| Bridges |
Santa Barbara |
CA |
0 |
$9,639,800 |
Streets/Roads |
-1 |
| Overlays |
Santa Barbara |
CA |
0 |
$8,000,000 |
Streets/Roads |
-34 |
| Streetlight Improvements |
Santa Barbara |
CA |
0 |
$6,500,000 |
Streets/Roads |
-8 |
| Overlay (Rubber AC) |
Santa Barbara |
CA |
0 |
$5,000,000 |
Streets/Roads |
-12 |
| Sidewalk Infill |
Santa Barbara |
CA |
0 |
$1,500,000 |
Streets/Roads |
-19 |
| Sidewalk Replacement |
Santa Barbara |
CA |
0 |
$1,300,000 |
Streets/Roads |
-14 |
| Access Ramps |
Santa Barbara |
CA |
0 |
$1,000,000 |
Streets/Roads |
6 |
| Storm Drain |
Santa Barbara |
CA |
0 |
$700,000 |
Streets/Roads |
6 |
| Water Mains |
Santa Barbara |
CA |
0 |
$4,587,500 |
Water |
6 |
| Headworks Screening |
Santa Barbara |
CA |
0 |
$4,500,000 |
Water |
-10 |
| Sewer Replacement |
Santa Barbara |
CA |
0 |
$925,000 |
Water |
19 |
| Sewer Rehabilitaion |
Santa Barbara |
CA |
0 |
$500,000 |
Water |
7 |
| Equilization Basin |
Santa Barbara |
CA |
0 |
$250,000 |
Water |
0 |
| Aeration Basin Diffusers |
Santa Barbara |
CA |
0 |
$200,000 |
Water |
-1 |
| Energency Generators |
Santa Barbara |
CA |
0 |
$200,000 |
Water |
9 |
| Water Distribution System |
Santa Barbara |
CA |
0 |
$195,000 |
Water |
9 |
| Lift station rehab |
Santa Barbara |
CA |
0 |
$180,936 |
Water |
3 |
| Reservoir Projects |
Santa Barbara |
CA |
0 |
$175,000 |
Water |
6 |
| Water Treatment |
Santa Barbara |
CA |
0 |
$60,000 |
Water |
6 |
| Airline Terminal Improvement Project - Construction of a 67,000 square foot two-story airline terminal facility, renovation of the existing 7,000 square foot historic 1942 airline terminal, vehicle parking and roadway improvements. Construction design is |
Santa Barbara |
CA |
0 |
$45,000,000 |
Airport |
-129 |
| Airport Sewer System - To construct a perimeter wastewater collection system for the area south of Hollister Avenue. Construct a lift station and force main from new lift station to Goleta Sanitary District trunk line in Fairview Avenue in accordance wit |
Santa Barbara |
CA |
0 |
$4,800,000 |
Airport |
-7 |
| Airport Water System Improvement Project - To construct a looped network system to supply domestic and fire supply to all areas of the southern portion of the Airport property. The looped system requires installation of 7,000 linear feet of 12†diameter |
Santa Barbara |
CA |
0 |
$1,360,000 |
Airport |
-12 |
| Marina One Replacement Project - Phase's 1,2,3
Replace 1200' of the main headwalk, all utilities, and shoreside electrical upgrades in Marina One. Plans and specifications are complete and the project is ready to go out to bid pending funding. |
Santa Barbara |
CA |
0 |
$4,300,000 |
CDBG |
-41 |
| Upper Las Positas Creek Restoration and Storm Water Management Project. The project has two primary objectives: 1) to construct storm water detention system (bioswales and detention ponds) to reduce flood flows and improve water quality in Las Positas Cr |
Santa Barbara |
CA |
0 |
$1,200,000 |
CDBG |
24 |
| Catch Basin Debris Screens - The purpose of this project is to install catch basin debris screens in various areas of the City to prevent trash, pollutants and debris from entering the storm drain system. This is a green project. |
Santa Barbara |
CA |
0 |
$1,100,000 |
CDBG |
18 |
| Sidewalk, curb and gutter infill projects - various locations throughout the City. |
Santa Barbara |
CA |
0 |
$1,075,000 |
CDBG |
-7 |
| Rebuild Municipal Tennis Stadium |
Santa Barbara |
CA |
0 |
$1,000,000 |
CDBG |
-71 |
| Chase Palm Park Renovation - The project includes replacement and repair of park lighting, walkways, playground, and landscaping. |
Santa Barbara |
CA |
0 |
$870,000 |
CDBG |
-12 |
| Mission Creek Steelhead Passage at Oak Park. The purpose of this project is to restore Mission Creek in Oak Park. The project would include non-native weed removal, revegetation with native plants, biotechnical stabilization of eroding creek banks |
Santa Barbara |
CA |
0 |
$800,000 |
CDBG |
7 |
| City Infrastucture Storm Water Quality Improvement Retrofit Project - The purpose of the project is to construct "Low Impact Development " demonstration projects, such as bioswales and infiltration basins, at City facilities to treat polluted urban storm |
