WARNING: You're looking at a page from the old site. We have relaunched with live stimulus data. Learn more here.


Recent News

Advanced search added: keywords, zip codes, and recipients 11/25/2009

Thanks to the tireless work of developer Peter Snyder, Stimulus Watch 2.0 now has an advanced search capability that will…

Jerry Brito on Washington DC’s Federal News Radio... 11/24/2009

Jerry Brito on Washington DC’s Federal News Radio discussing the new features available on Stimulus Watch 2.0.

We've relaunched with new official data of stimulus projects in your neighborhood! 11/18/2009

Welcome to Stimulus Watch 2.0. While our original site featured proposed stimulus projects taken from the U.S. Conference of Mayors…

OpenRegs.com
Find government regulations by issue or agency. Comment, add links and subscribe to regulations.

Projects in Bolingbrook, Illinois

Below are the "shovel-ready" projects for which this city submitted in the 2008 U.S. Conference of Mayors report. You can click on a project to read (and add to) its description. You can also discuss the project and vote on whether you believe it is critical or not.

The total cost of all the projects submitted by Bolingbrook is $107,900,000

Description City State Jobs Cost Program Type Vote Ratio
Full interchange at I-55 and Il. Rt. 126 Bolingbrook IL 0 $12,000,000 Streets/Roads 22
Kings Road, Hassert to Rodeo: construct urban cross-section roadway with landscaped median and bridge over the Lily Cache Creek. Bolingbrook IL 70 $6,800,000 Streets/Roads -12
Lily Cache Lane, Route 53 to Schmidt Road: reconstruct 2 lane roadway to 4 lanes plus a landscaped median. Bolingbrook IL 70 $5,900,000 Streets/Roads -4
Boughton Road rehabilitation, Pinecrest to Schmidt: repair curbs and stormsewers then patch and pave roadway. Bolingbrook IL 23 $3,000,000 Streets/Roads 2
Road rehabilitation program: perform pavement maintenance activities up to and including paving on a number of streets that have not been paved in over 20 years. Bolingbrook IL 30 $2,000,000 Streets/Roads 13
Lindsey Lane, Lily Cache Lane to existing Lindsey Lane stub: construct new roadway to provide access to Jane Addams School (school district project, with recapture from future developers). Bolingbrook IL 58 $1,000,000 Streets/Roads -9
Reagan Boulevard from Danhoff Lane to Plainfield-Naperville Road: reconstruction of a two lane country roadway to a urban cross-section with center median. Bolingbrook IL 58 $900,000 Streets/Roads -10
Traffic signal at St. James and Joliet Road, and roadway improvements to the north leg of intersection. Bolingbrook IL 58 $800,000 Streets/Roads 0
St. Andrew's Drive extension: extend St. Andrew's Drive and connect to quarry driveway. Bolingbrook IL 48 $700,000 Streets/Roads -6
Kings Road landscaped median: construct landscaped median to calm traffic, reduce runoff, and beautify the roadway. Bolingbrook IL 15 $400,000 Streets/Roads -16
Weber Road landscaped medians, north and south of Jennifer Lane. Bolingbrook IL 15 $400,000 Streets/Roads -38
Traffic signal at entrance to Gateway East and Costco site. Bolingbrook IL 5 $300,000 Streets/Roads -10
Traffic signal on Hassert Boulevard and Kings Road. Bolingbrook IL 5 $300,000 Streets/Roads -1
Traffic signal on Remington Boulevard and Schmidt Road, plus interconnect to traffic signal at hospital entrance. Bolingbrook IL 5 $300,000 Streets/Roads -4
Traffic signal on Remington Boulevard at entrance to Adventist Bolingbrook Hospital. Bolingbrook IL 5 $300,000 Streets/Roads -3
Frontage Road removal: remove abandoned frontage road and replace with topsoil and turf from Weber Road to Remington Boulevard. Bolingbrook IL 10 $300,000 Streets/Roads -17
Clow Airport traffic Circle: install a traffic circle on Clow Parkway to safely guide traffic into the airport. Bolingbrook IL 10 $100,000 Streets/Roads -17
Route 53 entrances to Arena Auto Auction: remove obsolete entrances / turn bays built for former Old Chicago amusement park. Bolingbrook IL 11 $100,000 Streets/Roads -19
Sewer plant expansion at Indian Boundary treatment plant Bolingbrook IL 0 $10,000,000 Water 0
New Runway at Bolingbrook-Clow Airport Bolingbrook IL 0 $10,000,000 Airport -39
Clow Airport, runway improvements: widen existing runway to allow use by larger planes. Bolingbrook IL 22 $10,000,000 Airport -48
Clow Airport: add additional hangers. Bolingbrook IL 50 $4,000,000 Airport -39
Kings Road Extension Bolingbrook IL 0 $10,000,000 CDBG -7
Police Department expansion: construction of an addition to the curent Police Department facility. Bolingbrook IL 95 $10,000,000 CDBG -63
Lily Cach Lane Widdening Bolingbrook IL 0 $4,000,000 CDBG -10
Cumberland Pond: dredging and rehabilitation of pond to improve water quality, fish habitat, and aestetics. Bolingbrook IL 24 $700,000 CDBG -26
Briarcliff Road stormsewer: replace a few hundred feet of stormsewer on Briarcliff Road as part of the master plan to resolve flooding problems in Historic Bolingbrook. Bolingbrook IL 18 $500,000 CDBG 7
Barbers Corners water & sewer: installation of water and sewer lines to remove several houses from well and septic systems. Bolingbrook IL 15 $400,000 CDBG 0
Historic Bolingbrook sidewalk construction: phase 11 includes constructing sidewalks in neighborhoods that do not have them on four streets. Bolingbrook IL 10 $200,000 CDBG -23
River Woods erosion control, phase 2: installation of gabion baskets, rip-rap, and other non-stuctural measures to restore the highly eroded banks of the creek in the River Woods neighborhood. Bolingbrook IL 10 $200,000 CDBG 4
Boughton Road sidewalk: construct sidewalk and related work to fill in missing gap in sidewalk network on Boughton Road by the Independent Baptist Church. Bolingbrook IL 14 $200,000 CDBG -1
Public Works Garage, add heavy duty shelving: add shelving to enable safe and cost effective storage of emergency supplies, supplies bought in bulk, and other necessary items. Bolingbrook IL 5 $100,000 CDBG -41
I-55 full interchange at Rt. 126 Bolingbrook IL 0 $12,000,000 Transit -19