WARNING: You're looking at a page from the old site. We have relaunched with live stimulus data. Learn more here.


Recent News

Advanced search added: keywords, zip codes, and recipients 11/24/2009

Thanks to the tireless work of developer Peter Snyder, Stimulus Watch 2.0 now has an advanced search capability that will…

Jerry Brito on Washington DC’s Federal News Radio... 11/24/2009

Jerry Brito on Washington DC’s Federal News Radio discussing the new features available on Stimulus Watch 2.0.

We've relaunched with new official data of stimulus projects in your neighborhood! 11/18/2009

Welcome to Stimulus Watch 2.0. While our original site featured proposed stimulus projects taken from the U.S. Conference of Mayors…

OpenRegs.com
Find government regulations by issue or agency. Comment, add links and subscribe to regulations.

Projects in Beverly Hills, California

Below are the "shovel-ready" projects for which this city submitted in the 2008 U.S. Conference of Mayors report. You can click on a project to read (and add to) its description. You can also discuss the project and vote on whether you believe it is critical or not.

The total cost of all the projects submitted by Beverly Hills is $22,000,000

Description City State Jobs Cost Program Type Vote Ratio
Grind and overlay of City streets and alleys (45 Miles) in the City of Beverly Hills selected utilizing the City's current Pavement Management Plan (PMP). These streets were last rehabilitated on average 30 years ago. If funded the project can commence in Beverly Hills CA 40 $10,000,000 Streets/Roads -211
Replacement of the existing five 50 year old water reservoirs, with a total capacity of 5.5 Million gallons. The design of these tanks is scheduled to commence in January 2009 and construction will start in July 2009. Beverly Hills CA 50 $7,000,000 Water -65
Replacement and/or rehabilitation of approximately 2 miles of existing 80 year old sewer lines throughout the city. These sewer lines will be selected upon completion of our Sanitary Sewer Master Plan which is currently being updated and is scheduled to b Beverly Hills CA 20 $2,500,000 Water -54
Replacement of the existing 60 year old waterline in Charleville Boulevard from El Camino Drive to Clark Drive. This water line replacement project is currently under design and will be advertised for bid in Feb. 2009 and Construction will start in April Beverly Hills CA 20 $2,500,000 Water -54