| SOUTH WATERFRONT PUBLIC IMPROVEMENTS: Land purchases and construction of a new park, streets, and utilities to revitalize former industrial waterfront area. |
Knoxville |
TN |
85 |
$18,000,000 |
Streets/Roads |
-63 |
| RESURFACING CITYWIDE: Resurface 100 miles of asphalt roadway throughout the City. |
Knoxville |
TN |
29 |
$12,000,000 |
Streets/Roads |
11 |
| FIRST CREEK DRAINAGE IMPROVEMENTS: Construction of an overflow channel along First Creek and two new bridges at Emorland and Fairmont Blvd. |
Knoxville |
TN |
25 |
$3,500,000 |
Streets/Roads |
27 |
| GAY STREET STREETSCAPES: Reconstruction of the 100 and 200 blocks of Gay Street. |
Knoxville |
TN |
55 |
$3,500,000 |
Streets/Roads |
-68 |
| ADA IMPROVEMENTS TO CITY FACILITIES: Renovation of 20 city facilities to improve accessibility to people with disabilities. |
Knoxville |
TN |
75 |
$2,500,000 |
Streets/Roads |
8 |
| BETHEL AVE: KUB Water Project - Cast Iron (7,500 lf). |
Knoxville |
TN |
6 |
$2,200,000 |
Streets/Roads |
2 |
| CROSS PARK DRIVE DRAINAGE IMPROVEMENTS: Drainage improvements along Cross Park Drive from Park Village Road to Cross Creek Road. |
Knoxville |
TN |
35 |
$2,200,000 |
Streets/Roads |
19 |
| HOLSTON DRIVE: KUB Water Project - Cast Iron/Galvanized Main (19,000 lf). |
Knoxville |
TN |
6 |
$1,700,000 |
Streets/Roads |
-11 |
| LONSDALE AREA: KUB Water Project - Cast Iron/Galvanized Main (18,000 lf). |
Knoxville |
TN |
6 |
$1,650,000 |
Streets/Roads |
2 |
| TRAFFIC SIGNAL UPGRADES CITYWIDE: Upgrade existing traffic signals, school flashers, and pedestrian signals throughout the City. |
Knoxville |
TN |
21 |
$1,600,000 |
Streets/Roads |
-32 |
| VALLEY VIEW REALIGNMENT PROJECT: Relocate roadway to intersect Washington Pike at Centerline Drive. |
Knoxville |
TN |
35 |
$1,600,000 |
Streets/Roads |
-2 |
| VESTAL BUSINESS DISTRICT INFRASTRUCTURE: Construction of public plaza, greenway, sidewalks, and curbs; creek and stormwater improvements; relocation of Chappell Road. |
Knoxville |
TN |
55 |
$1,600,000 |
Streets/Roads |
-3 |
| BRUHIN ROAD: KUB Water Project - Cast Iron/Galvanized Main (8,300 lf). |
Knoxville |
TN |
6 |
$1,500,000 |
Streets/Roads |
-5 |
| COLONIAL VILLAGE AREA: KUB Water Project - Cast Iron/Galvanized Main (13,000 lf). |
Knoxville |
TN |
6 |
$1,500,000 |
Streets/Roads |
0 |
| ALLEY PAVING CITYWIDE: Regrade and pave 100 alleys throughout the City. |
Knoxville |
TN |
19 |
$1,500,000 |
Streets/Roads |
-45 |
| CITYWIDE STREET LIGHT INSTALLATION: Installation and replacement of street lights along City streets. |
Knoxville |
TN |
20 |
$1,500,000 |
Streets/Roads |
6 |
| SOUTH HILLS DRIVE AREA: KUB Water Project - Galvanized Main (14,000 lf). |
Knoxville |
TN |
6 |
$1,400,000 |
Streets/Roads |
1 |
| CURB CUTS CITYWIDE: Install 1000 curb cuts at intersections with existing sidewalks throughout the City. |
Knoxville |
TN |
38 |
$1,400,000 |
Streets/Roads |
-20 |
| DEERFIELD AREA: KUB Water Project - Cast Iron/Galvanized Main (12,000 lf). |
Knoxville |
TN |
6 |
$1,300,000 |
Streets/Roads |
-2 |
| SUTHERLAND AVE: KUB Water Project - Cast Iron/Galvanized Main (12,000 lf). |
Knoxville |
TN |
6 |
$1,250,000 |
Streets/Roads |
-3 |
