Contract In accordance with the terms and conditions of the Indefinite Delivery/Indefinate Quantity (IDIQ) Contract the Contractor shall perform the work… $43,108 Denver CO 0 1
Contract The contractor shall provide all labor and materials necessary. $69,030 Denver CO 0 0
Contract Preparation of an Environmental Assessment (EA) evaluating the BRAC realignment recommendations for the relocation of the US Army Military Academy… $87,343 West Point NY 0 0
Contract The A-E will conduct field delineations in the vicinity of Building 6, Building 1210, Building 1212, Building 1510, Building 3208… $32,581 Picatinny Arsenal NJ 0 -1
Contract The principal objective is to provide the Army with an (I) RPMP in accordance with Army Regulation (ER) 210-20 and… $484,042 Concord CA 0 0
Contract Additional review and analysis and preparation of a third Draft Environmental Assessment. $13,991 West Point NY 0 0
Contract Contractor shall provide all materials, labor, and supervision necessary to prepare a Draft Environmental Assessment (EA) with three NPS reviews,… $199,998 Washington DC 0 0
Contract NEPA Documentation for BRAC Actions, Newark Delaware. Conduct an Environmental Assessment and Phase 1 Cultural Resource Survey for an Armed… $106,282 Providence RI 0 0
Contract NEPA Documentation and Analysis for BRAC Actions, Camden, New Jersey. Conduct an Environmental Assessment and Phase 1 Cultural Resource Survey… $160,181 Providence RI 0 0
Contract The A-E shall take redesigned polygons and perform all re-analyses that are required to determine the number of takes that… $180,150 Fort Benning GA 0 -1
Contract This modificaiton will increase finding to support additional labor for the NEPA document analysis and preparation; and add site-specific supporting… $90,492 Middletown CT 0 6
Contract This Scope of Work presents the requirements for the Contractor to provide National Environmental Policy Act of 1969 (NEPA) support… $99,721 Fort Belvoir VA 0 -1
Contract The consultant shall furnish a full-time roject engineer with a minimum 10 years experience with high technology to provide technical… $236,932 Fort George G Meade MD 0 0
Contract The objective of the Economic Modeling for Estimating Jobs Project is to ensure that United States Army Corps of Engineers… $747,965 Washington DC 0 0
Contract NEPA Documentation and Analysis for BRAC Actions, in Allentown/Bethlehem, PA and Newport naval Base, RI. Conduct Environmental Assessments and Phase… $177,915 Providence RI 0 0
Contract Environmental support for the USACE and military services including, but not limited to civil works, compliance and conformance, environmental management… $121,881 Fort Benning GA 0 0
Contract This task prder provides for planning and engineering support srevices to assist the U.S. Army Corps of Engineers (USACE) Baltimore… $157,511 Washington DC 0 0
Contract The US Army is proposing to build the National Museum of the US Army at Fort Belvoir, Virginia. The NMUSA… $1,396,278 Fort Belvoir VA 0 0
Contract AE Actions Required During Conduct of the Task Order (TO) Scope of Work (SOW); (1) Updated Progress Chart. An updated… $190,000 Moody A F B GA 0 0
Contract Wetlands Delineation Verifications. Perform verification of jurisdictional wetlands determinations, approximately 5.0 acres located at Picatinney, New Jersey and delineated under… $14,237 Middletown CT 0 0