| Pelandale Avenue/State Route 99 Interchange Reconstruction |
Modesto |
CA |
100 |
$50,000,000 |
Streets/Roads |
22 |
| 2009 Arterial Street Overlay Project |
Modesto |
CA |
500 |
$47,000,000 |
Streets/Roads |
12 |
| 2009 Collector Street Overlay Project |
Modesto |
CA |
500 |
$47,000,000 |
Streets/Roads |
7 |
| 2009 Cape & Slurry Seal Project |
Modesto |
CA |
500 |
$35,000,000 |
Streets/Roads |
-1 |
| ADA Curb Ramps |
Modesto |
CA |
100 |
$33,000,000 |
Streets/Roads |
-21 |
| MID Lateral Paths - Construct 34 Miles of Bike and Pedestrian Trails Along Irrigation Canals |
Modesto |
CA |
20 |
$18,700,000 |
Streets/Roads |
-29 |
| 2009 Street Rehab and Reconstruction |
Modesto |
CA |
25 |
$10,000,000 |
Streets/Roads |
16 |
| Virginia Corridor Construction - Construct 2.2 Miles of Pedestrian and Bike Lanes |
Modesto |
CA |
25 |
$10,000,000 |
Streets/Roads |
-22 |
| Tuolumne Boulevard Extension - Construct a 2 Lane Access Road to Tuolumne River Regional Park |
Modesto |
CA |
20 |
$5,000,000 |
Streets/Roads |
-14 |
| Pelandale Avenue Class I Bike Path - Construct 8 Miles of Bike Path Along the Pelandale Expressway |
Modesto |
CA |
10 |
$4,500,000 |
Streets/Roads |
-20 |
| Trail Connection/TRRP Gateway-Legion Park - Construct 1.5 Miles of Bike Trails |
Modesto |
CA |
25 |
$3,000,000 |
Streets/Roads |
-16 |
| Class II Bike Lanes - Construct 64 Miles of Class II Bike Lanes City Wide |
Modesto |
CA |
10 |
$2,000,000 |
Streets/Roads |
-4 |
| Hetch Hetchy Trail - Construct 3 Miles of Bike Trails Along Hetch Hetchy Transmission Lines |
Modesto |
CA |
10 |
$1,700,000 |
Streets/Roads |
-18 |
| Dry Creek Trail Erosion Repair |
Modesto |
CA |
6 |
$1,000,000 |
Streets/Roads |
-8 |
| Park Irrigation System Replacement |
Modesto |
CA |
5 |
$600,000 |
Streets/Roads |
-6 |
| Play Equipment Replacement |
Modesto |
CA |
6 |
$600,000 |
Streets/Roads |
-14 |
| Modesto Centre Plaza Roofing Upgrade |
Modesto |
CA |
5 |
$200,000 |
Streets/Roads |
-14 |
| Mancini Bowl - Replace Aluminum Benches |
Modesto |
CA |
5 |
$100,000 |
Streets/Roads |
-29 |
| Primary Outfall Rehabilitation |
Modesto |
CA |
40 |
$23,200,000 |
Water |
2 |
| Phase 1A Wastewater Treatment Plant - Increase Wastewater Capacity by up to 2.5 Million Gallons Per Day |
Modesto |
CA |
60 |
$20,000,000 |
Water |
14 |
| Downstream Improvements - Virginia Corridor - Install New Water Transmission Pipes |
Modesto |
CA |
20 |
$11,000,000 |
Water |
2 |
| Emerald Trunk Rehabilitation - Repair a 50 Year Old Main Sewer Trunk |
Modesto |
CA |
30 |
$9,600,000 |
Water |
8 |
| 9th Street Storm Drain Rehabilitation - Add a New Storm Drain Pipe |
Modesto |
CA |
20 |
$7,000,000 |
Water |
2 |
| Downstream Improvements -Yosemite Transmission Line - Install 3 Miles of New Water Transmission Pipe |
Modesto |
CA |
20 |
$7,000,000 |
Water |
4 |
| Sutter Avenue Bypass Rehabilitation |
Modesto |
CA |
20 |
$4,500,000 |
Water |
-5 |
| Downstream Improvements-Pressure Reduction Valves |
Modesto |
CA |
10 |
$4,000,000 |
Water |
-4 |
| El Rio Sewer Replacement - Relocate a Sewer Main Away from a Riparian Corridor |
Modesto |
CA |
10 |
$2,000,000 |
Water |
-3 |
| Mildred Perkins Water Well |
Modesto |
CA |
15 |
$2,000,000 |
Water |
-4 |
| Replace Well #226 |
Modesto |
CA |
15 |
$2,000,000 |
Water |
3 |
| Scenic Lift Station Improvements |
Modesto |
CA |
15 |
$2,000,000 |
Water |
-3 |
| Waterford Water Well |
Modesto |
CA |
15 |
$2,000,000 |
Water |
1 |
| State Route 132 Replace Waterline |
Modesto |
CA |
20 |
$2,000,000 |
Water |
8 |
| Emergency Generators - Install Backup Generators at Water Well and Tank Sites |
Modesto |
CA |
10 |
$1,000,000 |
Water |
10 |
| Gaseous Chlorine Conversion |
Modesto |
CA |
10 |
$1,000,000 |
Water |
-10 |
| Jennings Road Grout Stabilization |
Modesto |
CA |
10 |
$1,000,000 |
Water |
-7 |
| Shackelford Crossing - Rehabilitate an Existing Sewer Crossing Over the Tuolumne River |
