| Street Construction -- Increase construction to improve street condition based on audit of the residential street program. |
Milwaukee |
WI |
0 |
$41,600,000 |
Streets/Roads |
52 |
| Redevelopment of former Tower Automotive site -- Create business park at the site of the former Tower Automotive auto parts plant. Project includes demolition, environmental investigation and remediation, and design and installation of infrastructure (st |
Milwaukee |
WI |
700 |
$25,645,000 |
Streets/Roads |
-59 |
| Alleys -- Complete 100+ deferred alley construction and maintenance projects. |
Milwaukee |
WI |
0 |
$15,000,000 |
Streets/Roads |
-14 |
| Bridges -- Maintenance on six vertical lift bridges. |
Milwaukee |
WI |
0 |
$13,090,000 |
Streets/Roads |
31 |
| Street Construction -- Complete 2003-2008 deferred street project list. |
Milwaukee |
WI |
0 |
$10,000,000 |
Streets/Roads |
10 |
| Street Lighting -- Replace series circuitry to improve energy efficiency. |
Milwaukee |
WI |
0 |
$8,000,000 |
Streets/Roads |
19 |
| Street Lighting -- Accelerate control circuitry replacement. |
Milwaukee |
WI |
0 |
$5,000,000 |
Streets/Roads |
-8 |
| Street Maintenance -- Pavement joint repair, asphalt sealing, asphalt overlay, pavement crackfilling and sidewalk improvement. |
Milwaukee |
WI |
30 |
$5,000,000 |
Streets/Roads |
35 |
| 440th Air Force Reserve Base redevelopment -- To accommodate redevelopment of the property previously occupied by the 440th Air Force Reserve Base, closed February 2, 2008 under the Base Realignment and Closure Act of 2005, provide funds to separate prope |
Milwaukee |
WI |
0 |
$4,000,000 |
Streets/Roads |
-71 |
| Brewery Project -- Build new street system to support the redevelopment of the former Pabst Brewery as housing, office and retail uses. Streets are designed to incorporate bioswales and an innovative storm water management system. First phase of street |
Milwaukee |
WI |
1500 |
$3,005,000 |
Streets/Roads |
28 |
| Facility grounds -- Slope stabilization, regrading, sidewalks, railings, lighting, road repair/replacement. |
Milwaukee |
WI |
0 |
$3,000,000 |
Streets/Roads |
-12 |
| Street Construction -- Resurface deteriorating Port roads. |
Milwaukee |
WI |
116 |
$3,000,000 |
Streets/Roads |
18 |
| Buildings -- Salt Dome at Ruby Garage. |
Milwaukee |
WI |
0 |
$1,200,000 |
Streets/Roads |
-26 |
| Residential redevelopment at 31st/Galena -- Remediate parcels and design and install infrastructure for residential development. |
Milwaukee |
WI |
0 |
$550,000 |
Streets/Roads |
-16 |
| Sewer -- Complete 76 sewer projects that reduce sewer overflow. |
Milwaukee |
WI |
37 |
$31,430,000 |
Water |
61 |
| Sewer -- Complete sanitary sewer rehab, including laterals, for three systems as stipulated by DOJ. |
Milwaukee |
WI |
27 |
$23,000,000 |
Water |
17 |
| Water Business Park -- Develop a 200-acre business park and incubator space that serves the growing freshwater research and business sectors in metropolitan Milwaukee. Assemble and remediate land, design and install infrastructure. This project supports |
Milwaukee |
WI |
150 |
$15,000,000 |
Water |
53 |
| Great Lakes Research Facility -- Provide Infrastructure and facilities support for the recently created School of Freshwater Science, the first and only of its kind in the U.S. |
Milwaukee |
WI |
0 |
$10,000,000 |
Water |
51 |
| Business Expansion/Facility Relocation -- Relocate existing solid waste transfer station and self-help recycling center at Green Tree and Industrial Road to accommodate expansion of business. |
Milwaukee |
WI |
500 |
$7,000,000 |
Water |
2 |
| Water Mains -- Twenty-eight water main replacement projects, ranging from $45,000 to $3.3 million. |
Milwaukee |
WI |
0 |
$6,600,000 |
Water |
18 |
| Breakwater -- Rehabilitate deteriorating Lake Michigan breakwater. |
Milwaukee |
WI |
193 |
$5,000,000 |
Water |
25 |
| Storage Tank -- Menomonee water storage tanks demolition and decommissioning. |
Milwaukee |
WI |
0 |
