| Contract |
FURNISH ALL PLANT, LABOR, MATERIALS, EQUIPMENT, & TRANSPORTATION NECESSARY TO REPLACE EXISTING WATER MAIN ALONG VINCENT ROAD; REDSTONE ARSENAL AL.. |
$1,078,391 |
Huntsville |
AL |
12 |
-2 |
| Contract |
FURNISH ALL PLANT, LABOR, MATERIALS, EQUIPMENT, & TRANSPORTATION NECESSARY TO REPLACE EXISTING WATER MAIN ALONG REDSTONE ROAD; REDSTONE ARSENAL AL.. |
$1,195,217 |
Huntsville |
AL |
14 |
-3 |
| Contract |
This project consists of the demolition and reconstruction of the roof of the East portion of Building 3030; to include… |
$1,136,905 |
Fort Wainwright |
AK |
5 |
-1 |
| Contract |
This project consists of the demolition and reconstruction of the East IRMA roof of Building 3030 to include the built… |
$963,375 |
Fort Wainwright |
AK |
5 |
-1 |
| Contract |
CCI shall provide all labor and materials to construct a 2,015 SF addition to the existing Firehouse #2 as well… |
$898,829 |
Fort Wainwright |
AK |
1 |
0 |
| Contract |
Adjust doors and windows for opening and closing in Buildings 3444, 3446 and 3448. Clean kitchens, latrines, furniture and bedrooms… |
$226,016 |
Fort Wainwright |
AK |
1 |
-2 |
| Contract |
FURNISH ALL PLANT, LABOR, MATERIALS, EQUIPMENT, & TRANSPORTATION NECESSARY TO RENOVATE GATE #1 VISITOR CENTER EXTERIOR, BLDG 5105 REDSTONE ARSENAL. |
$393,908 |
Huntsville |
AL |
0 |
-2 |
| Contract |
FURNISH ALL PLANT, LABOR, MATERIALS, EQUIPMENT, & TRANSPORTATION NECESSARY TO REPLACE EXISTING WATER MAIN ALONG DIGNEY ROAD; REDSTONE ARSENAL AL.. |
$596,246 |
Huntsville |
AL |
5 |
-2 |
| Contract |
This project consists of the demolition and reconstruction of the roof of Building 3015; to include the built up roof… |
$1,471,858 |
Fort Wainwright |
AK |
2 |
-1 |
| Contract |
Building 1001 shall have a complete cosmetic renovation to include patching, texture and paint. New switch plate covers, cove base,… |
$1,216,179 |
Fort Wainwright |
AK |
1 |
-1 |
| Contract |
Building 3450 shall have a cosmetic renovation to include Exterior painting, new concrete sidewalk All cove base shall be replaced,… |
$220,838 |
Fort Wainwright |
AK |
0 |
-1 |
| Contract |
Replace all carpet and padding in bldg 702 with 28oz fire rated commercial grade over a 3/8 Pad. To include… |
$63,973 |
Fort Wainwright |
AK |
1 |
-1 |
| Contract |
CCI shall demolish the existing windows in Building 662 and replace them with blast resistant windows. |
$773,267 |
Fort Wainwright |
AK |
2 |
-1 |
| Contract |
Prepare exterior surface of building 663 by removing loose paint, grease, grout, caulking and other debris with the use of… |
$937,107 |
Fort Wainwright |
AK |
2 |
-1 |
| Contract |
CCI shall demolish the existing windows in Building 661 and replace them with blast resistant windows. |
$582,495 |
Fort Wainwright |
AK |
1 |
-1 |
| Contract |
The intent of this Project is to provide and install a new HVAC system throughout a large portion of building… |
$3,528,540 |
Fort Wainwright |
AK |
2 |
-1 |
| Contract |
CCI shall provide all materials, labor and equipment for the renovation of Building 3021 from warehouse/vehicle bay/office space to an… |
$1,498,636 |
Fort Wainwright |
AK |
0 |
-1 |
| Contract |
Building 3407 shall have a complete cosmetic renovation to include patching, texture and paint. New switch plate covers, cove base,… |
$285,509 |
Fort Wainwright |
AK |
1 |
-1 |
| Contract |
Provide all material and labor to install the Ameri-cure Inc – US Army Fort Wainwright Prep Station to include the… |
$320,544 |
Fort Wainwright |
AK |
2 |
-1 |
| Contract |
FURNISH ALL PLANT, LABOR, MATERIALS, EQUIPMENT, & TRANSPORTATION NECESSARY TO RENOVATE GATE #1 VISITOR CENTER EXTERIOR, BLDG 5105 REDSTONE ARSENAL. |
$423,007 |
Huntsville |
AL |
0 |
-2 |