Santa Barbara |
CA |
0 |
$800,000 |
CDBG |
9 |
| Harbor Breakwater Cap Repair Project
Demolish and reconstruct approximately 400' of the existing breakwater cap including sidewalk and parapet wall. |
Santa Barbara |
CA |
0 |
$800,000 |
CDBG |
-11 |
| Resurface Parks & Recreation Facilities parking lots |
Santa Barbara |
CA |
0 |
$655,000 |
CDBG |
-26 |
| Park & Recreation Facility Retrofits & Maintenance (Inlcludes public facilities such as recreation, senior, arts and community centers upgrades for lighting fixtures and roofs targeting energy conservation) |
Santa Barbara |
CA |
0 |
$588,000 |
CDBG |
-7 |
| Carrillo Gym Spalling Repair - A "Structure of Merit" the project includes the repair of the concrete gym walls. |
Santa Barbara |
CA |
0 |
$500,000 |
CDBG |
-15 |
| Shoreline Park Renovation Project - A popular community bluff top parks, the project includes renovation of walkways, realignment of fencing, replacement of storm drains, reconstruction of scenic overlooks, and renovation of group picnic areas to improve |
Santa Barbara |
CA |
0 |
$500,000 |
CDBG |
5 |
| Replace Library Fire and Intrusion Alarms (two libraries) |
Santa Barbara |
CA |
0 |
$420,000 |
CDBG |
0 |
| Main Library Roof Replacement (with cool roof system targeting energy conservation) |
Santa Barbara |
CA |
0 |
$350,000 |
CDBG |
4 |
| Upgrades and repair for the Ortega Park Restroom |
Santa Barbara |
CA |
0 |
$325,000 |
CDBG |
-18 |
| San Pascual Storm Drain Diversion - The purpose of the project is to improve water quality within Old Mission creek by diverting nuisance flows from the San Pascual storm drain to the sanitary sewer system for treatment. This is a green project. |
Santa Barbara |
CA |
0 |
$300,000 |
CDBG |
4 |
| Playground Replacement for Sunflower Park and Eastside Park - Playgrounds to be replaced to comply with playground safety standards. |
Santa Barbara |
CA |
0 |
$295,000 |
CDBG |
-6 |
| Public Works Corporate Yard and Administration Offices (Remove asphalt, repair failed basecourse, modify drainage as need and repave; repaint exterior of administration building to match existing |
Santa Barbara |
CA |
0 |
$280,000 |
CDBG |
-8 |
| Oak Park Restroom Renovation - The renovation project includes new fixtures, partitions, flooring, lighting and roof repairs. |
Santa Barbara |
CA |
0 |
$250,000 |
CDBG |
-14 |
| Alameda Park Gazebo - A historic gazebo in one of Santa Barbara's oldest parks, the project includes the replacement of the wood decks and stairs, electrical upgrades and repainting. |
Santa Barbara |
CA |
0 |
$200,000 |
CDBG |
-17 |
| Stearns Wharf & City Pier Pile Driving Project
Replace wooden piles, pile caps, stringers and deckboards on Historic Stearns Wharf and the City Pier. |
Santa Barbara |
CA |
0 |
$185,000 |
CDBG |
3 |
| Police Department Infrastructure Upgrade (Retrofit existing fluorescent fixtures, HVAC systems, and windows targeting energy conservation) |
Santa Barbara |
CA |
0 |
$153,000 |
CDBG |
-3 |
| Franklin Community Center Kitchen Renovation & Equipment |
Santa Barbara |
CA |
0 |
$150,000 |
CDBG |
-21 |
| Cabrillo Bathhouse Restroom Renovation - Located within the City's oldest beach front facility, the project includes the renovation of restrooms with new windows, tile, partitions, paint and fixtures. |
Santa Barbara |
CA |
0 |
$100,000 |
CDBG |
-21 |
| Fire Station Infrastructure Upgrades (retrofit exisiting lighting fixtures, HVAC systems and roofs targeting energy conservation) |
Santa Barbara |
CA |
0 |
$95,000 |
CDBG |
-4 |
| Replace windows and repair damaged wood at Las Positas Tennis Facility |
Santa Barbara |
CA |
0 |
$80,000 |
CDBG |
-33 |
| Security Cameras at two City Parks |
Santa Barbara |
CA |
0 |
$60,000 |
CDBG |
3 |
| Police Department Remodel Polygraph Room (remove asbestos, paint walls, replace ceiling, carpet and upgrade lights) |
Santa Barbara |
CA |
0 |
$25,000 |
CDBG |
-10 |
| Sunflower Park Landscape Renovation |
Santa Barbara |
CA |
0 |
$21,000 |
CDBG |
-32 |