| Ten Mile Road from Franklin to Cherry Lane |
Meridian |
ID |
95 |
$9,375,000 |
Streets/Roads |
7 |
| Ten Mile Road from Cherry Lane to Ustick |
Meridian |
ID |
75 |
$7,295,000 |
Streets/Roads |
4 |
| Eagle Road from Victory to Ridenbaugh Canal |
Meridian |
ID |
40 |
$3,855,000 |
Streets/Roads |
2 |
| Intersection of Pine Avenue and Linder Road |
Meridian |
ID |
30 |
$2,735,000 |
Streets/Roads |
8 |
| Intersection of Eagle Road and Victory Road |
Meridian |
ID |
20 |
$1,891,000 |
Streets/Roads |
11 |
| 2 Million Gallon Drinking Water Reservoir: Civil, Structural, and Geotechnical Engineers / Technicians (6), Excavation and Earthwork (6), Pipe Crew (4), Concrete / Metal Crew (12), Coating Crew (3), Electricians (3), Paving Crew (5), Landscape and Fencing |
Meridian |
ID |
47 |
$4,500,000 |
Water |
10 |
| Tertiary Filters Project (three cloth media filters and piping upgrades) |
Meridian |
ID |
8 |
$3,170,000 |
Water |
-6 |
| WWTP Struvite Recovery |
Meridian |
ID |
8 |
$2,750,000 |
Water |
-6 |
| Land Purchase (for projects such as flow equalization and constructed treatment of wetlands) |
Meridian |
ID |
1 |
$2,500,000 |
Water |
-23 |
| Headworks Fine Screens (greater removal efficiencies in the headworks) |
Meridian |
ID |
8 |
$2,500,000 |
Water |
-6 |
| Manhole rehabilitation / Repair |
Meridian |
ID |
4 |
$2,000,000 |
Water |
-9 |
| Downtown sewer Rehabilitation |
Meridian |
ID |
6 |
$1,500,000 |
Water |
-7 |
| IFAS (fixed film process for increased aeration basin capacity) |
Meridian |
ID |
5 |
$1,400,000 |
Water |
-5 |
| Primary Fermentation (conversion of two existing primary clarifiers to fermenters) |
Meridian |
ID |
5 |
$1,250,000 |
Water |
-3 |
| Headworks Odor Control (building around the headworks structure with odor control) |
Meridian |
ID |
5 |
$1,000,000 |
Water |
-4 |
| WWTP Reuse Demonstration Project (reuse project at Heroes Park) |
Meridian |
ID |
4 |
$800,000 |
Water |
-7 |
| Bioaugmentation (side stream nutrient treatment) |
Meridian |
ID |
4 |
$750,000 |
Water |
-5 |
| WWTP Digester Grinder Pumps (grinder pumps to help with the digestion processes) |
Meridian |
ID |
3 |
$700,000 |
Water |
-3 |
| Well 28 Well and Pumphouse |
Meridian |
ID |
7 |
$700,000 |
Water |
-2 |
| Digester 1, 2, and 3 Rehabilitation (rehab of existing digesters) |
Meridian |
ID |
4 |
$660,000 |
Water |
-3 |
| Pressure Zone 1, 3 Pressure Reducing Valve Stations |
Meridian |
ID |
4 |
$450,000 |
Water |
-5 |
| WWTP Plant Automation |
Meridian |
ID |
4 |
$450,000 |
Water |
-4 |
| Amity Road Waterline |
Meridian |
ID |
6 |
$350,000 |
Water |
-5 |
| Ultraviolet Disinfection Upgrades (additional disinfection at the plant) |
Meridian |
ID |
2 |
$250,000 |
Water |
-6 |
| WWTP Black Cat Box Odor Control (odor control at one of the influent structures) |
Meridian |
ID |
2 |
$235,000 |
Water |
-5 |
| Coagulation Building for Chemical Feed (chemical feed building for the plant) |
Meridian |
ID |
3 |
$150,000 |
Water |
-5 |
| Project Management (a City Employee to manage the projects) |
Meridian |
ID |
1 |
$100,000 |
Water |
-5 |
| Ashford Greens Sewer Trunk (trunk to serve north Meridian and abandon lift station) |
Meridian |
ID |
5 |
$1,900,000 |
CDBG |
-4 |
| Black Cat Lift Station Grinder Pumps (placed after bar racks to increase life and improve operation of lift station) |
Meridian |
ID |
2 |
$700,000 |
CDBG |
-4 |
| Moshers/Merrywood Sewer Trunk (trunk to abandon three lift stations) |
Meridian |
ID |
3 |
$500,000 |
CDBG |
-6 |
| Composting Project |
Meridian |
ID |
5 |
$2,000,000 |
Energy |
-17 |
| Digester Gas Conditioning / reuse |
Meridian |
ID |
3 |
$1,000,000 |
Energy |
-8 |
| Phosphorous recovery/centrate treatment |
Meridian |
ID |
4 |
$500,000 |
Energy |
-4 |
| Purchase of Hybrid Fleet Vehicles |
Meridian |
ID |
2 |
$100,000 |
Energy |
-37 |