ATLANTA, GA

TOLAND & MIZELL ARCHITECTS/APPLIED ENGINEERING SOLUTIONS - JOINT VENTURE

Total Received: $486,422.04 - Visit on the Web

Below you will find all the contracts, grants, and loans received by TOLAND & MIZELL ARCHITECTS/APPLIED ENGINEERING SOLUTIONS - JOINT VENTURE as of October 30, 2009. You can sort by the different table columns. Click on an item for more information and to comment and vote on the item.

Primary Recipient

Type Description Amount City State Jobs Vote
Contract Design to Repair Sprinkler System US Army Medical Research & Material Command, Bldg. 42, Natick, MA. Bldg. 42 is approximately… $146,407 Atlanta GA 1 -2
Contract Modify Condenser Water Discharge Design Madigan Army Medical Center, Bldg. 9040, Ft. Lewis, WA Modify condenser water discharge from the… $71,730 Atlanta GA 2 0
Contract Electrical and HVAC upgrades Building 35 and Roof Replacement various Buildings Southeast Poultry Research Laboratory, Athens, GA The purpose of… $106,543 Atlanta GA 2 -1
Contract HVAC Upgrades Buildings 1, 4, and 34 Southeast Poultry Research Laboratory, Athens, GA SEPRL has 3 facilities that are operated… $110,759 Atlanta GA 2 0
Contract Design of Repair Radiology Clinic Air Handling Units Madigan Army Medical Center, Bldg. 9040, Ft. Lewis, WA Repair of the… $50,984 Atlanta GA 1 0