| New Energy Efficiency Industrial Zones 100 Acres |
Cidra |
PR |
1628 |
$17,500,000,000 |
Energy |
-5266 |
| Miami-Dade Transit - Orange Line Phase 3, 10.5 mile East-West segment connecting Miami Intermodal Center to west Miami-Dade urban centers |
Miami-Dade |
FL |
400 |
$2,463,000,000 |
Streets/Roads |
-1087 |
| Solar LA Program |
Los Angeles |
CA |
31243 |
$2,160,000,000 |
Energy |
-1509 |
| Miami-Dade Transit - Orange Line Phase 2, 9.5 mile North Corridor Segment to Broward County line |
Miami-Dade |
FL |
400 |
$1,409,000,000 |
Streets/Roads |
-344 |
| I -74 Bridge replacement |
Moline |
IL |
400 |
$950,000,000 |
Streets/Roads |
-53 |
| North/South MetroLink Extensions |
St. Louis |
MO |
20000 |
$900,000,000 |
Transit |
153 |
| Railyards Tunnel / Connection to Old Sac |
Sacramento |
CA |
15 |
$750,000,000 |
Amtrak |
-597 |
| Transit Project: Newark Elizabeth Light Rail |
Newark |
NJ |
20000 |
$694,000,000 |
Energy |
-134 |
| Abengoa Solar designed 100MW solar parabolic trough electric generation plant |
Anniston |
AL |
3200 |
$600,000,000 |
Energy |
-9 |
| Forks of the Road Heritage Trail. This project would greatly enhance one of the primary gateways to our city by creating an African American/Ethnic Heritage Trail along a stretch of St. Catherine Street between the Forks of the Road Slave Market Site |
Natchez |
MS |
65 |
$600,000,000 |
CDBG |
-5622 |
| North Tarrant Express-Improving Loop 820 within North Richland Hills city limits |
North Richland Hills |
TX |
600 |
$600,000,000 |
Streets/Roads |
50 |
| Double Eagle Concentrated Solar Plant - 100 MW |
Albuquerque |
NM |
200 |
$532,000,000 |
Energy |
-152 |
| Maynard Jackson International Terminal |
Atlanta |
GA |
5000 |
$500,000,000 |
Airport |
-854 |
| Solar water Heaters for rural area families |
Cidra |
PR |
14 |
$500,000,000 |
Energy |
-1354 |
| Port of LA Green Jobs/CAAP (CTP, AMP, Clean Tech) |
Los Angeles |
CA |
12993 |
$500,000,000 |
Energy |
-290 |
| Major Street Repair and Resurfacing |
Los Angeles |
CA |
2893 |
$500,000,000 |
Streets/Roads |
-126 |
| SHRA |
Sacramento |
CA |
100 |
$500,000,000 |
Housing |
-1102 |
| Fort Worth T Rail Improvements:
NE@SW Rail |
Fort Worth |
TX |
5888 |
$471,000,000 |
Transit |
171 |
| Terminal Renovation |
Little Rock |
AR |
400 |
$465,000,000 |
Airport |
-211 |
| New Police Administration Building, to replace seismically vulnerable and obsolete Admin Building |
Oakland |
CA |
300 |
$450,000,000 |
Public Safety |
-248 |
| Miami-Dade Transit - Orange Line Phase 1, 2.4 mile fixed guideway connecting existing line to Miami Intermodal Center |
Miami-Dade |
FL |
250 |
$426,529,000 |
Streets/Roads |
-52 |
| New Mexico Events Center, Hotel and Events Center and realted infrastructure located in Downtown Albuquerque |
Albuquerque |
NM |
14000 |
$418,300,000 |
CDBG |
103 |
| Seaport Tunnel Project from connecting interstate system to Miami's Seaport; amount is County share |
Miami-Dade |
FL |
450 |
$400,000,000 |
Streets/Roads |
-127 |
| Construction of Convention Center Hotel |
Dallas |
TX |
3800 |
$386,000,000 |
CDBG |
-2316 |
| Trinity River Vision Flood Control & Related Projects:
Utility Relocations ($60.0M); Police & Fire Training Center Relocation Phase 1&2 ($111.50); Bypass Channel Arterial Bridges ($90.0M); Riverside WWTP Environmental Remediation & Park Restoration ( |
Fort Worth |
TX |
4794 |
$383,500,000 |
CDBG |
-902 |
| Las Vegas Performing Arts Center – Construct a new Performing Arts Center within the City’s Union Park Development. |
Las Vegas |
NV |
1875 |
$375,000,000 |
CDBG |
-1881 |
| City of Mobile: Mobile County Public School System: for the Survey period (2009-2010), we have sixty-four (64) school facility projects ranging from minor to total renovation, school additions and new schools “ready-to-goÂâ€. |