| SIDEWALK REPLACEMENT CITYWIDE: Replace 260,000 square feet of deteriorated sidewalks throughout the City. |
Knoxville |
TN |
38 |
$1,100,000 |
Streets/Roads |
-9 |
| NORTHSHORE - PHASE I: KUB Water Project - Increase Capacity (6,500 lf). |
Knoxville |
TN |
6 |
$1,000,000 |
Streets/Roads |
3 |
| ADA IMPROVEMENTS TO COLISEUM: Install elevator in coliseum parking garage and restripe parking spaces. Increase accessible seating in Coliseum. |
Knoxville |
TN |
25 |
$1,000,000 |
Streets/Roads |
-39 |
| DUNCAN ROAD AREA: KUB Water Project - Galvanized Main (5,945 lf). |
Knoxville |
TN |
6 |
$900,000 |
Streets/Roads |
-2 |
| WESTLAND DRIVE BRIDGE REPLACEMENT: Replace narrow bridge under Westland Drive and channel improvements upstream to alleviate roadway flooding. |
Knoxville |
TN |
25 |
$880,000 |
Streets/Roads |
10 |
| RIVERSIDE DRIVE: KUB Water Project - Cast Iron (2,200 lf). |
Knoxville |
TN |
6 |
$800,000 |
Streets/Roads |
1 |
| CONCORD STREET: KUB Water Project - Cast Iron (2,600 lf). |
Knoxville |
TN |
6 |
$575,000 |
Streets/Roads |
5 |
| RAMBLING ACRES: KUB Water Project - Galvanized Main (8,500 lf). |
Knoxville |
TN |
6 |
$550,000 |
Streets/Roads |
3 |
| RIFLE RANGE ROAD: KUB Water Project - Galvanized Main (5,200 lf). |
Knoxville |
TN |
6 |
$520,000 |
Streets/Roads |
0 |
| PAVEMENT MARKING MAINTENANCE CITYWIDE: Restripe all currently striped roadways throughout the City. |
Knoxville |
TN |
9 |
$500,000 |
Streets/Roads |
-30 |
| SIGNAL RETIMING/RENOVATION CITYWIDE: Retime and rephase signals along arterials throughout the City. |
Knoxville |
TN |
24 |
$500,000 |
Streets/Roads |
-2 |
| CHESTERFIELD AREA: KUB Water Project - Galvanized Main (8,800 lf). |
Knoxville |
TN |
6 |
$490,000 |
Streets/Roads |
0 |
| OLD DANDRIDGE PIKE: KUB Water Project - Increase Capacity (5,200 lf). |
Knoxville |
TN |
6 |
$468,000 |
Streets/Roads |
-2 |
| CHESTNUT STREET REALIGNMENT: Reconstruction of intersection including property acquisition, utilities relocation, and road construction. |
Knoxville |
TN |
25 |
$400,000 |
Streets/Roads |
-11 |
| SCHUBERT ROAD AREA: KUB Water Project - Galvanized Main (6,000 lf). |
Knoxville |
TN |
6 |
$350,000 |
Streets/Roads |
-2 |
| GUARDRAIL IMPROVEMENT CITYWIDE: Replace outdated lengths of guardrail throughout the City. |
Knoxville |
TN |
14 |
$350,000 |
Streets/Roads |
-20 |
| COESTA CIRCLE: KUB Water Project - Galvanized Main (3,700 lf). |
Knoxville |
TN |
6 |
$252,000 |
Streets/Roads |
0 |
| DOWNTOWN SIDEWALK REPLACEMENT: Replace sidewalk along Market Street from Cumberland Avenue to Church Avenue. |
Knoxville |
TN |
20 |
$250,000 |
Streets/Roads |
-38 |
| CURTIS ROAD: KUB Water Project - Galvanized Main (2,700 lf). |
Knoxville |
TN |
6 |
$150,000 |
Streets/Roads |
-7 |
| MARY JAMES PARK RESTORATION: Reshape existing alignment of Baker Creek to a more natural state thus improving water quality by decreasing erosion and introducing vegetation. |
Knoxville |
TN |
14 |
$50,000 |
Streets/Roads |
-29 |
| TRANSFER STATION WATER QUALITY UNIT: Install drainage devices at solid waste transfer station to address illicit discharge into storm drainage system. |
Knoxville |
TN |
14 |
$25,000 |
Streets/Roads |
26 |