Description City State Jobs Cost Program Type Vote Ratio
Distrillery District public improvements to include new sidewalks, Town Branch Trail, placement of utitility lines underground, storm drainage improvements, and new sanitary lines Lexington KY 250 $15,000,000 CDBG 1185
Veterans Nursing Home Construction Cleveland TN 310 $4,300,000 Housing 879
Enlarge water line from San Patricio water district for all Mustang Island Port Aransas TX 80 $8,000,000 Water 802
New City Animal Shelter Facility San Bernardino CA 33 $5,000,000 CDBG 770
Oak Park seeks the construction of new energy efficient government buildings to house the majority of municipal services. This would replace an energy inefficient building constructed more than 50 years ago and expanded several times to accomodate additi Oak Park MI 100 $17,000,000 Energy 629
Landfill Hydrogen Project Beaumont TX 50 $5,000,000 Energy 551
Euclid Shore Cultural Center Rehabilitation - Capital Improvements Euclid OH 90 $9,000,000 CDBG 457
Chula Vista Animal Shelter upgrades - energy retrofits and expansion & improvemetn of animal holding areas Chula Vista CA 78 $6,000,000 CDBG 421
Port of Anchorage Expansion - fully permitted, ready to proceed immediately, will create 1000-1500 jobs. Numerous projects including docking facilities and cargo handling areas. Anchorage AK 1500 $75,000,000 Transit 411
Municipal Animal Control Facility Visalia CA 133 $6,000,000 CDBG 387
Specialist Patrick A. Tinnell Memorial Sports Park Construction Lake Havasu City AZ 25 $1,400,000 CDBG 375
Energy-efficient natural gas power system for wastewater plant and line Port Aransas TX 20 $2,000,000 Water 315
Kansas State University Child Development Center Manhattan KS 0 $1,000,000 CDBG 265
Mary T. Meager Aquatic Facility Retrofit including energy efficient HVAC, solar water heating system and building insulation Louisville KY 25 $2,600,000 Energy 254
Additional police officers Port Aransas TX 4 $300,000 Public Safety 249
20 MW Geothermal Power Generation Plant Salt Lake City UT 70 $70,000,000 Energy 232
State Highway 21 (Powers Blvd) North, Extension to I-25 Colorado Springs CO 200 $105,000,000 Streets/Roads 214
Portland Bridge Repair: repair and reconstruction Portland OR 312 $22,000,000 Streets/Roads 210
Center for Emerging Technologies Expansion St. Louis MO 300 $10,000,000 CDBG 207
City-Wide Flood Control Program - Various flood control projects throughout City to manage stormwater drainage, pumping and detention to prevent flooding. Houston TX 4420 $221,000,000 Water 199
GRPS Blandford - Replacement of Portables with Structure Grand Rapids MI 45 $2,250,000 Schools 194
North Corridor Rail Line Charlotte NC 9380 $335,000,000 Transit 188
Carnegie Center; Windows/Painting/Flooring and HVAC Lexington KY 19 $910,000 CDBG 187
Renovation of Empty School Building into the Information Technology Empowerment Community Center Lansing MI 50 $3,000,000 CDBG 186
I-49 North ($288M total unfunded construction, $182M ready to bid) Shreveport LA 2880 $288,000,000 Streets/Roads 183
BOAT RAMPS IMPROVEMENTS – INSTALL PRE-CAST CONCRETE Renovate Angel Mounds and Dogtown Boat Ramps by installing new concrete sections. The existing ramps are over 30 years old and the water edge of the ramps has deteriorated and has become a problem Evansville IN 15 $1,500,000 CDBG 172
Fort Worth T Rail Improvements: NE@SW Rail Fort Worth TX 5888 $471,000,000 Transit 171
Civic Center/City Hall energy retrofit Port Aransas TX 4 $200,000 Energy 168
Paseo del Norte I-25 interchange, reduce congestion on regional raodway system Albuquerque NM 10000 $300,000,000 Streets/Roads 160
Light Rail Service from San Bernardino to Redlands San Bernardino CA 1486 $223,000,000 Transit 154
North/South MetroLink Extensions St. Louis MO 20000 $900,000,000 Transit 153
Mahoning Road Corridor Development project Canton OH 150 $8,000,000 CDBG 152
John's Island Road Improvements Charleston SC 675 $45,000,000 Streets/Roads 151
Metrolink Line Extension and Platform Relocation to San Bernardino Downtown Transit Center San Bernardino CA 466 $70,000,000 Transit 141
Butterfield Stage Road Gap Closure Project. Temecula CA 250 $27,000,000 Streets/Roads 141
Murrieta Creek Flood Control, Environmental Restoration, Recreation Project Temecula CA 150 $7,500,000 Water 141
Harry J. McDonald Center Anchorage AK 20 $3,000,000 CDBG 140
Landfill Methane Recovery Project Anchorage AK 20 $7,000,000 Energy 137
Tunnel Rehabilitation Project-10th Avenue Southeast Tunnel System - The 10th Avenue Tunnel system was built before 1950 and is one of the tunnels we have rated in poor condition. Minneapolis MN 20 $1,300,000 Water 137
Murrieta Creek Bridge and Overland Drive Bridge. This project will construct a new four lane bridge serving the City's business and industrial park. Temecula CA 130 $10,400,000 Streets/Roads 136
IH-35 / IH-820 Interchange Fort Worth TX 2500 $200,000,000 Streets/Roads 132
St. Joseph's Academy Artist's Loft Conversion - conversion of an existing vacant school into artists' loft housing and community space. The school is located in an distressed neighborhood that is currently undergoing reinvestment. Albany NY 22 $2,000,000 CDBG 131
West Lawn Septic Elimination Project, New sanitary sewer system for neighborhood with failed septic systems Fort Wayne IN 9 $5,500,000 Water 118
Sanitary sewer master plan projects and rehabilitation of system. Indianapolis IN 160 $33,624,500 Water 118
Flooded school replacement - replace uninhabitable OES Central School flooded on 9/08 with new school out of flood plain. Provide classrooms for 5th and 6th grades who have none. Ottawa IL 140 $24,712,000 Schools 115
Retrofit buildings for energy efficiency Port Aransas TX 1 $75,000 Schools 114
Advanced Recycled Water Treatment Facility San Jose CA 500 $55,000,000 Water 114
Murrieta Creek Bridge and Western by-pass extension. This project will construct a new four lane bridge serving the City's regional Western by pass route. Temecula CA 80 $7,300,000 Streets/Roads 114
Winchester Road (SR 79N) median improvements, irrigation, and landscape Project. Total Project cost $3.4 Million. This project will landscape an asphalt median island will be replaced with a reclaimed watered irrigation system. Temecula CA 40 $2,275,000 Streets/Roads 113
Extension of 5th Street (Railyards Blvd. to Richards. Blvd.) Sacramento CA 150 $47,000,000 CDBG 112