Mobile |
AL |
24375 |
$360,000,000 |
Schools |
-57 |
| Citywide Infrastructure Expansion and Upgrade |
Prichard |
AL |
1400 |
$358,574,000 |
Streets/Roads |
-195 |
| Construct Krome Detention Center jail facility with system-wide central support facility |
Miami-Dade |
FL |
275 |
$352,000,000 |
CDBG |
-52 |
| Infrastructure construction, rail system installation, and rail cars purchase for a Train System from Caguas to Cupey Station in Rio Piedras |
Caguas |
PR |
500 |
$350,000,000 |
Transit |
-125 |
| ICON: A 335,737 square feet office tower which includes a 260-unit high rise residential tower and 250 room hotel in Urban Center |
Irving |
TX |
2000 |
$350,000,000 |
CDBG |
-514 |
| Waterstreet: A mixed use project with 300,000 square feet of retail, 600 residential units and 250,000 square feet of office space in Urban Center. |
Irving |
TX |
2000 |
$350,000,000 |
CDBG |
-227 |
| Convention Center/Entertainment Venue: 275,000 square foot convention center and mixed use entertainment district project will be on 40-acres in the Las Colinas Urban Center.Components of the project include 300,000 square feet of entertainment venue on t |
Irving |
TX |
3000 |
$350,000,000 |
CDBG |
-234 |
| Light Rail and Heavy Rail Vehicle Rebuilding for the Blue Line and the Red Line Rail Systems |
Los Angeles |
CA |
2025 |
$350,000,000 |
Transit |
2 |
| Utility Expansion Program, Provide public water, sewer and wastewater recycle to replace well and septic-Sw 6/7area, Noth 1 through 8 areas and facility expamsion project |
Cape Coral |
FL |
1359 |
$345,400,000 |
CDBG |
-33 |
| North Corridor Rail Line |
Charlotte |
NC |
9380 |
$335,000,000 |
Transit |
188 |
| School Infrastructure 23 Elementary Schools 8 Middle Schools |
Fort Wayne |
IN |
900 |
$301,100,000 |
Schools |
-26 |
| Paseo del Norte I-25 interchange, reduce congestion on regional raodway system |
Albuquerque |
NM |
10000 |
$300,000,000 |
Streets/Roads |
160 |
| South Florida East Coast Corridor (SFECC) Transit Extension |
Miami |
FL |
6000 |
$300,000,000 |
Transit |
28 |
| Parking Garage at Oakland International Airport |
Oakland |
CA |
120 |
$300,000,000 |
Airport |
-239 |
| Bus Replacement Project (Metro Buses) |
Los Angeles |
CA |
1683.64 |
$291,000,000 |
Transit |
-117 |
| Central Mesa - Light Rail 3.5 miles of construction and utility relocations extending LRT through downtown Mesa to Horne Avenue |
Mesa |
AZ |
0 |
$290,000,000 |
Transit |
-104 |
| I-49 North ($288M total unfunded construction, $182M ready to bid) |
Shreveport |
LA |
2880 |
$288,000,000 |
Streets/Roads |
183 |
| Miami Streetcar |
Miami |
FL |
560 |
$280,000,000 |
Transit |
-173 |
| Breda LRV Midlife OverhaulMaintain/improve current vehicle availability and reduce unscheduled failures, and provide vehicle safety enhancement (replace obsolete propulsion system, brakes, artic harness wiring, doors and steps, compressors) for 151 light |
San Francisco |
CA |
200 |
$275,000,000 |
Transit |
-390 |
| Upgrades to Upper Rouge Tunnel CSO Control Project |
Detroit |
MI |
1200 |
$270,600,000 |
Water |
13 |
| Expand, relocate and upgrade 17 libraries |
Oakland |
CA |
180 |
$270,000,000 |
CDBG |
-215 |
| Water and Sewer - construct South District Water Reclaim Plant |
Miami-Dade |
FL |
75 |
$267,000,000 |
Water |
-28 |
| Neighborhood Energy Generation Pilot Project |
Albuquerque |
NM |
125 |
$250,000,000 |
Energy |
-100 |
| Regional Waste Water Treatment Plant. Constructed on former Brownfield site this would be a regional facility eliminating multiple discharge permits. Discharge from new facility would be utilized by steel making operations for cooling water or discharge |
Lorain |
OH |
300 |
$250,000,000 |
Water |
7 |