| Street Resurfacing |
Atlanta |
GA |
1200 |
$120,000,000 |
Streets/Roads |
22 |
| Bridge Replacement |
Atlanta |
GA |
750 |
$75,000,000 |
Streets/Roads |
31 |
| Hazardous Sidewalk Repairs |
Atlanta |
GA |
500 |
$50,000,000 |
Streets/Roads |
-15 |
| Traffic Signals & School Flashers |
Atlanta |
GA |
294 |
$29,400,000 |
Streets/Roads |
12 |
| Traffic Communications |
Atlanta |
GA |
180 |
$18,000,000 |
Streets/Roads |
6 |
| Streetlights |
Atlanta |
GA |
102 |
$10,200,000 |
Streets/Roads |
7 |
| Bridge Maintenance and Repairs |
Atlanta |
GA |
18 |
$1,800,000 |
Streets/Roads |
18 |
| South River Capacity Relief Tunnel and Pumping Station |
Atlanta |
GA |
1117 |
$111,685,000 |
Water |
7 |
| Southwest Main Improvements 30-inch |
Atlanta |
GA |
560 |
$56,000,000 |
Water |
10 |
| Koweta Rd. Water Main & P. S. |
Atlanta |
GA |
549 |
$54,850,000 |
Water |
9 |
| Georgia Tech/Midtiwn Water Main Replacement |
Atlanta |
GA |
434 |
$43,363,000 |
Water |
28 |
| Adamsville Transmission Main Improvements |
Atlanta |
GA |
423 |
$42,343,100 |
Water |
1 |
| Southwest Main 54 inch |
Atlanta |
GA |
412 |
$41,225,700 |
Water |
6 |
| Koweta Rd. Water Main & Pumping Station |
Atlanta |
GA |
381 |
$38,061,000 |
Water |
-4 |
| Fairburn Road Water Mains |
Atlanta |
GA |
320 |
$32,000,000 |
Water |
3 |
| Fairburn Road Water Mains |
Atlanta |
GA |
299 |
$29,937,000 |
Water |
6 |
| Adamsville Transmission Main Improvements |
Atlanta |
GA |
229 |
$22,926,000 |
Water |
1 |
| North Area Main Improvements |
Atlanta |
GA |
225 |
$22,522,000 |
Water |
3 |
| South River Basin - North South Basin Capacity Relief Projects |
Atlanta |
GA |
223 |
$22,315,000 |
Water |
3 |
| Southwest Main Improvements 30-inch |
Atlanta |
GA |
207 |
$20,700,000 |
Water |
1 |
| Hemphill Finished Water Pump Station |
Atlanta |
GA |
194 |
$19,400,000 |
Water |
5 |
| South River Basin - East Point Trunk Replacement |
Atlanta |
GA |
178 |
$17,800,000 |
Water |
1 |
| Sewer Group 5 & 6 - SSES Contract A |
Atlanta |
GA |
150 |
$15,000,000 |
Water |
5 |
| Sewer Group 5 & 6 - SSES Contract B |
Atlanta |
GA |
150 |
$15,000,000 |
Water |
3 |
| Year 2011 Small Diameter Capacity relief Projects - Pipebursting |
Atlanta |
GA |
105 |
$10,500,000 |
Water |
3 |
| Water Tank Painting & Structural Repair |
Atlanta |
GA |
91 |
$9,112,880 |
Water |
-13 |
| Proctor Creek Basin - Terrell Creek Replacement Project |
Atlanta |
GA |
87 |
$8,700,000 |
Water |
3 |
| Automation of the Hemphill and Chattahoochee Water Treatment Plants |
Atlanta |
GA |
66 |
$6,600,000 |
Water |
0 |
| Downtown Elevated Storage Tank |
Atlanta |
GA |
42 |
$4,215,400 |
Water |
-2 |
| Proctor Creek Basin - East Proctor Capacity Relief Project |
Atlanta |
GA |
28 |
$2,800,000 |
Water |
-2 |
| Hemphill WTP Electrical Switchgear Replacement |
Atlanta |
GA |
13 |
$1,270,000 |
Water |
2 |
| Maynard Jackson International Terminal |
Atlanta |
GA |
5000 |
$500,000,000 |
Airport |
-854 |
| Renovation of 25 Neighborhood Recreation Centers |
Atlanta |
GA |
395 |
$39,500,000 |
CDBG |
-60 |
