HUNTSVILLE, AL

CCI GROUP, LLC

Total Received: $52,249,967.32 (primary), $1,785,724.00 (sub-recipient) - Visit on the Web

Below you will find all the contracts, grants, and loans received by CCI GROUP, LLC as of October 30, 2009. You can sort by the different table columns. Click on an item for more information and to comment and vote on the item.

Primary Recipient

Type Description Amount City State Jobs Vote
Contract FURNISH ALL PLANT, LABOR, MATERIALS, EQUIPMENT, & TRANSPORTATION NECESSARY TO REPLACE EXISTING WATER MAIN ALONG VINCENT ROAD; REDSTONE ARSENAL AL.. $1,078,391 Huntsville AL 12 -2
Contract FURNISH ALL PLANT, LABOR, MATERIALS, EQUIPMENT, & TRANSPORTATION NECESSARY TO REPLACE EXISTING WATER MAIN ALONG REDSTONE ROAD; REDSTONE ARSENAL AL.. $1,195,217 Huntsville AL 14 -3
Contract This project consists of the demolition and reconstruction of the roof of the East portion of Building 3030; to include… $1,136,905 Fort Wainwright AK 5 -1
Contract This project consists of the demolition and reconstruction of the East IRMA roof of Building 3030 to include the built… $963,375 Fort Wainwright AK 5 -1
Contract CCI shall provide all labor and materials to construct a 2,015 SF addition to the existing Firehouse #2 as well… $898,829 Fort Wainwright AK 1 0
Contract Adjust doors and windows for opening and closing in Buildings 3444, 3446 and 3448. Clean kitchens, latrines, furniture and bedrooms… $226,016 Fort Wainwright AK 1 -2
Contract FURNISH ALL PLANT, LABOR, MATERIALS, EQUIPMENT, & TRANSPORTATION NECESSARY TO RENOVATE GATE #1 VISITOR CENTER EXTERIOR, BLDG 5105 REDSTONE ARSENAL. $393,908 Huntsville AL 0 -2
Contract FURNISH ALL PLANT, LABOR, MATERIALS, EQUIPMENT, & TRANSPORTATION NECESSARY TO REPLACE EXISTING WATER MAIN ALONG DIGNEY ROAD; REDSTONE ARSENAL AL.. $596,246 Huntsville AL 5 -2
Contract This project consists of the demolition and reconstruction of the roof of Building 3015; to include the built up roof… $1,471,858 Fort Wainwright AK 2 -1
Contract Building 1001 shall have a complete cosmetic renovation to include patching, texture and paint. New switch plate covers, cove base,… $1,216,179 Fort Wainwright AK 1 -1
Contract Building 3450 shall have a cosmetic renovation to include Exterior painting, new concrete sidewalk All cove base shall be replaced,… $220,838 Fort Wainwright AK 0 -1
Contract Replace all carpet and padding in bldg 702 with 28oz fire rated commercial grade over a 3/8 Pad. To include… $63,973 Fort Wainwright AK 1 -1
Contract CCI shall demolish the existing windows in Building 662 and replace them with blast resistant windows. $773,267 Fort Wainwright AK 2 -1
Contract Prepare exterior surface of building 663 by removing loose paint, grease, grout, caulking and other debris with the use of… $937,107 Fort Wainwright AK 2 -1
Contract CCI shall demolish the existing windows in Building 661 and replace them with blast resistant windows. $582,495 Fort Wainwright AK 1 -1
Contract The intent of this Project is to provide and install a new HVAC system throughout a large portion of building… $3,528,540 Fort Wainwright AK 2 -1
Contract CCI shall provide all materials, labor and equipment for the renovation of Building 3021 from warehouse/vehicle bay/office space to an… $1,498,636 Fort Wainwright AK 0 -1
Contract Building 3407 shall have a complete cosmetic renovation to include patching, texture and paint. New switch plate covers, cove base,… $285,509 Fort Wainwright AK 1 -1
Contract Provide all material and labor to install the Ameri-cure Inc – US Army Fort Wainwright Prep Station to include the… $320,544 Fort Wainwright AK 2 -1
Contract FURNISH ALL PLANT, LABOR, MATERIALS, EQUIPMENT, & TRANSPORTATION NECESSARY TO RENOVATE GATE #1 VISITOR CENTER EXTERIOR, BLDG 5105 REDSTONE ARSENAL. $423,007 Huntsville AL 0 -2
Page: 1 2 3 > 

Sub Recipient

Type Description Amount City State Jobs Vote
Contract Construction of Power Services Bldg $1,785,724 Atlanta GA N/A -1