Modesto |
CA |
10 |
$1,000,000 |
Water |
-1 |
| Strengthen & Replace Waterlines |
Modesto |
CA |
10 |
$1,000,000 |
Water |
3 |
| Wellhead Treatment - Salida |
Modesto |
CA |
10 |
$1,000,000 |
Water |
-4 |
| Kansas-Needham Soil Remediation |
Modesto |
CA |
15 |
$1,000,000 |
Water |
-12 |
| Water Quality Laboratory Remodel |
Modesto |
CA |
20 |
$1,000,000 |
Water |
-2 |
| Annual Sewer Rehabilitation |
Modesto |
CA |
10 |
$800,000 |
Water |
-4 |
| Ellison Sewer Rehabilitation - Replace a Collapsed Sewer Main |
Modesto |
CA |
10 |
$300,000 |
Water |
4 |
| Tank Safety Fall Protection |
Modesto |
CA |
3 |
$100,000 |
Water |
-4 |
| Airport Irrigation Well |
Modesto |
CA |
5 |
$100,000 |
Water |
-4 |
| Terminal Complex - Design (Initial 2010) |
Modesto |
CA |
20 |
$1,578,950 |
Airport |
-16 |
| Apron Rehabilitation (Westside) - Prevent Damage to Aircrafts |
Modesto |
CA |
20 |
$400,000 |
Airport |
-10 |
| Enhance Runway Safety Area (Rwy 10R) - Construct New Taxiway |
Modesto |
CA |
20 |
$400,000 |
Airport |
-4 |
| Environmental Assessment - Terminal Project |
Modesto |
CA |
10 |
$368,421 |
Airport |
-16 |
| Construct a Second Train Track - Modesto Amtrak Station |
Modesto |
CA |
20 |
$2,000,000 |
Amtrak |
19 |
| Modesto Airport Neighborhood Empire St |
Modesto |
CA |
10 |
$400,000 |
CDBG |
-11 |
| Neighborhood Revitalization Related Construction - Construct a Small Community Center |
Modesto |
CA |
15 |
$300,000 |
CDBG |
-14 |
| Weed and Seed Construction - Construct a Small Community Center |
Modesto |
CA |
15 |
$300,000 |
CDBG |
-19 |
| Solar Roofs on City Government Buildings -install solar roofs on 6 City buildings to provide power to those buildings. |
Modesto |
CA |
100 |
$5,000,000 |
Energy |
20 |
| 500 kw Solar Roof on Corporation Yard Building -install 500 kw Solar roof on City Corporation Yard building to power operations at maintenance and transportation facilities |
Modesto |
CA |
100 |
$2,500,000 |
Energy |
6 |
| Partnership for Residential Solar Retrofits -install 5kw solar systems on 100 low income and Habitat for Humanity residences |
Modesto |
CA |
100 |
$2,000,000 |
Energy |
-18 |
| 50 kw Solar Shade Structures on 3 City Parking Garages -install 50 kw shade structure on each of 3 City pkg garages to power City/County bldg &ot her downtown public buildings & plug-ins for electric vehicles |
Modesto |
CA |
50 |
$1,500,000 |
Energy |
6 |
| 100 kw Solar Array at Modesto Composting -install a 100kw solar array at Modesto Composting to power equipment and maintenance facilities |
Modesto |
CA |
20 |
$700,000 |
Energy |
7 |
| Energy Retrofits of Government Buildings, VFD -install VFD on HVAC units in City buildings to reduce energy use |
Modesto |
CA |
20 |
$500,000 |
Energy |
3 |
| 5kw Solar Shade Structures in 5 City Parks -install 5kw Solar shade structures in 5 City parks to provide green power to tennis courts, other lighting fixtures, irrigation systems, etc |
Modesto |
CA |
10 |
$200,000 |
Energy |
-9 |
| Energy Efficient, Green Classroom Retrofit retrofit existing modular at Modesto Composting for use in Resource Conservation Education program |
Modesto |
CA |
10 |
$200,000 |
Energy |
-11 |
| Public Housing Modernization |
Modesto |
CA |
30 |
$7,500,000 |
Housing |
-33 |
| Additional Sworn Police Officer Staffing/Hiring Grant |
Modesto |
CA |
45 |
$4,500,000 |
Public Safety |
36 |
| DNA Evidence Collection, Processing, and Analysis - Process DNA Evidence for Unsolved Crimes |
Modesto |
CA |
5 |
$1,500,000 |
Public Safety |
5 |
| Bus Maintenance Facility Design & Construction |
Modesto |
CA |
40 |
$8,000,000 |
Transit |
-12 |
| Purchase 7 New Buses |
Modesto |
CA |
10 |
$3,000,000 |
Transit |
-7 |
| Bus Rehabilitation |
Modesto |
CA |
10 |
$500,000 |
Transit |
-4 |
| Bus Stop Improvements - Add Shelters and Pavement. |
Modesto |
CA |
20 |
$500,000 |
Transit |
-8 |