| Build Consolidated Multi-Use Public Safety Training Facility to meet critical training needs |
Atlanta |
GA |
280 |
$28,000,000 |
CDBG |
-23 |
| Replace 8 Fire Stations that are over 50 years old and under poor conditions |
Atlanta |
GA |
240 |
$24,000,000 |
CDBG |
54 |
| Develop Swat Pistol Range to replace trailers used for training and upgrade Mounted Training Area |
Atlanta |
GA |
39 |
$3,835,700 |
CDBG |
-40 |
| Detention Center Repairs |
Atlanta |
GA |
38 |
$3,800,000 |
CDBG |
-18 |
| Historic City Hall and Annex Repair Projects |
Atlanta |
GA |
34 |
$3,400,000 |
CDBG |
-25 |
| Parks- Water Line Backflow Preventers |
Atlanta |
GA |
25 |
$2,475,000 |
CDBG |
1 |
| Tree Canopy Preservation - Invasive Removal |
Atlanta |
GA |
15 |
$1,500,000 |
CDBG |
-26 |
| Parks - Sidewalks and Pathways |
Atlanta |
GA |
11 |
$1,050,000 |
CDBG |
-7 |
| Parks - Retaining Walls and Slopes |
Atlanta |
GA |
10 |
$980,000 |
CDBG |
-5 |
| Parks - Driveways and Parking Lots |
Atlanta |
GA |
10 |
$950,000 |
CDBG |
-14 |
| Parks - Drainage Structures |
Atlanta |
GA |
8 |
$750,000 |
CDBG |
0 |
| Parks- Curbing Installation |
Atlanta |
GA |
8 |
$750,000 |
CDBG |
-15 |
| Police facility improvements for Zone 1, Zone 3 and Zone 4 (plumbing, electrical and other maintenance) |
Atlanta |
GA |
2 |
$185,000 |
CDBG |
16 |
| Green Fleet- hybrid and electric vehicles, biodiesel and biodiesel fueling station, fuel cell pilot program |
Atlanta |
GA |
550 |
$64,000,000 |
Energy |
-98 |
| Install solar thermal and photovoltaic systems |
Atlanta |
GA |
524 |
$52,390,000 |
Energy |
-23 |
| Install waste-to-energy recovery systems (fuel cells, microturbines, and gasification systems) to convert waste energy sources (landfill gas, wastewater treatment system gas, yard waste, and waste grease) to renewable electricity for city government opera |
Atlanta |
GA |
130 |
$13,000,000 |
Energy |
50 |
| HVAC system efficiency upgrades, including replacement of inefficient equipment with high-performance systems, installation of automatic controls, and recomissioning of existing systems |
Atlanta |
GA |
100 |
$12,673,600 |
Energy |
9 |
| Upgrade building envelopes, including installation of reflective of green roofing, insulation, and high-performance windows and doors. |
Atlanta |
GA |
55 |
$5,515,470 |
Energy |
1 |
| Replace inefficient lighting with high-efficiency lighting, and install automatic lighting controls |
Atlanta |
GA |
29 |
$4,117,850 |
Energy |
13 |
| Install low-flow plumbing fixtures |
Atlanta |
GA |
21 |
$2,107,820 |
Energy |
-10 |
| Hire 200 Police Officers |
Atlanta |
GA |
200 |
$20,000,000 |
Public Safety |
101 |
| Streetcar Midtown-Downtown line - 3.6 miles |
Atlanta |
GA |
600 |
$81,000,000 |
Transit |
-66 |
| Streetcar East-West line -2.27 miles, 9 stations, 2 cars |
Atlanta |
GA |
400 |
$40,000,000 |
Transit |
-48 |
| 5 Miles of Beltline Trail and Spur Trails |
Atlanta |
GA |
180 |
$18,000,000 |
Transit |
41 |
| Travel Demand Model and Engineering for Beltline Transit and Trail |
Atlanta |
GA |
60 |
$6,000,000 |
Transit |
11 |