WARNING: You're looking at a page from the old site. We have relaunched with live stimulus data. Learn more here.


Recent News

Advanced search added: keywords, zip codes, and recipients 11/25/2009

Thanks to the tireless work of developer Peter Snyder, Stimulus Watch 2.0 now has an advanced search capability that will…

Jerry Brito on Washington DC’s Federal News Radio... 11/24/2009

Jerry Brito on Washington DC’s Federal News Radio discussing the new features available on Stimulus Watch 2.0.

We've relaunched with new official data of stimulus projects in your neighborhood! 11/18/2009

Welcome to Stimulus Watch 2.0. While our original site featured proposed stimulus projects taken from the U.S. Conference of Mayors…

OpenRegs.com
Find government regulations by issue or agency. Comment, add links and subscribe to regulations.

Projects in Turlock, California

Below are the "shovel-ready" projects for which this city submitted in the 2008 U.S. Conference of Mayors report. You can click on a project to read (and add to) its description. You can also discuss the project and vote on whether you believe it is critical or not.

The total cost of all the projects submitted by Turlock is $78,247,000

Description City State Jobs Cost Program Type Vote Ratio
PSRPSE and Construction, Fulkerth Rd. and 99 Freeway Interchange Upgrade. Modification of the existing interchange to meet traffic demands Turlock CA 315 $6,000,000 Streets/Roads 9
Project: Construction of off-site improvements for Public Safety Center in the downtown. Project Description: The off-site improvements are necessary to serve the new 58,000 square foot public safety building in downtown Turlock. Turlock CA 94 $1,800,000 Streets/Roads -6
W. Monte Vista Ave.Pavement Overlay/Resurface: Crowell Rd. to Geer Rd. Rehabilitation Turlock CA 81 $1,523,000 Streets/Roads -6
Golden State Blvd Pavement Overlay/Resurface: Crane St. to South city limits Rehabilitation Turlock CA 68 $1,307,000 Streets/Roads 3
Fulkerth Rd. Pavement Overlay/Resurface: Tully Rd. to N. Golden State Blvd. Rehabilitation Turlock CA 60 $1,126,000 Streets/Roads -1
Geer Rd. Pavement Overlay/Resurface: Monte Vista Ave. to Taylor Rd. Rehabilitation Turlock CA 57 $1,094,000 Streets/Roads -5
Golden State Blvd. Pavement Overlay/Resurface: Fulkerth Rd. to Tuolumne Rd. Rehabilitation Turlock CA 55 $1,057,000 Streets/Roads 2
Handicapped Wheelchair Ramps 250 Locations Turlock CA 49 $950,000 Streets/Roads 2
Cristoffersen Parkway and Fosburg Rd. Intersection Improvements: install traffic signal Intelligent Transportation System Turlock CA 39 $750,000 Streets/Roads -1
Golden State Blvd. and Pedras Rd. Intersection Improvements: install traffic signal Intelligent Transportation System Turlock CA 39 $750,000 Streets/Roads -2
Hawkeye Ave. and Denair St. Intersection Improvements: install traffic signal Intelligent Transportation System Turlock CA 39 $750,000 Streets/Roads 2
W. Main St. and Tegner Rd. Intersection Improvements: install traffic signal Intelligent Transportation System Turlock CA 39 $750,000 Streets/Roads 4
W. Main St. Pavement Overlay/Resurface: Lander Ave. to West Ave. South Rehabilitation Turlock CA 39 $725,000 Streets/Roads 4
N. Olive Ave. Pavement Overlay/Resurface: Monte Vista Ave. to Fullerton Rehabilitation Turlock CA 36 $696,000 Streets/Roads 4
E. Hawleye Ave.Pavement Overlay/Resurface: Quincy Rd. to Palmer Dr. Rehabilitation Turlock CA 36 $671,000 Streets/Roads 4
Golden State Blvd and "F" St. Intersection Improvement: Install traffic signal Intelligent Transportation System Turlock CA 34 $650,000 Streets/Roads 6
Pedras Rd. Pavement Overlay/Resurface: Geer Rd. to Del's Ln. Rehabilitation Turlock CA 31 $573,000 Streets/Roads 4
Project: High Street Roadway Improvements from Lander Avenue to West Avenue South Project Description: The project would provide a 2” asphalt overly to High Street. In addition, all existing pedestrian routes will be improved to meet ADA standards. Turlock CA 26 $500,000 Streets/Roads 5
Sidewalk Hawkeye Ave. Geer Rd to Donnelly Park Dr Turlock CA 5 $75,000 Streets/Roads 1
Project: Turlock Regional Water Quality Control Facility Expansion Project Description: The project will make improvements to the RWQCF to expand treatment capacity and enhance water quality (nitrates), solids handling, and the removal of organics. Turlock CA 35 $30,000,000 Water 5
Project: Wastewater Outfall Line (Harding Drain Bypass) Project Description: This project will install approximately 6 miles of pipeline from the current point of discharge into the Harding Drain to the San Joaquin River. This pipeline serves the entire Turlock CA 15 $25,000,000 Water 10
Land acquisition for transit hub. The City of Turlock currently provides a fixed route transit system to its citizens. In addition, Turlock is served by Stanislaus and Merced County Transit Systems. Currently, these three transit system have no single lo Turlock CA 22 $1,500,000 Transit -12