$4,500,000 |
Water |
-14 |
| Major Equipment -- Replace crawler crane to improve export capacity. |
Milwaukee |
WI |
278 |
$4,100,000 |
Water |
-3 |
| Filtering System -- Replace media filters at Linnwood and Howard water treatment plants. |
Milwaukee |
WI |
0 |
$4,000,000 |
Water |
11 |
| Port Expansion -- Move container yard to consolidate open space for additional Port development and improve Port operational efficiency. |
Milwaukee |
WI |
0 |
$3,000,000 |
Water |
1 |
| Howard Plant -- Howard water treatment plant west clear well and pump room roof replacements. |
Milwaukee |
WI |
0 |
$2,700,000 |
Water |
3 |
| Storage Tank -- Greenfield elevated water storage tank painting project. |
Milwaukee |
WI |
0 |
$2,500,000 |
Water |
-14 |
| Various O&M Projects -- Various maintenance projects at all Water facilities. |
Milwaukee |
WI |
0 |
$1,875,000 |
Water |
0 |
| Linnwood Plant -- Linnwood water treatment plant fluoride chemical feeds system replacement. |
Milwaukee |
WI |
0 |
$750,000 |
Water |
0 |
| Various Infrastructure -- Terminal resurfacing, dock walls, ship aprons, dredging, phytoremediation area. |
Milwaukee |
WI |
45 |
$685,000 |
Water |
6 |
| Pipeline -- Reline the wash water tank pipeline at the Linnwood Plant. |
Milwaukee |
WI |
0 |
$500,000 |
Water |
-3 |
| Port Facilities -- Terminals, demolition of old facilities, tuck pointing. |
Milwaukee |
WI |
0 |
$475,000 |
Water |
-1 |
| Buildings -- New porous parking lots to reduce rain runoff. |
Milwaukee |
WI |
0 |
$325,000 |
Water |
17 |
| Water Meter Shop -- Replace acid cleaning area, valves, piping, test benches. |
Milwaukee |
WI |
0 |
$175,000 |
Water |
1 |
| Job Training - Dept. of Public Works Environmental Services in partnership with the Milwaukee Area Workforce Investment Board, Inc. and BIG STEP/Wisconsin Regional Training Partnership have developed the Urban Forestry Training Pilot Program - Connecting |
Milwaukee |
WI |
80 |
$2,000,000 |
CDBG |
-3 |
| Customized and green collar job training in the 30th Street Industrial Corridor -- Provide funds to corridor employers to provide skills-specific training to corridor residents for "traditional" corridor jobs. Develop job training program for residents i |
Milwaukee |
WI |
0 |
$750,000 |
CDBG |
-4 |
| Buildings -- Create three Regional Libraries ($10 M each). |
Milwaukee |
WI |
0 |
$30,000,000 |
Energy |
-57 |
| Milwaukee Energy Efficiency (Me2) -- Retrofit much of the city's building stock by allowing property owners and renters to implement energy efficiency measures with immediate savings and no upfront costs. It saves customers money, helps reduce greenhouse |
Milwaukee |
WI |
300 |
$20,000,000 |
Energy |
41 |
| Street Lighting Energy Efficiency -- Retrofit 10% of existing city street lighting with emerging, energy reducing LED technology. |
Milwaukee |
WI |
0 |
$14,000,000 |
Energy |
14 |
| City Building Energy Efficiency -- Retrofit existing lighting, HVAC, windows, building systems, etc. that reduce energy consumption. |
Milwaukee |
WI |
0 |
$5,000,000 |
Energy |
6 |
| Buildings -- Central Library: Media/Technology Center. |
Milwaukee |
WI |
0 |
$2,600,000 |
Energy |
-5 |
| Buildings -- Forestry and Sanitation Lincoln Avenue facility. |
Milwaukee |
WI |
0 |
$2,500,000 |
Energy |
-2 |
| Buildings -- New East Library (joint use) |
Milwaukee |
WI |
0 |
$2,500,000 |
Energy |
-7 |
| Buildings -- New Villard Library (joint use) |
Milwaukee |
WI |
0 |
$2,500,000 |
Energy |
31 |
| Operating Systems -- RFID & Self-Check technology (partially funded in 2009 budget, total project cost $3.5 million). |
Milwaukee |
WI |
0 |
$1,500,000 |
Energy |
-6 |
| Buildings -- Create three Express Center libraries. |
Milwaukee |
WI |
0 |
$1,000,000 |
Energy |
-17 |
| Buildings -- HVAC upgrades at two neighborhood libraries. |
Milwaukee |
WI |
0 |
$1,000,000 |
Energy |
-7 |
| Buildings -- Install green roof on Central Library. |
Milwaukee |
WI |
0 |
$1,000,000 |
Energy |
-18 |
