project would include Energy Efficient/Green outdoor recreational lighting, and drought tolerant landscaping. |
Bell Gardens |
CA |
10 |
$1,500,000 |
Energy |
-34 |
| John Anson Ford Park Gymnasium Lighting System Upgrade to Energy Efficient/Green Indoor Recreational Lighting. |
Bell Gardens |
CA |
5 |
$250,000 |
Energy |
-6 |
| Energy Efficient/Green Public Aquatics Center at John Anson Ford Park. Complete Renovation of an existing outdoor seasonal olympic size public pool, to an indoor, energy efficient olympic size pool with lighting, HVAC and filtering system for pool system. |
Bell Gardens |
CA |
20 |
$10,000,000 |
Energy |
-86 |
| Energy Efficient/Green Recreational Park Lighting for east side of John Anson For Park. Possibly utilize Solar Panels or some other alternative energy source. |
Bell Gardens |
CA |
10 |
$1,000,000 |
Energy |
-10 |
| Cerritos Center for the Performing Arts Audio System: Conversion of audio system from analog to digital technology to achieve a minimum 40% increase in energy efficiency |
Cerritos |
CA |
4 |
$250,000 |
Energy |
-24 |
| Expansion of Cerritos Library: addition of 3,000 square feet and incorporation of energy-efficient lighting solutions |
Cerritos |
CA |
150 |
$4,200,000 |
Energy |
-32 |
| Replacement of City HVAC System: replacement of 30-year-old heating/ventilation/air conditioning system at Cerritos Civic Center to increase energy efficiency and convenience for the public |
Cerritos |
CA |
30 |
$3,000,000 |
Energy |
-3 |
| Swim Center Environmental Control System: replacement of 25-year-old boiler with high-efficiency environmental control system, to reduce energy usage by approximately 70% |
Cerritos |
CA |
8 |
$500,000 |
Energy |
2 |
| Replacement of Library Computers: replacement of 150 desktop computers to reduce energy consumption and provide more efficient service to Library patrons, for research and job training purposes |
Cerritos |
CA |
6 |
$250,000 |
Energy |
-22 |
| "Go Green" Supplemental Power System for Cerritos Library: installation of micro-turbine generators in accordance with California state requirements, to prevent blackouts and reduce adverse environmental impacts |
Cerritos |
CA |
5 |
$360,000 |
Energy |
39 |
| Replacement of Auto Square Signage: upgrade of existing Cerritos Auto Square full-color display signage with LED technology; estimated 60% reduction in energy usage |
Cerritos |
CA |
4 |
$500,000 |
Energy |
-23 |
| Weatherize various City facilities to improve energy efficiency |
Compton |
CA |
14.44 |
$1,300,000 |
Energy |
-1 |
| Hybrid HVAC/Night Shift system with solar powered air handlers |
Fountain Valley |
CA |
5 |
$800,000 |
Energy |
-20 |
| Solar power panel funding to assist low and moderate income house hold owners with installation costs for energy reduction. |
Glendora |
CA |
55 |
$1,950,000 |
Energy |
0 |
| Solar power panel funding to assist small business owners with the installation costs. |
Glendora |
CA |
45 |
$975,000 |
Energy |
-2 |
| Traffic Controllers - Replace all 150 traffic controllers with new state of the art controller system |
Hayward |
CA |
40 |
$1,500,000 |
Energy |
-3 |
| Waste Water Treatment Plant 1MW Photovoltaic System |
Hayward |
CA |
200 |
$8,000,000 |
Energy |
18 |
| Solar Energy Generation for various City Facilities |
Hayward |
CA |
200 |
$4,000,000 |
Energy |
20 |
| LED Street Lights - Replace street lights with LEDs Citywide. |
Hayward |
CA |
150 |
$8,000,000 |
Energy |
29 |
| Utility Capital Projects |
Hercules |
CA |
118 |
$3,273,840 |
Energy |
2 |
| Retrofit City Facilities to allow participation in next generation Demand Response Programs. (create A/B circuits on lighting circuits, install timeclock & controls on fountain pumps, oil pumps, etc.) |
Huntington Beach |
CA |
25 |
$1,000,000 |
Energy |
-6 |
| City & SCE owned Street & pole light & purchased utility meter inventory, audit and Geographical Information System (GIS) input. |
Huntington Beach |
CA |
4 |
$150,000 |
Energy |
-15 |
| Huntington Beach Large Scale Photovoltaic purchase. Install 2.5 MW of photovoltaic systems across selected appropriate sites in the city. |
Huntington Beach |
CA |
65 |
$15,200,000 |
Energy |
-39 |
| Phase 2 energy projects-retrofit all city owned and operated facilities to achieve best in class energy efficiency performance. Lighting systems redesign & retrofit, HVAC systems, controls, outdoor security lighting, utility infrastructure. |
Huntington Beach |
CA |
50 |
$4,000,000 |
Energy |
-12 |
| Replace high voltage downtown streetlight system with energy efficient lighting |
Huntington Beach |
CA |
35 |
$3,500,000 |
Energy |
1 |
| Huntington Beach/Goldenwest College training center of excellence for energy efficiency & renewable energy, providing trained and re-trained green collar workers (30 qualified/re-trained employees annually) |
Huntington Beach |
CA |
30 |
$500,000 |
Energy |
-16 |
| Photovoltaic technology Senior Center. Self power generating. Design complete. |
Indio |
CA |
50 |
$1,000,000 |
Energy |
4 |
| Parks Energy Enhancements: This project will provide new electrical panels, conduits, transformers and needed equipment at various parks to centralize electrical controls at each site and create greater efficiency and improved safety. |
Inglewood |
CA |
5 |
$430,000 |
Energy |
4 |
| Civic Building Alternative Energy Renovations: This project includes energy renovations for City Hall, Main City Library, and New Senior Center. The energy renovations will include the installation of solar panels, reduced water fixtures, solar shades and |
Inglewood |
CA |
100 |
$5,000,000 |
Energy |
1 |
| Convert I-Shuttle buses to natural gas or hydrogen |
Irvine |
CA |
4 |
$2,000,000 |
Energy |
-70 |
| Solar Contractural Assessment Program (California Assembly Bill 811) |
Irvine |
CA |
3 |
$500,000 |
Energy |
-25 |
| Alternative energy efficiency grants for business and workforce housing |
Livermore |
CA |
7 |
$1,500,000 |
Energy |
-4 |
| Citywide landscape improvements to improve water conservation and solar heat island abatement |
Livermore |
CA |
4 |
$1,000,000 |
Energy |
-3 |
| Implement energy efficiency retrofit in CityÂ’s Multi-Service Center (Ten tenants provide services to over 10,000 low income residents per year) |
Livermore |
CA |
2 |
$200,000 |
Energy |
-1 |
| Convert existing street lights and Internally Illuminated Street Name Signs to LED for energy savings |
Livermore |
CA |
52 |
$12,290,000 |
Energy |
4 |
| Energy Retrofits for Municipal Buildings—Increase energy efficiency and reduce costs to the City by retrofitting the Long Beach Senior Center, the City’s Fleet Services, the Public Safety Building, and City Hall. |
Long Beach |
CA |
105 |
$90,000,000 |
Energy |
-17 |
| Alternative Fuels—Invest in and promote the use of alternative fuels among residents and businesses, and partner with an organization to collect used cooking grease from local restaurants for use in developing biodiesel fuels. |
Long Beach |
CA |
56 |
$40,000,000 |
Energy |
-46 |