WARNING: You're looking at a page from the old site. We have relaunched with live stimulus data. Learn more here.


Recent News

Advanced search added: keywords, zip codes, and recipients 11/25/2009

Thanks to the tireless work of developer Peter Snyder, Stimulus Watch 2.0 now has an advanced search capability that will…

Jerry Brito on Washington DC’s Federal News Radio... 11/24/2009

Jerry Brito on Washington DC’s Federal News Radio discussing the new features available on Stimulus Watch 2.0.

We've relaunched with new official data of stimulus projects in your neighborhood! 11/18/2009

Welcome to Stimulus Watch 2.0. While our original site featured proposed stimulus projects taken from the U.S. Conference of Mayors…

OpenRegs.com
Find government regulations by issue or agency. Comment, add links and subscribe to regulations.

Projects in Meridian, Idaho

Below are the "shovel-ready" projects for which this city submitted in the 2008 U.S. Conference of Mayors report. You can click on a project to read (and add to) its description. You can also discuss the project and vote on whether you believe it is critical or not.

The total cost of all the projects submitted by Meridian is $60,016,000

Description City State Jobs Cost Program Type Vote Ratio
Ten Mile Road from Franklin to Cherry Lane Meridian ID 95 $9,375,000 Streets/Roads 7
Ten Mile Road from Cherry Lane to Ustick Meridian ID 75 $7,295,000 Streets/Roads 4
Eagle Road from Victory to Ridenbaugh Canal Meridian ID 40 $3,855,000 Streets/Roads 2
Intersection of Pine Avenue and Linder Road Meridian ID 30 $2,735,000 Streets/Roads 8
Intersection of Eagle Road and Victory Road Meridian ID 20 $1,891,000 Streets/Roads 11
2 Million Gallon Drinking Water Reservoir: Civil, Structural, and Geotechnical Engineers / Technicians (6), Excavation and Earthwork (6), Pipe Crew (4), Concrete / Metal Crew (12), Coating Crew (3), Electricians (3), Paving Crew (5), Landscape and Fencing Meridian ID 47 $4,500,000 Water 10
Tertiary Filters Project (three cloth media filters and piping upgrades) Meridian ID 8 $3,170,000 Water -6
WWTP Struvite Recovery Meridian ID 8 $2,750,000 Water -6
Land Purchase (for projects such as flow equalization and constructed treatment of wetlands) Meridian ID 1 $2,500,000 Water -23
Headworks Fine Screens (greater removal efficiencies in the headworks) Meridian ID 8 $2,500,000 Water -6
Manhole rehabilitation / Repair Meridian ID 4 $2,000,000 Water -9
Downtown sewer Rehabilitation Meridian ID 6 $1,500,000 Water -7
IFAS (fixed film process for increased aeration basin capacity) Meridian ID 5 $1,400,000 Water -5
Primary Fermentation (conversion of two existing primary clarifiers to fermenters) Meridian ID 5 $1,250,000 Water -3
Headworks Odor Control (building around the headworks structure with odor control) Meridian ID 5 $1,000,000 Water -4
WWTP Reuse Demonstration Project (reuse project at Heroes Park) Meridian ID 4 $800,000 Water -7
Bioaugmentation (side stream nutrient treatment) Meridian ID 4 $750,000 Water -5
WWTP Digester Grinder Pumps (grinder pumps to help with the digestion processes) Meridian ID 3 $700,000 Water -3
Well 28 Well and Pumphouse Meridian ID 7 $700,000 Water -2
Digester 1, 2, and 3 Rehabilitation (rehab of existing digesters) Meridian ID 4 $660,000 Water -3
Pressure Zone 1, 3 Pressure Reducing Valve Stations Meridian ID 4 $450,000 Water -5
WWTP Plant Automation Meridian ID 4 $450,000 Water -4
Amity Road Waterline Meridian ID 6 $350,000 Water -5
Ultraviolet Disinfection Upgrades (additional disinfection at the plant) Meridian ID 2 $250,000 Water -6
WWTP Black Cat Box Odor Control (odor control at one of the influent structures) Meridian ID 2 $235,000 Water -5
Coagulation Building for Chemical Feed (chemical feed building for the plant) Meridian ID 3 $150,000 Water -5
Project Management (a City Employee to manage the projects) Meridian ID 1 $100,000 Water -5
Ashford Greens Sewer Trunk (trunk to serve north Meridian and abandon lift station) Meridian ID 5 $1,900,000 CDBG -4
Black Cat Lift Station Grinder Pumps (placed after bar racks to increase life and improve operation of lift station) Meridian ID 2 $700,000 CDBG -4
Moshers/Merrywood Sewer Trunk (trunk to abandon three lift stations) Meridian ID 3 $500,000 CDBG -6
Composting Project Meridian ID 5 $2,000,000 Energy -17
Digester Gas Conditioning / reuse Meridian ID 3 $1,000,000 Energy -8
Phosphorous recovery/centrate treatment Meridian ID 4 $500,000 Energy -4
Purchase of Hybrid Fleet Vehicles Meridian ID 2 $100,000 Energy -37