| Widened Lakeridge Parkway from 4 lanes to 6 lanes between Joe Pool Lake and Great Southwest Parkway |
Grand Prairie |
TX |
90 |
$7,930,000 |
Streets/Roads |
4 |
| Construct a new 4 lane road between State Highway 360 and Lakeridge Parkway. |
Grand Prairie |
TX |
90 |
$7,100,000 |
Streets/Roads |
2 |
| Construct a 5 lane roadway that intersects Interstate Highway 30 at Bagdad and Gifford. |
Grand Prairie |
TX |
50 |
$4,000,000 |
Streets/Roads |
-8 |
| Repair embankment on Lakeridge Parkway at Joe Pool Lake. |
Grand Prairie |
TX |
50 |
$3,600,000 |
Streets/Roads |
0 |
| Extend January Lane from Dallas Street to State highway 161. This will be a 4 lane road. |
Grand Prairie |
TX |
40 |
$3,100,000 |
Streets/Roads |
-7 |
| Reconstruction of Camp Wisdom Road Paving from Robinson to Carrier Parkway from two lane to Four lanes. |
Grand Prairie |
TX |
45 |
$3,100,000 |
Streets/Roads |
12 |
| Reconstruction of Freetown Road from Corn Valley to Carrier Parkway. This would change it from a two lane asphalt road to a three lane concrete paved road. |
Grand Prairie |
TX |
45 |
$3,100,000 |
Streets/Roads |
-1 |
| Install South Sector of Grand Prairie Wastewater System. This wastewater system will allow the development of over 5000 acres in the City South of Joe Pool Lake. Over 9100 homes are planned for this area. |
Grand Prairie |
TX |
850 |
$9,709,550 |
Water |
-6 |
| Provide Strom Drain and Wastewater main improvements along Nadine Lane from Matthew Road to Prairie Lane. |
Grand Prairie |
TX |
20 |
$1,292,000 |
Water |
-1 |
| Relocate Fire Station 7 to provide for quicker response times for those citizens and businesses located south of Camp Wisdom. |
Grand Prairie |
TX |
25 |
$10,000,000 |
CDBG |
-10 |
| Provide a new aquatic facility for the Dalworth community center. |
Grand Prairie |
TX |
50 |
$7,500,000 |
CDBG |
-36 |
| Build city wide trail link system to move 175,000 citizens to major event centers such as lakes, parks, librairies, downtown and schools. |
Grand Prairie |
TX |
50 |
$5,500,000 |
CDBG |
-12 |
| Construct an arboretum on historical city property. |
Grand Prairie |
TX |
45 |
$5,000,000 |
CDBG |
-14 |
| Purchase and convert empty downtown buildings space for artist sans while creating green space areas. |
Grand Prairie |
TX |
50 |
$5,000,000 |
CDBG |
-27 |
| Relocation of overhead utilities to be placed underground for the Uptown District |
Grand Prairie |
TX |
75 |
$4,000,000 |
CDBG |
-5 |
| Provide 6 buses to transport citizens to major recreation facilities in 27 mile long community serving 175,000 citizens. There is no current public transportation. |
Grand Prairie |
TX |
50 |
$2,950,000 |
CDBG |
-2 |
| Provide infrastructure improvements for a metropolitan park that needs additional park roads, picnic tables, boat ramps, camping facilities, cabins and fishing piers which will provide city dwellers closer access to these types of facilities. |
Grand Prairie |
TX |
40 |
$2,500,000 |
CDBG |
-11 |
| Provide an addition to the Dalworth neighborhood community center. The facility was built in the 1950's and is in dire need of expansion and renovation. |
Grand Prairie |
TX |
50 |
$2,500,000 |
CDBG |
-8 |
| Abatement of Asbestos from buildings on Main Street in the Uptown district |
Grand Prairie |
TX |
50 |
$2,000,000 |
CDBG |
-6 |
| Weatherizing & provide energy efficient windows, roofs and enclosures for the Uptown District |
Grand Prairie |
TX |
100 |
$2,000,000 |
CDBG |
-1 |
| Provide additional parks infrastructure to existing parks; such as disc golf, additional picnic tables, playground equipment, and other outdoor recreational facilities |
Grand Prairie |
TX |
40 |
$1,850,000 |
CDBG |
-23 |
| Construct a Public gathering and festival location on Main street |
Grand Prairie |
TX |
50 |
$1,500,000 |
CDBG |
-14 |
| Convert a vacant school into a municipal building |
Grand Prairie |
TX |
50 |
$1,500,000 |
CDBG |
-9 |
| Rebuild 2700 feet of dilapadated Main Street facades and signage to jumpstart the ongoing revitalization of the downtown area. The City of Grand Prairie currently is investing funds to rejuvenate this area to attract new merchants and jobs. |
Grand Prairie |
TX |
150 |
$1,500,000 |
CDBG |
0 |
| Abatement of lead paint from buildings on Main street in the uptown District |
Grand Prairie |
TX |
25 |
$1,000,000 |
CDBG |
-2 |
| Street Light Replacement for the Uptown district |
Grand Prairie |
TX |
25 |
$1,000,000 |
CDBG |
-3 |
| Parking for Uptown Theater |
Grand Prairie |
TX |
15 |
$850,000 |
CDBG |
-20 |
| Provide job retraining for displaced workers in community facilities. Such topics for retraining could include the following: Horticulture, conference center operations, retail, landscape maintenance, youth center leadership, coaching, food and beverage |
Grand Prairie |
TX |
60 |
$795,000 |
CDBG |
-7 |
| Public space improvements & maintenance; add more lighting, complete sidewalk repair, install landscaping, irrigation, tree wells, park benches, receptacles |
Grand Prairie |
TX |
12 |
$600,000 |
CDBG |
-5 |
| Replacement and/or addition of canopies or awnings that will shade and promote pedestrian traffic in the Main Street Revitalization efforts |
Grand Prairie |
TX |
20 |
$600,000 |
CDBG |
-4 |
| Acquisition of land for parking for Main street businesses and artwork display for the Uptown district |
Grand Prairie |
TX |
10 |
$500,000 |
CDBG |
-6 |
| Provide directional signage for the Uptown District and for the entire city |
Grand Prairie |
TX |
12 |
$500,000 |
CDBG |
-9 |
| Landscape wall & provide irrigation that will buffer Main Street businesses from the railroad tracks |
Grand Prairie |
TX |
15 |
$500,000 |
CDBG |
-7 |
| Removal of pole signs in Uptown district. |
Grand Prairie |
TX |
20 |
$500,000 |
CDBG |
-15 |
| Expand sidewalks and provide ADA compliance to promote pedestrian traffic for Main Street Businesses |
Grand Prairie |
TX |
10 |
$400,000 |
CDBG |
4 |
| Relocate overhead power transmission lines at Public Safety building and Adult Activity Center |
Grand Prairie |
TX |
25 |
$6,000,000 |
Energy |
-5 |
| Provide a Energy Efficient Building System for City Buildings which are currently not on this system. |
Grand Prairie |
TX |
25 |
$2,000,000 |
Energy |
-2 |
| Installation of landscaping and trail system surrounding the new Public Safety Building |
Grand Prairie |
TX |
20 |
$1,250,000 |
Public Safety |
-18 |
| Installation of new gaslines for the new Public Safety building. |
Grand Prairie |
TX |
12 |
$350,000 |
Public Safety |
-3 |