| Urban agriculture project -- Acquire 3-story, 20,000-SF building and combine with adjacent City-owned 2-acre parcel to create a grower-to-market economic opportunity. |
Milwaukee |
WI |
0 |
$772,000 |
Energy |
9 |
| Buildings -- Zablocki Library: replace HVAC, carpet, tile installation. |
Milwaukee |
WI |
0 |
$750,000 |
Energy |
-4 |
| Develop quality, affordable rental housing -- Revitalization of over 800 units of affordable housing for seniors, families, and disabled, including the acquisition and rehabilitation of foreclosed properties. |
Milwaukee |
WI |
0 |
$56,000,000 |
Housing |
-35 |
| Security and Energy --
Provide contracting opportunities to address deferred maintenance needs, which would include painting, landscaping, modernization of elevators for seniors and disabled, enhanced security systems, etc. |
Milwaukee |
WI |
0 |
$7,050,000 |
Housing |
2 |
| Conserve natural resources -- Replace 15% of our fleet with energy-efficient vehicles, which will also reduce ongoing operating costs. Install passive solar systems and green roofs on high-rises for the elderly and disabled. |
Milwaukee |
WI |
0 |
$5,400,000 |
Housing |
-13 |
| Lead Abatement -- Provide funding to abate lead in 1,000 housing units including related administrative and laboratory costs. |
Milwaukee |
WI |
0 |
$5,000,000 |
Housing |
-17 |
| Redevelopment of former T.C. Esser Paint factory site -- Remediate and redevelop abandoned, contaminated factory complex into housing. |
Milwaukee |
WI |
0 |
$2,595,000 |
Housing |
12 |
| Riverwalks -- Finish court ordered ADA improvement on riverwalks. |
Milwaukee |
WI |
0 |
$2,000,000 |
Housing |
2 |
| Employment and Training --
Provide critical employment and training opportunities for a minimum of 70 youth, young adults and dislocated workers. |
Milwaukee |
WI |
70 |
$1,550,000 |
Housing |
8 |
| Repair Shop -- Replace existing inadequate Fire equipment repair facility with new facility. |
Milwaukee |
WI |
0 |
$15,000,000 |
Public Safety |
-1 |
| Buildings -- Replace hollow walk and foundation stabilization/repair of City Hall. |
Milwaukee |
WI |
0 |
$11,700,000 |
Public Safety |
-3 |
| Engine House Replacement -- Replace Fire Engine House #8 and #17. |
Milwaukee |
WI |
0 |
$8,400,000 |
Public Safety |
8 |
| Buildings -- City Hall -- 8th Floor City Attorney Offices |
Milwaukee |
WI |
0 |
$5,700,000 |
Public Safety |
-47 |
| Buildings -- Central Library: Restoration of Mosaic and Scagiola in Rotunda. |
Milwaukee |
WI |
0 |
$5,000,000 |
Public Safety |
-8 |
| Police Administration Building -- Upgrade building systems and asbestos abatement. |
Milwaukee |
WI |
0 |
$5,000,000 |
Public Safety |
-1 |
| Various Police Facilities -- Improvements and building system upgrades to 6 police district stations and evidence storage facility. |
Milwaukee |
WI |
0 |
$5,000,000 |
Public Safety |
2 |
| Police Cars -- Replace 100 police cars. |
Milwaukee |
WI |
0 |
$3,500,000 |
Public Safety |
-38 |
| Buildings -- Central Library: Masonry repair, painting, mechanical upgrades, solar panels, interior finishes, drive-up window upgrade, Centennial Hall upgrades. |
Milwaukee |
WI |
0 |
$2,090,000 |
Public Safety |
11 |
| Buildings -- Lower Parking floor replacement in Zeidler Municipal Building. |
Milwaukee |
WI |
0 |
$1,300,000 |
Public Safety |
-13 |
| Buildings -- Zeidler Municipal Building elevator modernization project. |
Milwaukee |
WI |
0 |
$1,200,000 |
Public Safety |
-5 |
| 3rd District Police -- Renovation of old 3rd District Station into neighborhood task force facility. |
Milwaukee |
WI |
0 |
$1,000,000 |
Public Safety |
3 |
| UWM-Engineering School -- Purchase downtown land and prepare land for the new location of the UWM-Engineering School. |
Milwaukee |
WI |
0 |
$5,000,000 |
Schools |
14 |
| Mass Transit -- Develop and implement a Connector system/street car system to improve access to downtown, reduce travel time and reduce vehicle emissions. |
Milwaukee |
WI |
0 |
$100,000,000 |
Transit |
12 |